1 STATE OF CALIFORNIA - BUSINESS, TRANSPORTATION AND HOUSING AGENCY DEPARTMENT OF MOTOR VEHICLES ADMINISTRATIVE SERVICES DIVISION P.O. BOX SACRAMENTO, CA EDMUND G. BROWN JR., Governor QUESTIONS & ANSWERS October 12, 2011 To: All Prospective Bidders Re: Invitation for Bid # (West Covina DMV Cabling, Electrical, and Hardware Installation Services) Location: Department of Motor Vehicles West Covina The following are questions that were submitted by potential bidding contractors for Invitation for Bid # followed by answers provided by the DMV: Question #1 What is the total number of electrical outlets to be installed? Answer #1 Five (5) outlets total. Question #2 Drawing shows three (3) each dedicated isolated ground outlets. Are there any existing isolated ground bus bars in these locations? If yes, where are they located? Answer #2 There are no existing ground bus bars. A ground bus bar will be provided and installed by the contractor in the processor room. Question #3 Is all electric outlets convenient outlets? If dedicated outlets are required, which panel will they connect to, and where is the panel location? Answer #3 There will be both convenient and dedicated outlets required. Connection panel will be determined by availability of panel schedule. Question #4 Does any low voltage wire require conduit protection? Answer #4 It is possible that low voltage wire will require conduit protection. Question #5 Is there a specific manufacturer for Category-5e cable? California Relay Telephone Service for the deaf or hearing impaired from TDD Phones: ; from Voice Phones: ADM 668 (REV. 11/2003) EF A Public Service Agency
2 Answer #5 No. Question #6 Are all cameras going to be supplied? What if they are not in working condition? Answer #6 All cameras are provided by the DMV. All cameras were tested and verified to be in good working order prior to disconnection. Question #7 We will be supplying UTP Category-5e wiring for all communications. Is there any other type of wiring needed? Answer #7 Refer to the Invitation For Bid (IFB) package for cabling types to be provided and installed. Question #8 What is the exact number of drops needed? The plan is unclear. Answer #8 New AutoCad compatible drawing file provided indicates the exact number of drops needed. Question #9 Can we get updated plans with new drops located and full-scale? Answer #9 New AutoCad compatible drawing file provided indicates the exact drops locations. Question #10 Will everything be run underground or overhead? Answer #10 When possible, you will use the Walker Duct system to run cables. Question #11 Will racking and ladder system be provided by DMV? Answer #11 No, the contractor will provide and install all racking and ladder systems as indicated in the IFB package. Question #12 Will DMV be supplying electrical boxes? How will we connect to Desks? Answer #12 Not electrical boxes will be supplied by the DMV. Contractor will supply electrical boxes. Modular systems furniture by PIA use whips to connect power the workstations. Question #13 Will the ceiling be open or closed by the time the contractor begins performing services?
3 Answer #13 The ceiling will be closed, but the DMV Project Manager will coordinate with the general contractor for access. Question #14 Will everything need to be roughed-in or will that be done? Answer #14 The contractor will need to rough-in everything as needed. Question #15 Is conduit required? Answer #15 It is possible that conduit will be required. Question #16 Are we installing alarm wiring in this project? Answer #16 No alarm wiring will be installed by the contractor. Question #17 Does the scope of work include all Voice/Data/Sound/CCTV/Alarm wiring? Answer #17 Yes to all except for alarm wiring. No alarm wiring will be installed by the contractor. Question #18 It is difficult to distinguish the symbols on the plan sheet you provided. Can you please provide a count for each symbol or a plan sheet that is clear? Answer #18 New AutoCad compatible drawing file is being provided that provides distinguishable symbols. Question #19 Will all queuing system components be supplied? Also what are the types of cables to be run for the queuing system? Answer #19 DMV will provide the queuing system components. Contractor shall provide and install only those types of cables indentified in the IFB. Question #20 Drawing identifies only three (3) new electrical power outlets. Please identify which furniture will receive new power outlets (quantity). Are there any existing electrical power outlets? To what power breaker box will the new and existing outlets run to? Will the existing breaker box need to be upgraded? What circuit breaker number will the new power outlets run to? Please provide an electrical power outlet schedule by an electrical engineer. Answer #20 The contractor will need to work with the DMV Project Manager to determine furniture outlet locations. There are existing power outlets. Any new outlets will run to the closest available sub-panel. It is not anticipated that the existing breaker box will need to be upgraded. However, the contractor needs to be
