New Jersey Army National Guard. Environmental Compliance Database



Similar documents
Chicago Public Schools 6 Month Asbestos Surveillance Spring

Asbestos Survey Former Kraft General Foods Facility 500 Dalton Avenue and 1222 Statesville Avenue Charlotte, North Carolina. H&H Job No.

SUMMARY OF ASBESTOS CONTAINING MATERIAL IN BUILDINGS AND BULK SAMPLE ANALYSIS

Appendix 2-A: Asbestos Assessment Summary Table

6% Chrysotile NA White floor tile 2 nd Floor 10,000 sq ft Cat 1 2% Chrysotile Poor


Chicago Public Schools 6 Month Asbestos Surveillance Fall

Building Condition Assessment Report

Bond Priorities. Repairs and Maintenance. School Safety. Capacity

2013 AHERA 3 Year Re-Inspection Report For. Northeast Elementary School 82 Scofieldtown Road Stamford, CT. Performed by

AHERA 3-Year Asbestos Re-Inspection

UNVERSITY HIGH SCHOOL U W. Gregory St. Normal, IL School Asbestos Management Plan. Supplemental.

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST

Photo 1: This photograph shows drywall, joint compound, cove base mastic, carpet adhesive, and ceiling tile in store front No. 1.

Schedule B to By-law

ASBESTOS INSPECTION REPORT 2 Delaware Street, 38 and 39 North Henry Court South Burlington, VT AIP 84

Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen

Exterior Condition Report

HOMEOWNER S PERMIT GUIDE

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015

ASBESTOS BUILDING INSPECTION REPORT. for. Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823

Asbestos Survey Form (See Instructions)

Safeway 691 Berkeley Shattuck Place Date: May 3, 2007 MDA. Store Data: Interior Construction Materials: Exterior Construction Materials:

7.0 REHABILITATION /RESTORATION / MAINTENANCE PLAN

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

Historic Preservation Certification Application Part Main Street West South Haven, Vermont NPS Project No

Board Seminar Facilities. School Year Submitted by Joseph L. Lisa-Director of Facilities

ASBESTOS BUILDING INSPECTION REPORT. for the. City of East Lansing Waste Water Treatment Plant East Lansing, Michigan

Holz Choices & Specifications

Asbestos Management POLICY

Asbestos Procedures. Asbestos Products

Schedule B to By-law Part A Fees Payable for Permits

Self-Home Inspection Checklist

Building Condition Assessment Report

Maryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009

Botetourt County, Virginia. Frequently Asked Questions

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

2012 Annual Report. Greene County Buildings and Grounds

Rehab Inspection Report Page 1

NARRATIVE REPORT. The Asbestos Bulk Sample Results Table includes asbestos sampling data.

FIRE EXTINGUISHER DORM #1 SYMPHONY

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

New York, Dean. Price 182,500

Building Description Project Description Estimated Cost Notes Total Deferred

MEMORANDUM. DATE: January 6, Campus Community. Tim Ridley, CSP, ARM-P Director, Safety and Risk Management. SUBJECT: Asbestos Notification 2015

How to report a repair

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

Home Management Checklist: Spring

May 23, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California

Items in red were complete Items in green were complete on Lined out items are Life Safety Codes.

Don Hau, Project Development, 100 Shops Building, th Avenue SE, Minneapolis, MN 55414

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

BUNKER HILL ELEMENTARY SCHOOL

Virginia. American Recovery and Reinvestment Act. 83 DoD Projects ($ 75.7M) Completed or Under Way by August 31, 2009

NEW YORK STATE OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION HISTORIC HOMEOWNERSHIP REHABILITATION TAX CREDIT APPLICATION: PART 1

Facility Assessment for East Main Street, Huntley, IL

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER

PROPERTY INSPECTION REPORT

Project Close Out Summary

Print Shop/Mail Room

Former National Guard Armory Cherokee, Oklahoma Remediation Final Report

Name Of Occupancy Date. Yes No Describe

October 5, 2015 Dear Client,

Home Inspection Report

MILTON HALL BCO AWARDS 2014 THE WORKSPACE CONSULTANTS LLP

City of St. Charles Basement Finish or Remodel

ASBESTOS IN THE HOME

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

Asbestos in the home. A guidance booklet for tenants. Please keep this document as a reference guide- It contains important safety information

Estimated Cost of Repair

Memorandum. July 16, To: Plan Commission City of Madison

WEBSTER ELEMENTARY SCHOOL New Rochelle, New York Evaluation of Collapsed Ceiling Room 204

CITY OF SHAKER HEIGHTS HOUSING INSPECTION DEPARTMENT 3450 LEE ROAD SHAKER HEIGHTS, OHIO (216) POINT OF SALE CERTIFICATE OF INSPECTION

HOUSTON ELEMENTARY SCHOOL

POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for

Why was asbestos used?

