Key personnel and References 12/2013



Similar documents
February 9, 2011 Peter Kling, ÅF Consult Ltd Vice President, Bio and WtE Consulting

M.Sc. Matti Kivelä Power Plant Manager R&D Lahti Energia Oy P.O. Box 93 FIN Lahti Finland Tel matti.kivela@lahtienergia.

Power and heating plants, environmental studies

BIOMASS LOOKING FOR EFFICIENT UTILIZATION THE REHEAT CONCEPT. Jaroslav Lahoda Olaf Arndt Walter Hanstein. Siemens Power Generation (PG)

Tutkimuksen merkitys menestyvässä liiketoiminnassa- Innovaatiosta tuotteeksi

- Personal engineering with total economy

The new waste burning investment in the Helsinki Metropolitan Area

Fortum Otso -bioliquid

Valmet biotechnologies and pyrolysis status update. Joakim Autio Product manager, Pyrolysis systems Valmet

VESI JA ENERGIA VIENTITUOTTEENA. Fortum Miko Olkkonen Senior Executing Manager, Hydro Projects Fortum Power & Heat Oy

Role of Northern European forestry in the energy production chain, case Fortum. Jari Nylén Purchasing Manager Fortum Power and Heat Oy, HEAT

University of Maryland College Park District Energy System. IDEA Campus Energy Conference February 9, 2012

Steam and hot water boiler systems for industrial and municipal power generation Dr.-Ing. Wolfgang Sobbe VKK Standardkessel Köthen GmbH

Weiss A/S Presentation. by Bo Johansen

Country Report, SWEDEN

Siemens turbine solutions for urban cogeneration

Evaluation of mobile storage systems for heat transport. G. Storch, A. Hauer, A. Krönauer ZAE Bayern, Walther-Meißner-Str. 6, Garching, Germany

Finanzierung von Erneuerbaren Energie und Energieeffizienz Projekten in Asien. INTEC Engineering GmbH Berlin,

Hybrid system. Energy-efficient and environmentally friendly

The heat plant Future biorefinery. Panndagarna 2015 Västerås, April

The development of gas cogeneration

Drying of Woody Biomass. Process Engineering / GEA Barr-Rosin

BIOPOWER 5 CEX. 1 Wärtsilä 10 January 2012 Presentation name / Author

Automation, electrification (selected references)

Renewable Energy from Biomass. Opportunities in London and Area? Eric Rosen

What can Eindhoven do?

PRE-QUALIFICATION ANNOUNCEMENT

Enhanced power and heat generation from biomass and municipal waste. Torsten Strand. Siemens Power Generation Industrial Applications

Fortum bygger Sveriges största biokraftvärmeverk i Stockholms stad. Daniel Nilsson Värme & Kraftkonferensen, Stockholm 12 november 2014

INTEC Engineering GmbH Heating Solutions for the Marine Industry

Allocation of Fuel Energy and Emissions to Heat and Power in CHP

Aurinkolämpömarkkinat Skandinaviassa ATY Aurinkoseminaari Jari Varjotie, CEO

GOOD PRACTICE: Kuhmon Lampö (Kuhmo s Heating)

Carbon Capture. Investment for the Future

Energy story of Turku region, history and future

KUHMO: the perfect example of local bioenergy production

Advanced Steam Parameters in a Large Scale CFB Application Operating on REF and Biofuels background and experiences

Södra Näs Vimmerby Energi AB Biomass District Heating Plant, Sweden

Rauhalahti Biomass CHP Plant

Work together with Energy Experts from Finland

Stora Enso Fors Ltd Sweden

Switch from gas to biomass in district heating Case Jelgava, Latvia. Kristian Rehnström, 25 February 2015

IEA Workshop Copenhagen Small scale biomass co-generation with modern steam engines

OROT RABIN POWER STATION UNITS x 350 MW

EFFICIENT ENERGY SUPPLY (ELECTRICITY AND DISTRICT HEAT) FOR THE CITY OF LINZ

A Weissenbach AUSTRIA Tel. +43/2672/890-0, Fax: Internet: office@polytechnik.at

Swiss media visit to Olkiluoto August 15, 2014

Wood market in Poland: structure of use, industrial and energy purposes

Bioenergy. A sustainable energy source.