4 prepared to make any upgrades if necessary. No electrical power outlet schedule will be provided by an electrical engineer. Question #21 Please identify the new office furniture manufacturer and model number that will be installed. Provide information on the manufacturer mounting devices for data and electrical that is dissimilar to the standard wall outlets. Answer #21 The furniture manufacturer is Prison Industry Authority (PIA). A modular systems furniture schematic will be provide to the awarded contractor. Question #22 Are ceiling speakers OFCI (Owner Furnished Contractor Installed)? If speakers are OFCI will the speaker T-Bar mounting brackets also be OFCI? Will the awarded contractor be responsible for working condition of the speaker system? Answer #22 Speakers are already installed. The contractor will only be required to run cabling to the speakers and terminating connections. Question #23 Regarding the CCTV System, it was noted during the job walk that some CCTV cameras have already been removed. The awarded contractor can not verify the operational condition of these cameras and system. Will the awarded contractor be responsible for the working condition of the existing cameras and DVR system? Answer #23 The contractor is only responsible for disconnecting, dismounting, re-installing, and setting-up the existing CCTV system. After re-installation of existing CCTV system equipment, if the contractor finds that existing CCTV system equipment is defective, the DMV will be responsible for replacing the defective equipment. Question #24 What data drops and electrical outlets will be run through the existing Walker Duct system? Does the Walker Duct system run from the data room underground? Answer #24 All data and electrical will be run through the existing Walker Duct system. The existing system runs from the data room underground throughout the office building. Question #25 Will new data cabling be allowed to be run free above T-Bar ceiling on J-hooks from data drops back to the Data Room? Please identify which data drops will be run free. What is the DMV standard for J- hooks? Answer #25 Yes, new data cabling will be allowed to run free above T-Bar ceiling on J-hooks from data drops back to the Data Room. The contractor will need to indentify which data drops will be run free or contained within conduit. There is no DMV standard for J-hooks. Question #26 Please identify the data drops that will require new raceway or conduit to their respective outlet. Is there a DMV standard for raceway or conduit for the new data drops?
5 Answer #26 Contractor shall which data drops will require new raceway or conduit. Panduit or approved equal raceways are to be used when required. There is no DMV standard for raceway or conduit. Question #27 Exhibit H of the IFB, Data Rack Layout, please identify what is OFCI (Owner Furnished Contractor Installed). Answer #27 Nothing is OFCI. Per the IFB, the contractor will provide and install data racks. Question #28 Exhibit H of the IFB, Equipment Room Layout, will a cable ladder rack be required in the room? Please provide a drawing indicating layout of cable ladder rack and its height. Answer #28 Yes, a cable ladder rack will be required in the room. Refer to the Exhibit H in the IFB for drawing. Question #29 In the IFB, in the Electrical section B,(1),a,7, it says Concrete work that is part of the electrical installation. Is there any concrete work that the electrician will have to do? Please identify on a drawing where concrete work will be required. Answer #29 It is not foreseen that concrete work will be required, but the contractor should be prepared for this type of work should it be required. Question #30 Do the numbers below the voice/data symbols reflect the quantity of drops at that location? (1-4 being a total of 4 voice/data drops) Answer #30 Yes. Question #31 What are the circuit requirements for the new cubicles? How many cubicles per circuit? Answer #31 4 cubicles per circuit. Question #32 Who is responsible for the load calculations for the existing panel when we add these additional circuits? Answer #32 Vendor is responsible for load calculations. Question #33 Is there a designated panel for the new circuits? Answer #33 No, this will be determined by availability of panel schedule.