Asbestos 2 hr. Awareness

TENANT AND LANDLORD REPAIR RESPONSIBILITIES

Cherokee Trail High School East Arapahoe Road Aurora, Colorado 80016

Environmental Education Associates. Asbestos in Construction

159 Morningside Avenue, Toronto

Home Warranty Inspection Report

SUMMARY REPORT THE BOTTOM LINE. Electrical. Report Number: Inspection Date: Saturday, February XX, XXXX

Doughty Environmental Hygiene Associates

MURCH ELEMENTARY SCHOOL

Gramercy Place Condo Association, Inc.

Asbestos Frequently Asked Questions

The Richard Stockton University ASBESTOS MANAGEMENT PLAN

Table of Contents. I Introduction 2. II Definitions & Area Calculation 2. III Room Numbering 7. IV Appendix A 9

Transcription:

New Jersey Army National Guard Environmental Compliance Database All Presumend and Confirmed Asbestos Containing Materials Facility Facility Homogenious / Atlantic City Armory 1st Armorer's Supply Insulation, fittings HM2 Atlantic City Armory 1st Armorer's Supply Plaster ceiling\walls HM3 Atlantic City Armory 1st Armorer's Supply Insulation, fittings Atlantic City Armory 1st Armore's Apartment Floor tile, 12" x 12", blue Stairwell Atlantic City Armory 1st Armore's Apartment Plaster, Wall HM3 Stairwell Atlantic City Armory 1st Armore's Apartment Insulation, fittings HM2 Stairwell Atlantic City Armory 1st Armore's Apartment, Ceiling tile, 2' x 4' HM4 Stairwell Atlantic City Armory 1st Boiler Insulation, Pipe, Pipe Fittings Atlantic City Armory 1st Boiler Boiler Jacket ACBM Atlantic City Armory 1st Boiler Plaster walls\walls HM3 Atlantic City Armory 1st Co. E 1/114 Admin s Ceiling tile, 2' x 4' HM4 Atlantic City Armory 1st Co. E 1/114 Admin s Floor tile, 12" x 12", lt brown\tan HM7 Atlantic City Armory 1st Co. E 1/114 Admin s Insulation, Partitions Atlantic City Armory 1st Co. E 1/114 Admin s Insulation, Pipe HM1 Atlantic City Armory 1st Co. E 1/114 Admin s Ceiling tile, 2' x 2' HM6 Lobby Atlantic City Armory 1st Co. E 1/114 Admin s Insulation, Pipe HM1 Lobby Atlantic City Armory 1st Co. E 1/114 Admin s Floor tile, 12" x 12", lt green Lobby Atlantic City Armory 1st Co. E 1/114 Admin s Plaster walls\walls HM3 Lobby Atlantic City Armory 1st Drill Floor Insulation, Pipe Atlantic City Armory 1st Drill Floor Insulation, Pipe HM1 Atlantic City Armory 1st Drill Floor Insulation, fittings HM2 Atlantic City Armory 1st Fire Alarm Ceiling tile, 2' x 2' HM6 Atlantic City Armory 1st Fire Alarm Plaster walls\walls HM3 Atlantic City Armory 1st Foyer Insulation, Pipe HM1 Atlantic City Armory 1st Foyer Floor tile, 9" x 9", green Atlantic City Armory 1st Foyer Ceiling tile, 2' x 2' HM6 Atlantic City Armory 1st Foyer Plaster walls\walls HM3 Atlantic City Armory 1st Foyer Caulking on front door Atlantic City Armory 1st Gym Wallboard HM5 Atlantic City Armory 1st Gym Ceiling tile, 2' x 4' HM4 Atlantic City Armory 1st Gym Hallway Insulation, Pipe HM2 Atlantic City Armory 1st Hallway Plaster walls\walls HM3 Atlantic City Armory 1st Hallway Insulation, Pipe HM1 Atlantic City Armory 1st Hallway Floor tile, 12" x 12", lt brown\tan HM7 Atlantic City Armory 1st Kitchen Ceiling tile, 2' x 4' HM4 Atlantic City Armory 1st Kitchen Insulation, fittings HM2 Monday, September 27, 2004 Page 1 of 53

