PENNDOT 3D MODELING FOR STRUCTURES WORKSHOP. Presented by: Steven Pletcher and Chris Daniels, P.E. October 21, 2014

Similar documents
Safe & Sound Bridge Terminology

Informational Workshop Public Meeting Kanawha Falls Bridge Project

Kingsbury Run Greenway Project

3.1 Historical Considerations

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.

Design of Bridges. Introduction. 3 rd to 4 th July Lecture for SPIN Training at the University of Dar es Salaam

REHABILITATION PACKAGE 1-a

Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC October 27, 2015 Session 26

3 Tappan Zee Bridge Rehabilitation Options

Red Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013

CHAPTER 20. GEOPAK Road > 3D Tools > 3D Modeling

KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER

SUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION:

Civil 3D 2009 New Features

The Rehabilitation Alternative Huey P. Long Bridge Case Study. Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc.

2015 ODOT Bridge Design Conference May 12, DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement.

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES

Quality Control and Quality Assurance Guide

5 ALTERNATIVE SOLUTIONS AND EVALUATION

ADA POST INSPECTION CHECKLIST. Job No. Route County Location

TABLE OF CONTENTS. INTRODUCTION... 5 Advance Concrete... 5 Where to find information?... 6 INSTALLATION... 7 STARTING ADVANCE CONCRETE...

Guidelines for Fiber Optic Cable Permits

Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs -

720 Contour Grading. General. References. Resources. Definitions

Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

How To Create A View Frame In 3D

Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D

Public Information & Public Scoping Meeting

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA

Dulles Corridor Metrorail Project

REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE MAULE EARTHQUAKE

TechnicalNotes. Terramodel Software for Construction

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

Alternatives Presentation Meeting Middlebury WCRS(23)

Open House Public Meeting for the Thurmond Bridge Rehabilitation Project State Project: State Project S310-25/ Federal Project: BR-0252(001)D

Elev. A = , Elev. B = , horizontal distance = 1625 feet a. 7.7 b..077 c d. 1.28

Analysis of the Interstate 10 Twin Bridge s Collapse During Hurricane Katrina

Estimating Trench Excavation

How To Write An Analysis System For Bridge Test

Roof Tutorial. Chapter 3:

Requirements for Building Application Submission

Utilities Section Update

Veterans Memorial Bridge (Orange Avenue) PD&E Study

RANDOM/GRID BLOCK CRACKING EXTREME SEVERITY. Transverse Cracking- Extreme Severity. Alligator Cracking- High. Severity

CAPPELEN MEMORIAL BRIDGE REHABILITATION

EI ENGINEERING INSTRUCTION

TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African

US 51 Ohio River Bridge Engineering and Environmental Study

FDOT Roadway Design and 3D Modeling

technical notes trimble realworks software

LAB 31 - Create End Conditions to Search a Surface

Assessing Paved Trails for Compliance with Standards and Best Practices

AutoCAD Civil 3D 2008

MOHAMMAD I CHAUDHRY, P.E. A CONSTRUCTION PROJECT MANAGER Specialized in Highways, Bridges and Infrastructures construction & Maintenance

EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

Trimble Realworks Software

Ten Easy Steps to Intersections in AutoCAD Civil 3D

How to Design and Build a Fence/G traverse Bridge or Graffiti Project

Virginia Approach Spans

NAME: POWER UNIT ID: NAME OF APPLICANT (RESPONSIBLE MOTOR CARRIER) REGISTRATION/VIN STATE. Meet At: Meet Date: Meet Time:

SECTION 5 DRAFTING STANDARDS

IH-635 MANAGED LANES PROJECT, SEG. 3.2

BRIDGES ARE relatively expensive but often are

Spatial / GIS Resources Brown Bag Discussion: Metro LAR-IAC4 Pictometry Tool

CONCEPTUAL REHABILITATION ALTERNATIVE

BRIDGE DESIGN MANUAL

Value Engineering vs. Alternate Designs in Bridge Bidding

Building 3D PDFs to Visualize Geological Data

AutoCAD Civil 3D 2010 ESSENTIALS

REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA

The unit costs are based on the trend line of the 3 low bids for the average quantity.

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Transportation Authorities Project Descriptions

INDIANA DEPARTMENT OF TRANSPORTATION BRIDGE INSPECTION PROGRAM CODING GUIDE

CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE

Specifying Laser Scanning Services. A Quantapoint White Paper

Building Visualization using Autodesk VIZ

LOAD TESTING OF SOME NEW BRIDGES IN LATVIA

BIM: FOR PROJECT MANAGERS CSI Southwest Region Conference Program 1B 8:45am 11:00am

I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA. PSPE Presentation, December 3, 2015

Designing Pedestrian Facilities for Accessibility. ADA Compliance Training. Local Programs Engineer FHWA NJ Division

Methodology to Identify Preservation Priority Bridges

What s New in Autodesk Revit 2014

MID-HUDSON SOUTH TRANSPORTATION COORDINATING COMMITTEE APRIL 6, TIP Public Review Meeting