6 Question #34 Will permits be required? Answer #34 Vendor is responsible for any applicable permits. COREY HOLLOWELL Contract Administrator
2301.1 Scope: Communications and Electronic Systems addressed in this section include:
Chapter 23 COMMUNICATIONS / ELECTRONIC SYSTEMS SECTION 2301 - GENERAL 2301.1 Scope: Communications and Electronic Systems addressed in this section include: 1. Fire Alarm System 2. Telecommunication and
This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents and Prior Addenda if any, as identified above.
To: All Vendors Bidding on The College of New Jersey Security Cameras Phase III From: Roselle Horodeski Finance and Business Services Date: April 10, 2015 ADDENDUM NO. 1 ISSUE DATE: April 10, 2015 REFERENCE:
TAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE
TAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE The University of Arizona has implemented a Keyless Access and Security System program to provide a cost effective, efficient, and maintainable means
OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003
OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved Electrical Contractor
SECTION 28 05 00 COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY
SECTION 28 05 00 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specifications Sections, apply
TAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE
TAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE The University of Arizona has implemented a Keyless Access and Security System program to provide a cost effective, efficient, and maintainable means
SECTION 17400 ACCESS CONTROL SYSTEM. CONDITIONS OF THE CONTRACT AND DIVISION 1, as applicable, apply to this Section.
SECTION 17400 ACCESS CONTROL SYSTEM CONDITIONS OF THE CONTRACT AND DIVISION 1, as applicable, apply to this Section. PART 1 - GENERAL 1.1 RELATED WORK A. 16060 Grounding and Bonding B. 16070 Electrical
ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1
KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 16050 A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1
The following components are common to most cubicles; this example is an ABB HK cubicle.
4.0 CIRCUIT BREAKER CUBICLE Learning Objectives The circuit breaker cubicle is the component of the switchgear that holds the circuit breaker, and the controls and cabling for the distribution system.
nr 28 nr 68 nr 4 nr 1
SEEB INTERNATIONAL BILL OF QUANTITIES AIRPORT ELECTRICAL WORKS NEW TERMINAL PIER ITEM ITEM DESCRIPTION UNIT QUANTITY BILL PART SECTION No. VOLUME 3 4 UNIT RATE (R.O.) (in words) (in figures) SECTION R:
DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION 17650 SECURITY SYSTEMS
PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES A. Inspections and observations by the Owner do not relieve the A/E of contract responsibilities. B. Chain of command 1. The DPS Project Manager is
FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.
Polk School District Specifications for the New Fire Alarm in the Existing Building Eastside Elementary School FIRE ALARM SYSTEM 1.01 SUBMITTALS A. Shop drawings shall be submitted as follows: 1. Manufacturer's
H.V.A.C. Design Plumbing Design
H.V.A.C. Design H.V.A.C. Design Mira Costa College Arts Complex CP Upgrade 1. PART 1 GENERAL 1.1. DESCRIPTION SECTION 23 09 00 HVAC INSTRUMENTATION AND CONTROL 2. PART 2 - PRODUCTS 2.1. Materials
FIRE ALARM AND DETECTION SYSTEMS SECTION 16721
PART 1 - GENERAL 1.01 WORK INCLUDED FIRE ALARM AND DETECTION SYSTEMS SECTION 16721 A. Provide a complete fully addressable, power limited, fire detection and evacuation system. The system shall be connected
BASIC NEC CODE RULES AND DESIGN PRACTICE
BASIC NEC CODE RULES AND DESIGN PRACTICE Wire Ampacity and Size Circuit Breaker Size 1. Maximum loading for any branch circuit is 80% of rating of circuit for ampacity of wire for any load. NEC 220-2,
TCTC Cabling Specifications
TCTC Cabling Specifications Purpose: To provide a standard specification that will be used for all Tri County Technical College (TCTC) facilities requiring structured cabling installation. Product specifications,
Request for Proposals for Photovoltaic System Installation
Request for Proposals for Photovoltaic System Installation Presented by: Prepared by: Location: Contact: Date: Capitol Hill Housing Foundation Bonneville Environmental Foundation, Renewable Energy Group
Addendum #2 Contract UK-11-13
Addendum #2 Contract UK-11-13 Utilities Kingston Purchase and Replacement of Switchgear at Kingston Hydro Substation MS11 March 25, 2011 Delivered to: All RFP recipients Total number of pages: Nine (9)