Facility Facility Homogenious / Atlantic City Armory 1st Kitchen Atlantic City Armory 1st Men's Latrine, Shower Wallboard Wallboard HM5 HM5 Atlantic City Armory 1st Men's Latrine, Shower Insulation, Pipe Atlantic City Armory 1st Mess Hall Insulation, Pipe HM1 Atlantic City Armory 1st Mess Hall Insulation, fittings HM2 Atlantic City Armory 1st Mess Hall Floor tile, 9" x 9", dk brown HM8 Atlantic City Armory 1st Mess Hall Ceiling tile, 2' x 4' HM4 Atlantic City Armory 1st Old Boiler Insulation, fittings HM2 Atlantic City Armory 1st Old Boiler Boiler Jacket Atlantic City Armory 1st S2\3 Floor tile, 12" x 12", lt brown\tan HM7 Atlantic City Armory 1st S2\3 Insulation, Pipe HM1 Atlantic City Armory 1st S2\3 Insulation, Pipe HM1 Atlantic City Armory 1st S2\3 Ceiling tile, 2' x 4' HM4 Atlantic City Armory 1st S2\3 Floor tile, 12" x 12", lt brown\tan HM7 Atlantic City Armory 1st S2\3 Plaster ceiling HM3 Atlantic City Armory 1st S2\3 Insulation, Pipe Atlantic City Armory 1st S2\3 Insulation, fittings HM2 Atlantic City Armory 1st Sprinkler Valve Insulation, fittings HM2 Atlantic City Armory 1st Supply Insulation, fittings HM2 Atlantic City Armory 1st Supply Insulation, Pipe, Pipe Fittings Atlantic City Armory 1st Vault Insulation, Fire Door Atlantic City Armory 1st Women's Latrine, Shower Wallboard HM5 Atlantic City Armory 2nd Armorer's Floor tile, 12" x 12", lt brown\tan HM7 Atlantic City Armory 2nd Armorer's Plaster, walls\walls HM3 Atlantic City Armory 2nd Armorer's Ceiling tiles, 2' x 4' HM4 Atlantic City Armory 2nd Break Floor tile, 9" x 9", dk brown HM8 Atlantic City Armory 2nd Break Plaster, Wall HM3 Atlantic City Armory 2nd Classroom 1 Insulation, Pipe HM1 Atlantic City Armory 2nd Classroom 1 Ceiling tile, 2' x 4' HM4 Atlantic City Armory 2nd Classroom 1 Wallboard HM5 Atlantic City Armory 2nd Classroom 1 Chalk Board Atlantic City Armory 2nd Classroom 1 Plaster, Wall HM3 Atlantic City Armory 2nd Classroom 1 Floor tile, 9" x 9", dk brown HM8 Atlantic City Armory 2nd Classroom 1 Storage Ceiling tile, 2' x 4' HM4 Atlantic City Armory 2nd Classroom 1 Storage Floor tile, 9" x 9", dk brown HM8 Atlantic City Armory 2nd Club Textured paint on wall near bar Atlantic City Armory 2nd Club Particle board behind ceiling tile Atlantic City Armory 2nd Club Ceiling tile, 2' x 2' HM6 Atlantic City Armory 2nd Club Bar Floor tile, 9" x 9", black Atlantic City Armory 2nd Commander's Plaster, walls\walls HM3 Atlantic City Armory 2nd Commander's Ceiling tiles, 2' x 4' HM4 Atlantic City Armory 2nd Commander's Floor tile, 12" x 12", lt brown\tan HM7 Atlantic City Armory 2nd CSM Plaster, walls\walls HM3 Atlantic City Armory 2nd CSM Floor tile, 12" x 12", lt brown\tan HM7 Atlantic City Armory 2nd CSM Ceiling tile, 2' x 4' HM4 Atlantic City Armory 2nd EOC Plaster, Wall HM3 Atlantic City Armory 2nd EOC Floor tile, 12" x 12", lt brown\tan HM7 Atlantic City Armory 2nd EOC Hallway Floor tile, 12" x 12", lt brown\tan HM7 Atlantic City Armory 2nd EOC Hallway Ceiling tile, 2' x 4' HM4 Atlantic City Armory 2nd EOC Hallway Plaster, Wall HM3 Atlantic City Armory 2nd EOC Supply Floor tile, 9" x 9" Atlantic City Armory 2nd EOC Supply Plaster, ceiling HM3 Atlantic City Armory 2nd HHD CDR Ceiling tiles, 2' x 4' HM4 Monday, September 27, 2004 Page 2 of 53