Good Practice Form

COMBLOC The future of packaged multi-fuel fired steam boilers. Ultra Compact. High Performance

Green Energy in Europe - Potentials and Prospects

NEW NUCLEAR POWER PLANT UNIT IN FINLAND ACCEPTED BY THE FINNISH PARLIAMENT

Uusiutuvien teknologioiden kehittäminen yhteistyössä partnereiden kanssa

10 Nuclear Power Reactors Figure 10.1

Nuclear Design Practices and the Case of Loviisa 3

Technologies for small scale Biomass CHP-Plants an actual survey

Efficiency Metrics for CHP Systems: Total System and Effective Electric Efficiencies

THE PRODUCTION OF ELECTRICITY FROM WOOD AND OTHER SOLID BIOMASS

Introduction to ESB Group

High-performance steam boiler and hot water boiler plants for industry

From today s systems to the future renewable energy systems. Iva Ridjan US-DK summer school AAU Copenhagen 17 August 2015

Large Combustion Plant (LCP) Directive Flexibility Mechanisms

SURALAYA SPP (Indonesia Power Generation Business Unit)

Small Scale Coal Power Plant in Indonesia

Cofiring of biomass in coal-fired power plants European experience Dr Colin Henderson IEA Clean Coal Centre

ARP Food Industry, Portugal

Bioenergy Småland. Business development through biomass in the region of Småland

The Development of the 500MW Co-firing facility at Drax Power Station

Häkäpöntöstä pyrolyysikaasuttimeen Development of woodgas generator

Project Management for electrical Generation: Geothermal Energy in Combination with other Sources of Renewable Energy

Assessing the Changes Required by the Industrial Boiler MACT Regulations

FAS Training Course on Energy Efficiency / Renewable Energy

The Technology and Business of Power Andrew Valencia, P.E. Lower Colorado River Authority

Welcome to Norrenergi

BUILDING THE BUSINESS CASE FOR LARGE-SCALE UTILIZATION OF FOREST RESIDUES AS FEEDSTOCKS FOR PRODUCTION OF ENERGY COMMODITIES:

System analysis of overall efficiencies of different routes for bioenergy. Content

GENERATION TECHNOLOGY ASSESSMENT

Energy Efficiency in Steam Systems

Natural Gas Information Contents

London Pollution Study Group

Oilon heat pump system references

Biomass Boiler House Best Practices. Irene Coyle & Fernando Preto CanmetENERGY

Biomass Pellet Prices Drivers and Outlook What is the worst that can happen?

CSP- Biomass Hybrid cogeneration system offers synergistic solution for continuous process industries. 9 th May 2013 Chennai

Preliminary pellet market country report SWEDEN

Experience with co-combustion of biomass and waste in coal-fired power plants

Den Haag and Leiden Repowering

Teollisuuden Voima Oyj - General Presentation January Ilkka Mikkola Senior Adviser (Former Fuel Manager) Teollisuuden Voima Oyj

Investigations of a Long-Distance 1000 MW Heat Transport System with APROS Simulation Software

Pocket Guide Pocket Guide

A New CHP Concept for tons of SRF

Technologies and Economics of Energy Generation from Logging Residues and Wood Processing Waste

Transcription:

Key persons M.Sc. (Eng.) Aarne Pehkonen Boiler Design, Project Management, Power and Boiler Plants M.Sc. (Eng.) Markku Nummela Electrical Systems and Automation, Power and Boiler Plants M.Sc. (Eng.) Sami Sivola Project Development, Project Management, Power Plants B.Sc. (Civ) Hannu Hirvelä Civil works, Buildings, Constructions, Site Management Reference Projects during last years 2013-2014 EPCM (Engineering, Procurement, Construction and Management), Project Management during implementation for gas fired power plant 1*126 MWe. A- Power Systems/PT Cikarang Listrindo 2011-2017 EPCM (Engineering, Procurement, Construction and Management), Project and Site Management including process, layout, pipe and main dimensioning design, coal fired power plant 3 x135 MWe (CFB). AF-Consult/PT Cikarang Listrindo, Indonesia. 2011 Design of 3 MW grate fired Boiler for Planora Oy/Komforts for Taalintehdas, Finland. 2010 Basic Design for CCGT power plants of Al-Shabab 1000 MWe (Frame 9Es, 8 pcs) and Damietta 500 MWe ( Frame 9Es, 4 pcs) in Egypt. Kharafi National/ÅF-Consult, Finland. 2008-2011 Engineering & Construction, Project Management including process, layout, pipe and main dimensioning design, combined cycle power plant CCGT 209E, 370 MWe. PT Cikarang Listrindo, Indonesia. 2009 Energy Survey in Aceh, Indonesia. Sustainable Forestry Management, UK. 2008-09 Basic Engineering for Sabiya CCGT Power Station of 2000 MWe in Kuwait. Project Manager including process, layout, pipe and main dimensioning design. Kharafi National/ÅF-Consult, Finland. 1(5)

2008 Basic Engineering for CCGT Power Plant of 375 MWe in United Arab Emirates. Project Manager including process, layout, pipe and main dimensioning design. Kharafi National, Kuwait /ÅF-Consult, Finland 2008 Basic Engineering for OCGT Power Plant of 125 MWe for tender issue in Argentina. Project Manager including process, layout, pipe and main dimensioning design. Maire Engineering S.p.A, Italy/ÅF-Enprima, Finland 2007 Basic Engineering for high pressure steam boiler of 32 t/h, 62 barg, 460C.ElektroSandeberg AB /Sweden 2007 Basic Engineering for OCGT Power Plant of 500 MWe for tendering in Sarir, Libya. Engineering Manager. Kharafi National, Kuwait/Maire Engineering S.p.A, Italy/ÅF-Enprima, Finland. 2007 Basic Engineering for OCGT Power Plant of 750 MWe in Tobruk, Libya. Engineering Manager. Kharafi National, Kuwait/Maire Engineering S.p.A, Italy/ÅF-Enprima, Finland. 2007 Basic Engineering for OCGT Power Plant of 2500 MWe in Sabiya, Kuwait. Engineering Manager. Kharafi National, Kuwait/ÅF-Enprima, Finland. 2007 Retrofit of high pressure steam boilers 50 bara, 450ºC of 100 t/h, 50 t/h and 40 t/h, Basic engineering for the modification for wood powder firing, CSM, Netherlands. 2007 Pelletizing plant of 500.000 t/a British Canada, Engineering Manager. Basic design. 2007 Åmotfors / TPS Termiska Processer AB, Sweden. Design of the municipal waste fired power plant and design of 25 MWth/4.5 MWe high pressure boiler for 2006 Oulu Energia/KPA Unicon, Finland. Oil fired boiler of 40 MW. Boiler design for 2006 UPM Kymmene/KPA Unicon, Finland. Natural gas fired boiler of 180 t/h, 16 barg, 204.5C. Design for the bid. 2(5)