Introduction to Minimal Excavation Foundations

Chaudière Crossing Bridge Rehabilitation

Basic Requirements for Residential Plan Review _

DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT

RHODE ISLAND TURNPIKE AND BRIDGE AUTHORITY NEWPORT, RHODE ISLAND CONTRACT NO

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination

NCDOT MAPPING GUIDELINES FOR PLANNING AND DESIGN ACTIVITIES MAPPING PRODUCTS FOR ROADWAY DESIGN AND PDEA STEPS FOR REQUESTING MAPPING PRODUCTS

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

Transcription:

PENNDOT 3D MODELING FOR STRUCTURES WORKSHOP Presented by: Steven Pletcher and Chris Daniels, P.E. October 21, 2014

Agenda Introduction G.A. & F.C. Wagman History Process used to prepare 3D models Estimating and bid preparation; cost and constructability Construction planning and project management Error checking and/or conflicting information Sharing 3D information Closing and open for questions

3D Modeling Software and Tools AutoCAD & Carlson Software Micro Station for conversion of DOT plans AutoCAD DWG viewer for 3D sharing Google Earth for spatial placement and sharing

Paper Plans to Digital Model Files Entering horizontal alignments and project coordinates Entering vertical alignment and elevations Entering bridge deck surface geometry slopes and widths

Paper Plans to Digital Model Files Horizontal Alignment - Coordinates

Paper Plans to Digital Model Files Horizontal Alignment - Baselines

Paper Plans to Digital Model Files AutoCAD View Horizontal Alignment - Baselines

Paper Plans to Digital Model Files Vertical Alignment Roadway Profiles

Paper Plans to Digital Model Files AutoCAD View Vertical Alignment - Profiles

Paper Plans to Digital Model Files Cross Slope Typical Sections

Paper Plans to Digital Model Files AutoCAD View Cross Slopes Typical Sections

Adding Bridge Elements - Footings, Piling, and Girders Working point coordinates entered from plan table Substructure line work created from working points 2D girder lines drawn Spans checked for consistency and compared to plan distances Girder Shapes drawn and attached to 3D Girder Lines.

Example - ECMS 79686 Philadelphia GR1 The description and location of the project is as follows: Reconstruction and relocation of S.R. 2001; reconstruction of S.R. 2008 and rehabilitation of the bridge over S.R. 2009; construction of four single-span railroad bridges and four retaining walls; extension of the Somerset Street sewer; reconstruction of the associated interceptor chamber; two traffic signal installations; ITS devices; utility relocations; and other miscellaneous construction (All as indicated on approved drawings for State Route 0095, Section GR1, in Philadelphia County, City of Philadelphia, from approximately Dyott Street at segment 0130 offset 2384 to approximately Ann Street at segment 0160 offset 1147)

GR1- Contract Substructure Plans

GR1- Contract Substructure Plans

GR1 Frame 2D Plan

GR1 Frame 3D Plan

GR1 Frame 3D Plan

GR1 3D Animation Showing Piling Locations

GR1 3D Model Showing Existing Bridge Beams and Proposed Piling

Estimating, Planning, and Project Management Construction access Material handling Crane sizing and setup

Estimating Dominion Boulevard, Chesapeake, VA

Estimating Crane Positioning and Setup Dominion Boulevard, Chesapeake, VA

Estimating Crane Positioning and Setup Plan View Dominion Boulevard, Chesapeake, VA

Estimating NC 12 Pea Island, Dare County N.C.

Estimating Pile and Footing Plan View to 3D View NC 12 Pea Island, Dare County N.C.

Estimating Crane Positioning and Setup Plan View NC 12 Pea Island, Dare County N.C.

Estimating Crane Positioning and Setup Plan View NC 12 Pea Island, Dare County N.C.

Estimating Crane Positioning and Setup Elevation View NC 12 Pea Island, Dare County N.C.

Job Planning Construction Analysis Garden State Parkway, Great Egg Harbor, NJ

Job Planning Construction Analysis Garden State Parkway, Great Egg Harbor, NJ

Job Planning Construction Analysis Visual aids for complex designs

Job Planning Construction Analysis Visual aids for construction PA Turnpike, M.P. 245 over Susquehanna River

Job Planning Construction Analysis Bridge substructure with causeway placement PA Turnpike, M.P. 245 over Susquehanna River

Plan Conflict Identification I-95/I-695 Sec 100, MD Owner s Rendering

Plan Conflict Identification I-95/I-695 Sec 100, MD

Plan Conflict Identification Wire Frame Model S-8 Pier5- Cap Redesign

Plan Conflict Identification Money and time savings redesign with minimal impacts

Plan Conflict Identification Money and time savings Example of subterranean conflict

Plan Conflict Identification Money and time savings Example of subterranean conflict

Plan Conflict Identification Money and time savings Example of subterranean conflict

Sharing/Distributing 3D Information Export using Google Earth- Dulles Metro

Sharing/Distributing 3D Information Export using Autodesk DWG Design Review

Closing Ideas Owner information supplied in digital format will reduce the amount of time spent converting paper plans into useable digital 3D information Need for deliverables to be in real world coordinate systems or specific project grid Nad83 North or South for PennDOT projects. Ideas for formats to share digital files AutoCAD/ MicroStation