Facility Facility Homogenious / Atlantic City Armory 2nd HHD CDR Floor tile, 12" x 12", lt brown\tan HM7 Atlantic City Armory 2nd HHD CDR Plaster, walls\walls HM3 Atlantic City Armory 2nd HHD Clerk Ceiling tile, 2' x 4' HM4 Atlantic City Armory 2nd HHD Clerk Plaster, walls\walls HM3 Atlantic City Armory 2nd HHD Clerk Floor tile, 12" x 12", lt brown\tan HM7 Atlantic City Armory 2nd HHD Det SGT Floor tile, 12" x 12", lt brown\tan HM7 Atlantic City Armory 2nd HHD Det SGT Ceiling tiles, 2' x 4' HM4 Atlantic City Armory 2nd HHD Det SGT Plaster, walls\walls HM3 Atlantic City Armory 2nd Landing Floor tile, 12" x 12", grey Atlantic City Armory 2nd Landing Floor tile, 12" x 12", lt brown\tan HM7 Atlantic City Armory 2nd Landing Ceiling tile, 2' x 4' HM4 Atlantic City Armory 2nd Landing Plaster, walls\walls HM3 Atlantic City Armory 2nd Men's Latrine Ceiling tile, 2' x 2' HM6 Atlantic City Armory 2nd Men's Latrine Plaster, walls\walls HM3 Atlantic City Armory 2nd Men's Latrine Floor tile, 12" x 12", lt brown\tan HM7 Atlantic City Armory 2nd Recruiter's Plaster, walls\walls HM3 Atlantic City Armory 2nd Recruiter's Floor tile, 12" x 12", lt brown\tan HM7 Atlantic City Armory 2nd Recruiter's Insulation, Pipe HM1 Atlantic City Armory 2nd Recruiter's Ceiling tile, 2' x 4' HM4 Atlantic City Armory 2nd S1 Hallway Ceiling tile, 2' x 4' HM4 Atlantic City Armory 2nd S1 Hallway Plaster, ceiling HM3 Atlantic City Armory 2nd S1 Hallway Floor tile, 12" x 12", lt brown\tan HM7 Atlantic City Armory 2nd S1 s Insulation, Partitions Atlantic City Armory 2nd S1 s Floor tile, 12" x 12", lt brown\tan HM7 Atlantic City Armory 2nd S1 s Plaster, walls\walls HM3 Atlantic City Armory 2nd S1 s Ceiling tiles, 2' x 2' HM6 Atlantic City Armory 2nd S2\3 Ceiling tiles, 2' x 4' HM4 Atlantic City Armory 2nd S2\3 Plaster, walls\walls HM3 Atlantic City Armory 2nd S2\3 Floor tile, 12" x 12", lt brown\tan HM7 Atlantic City Armory 2nd XO Plaster, walls\walls HM3 Atlantic City Armory 2nd XO Floor tile, 12" x 12", lt brown\tan HM7 Atlantic City Armory 2nd XO Ceiling tile, 2' x 4' HM4 Atlantic City Armory 3rd Food Svc Advisor Plaster, walls\walls HM3 Atlantic City Armory 3rd Food Svc Advisor Floor tile, 12" x 12", red HM9 Atlantic City Armory 3rd Food Svc Advisor Ceiling tiles, 2' x 4' HM4 Atlantic City Armory 3rd Landing Plaster, walls\walls HM3 Atlantic City Armory 3rd Landing Floor tile, 12" x 12", grey Atlantic City Armory 3rd Landing Floor tile, 12" x 12", red HM9 Atlantic City Armory 3rd Log Plaster, walls\walls HM3 Atlantic City Armory 3rd Log Floor tile, 12" x 12", red HM9 Atlantic City Armory 3rd Log Ceiling tiles, 2' x 4' HM4 Atlantic City Armory 3rd Maintenance Ceiling tiles, 2' x 4' HM4 Atlantic City Armory 3rd Maintenance Floor tile, 12" x 12", red HM9 Atlantic City Armory 3rd Maintenance Plaster, walls\walls HM3 Atlantic City Armory 3rd s Wallboard HM5 Atlantic City Armory 3rd PBT Floor tile, 12" x 12", red HM9 Atlantic City Armory 3rd PBT Plaster, walls\walls HM3 Atlantic City Armory 3rd PBT Ceiling tiles, 2' x 4' HM4 Atlantic City Armory 3rd S4 Ceiling tiles, 2' x 4' HM4 Atlantic City Armory 3rd S4 Floor tile, 12" x 12", red HM9 Atlantic City Armory 3rd S4 Plaster, walls\walls HM3 Atlantic City MVSB Throughout Caulking Atlantic City MVSB Throughout Wallboard Monday, September 27, 2004 Page 3 of 53