ADVANCED ELECTRICAL TOPICS
NCCER 13614 Progress Blvd., Alachua, Florida 32615 Phone: (888) 622-3720 Email: [email protected] ADVANCED ELECTRICAL TOPICS Performance Tasks Level One MODULE 33301-04 CABLE SELECTION 1 In order to prevent
PROPOSALS REQUESTED THE TOWN OF OLD ORCHARD BEACH POLICE DEPARTMENT FOR IP-BASED VOICE COMMUNICATION SYSTEM
PROPOSALS REQUESTED BY THE TOWN OF OLD ORCHARD BEACH POLICE DEPARTMENT FOR IP-BASED VOICE COMMUNICATION SYSTEM The Town of Old Orchard Beach will receive sealed bids for an IP based phone system. The project
Step 1: Application Instructions
Step 1: Application Instructions CONTENTS Introduction Customer and Electrician Instructions Completing Section 1 or Section 2 Definitions INTRODUCTION Every effort has been made to provide clear instruction
Solar Panel Installations
Solar Panel Installations Page 1 of 6 SINGLE-FAMILY RESIDENTIAL CHECKLIST City of Hayward Development Services Department Revised: 7-09-15 PERMIT REQUIREMENTS Permits are required for all solar panel installations.
CommScope Intelligent Building Infrastructure Solutions (IBIS)
SYSTIMAX Solutions CommScope Intelligent Building Infrastructure Solutions (IBIS) Questions & Answers Q. What is an Intelligent Building? A. An intelligent building can be defined as one which provides
Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders
INTRODUCTORY INFORMATION TABLE OF CONTENTS 00 0101 PROJECT TITLE PAGE PROCUREMENT REQUIREMENTS (PROJECT MANUAL) Tab A - Invitation for Bids Tab B - Instructions to Bidders Tab C Bid Form for General Bids
Fire Alarm System Plans Submittal Guidelines For New and Existing Systems
Fire Alarm System Plans Submittal Guidelines For New and Existing Systems SCOPE The Temecula Fire Prevention Bureau (TFPB) has established the following requirements for the submittal of all fire alarms,
PART A. Option 1: City Hall & POA Supply and Install Lenel Onguard Security Upgrade and supply and Install Axis IP Cameras
PART A Option 1: City Hall & POA Supply and Install Lenel Onguard Security Upgrade and supply and Install Axis IP Cameras General The City of Guelph has standardized on Lenel OnGuard as the corporate access
PLAN REVIEW GUIDE FOR FIRE ALARM
PLAN REVIEW GUIDE FOR FIRE ALARM PROJECT NAME: PERMIT # PROJECT ADDRESS: CONTACT PERSON: PHONE Fire alarm system installation information shall be provided on the appropriate architectural and electrical
CalMod Design-Build Electrification Services
SECTION 28 16 00 INTRUSION DETECTION SYSTEM PART 1 - GENERAL 1.1 DESCRIPTION A. This section describes the detailed technical requirements for the Intrusion Detection System (IDS), where the Contractor
MASTER ELECTRICIAN CODE EXAMINATION EXAMINATION REFERENCE MATERIAL AND CONTENT OUTLINE. Answers to sample questions: CONTENT OUTLINE
Answers to sample questions: Question Answer Reference 1 4 Section 362.12(6) 2 2 Table 310-16; 310.15(B)(2)(a) 3 4 Table. 250-66 4 2 Table 430.250 & 430.52 5 2 American Electrician Handbook, Figure 7-159
How To Move Your Data Center
The IT Management Guide to Business Relocation Relocating your business is a major project that entails careful planning. You want to minimize the disruption to your business, provide a new space that
SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT
SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The Work specified in this Section consists of designing, furnishing and installing factory-assembled
UNO CHARTER SCHOOL NETWORK ( UNO-CSN ) Invitation for Bids ( IFB ) for ELECTRICAL UPGRADES
UNO CHARTER SCHOOL NETWORK ( UNO-CSN ) Invitation for Bids ( IFB ) for ELECTRICAL UPGRADES All Bids must be sent electronically to: [email protected] All communications should be addressed
Revised RFP submission schedule October 15 th 3:00 PM EST Last Day to Submit Questions October 30 th 3:00 PM EST Proposals Due
Revised RFP submission schedule October 15 th 3:00 PM EST Last Day to Submit Questions October 30 th 3:00 PM EST Proposals Due III. Scope of Services The work in this section outlines the materials, installation,
TELECOMMUNICATIONS STRUCTURED CABLING GUIDELINES AND SPECIFICATIONS. University of Chicago IT Services Infrastructure Services October 2011
TELECOMMUNICATIONS STRUCTURED CABLING GUIDELINES AND SPECIFICATIONS IT Services Infrastructure Services October 2011 Table of Contents 1 Introduction... 4 1.1 Planning and Design... 4 1.2.1 Roles and Responsibilities...