2006 Primet Oy, Finland. Waste fired grate boiler of 3.5 MW. Boiler design for 2006 Pelletizing plant of Sia Talloil, Latvia. Increase of pellets production capacity of the existing plant up to 70.000 t/a. Design and project management. 2006 Söderenergi AB, Sweden. Modification of the oil fired boiler of 150 MW to pellets firing. Pressure vessel design including supporting steel structures for 2005-06 Ferrybridge C Power Station, UK. Switch of the coal fired boilers to wood powder combustion. Retrofit of 12 x 25 MWth Bioswirl burners to two of four boilers (each 1350 MWth). Fuel handling Facility for the wood pellets and wood chips. 2005 Assessment of utilization of waste energy sources of Rautaruukki factories in Raahe for pellet production. Rautaruukki and City of Raahe. Pelletising and energy expert. 2005 3 pcs of gas fired hot water boilers of 60 MW th, totally 240 MW th. KPA Unicon Oy/St. Petersburg Energy, Finland. Design for 2005 Pellet fired boiler of 25 MW th. TPS Termiska Processer AB/Umeå Energi AB, Sweden. Design for 2004 5 pcs of oil fired hot water boilers of 47 MW th, totally 235 MW th. KPA Unicon Oy/Helsinki Energia, Finland. Design for 2004 Oil fired hot water boiler of 60 MW th, Tampere Electricity Works, Finland. Design. 2003 Pelletizing plant 7 t/h of SIA Marama Latvia. For TallOil Stora Vika Biobränsle AB. Drying and fuel treatment of wet saw dust. 2003 Heat Recover Hot Water Boiler 15 MWth for gas turbine plant in Kouvola Finland. Design. 2003 Oil fired hot water boiler of 40 MW th for Jyväskylä Energy in Jyväskylä Finland. Design. 3(5)

2003 Waste fired power plant 11MWth/1.5 MWe SLP AB Helsingborg/TPS Termiska Processer AB, Sweden. Pre-engineering and feasibility study for bidding. 2003 CHP Power Plant 68 MWth/18 MWe Country Electricity Company/Enprima Oy, Thailand. Engineering for bidding and procurement of main components. 2002 CHP Power Plant Rottneroos/TPS Termska Processer AB Pre-engineering for to dismantle small scale power plant of 4.7 MWe/17 MWth for coal firing in Hallsberg and to remove it to Rottneros and modify it for bio fuel firing. 2001 CHP Power Plant Portugal/Talloil AB Engineering for the small scale power plant 38 MWth/10.4MWe extraction condensing steam turbine by Babcock Borsig Power/Austrian Energy. 2001 Finspång/TPS Termiska Processer AB Pre-engineering for the small scale power plant 8.85 MWt/0.9 MWe with saturated steam and Curtis steam turbine by Nadrowski 2001-2002 Kil Energi AB/TPS Termiska Processer AB Engineering for implementation including layout, process and documents for procurement of district heating boiler plant, totally 8 + 8 MW t 1999-2001 Fortum Engineering Oy, Laem Chabang CCGT Power Plant Engineering, Procurement and Erection Manager of CCGT power plant of 234 MWth/ 110 MW e and 50 tn/hr process steam 2000 Fortum Engineering Ltd/ Chai-Nat, Thailand. Rice husk fired power plant 22 MWth/4 MWe. Boiler assessment for renovation of combustion technology. 1999 Kuhmon Lämpö Oy Engineering and documentation for district heating steam boiler, 12 MW th 1998 Inergia Oy Engineering and procurement control of the district heating power plant of one solid fuel fired boiler and two fuel oil fired boiler, totally 10 MW th 1998 Borås Energi AB / TPS Termiska Processer, Sweden Basic design of auxiliary steam CFB steam boiler (20 MW th ) including layout and technical specification for bidding. 4(5)

1998-99 Fortum Engineering Oy, Sormovskaya Power Plant, Extracting condensing power plant, Nitzniy Novgorod, Federation of Russia, Tacis Project, Operational and environmental improvements of the power plant 350 MW e. 1998 Oulun Seudun Sähkö, (Electric Works of Oulu) CHP (Back Pressure) Power Plant 5 MWe/13 MWth of Kempele. Feasibility Study, Basic design and Invitation to Bids. 1998 Fiskeby Board AB, Sweden, Rebuilt of 20 MWth steam boiler (24 bar(g), 235 o C), pressure vessel and pipe line construction 5(5)