Facility Facility Homogenious / Bordentown Armory 1st 1SGT 1 x 1 ceiling Tile HM5 Bordentown Armory 1st 1SGT Wallboard HM6 Bordentown Armory 1st 1SGT 12 x 12 lt. green floor tile HM3 Bordentown Armory 1st Admin. Wallboard HM6 Bordentown Armory 1st Admin. 1 x 1 Ceiling Tile HM5 Bordentown Armory 1st Admin. 12 x 12 lt. green floor tile HM3 Bordentown Armory 1st Admin., Commander's Insulation inside office partitions, Training Bordentown Armory 1st Armorer's Closet Wallboard on ceiling HM6 Bordentown Armory 1st Armorer's Closet Pipe Insulation HM1 ACBM Bordentown Armory 1st Armorer's Closet 12 x 12 red brown floor tile HM4 Bordentown Armory 1st Armorer's Wallboard on ceiling HM6 Bordentown Armory 1st Armorer's 12 x 12 lt. green floor tile HM3 Bordentown Armory 1st Boiler Pipe Insulation HM1 ACBM Bordentown Armory 1st Boiler Plaster Ceiling HM2 Bordentown Armory 1st Boiler Foyer Plaster Ceiling HM2 Bordentown Armory 1st Boiler Foyer 12 x 12 lt. green floor tile HM3 Bordentown Armory 1st Commander's 1 x 1 Ceiling Tile HM5 Bordentown Armory 1st Commander's Wallboard HM6 Bordentown Armory 1st Commander's 12 x 12 red brown floor tile HM4 Bordentown Armory 1st Drill Floor 1 x 1 ceiling tile HM5 Bordentown Armory 1st Drill Floor Pipe Insulation HM1 ACBM Bordentown Armory 1st Kitchen Plaster Ceiling HM2 Bordentown Armory 1st Kitchen 12 x 12 red brown floor tile HM4 Bordentown Armory 1st Main entrance foyer and Pipe Insulation HM1 ACBM hallway Bordentown Armory 1st Men's latrine and shower Plaster Ceiling HM2 room Bordentown Armory 1st Men's latrine and shower Pipe Insulation HM1 ACBM room Bordentown Armory 1st Men's Latrine Foyer Plaster Ceiling HM2 Bordentown Armory 1st Mess Hall 12 x 12 red brown floor tile HM4 Bordentown Armory 1st Mess Hall 1 x 1 ceiling Tile HM5 Bordentown Armory 1st Mess Hall Pipe insulation on roof drain HM1 ACBM Bordentown Armory 1st Recruiter's Wallboard on ceiling HM6 Bordentown Armory 1st Recruiter's 12 x 12 lt. green floor tile HM3 Bordentown Armory 1st Supply 1 Wallboard on ceiling HM6 Bordentown Armory 1st Supply 2 12 x 12 lt. green floor tile HM3 Bordentown Armory 1st Supply 2 Wallboard on ceiling HM6 Bordentown Armory 1st Supply 3 12 x 12 lt. green floor tile HM3 Bordentown Armory 1st Supply 3 Wallboard HM6 Bordentown Armory 1st Supply 12 x 12 lt. green floor tile HM3 Bordentown Armory 1st Supply Wallboard on ceiling HM6 Bordentown Armory 1st Training 12 x 12 red brown floor tile HM4 Bordentown Armory 1st Training Wallboard HM6 Bordentown Armory 1st Training 1 x 1 Ceiling Tile HM5 Bordentown Armory 1st Vault Plaster Ceiling HM2 Bordentown Armory 1st Vault Fire Door Insulation Bordentown Armory 1st Women's Latrine Plaster Ceiling HM2 Bordentown Armory 1st Women's Latrine Pipe Insulation HM1 ACBM Bordentown Armory 1st Women's Latrine, Foyer Pipe Insulation HM1 ACBM Bordentown Armory 1st Women's Latrine Foyer Plaster Ceiling HM2 Bordentown CSMS Armorer's Roof Roof Roofing Shingles Monday, September 27, 2004 Page 4 of 53

Facility Facility Homogenious / Bordentown CSMS Armorer's South and Transite wall shingles east side of building Bordentown CSMS Armorer's Throughout Caulking, window\door Bordentown CSMS 1st Automotive Supervisor Floor tile, 12" x 12", white speckled HM5 Bordentown CSMS 1st Automotive Supervisor Partitions HM6 Bordentown CSMS 1st Automotive Supervisor Ceiling tile, 2' x 4' HM2 Bordentown CSMS 1st Boiler Boilers' Jacket Bordentown CSMS 1st Boiler Insulation, Pipe HM1 Bordentown CSMS 1st Break Insulation, Pipe HM1 Bordentown CSMS 1st Break Floor tile, 12" x 12", lt white/green HM7 Bordentown CSMS 1st Break Ceiling tile, 2' x 4' HM2 Bordentown CSMS 1st Break Wallboard HM4 Bordentown CSMS 1st Break, Armorer's Floor tile, 12" x 12", lt white/green HM7 Closet Bordentown CSMS 1st Clerk's Ceiling tile, 2' x 4' HM2 Bordentown CSMS 1st Clerk's Floor tile, 12" x 12", lt tan/brown Bordentown CSMS 1st Clerk's Insulation, Pipe Bordentown CSMS 1st Clerk's Latrine Floor tile, 12" x 12", lt tan/brown Bordentown CSMS 1st Clerk's Latrine Insulation, Pipe HM1 Bordentown CSMS 1st Commander's Insulation, Pipe HM1 Bordentown CSMS 1st Commander's Ceiling tile, 2' x 4' HM2 Bordentown CSMS 1st Commander's Floor tile, 12" x 12", lt. green/white HM7 Bordentown CSMS 1st Hallway Ceiling tile, 2' x 4' Bordentown CSMS 1st Hallway Floor tile, 12" x 12", lt white/green HM7 Bordentown CSMS 1st Hallway Insulation, Pipe Bordentown CSMS 1st Hallway Wallboard Bordentown CSMS 1st Inspection Wallboard HM4 Bordentown CSMS 1st Inspection Ceiling tile, 2' x 4' HM2 Bordentown CSMS 1st Inspection Floor tile, 12" x 12", white HM4 Bordentown CSMS 1st Inspection Partitions HM6 Bordentown CSMS 1st Locker Floor tile, 12" x 12", white speckled HM5 Monday, September 27, 2004 Page 5 of 53