Electrical. This section applies to the design and installation of building power distribution systems.
Basis of Design This section applies to the design and installation of building power distribution systems. Design Criteria This section contains the architectural, structural and mechanical provisions
Electric Service Conversion Overhead-to-Underground. Minnesota
Electric Service Conversion Overhead-to-Underground Xcel Energy Electric Connections Minnesota Process Please fill out these forms and complete this checklist to begin your application process: 1) Overhead-to-Underground
ATTACHMENT F 050R6800016 - CABLE AND WIRING SERVICES FUNCTIONAL AREA I PRICE PROPOSAL FORM Amendment 6
050R6800016 CABLE AND WIRING SERVICES (Column A) (Column B) (Column C) (Column D) (Column E) (Column F) (Column G) (B+C+D+E)*F= G Item Description PER 100' RUN PER 150' RUN PER 200' RUN PER 300' RUN QUANTITY
TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST
TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST In order to provide a comprehensive plan review in a timely manner, and to insure the design and installation of fire alarm systems
DIVISION 27. Telecommunications Systems
DIVISION 27 Telecommunications Systems Abstract Division 27 governs the infrastructure for the low-voltage information transport systems (ITS), which include voice, data, and CATV systems and their pathways
Engineers Edge, LLC PDH & Professional Training
510 N. Crosslane Rd. Monroe, Georgia 30656 (770) 266-6915 fax (678) 643-1758 Engineers Edge, LLC PDH & Professional Training Copyright, All Rights Reserved Engineers Edge, LLC An Introduction to Communication
ANNEX C - DESIGN BRIEF
ANNEX C - DESIGN BRIEF SCOPE OF WORKS 1.0 OBJECTIVE The Contractor undertakes the fit-out works in the area outlined in the layout plan, 2 nd Floor and new extension space on the 11 th Floor, at the EBRD
NC State University Design and Construction Guidelines Division 26 Fire Alarm Systems
NC State University Design and Construction Guidelines Division 26 Fire Alarm Systems 1.0 Purpose A. The following guideline provides the minimum standards and requirements for fire alarm systems. 2.0
City of San Diego Residential Photovoltaic Systems Inspection Guidelines
City of San Diego Residential Photovoltaic Systems Inspection Guidelines The purpose of inspections by DSD staff is to ensure compliance with the California Electrical Code (CEC), other applicable codes
1. Furnish and install faceplate and modular jacks at each single gang outlet as described below:
Washington University in St. Louis Building: Communication Specification: Research Voice/Network/Typical 1. Furnish and install faceplate and modular jacks at each single gang outlet as described below:
INSIDE TELEPHONE WIRING FOR Business
Do It Yourself Guide INSIDE TELEPHONE WIRING FOR Business As of March 1, 2015 all single line business customers that have a demarcation point such as but not limited to a Network Interface Device (NID),
Standard Comms Rooms Specification
Standard Comms Rooms Specification Room Configuration Electrical General Distribution Boards Small Power Lighting Containment Fire Detection General To be defined in the project brief but should meet requirements
Security Systems Social Service Tax Act
www.gov.bc.ca/sbr Bulletin SST 121 ISSUED: August 2006 REVISED: September 2008 Security Systems Social Service Tax Act Do you sell, install or repair security systems? Do you need to know how tax applies