Facility Facility Homogenious / Bordentown CSMS 1st Locker Wallboard HM4 Bordentown CSMS 1st Locker Insulation, Pipe HM1 Bordentown CSMS 1st Main Garage Insulation, Pipe HM1 Bordentown CSMS 1st Main Garage Chalk Board Bordentown CSMS 1st Men's Latrine Floor tile, 12" x 12", lt tan/brown Bordentown CSMS 1st Men's Latrine Insulation, Pipe Bordentown CSMS 1st Pipe Chase between Insulation, Pipe HM1 building 1and 2 Bordentown CSMS 1st Production Floor tile, 12" x 12", white HM3 Bordentown CSMS 1st Production Ceiling tile, 2' x 4' HM2 Bordentown CSMS 1st Production Latrine Floor tile, 12" x 12", white HM3 Bordentown CSMS 1st Tool and Parts Wallboard HM4 Bordentown CSMS 1st Tool and Parts Ceiling tile, 2' x 4' HM2 Bordentown CSMS 1st Tool and Parts Floor tile, 12" x 12", white HM3 Bordentown CSMS 1st Tool and Parts Supply Insulation, Pipe HM1 Bordentown CSMS 2nd Armorer's Insulation, Pipe HM1 Bordentown CSMS 2nd Armorer's Floor tile, 9" x 9", lt gray Bordentown CSMS 2nd Armorer's Ceiling tile, 2' x 4' HM2 Bordentown CSMS 1st Armament Shop Foreman's No. 2 Floor tile, 12" x 12",white Bordentown CSMS 1st Armament Shop Foreman's No. 2 Wallboard on ceiling\walls HM2 Bordentown CSMS 1st Armament Shop Garage Insulation, Pipe No. 2 Bordentown CSMS 1st Armament Shop Garage No. 2 Latrine Wallboard on ceiling Bordentown CSMS 1st Armament Shop Garage No. 2 Latrine Insulation, Pipe Bordentown CSMS 1st Armament Shop Workshop Insulation, Fire Door No. 2 Bordentown CSMS 1st Armament Shop Workshop Plaster, Wall No. 2 Bordentown CSMS 1st Calibration Shop Ceiling tile, 2' x 4' No. 2 Bordentown CSMS 1st Calibration Shop Floor tile, 12" x 12", white No. 2 Bordentown CSMS 1st Electronics Shop Ceiling tile, 2' x 4' HM3 No. 2 Bordentown CSMS 1st Electronics Shop Floor tile, 12" x 12", white No. 2 Bordentown CSMS 1st FME Garage Insulation, Pipe HM1 No. 2 Bordentown CSMS 1st Paint Shop Insulation, Pipe HM1 No. 2 Monday, September 27, 2004 Page 6 of 53

Facility Facility Homogenious / Bordentown CSMS 1st Paint Shop Garage Insulation, Pipe HM1 No. 2 Bordentown CSMS 1st 1st Floor Wallboard No. 3 Bordentown CSMS 1st Garage Insulation, Pipe No. 3 Bordentown CSMS 1st Gym, Shower Ceiling tile, 2' x 2' No. 3 Bordentown CSMS 1st Gym, Shower Floor tile, 12" x12", white No. 3 Bordentown CSMS 1st Gym, Shower Wallboard No. 3 Bordentown CSMS 1st Gym Latrine Floor tile, 12" x 12", lt green No. 3 Bordentown CSMS 1st Pipe chase outside of Insulation, Pipe No. 3 building in parking lot Bordentown CSMS Throughout Garage Caulking on windows/exterior doors No. 3 Bordentown MVSB 1st Battery Transite ACBM Bordentown MVSB 1st Boiler Pipe Insulation HM2 ACBM Bordentown MVSB 1st Boiler Wallboard on walls/walls HM1 Bordentown MVSB 1st Break 12" x 12" red brown floor tile HM3 Bordentown MVSB 1st Break 2 x 4 Ceiling Tile HM4 Bordentown MVSB 1st Break Wallboard on wall HM1 Bordentown MVSB 1st Dispatch Wallboard on walls/walls HM1 Bordentown MVSB 1st Garage Pipe Insulation HM2 ACBM Bordentown MVSB 1st Garage Foyer Wallboard HM1 Bordentown MVSB 1st Locker Wallboard on ceiling and walls HM1 Bordentown MVSB 1st Locker 12 x 12 lt. green floor tile Bordentown MVSB 1st Men's Latrine 12" x 12" red brown floor tile HM3 Bordentown MVSB 1st Men's Latrine Plaster shower Bordentown MVSB 1st Men's Latrine Wallboard HM1 Bordentown MVSB 1st Men's Latrine 2 x 4 Ceiling Tile HM4 Bordentown MVSB 1st Men's Latrine Pipe Insulation HM2 ACBM Bordentown MVSB 1st Shop Foreman's 2 x 4 Ceiling Tile HM4 Bordentown MVSB 1st Shop Foreman's Wallboard HM1 Bordentown MVSB 1st Supply Wallboard HM1 Bordentown MVSB Roof Roof Roofing Shingles Bordentown MVSB Throughout Window caulking Bridgeton Armory 1st Armorer's Closet Plaster Ceiling Bridgeton Armory 1st Classroom Pipe Fittings on interior roof drains HM1 HM5 behind drop ceiling Bridgeton Armory 1st Classroom 9x9 Brown Floor Tile HM3 Bridgeton Armory 1st Classroom HVAC Ductwork Insulation HM4 Bridgeton Armory 1st Classroom 2 x 4 White Ceiling Tile HM2 Bridgeton Armory 1st Classroom Pipe Insulation on interior roof drains HM6 behind drop ceiling Bridgeton Armory 1st Classroom Chalk Board Bridgeton Armory 1st Drill Floor Hallway Plaster Ceiling HM1 Bridgeton Armory 1st Electrical Tank Jacket Bridgeton Armory 1st Electrical Plaster Ceiling HM1 Bridgeton Armory 1st Electrical Pipe Insulation HM7 Bridgeton Armory 1st Foyer 2 x 4 White Ceiling Tile HM2 Bridgeton Armory 1st Kitchen 2 x 4 White Ceiling Tile HM2 Bridgeton Armory 1st Kitchen 9x9 Tan Floor Tile HM3 Monday, September 27, 2004 Page 7 of 53

Facility Facility Homogenious / Bridgeton Armory 1st Men's Latrine Plaster Ceiling HM1 Bridgeton Armory 1st Men's Shower Plaster Ceiling HM1 Bridgeton Armory 1st Orderly Pipe Insulation on interior roof drains HM6 behind drop ceiling Bridgeton Armory 1st Orderly Partitions Bridgeton Armory 1st Orderly Pipe Fittings HM2 Bridgeton Armory 1st Orderly 9 x 9 Brown Floor Tile HM3 Bridgeton Armory 1st Orderly 2 x 4 White Ceiling Tile HM2 Bridgeton Armory 1st Women's Latrine Plaster Ceiling HM1 Bridgeton Armory 1st Women's Latrine Foyer Plaster Ceiling HM1 Bridgeton Armory Throughout Window Caulking Bridgeton MVSB 1st Latrine Wallboard None Detected Bridgeton MVSB 1st Manager's Wallboard None Detected Bridgeton MVSB Throughout Window Caulking Burlington Armory 1st Classroom 2 x 4 ceiling tile HM3 Burlington Armory 1st Classroom Wallboard HM2 Burlington Armory 1st Classroom Foyer 2 x 4 Ceiling Tile HM3 Burlington Armory 1st Classroom Foyer 12 x 12 red brown floor tile HM4 Burlington Armory 1st Classroom Foyer Wallboard on ceilings and walls HM2 Burlington Armory 1st Drill Floor Chalk Board Burlington Armory 1st Drill Floor Foyer Plaster Ceiling Plaster Wall HM6 Burlington Armory 1st Men's Latrine Wallboard on ceiling HM2 Burlington Armory 1st Men's Latrine 2 x 4 Ceiling Tile HM3 Burlington Armory 1st Men's Latrine 12 x 12 red brown floor tile HM4 Burlington Armory 1st Recruiter's 2 x 4 Ceiling Tile HM3 Burlington Armory 1st Recruiter's Wallboard HM2 Burlington Armory 1st Women's Latrine Wallboard on ceiling HM2 Burlington Armory 1st Women's Latrine 2 x 4 ceiling tile HM3 Burlington Armory Basement Armorer's Pipe Insulation HM1 Burlington Armory Basement Armorer's 12' x 12' red brown floor tile HM4 Burlington Armory Basement Boiler Pipe Insulation HM1 Burlington Armory Basement Boiler Wallboard on ceiling HM2 Burlington Armory Basement Boiler Breeching Burlington Armory Basement Club 12' x 12' lt. brown floor tile Burlington Armory Basement Co. C 1/114 Supply Wallboard HM2 Burlington Armory Basement Co. C 1/114 Supply Pipe Insulation HM1 Burlington Armory Basement Commander's office 12 x 12 lt. blue floor tile HM5 Burlington Armory Basement Commander's office Wallboard HM2 Burlington Armory Basement Commander's office latrine Wallboard HM2 Burlington Armory Basement Commander's Wallboard HM5 Hallway Burlington Armory Basement Kitchen Plaster wall\wall HM6 Burlington Armory Basement Kitchen Hallway Wallboard HM2 Burlington Armory Basement Kitchen Serving Wallboard on walls and ceiling HM2 Burlington Armory Basement Landing Plaster Ceiling, Plaster Wall HM6 Burlington Armory Basement Men's Latrine Wallboard on ceiling HM2 Burlington Armory Basement Mess Hall 2 x 4 Ceiling Tile HM3 Burlington Armory Basement Operations and Training 12 x 12 lt. blue floor tile HM5 Burlington Armory Basement Operations and Training Wallboard HM2 Burlington Burlington Armory Armory Basement Orderly Basement Orderly Wallboard 12 x 12 lt. blue floor tile HM2 HM5 Monday, September 27, 2004 Page 8 of 53