v 1.42b Conceal-Alarm Information Packet for Fire Alarm System Contractors & Installers Conceal -Alarm
v 1.42b Conceal-Alarm Information Packet for Fire Alarm System Contractors & Installers Conceal -Alarm Quick Reference Sheet Important Items to Understand > The Conceal-Alarm series product family is compatible
WISCONSIN DEPARTMENT OF SAFETY & PROFESSIONAL SERVICES
Scott Walker Governor David Ross Secretary WISCONSIN DEPARTMENT OF SAFETY & PROFESSIONAL SERVICES 1400 E Washington Ave PO Box 8935 Madison WI 53708-8935 Email: [email protected] Voice: 608-266-2112 FAX:
Request for Proposal DESIGN AND INSTALLATION OF STRUCTURED COMMUNICATIONS CABLE SYSTEMS. Kalispell Public Schools
Request for Proposal DESIGN AND INSTALLATION OF STRUCTURED COMMUNICATIONS CABLE SYSTEMS For Kalispell Public Schools 2015 TABLE OF CONTENTS I. PROJECT DESCRIPTION / GENERAL SCOPE OF WORK...3 II. PROJECT
SCOPE OF WORK PROVISION FOR ELECTRICIAN: SOUND AND SIGNAL TECHNICIAN SAN DIEGO AND IMPERIAL COUNTIES
STATE OF CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS Office of the Director Research Unit 455 Golden Gate Avenue, 9 th Floor San Francisco, CA 94102 Edmund G. Brown Jr., Governor MAILING ADDRESS: P.
OPEN EXAMINATION DATA PROCESSING MANAGER I
CALIFORNIA STATE GOVERNMENT SUPPORTS EQUAL OPPORTUNITY TO ALL REGARDLESS OF RACE, COLOR, CREED, NATIONAL ORIGIN, ANCESTRY, SEX, MARITAL STATUS, DISABILITY, RELIGIOUS OR POLITICAL AFFILIATION, AGE, OR SEXUAL
FVSU-33201301 REPAIR & UPGRADE FIBER OPTIC 280000-1 SECTION 280000 FIRE ALARM SYSTEM CONNECTIVITY
FVSU-33201301 REPAIR & UPGRADE FIBER OPTIC 280000-1 SECTION 280000 FIRE ALARM SYSTEM CONNECTIVITY PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Fire-alarm control unit. 2. Addressable interface
CHUGACH ELECTRIC ASSOCIATION, INC. Anchorage, Alaska. February 10, 2014
CHUGACH ELECTRIC ASSOCIATION, INC. Anchorage, Alaska February 10, 2014 QUESTIONS AND ANSWERS TO: Prospective Proposers FROM: Chugach Electric Association, Inc. 5601 Electron Drive Anchorage, Alaska SUBJECT:
Attachment III Scope of Work Tehama Count Dept of Social Services Phone System Replacement RFP 2014
Attachment III Scope of Work Tehama Count Dept of Social Services Phone System Replacement RFP 2014 1. Scope of work a. The proposed system will be installed at three TCDSS offices in Red Bluff and Corning,
TECHNICAL QUESTIONS AND ANSWERS ITN-DOT-14/15-7009RM TAMPA OPERATIONS CENTER VIDEO SURVEILLANCE/SECURITY ACCESS SYSTEM
TECHNICAL QUESTIONS AND ANSWERS ITN-DOT-14/15-7009RM TAMPA OPERATIONS CENTER VIDEO SURVEILLANCE/SECURITY ACCESS SYSTEM 1) Does the department have an estimate on the total number of cameras required and
dpd Seattle Permits Tip Installation of Electric Vehicle (EV) Charger for Commercial Properties www.seattle.gov/dpd Things to Consider
dpd Department of Planning and Development Tip 133 Seattle Permits part of a multi-departmental City of Seattle series on getting a permit Installation of Electric Vehicle (EV) Charger for Commercial Properties
Guideline for Fire Safety Elements of Solar Photovoltaic Systems July 17, 2008 Rev: 1/1/10
Guideline for Fire Safety Elements of Solar Photovoltaic Systems July 17, 2008 Rev: 1/1/10 This document was developed by the Orange County Fire Chiefs Association, Orange County Fire Marshal Committee.
How to Estimate the Cost of a Clean Room and Data Center Equipment Electrical Work. Section 2 Types of Methods of Measurements page 4
How to Estimate the Cost of a Clean Room and Data Center Equipment Electrical Work Table of Contents Section 1 Introduction page 3 Section 2 Types of Methods of Measurements page 4 Section 3 Project Specific
Architectural. Access Control System - CAAMS
Basis of Design The section applies to the design, rough-in, and installation of an "access control" system for building entrances/exits and for specified access control zones within a building. Campus
Doc 10. UTM Standards: Card Access Security System
Doc 10 UTM Standards: Card Access Security System 1. GENERAL... 2 1.1. GENERAL REQUIREMENTS.... 2 1.2. SUMMARY OF WORK INCLUDED... 2 1.3. OVERVIEW... 2 1.4. MANDATORY REQUIREMENTS... 3 1.5. ACCESS CONTROL
EAGLE Power over Ethernet Products for IP Powering Applications. Flexibility, Simplicity and Value LAN POWER SYSTEMS. Trend Datacom USA, Inc.
EAGLE Power over Ethernet Products for IP Powering Applications Flexibility, Simplicity and Value LAN POWER SYSTEMS Trend Datacom USA, Inc. Presentation Agenda IEEE802.3af PoE Technology Definitions and
Please Refer to Attached Sample Form
Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 32106-E Cancelling Revised Cal. P.U.C. Sheet No. 28314-E Electric Sample Form No. 62-0687 Application for Service
SAME JETC May 22-25, 2012. St. Louis, Missouri IMPORTANT
18a Electrical Terms and Conditions IMPORTANT Please read the list of work below. If you require any of this work to be performed in your booth space, it must be performed by a show electrician. This work
INVITATION TO BID SECURITY CAMERA & INTRUSION DETECTION SYSTEM
INVITATION TO BID SECURITY CAMERA & INTRUSION DETECTION SYSTEM City of Ridgefield Solicitation #: C2015-041 Mandatory Contractor Meeting Date & Time: Monday, May 4, 2015, 11:00 a.m. 12:00 p.m., Ridgefield
NYC Department of Education Building Condition Assessment Survey 2014-2015 P.S. 64 (OLD 71) - MANHATTAN, 600 EAST 6 STREET, MANHATTAN, NY, 10009
School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 P.S. 64 (OLD 7) - MANHATTAN, 600 EAST 6 STREET, MANHATTAN, NY, 0009 Time In Last Edited 095 ELECTRICAL 205-0-6 08:45AM
TRANSBAY JOINT POWERS AUTHORITY
STAFF REPORT FOR CALENDAR ITEM NO.: 14 FOR THE MEETING OF: November 13, 2014 BRIEF DESCRIPTION: TRANSBAY JOINT POWERS AUTHORITY Amending Contract No. 08-04-CMGC-000, authorizing Webcor/Obayashi Joint Venture
POWER DISTRIBUTION. Power and Undercarpet Products POWER AND UNDERCARPET PRODUCTS. Chapter Summary
Power and Undercarpet Products POWER AND UNDERCARPET PRODUCTS AMPINNERGY Modular Power Distribution System................... 270 Raised Access Floor/Zone Wiring Distribution System................ 270
COLOR VIDEO DOOR PHONE CDV-71BE/D
COLOR VIDEO DOOR PHONE CDV-71BE/D 513-11, Sangdaewon-dong, Jungwon-gu, Seongnam-si, Gyeonggi-do, Korea Int l Business Dept. : Tel.; +82-31-7393-540~550 Fax.; +82-31-745-2133 Web site : www.commax.com Printed
Contact us for a free consultation today! 630-936-4045 [email protected]
IT Relocation Schedule Moving offices? Often, relocating your IT infrastructure can be one of the most daunting aspects of the move, and it s also the most critical to business continuity. Servers, PCs,
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION
CHARTER TOWNSHIP OF SHELBY REQUEST FOR PROPOSAL. Fiber Optic and Data Cabling Project Shelby Township Police Building
CHARTER TOWNSHIP OF SHELBY REQUEST FOR PROPOSAL The Charter Township of Shelby is soliciting proposals to install fiber optic and data cabling to serve a new Police Building that is under construction
**ATTENTION** WE DO NOT PROMOTE OR ENCOURAGE YOU TO DO YOUR OWN ELECTRICAL WIRING!!! IT IS BY FAR THE MOST DANGEROUS THING YOU CAN ATTEMPT
**ATTENTION** WE DO NOT PROMOTE OR ENCOURAGE YOU TO DO YOUR OWN ELECTRICAL WIRING!!! IT IS BY FAR THE MOST DANGEROUS THING YOU CAN ATTEMPT. YOU COULD PUT YOUR FAMILY AND WORLDLY POSSESSIONS IN DANGER!!!
ELECTRICIAN, LEAD. Job Code Pay Grade 13722 CL14
ELECTRICIAN, LEAD 13722 CL14 Nature of Work This is lead journeyman level electrical work in the installation, alteration, repair and maintenance of electrical systems, fixtures and equipment. The incumbent
Reference Design. conference rooms
Reference Design conference rooms Tomaro Design Group conference rooms The modern commercial conference room embraces communication and multi-media technology from projectors and video conferencing, to
Minimum Standards for Data/Voice Infrastructure in New Building Construction
UNIVERSITY OF WATERLOO Minimum Standards for Data/Voice Infrastructure in New Building Construction 12/17/2012 Offices 1. Two Work Area Outlets (WAO) on opposite walls, each with 2 jacks 2. Each WAO shall
EXHIBIT A SCOPE OF WORK
EXHIBIT A SCOPE OF WORK 1. (Contractor) shall provide fire alarm system maintenance/repair/testing services as described herein to the California Department of Veterans Affairs (hereinafter CDVA, CalVet,
Home Inspection Report
4949 Brownsboro Rd Suite 293 Louisville, KY 40223 (502) 414-1440 [email protected] Inspected By: William Carter, HI-1956 Home Inspection Report Prepared For: Edward Cullen Property Address:
Please Refer to Attached Sample Form
Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 32104-E Cancelling Revised Cal. P.U.C. Sheet No. 28312-E Electric Sample Form No. 62-0685 Application for Service
Electric Service Guide for Commercial Construction
Electric Service Guide for Commercial Construction Contents Contacting KCP&L... 2 Voltages... 2 Temporary Service... 2 Customer-Provided Temporary Service... 2 KCP&L-Provided Temporary Service.... 2 Current
Special Specification 6033 Computerized Transportation Management System
6033 Special Specification 6033 Computerized Transportation Management System 1. DESCRIPTION Relocate computerized transportation management system (CTMS) equipment as shown on the plans and as described
A. Shop Drawing submittals shall include, but not be limited to, the following:
SECTION 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Divisions 0 and 1 and Section 26 00 01, Electrical
Electrical Design TABLE OF CONTENTS FOREWORD... 1. BASIC ELEMENTS OF ELECTRICITY... 2 Electricity works much like water Ohm s Law
TABLE OF CONTENTS Electrical Design TABLE OF CONTENTS FOREWORD.......................................................................... 1 BASIC ELEMENTS OF ELECTRICITY..................................................
Specifying an IT Cabling System
Specifying an IT Cabling System This guide will help you produce a specification for an IT cabling system that meets your organisation s needs and gives you value for money. You will be able to give your
REQUEST FOR BID. Server/Computer and VAV Controls with Backup Bid
1. INTRODUCTION REQUEST FOR BID Server/Computer and VAV Controls with Backup Bid The Northwest Arkansas Regional Airport Authority is seeking bids for the replacement of VAV box controllers, the shielded
The Pennsylvania State University ------------- Physical Security Office. Intrusion Alarm. Performance Specification
The Pennsylvania State University ------------- Physical Security Office Intrusion Alarm Performance Specification By PHYSICAL SECURITY OFFICE Group (Access Controls & Electronic Security Programs) and