Facility Facility Homogenious / Burlington Armory Basement Readiness Wallboard HM2 Burlington Armory Basement Readiness 12 x 12 lt. blue floor tile HM5 Burlington Armory Basement Vault 12 x 12 red brown floor tile HM4 Burlington Armory Basement Vault Fire Door Insulation Burlington Armory Basement Vault foyer Plaster Ceiling HM6 Burlington Armory Basement Vault foyer Pipe Insulation HM1 Burlington MVSB Roof Roof Roofing Paper Burlington MVSB Throughout Window/door caulking Cape May Armory 1st 1SGT Ceiling tile, 2' x 4' HA2 Cape May Armory 1st 1SGT Insulation, Partitions HM4 ACBM Cape May Armory 1st 1SGT Floor tile, 9" x 9", dk brown HM3 Cape May Armory 1st 1st Platoon's s Floor tile, 9" x 9", dk brown HA3 Cape May Armory 1st 1st Platoon's s Insulation, Partitions HA4 ACBM Cape May Armory 1st 1st Platoon's s Ceiling tile, 2' x 4' HA2 Cape May Armory 1st 253rd Supply Insulation, Pipe HA1 ACBM Cape May Armory 1st 253rd Supply Floor tile, 9" x 9", dk brown HA3 Cape May Armory 1st 253rd Supply Wallboard HA5 Cape May Armory 1st 253rd Supply Ceiling tile, 2' x 4' HA2 Cape May Armory 1st 253rd Supply Insulation, Pipe HA1 ACBM Cape May Armory 1st 3rd Platoon's s Insulation, Partitions HA4 ACBM Cape May Armory 1st 3rd Platoon's s Ceiling tile, 2' x 4' HA2 Cape May Armory 1st 3rd Platoon's s Floor tile, 9" x 9", dk brown HA3 Cape May Armory 1st Admin Hallway Insulation, Pipe HA1 ACBM Cape May Armory 1st Admin Hallway Ceiling tile, 2' x 2' HA7 Cape May Armory 1st Admin Hallway Floor tile, 9" x 9", dk brown HA3 Cape May Armory 1st Admin. s Insulation, Partitions HA4 ACBM Cape May Armory 1st Admin. s Ceiling tile, 2' x 4' HA2 Cape May Armory 1st Admin. s Floor tile, 9" x 9", dk brown HA3 Cape May Armory 1st Armorer's Closet Ceiling tile, 2' x 4' HA2 Cape May Armory 1st Armorer's Closet Floor tile, 9" x 9", dk brown HA3 Cape May Armory 1st Armorer's Closet Insulation, Pipe HA2 ACBM Cape May Armory 1st Armorer's Ceiling tile, 2' x 4' HA2 Cape May Armory 1st Armorer's Floor tile, 9" x 9", dk brown HA3 Cape May Armory 1st Armorer's Insulation, Partitions HA4 ACBM Cape May Armory 1st Boiler Boiler Jacket, Breeching Cape May Armory 1st Boiler Plaster, Ceiling None Detected Cape May Armory 1st Boiler Hallway Insulation, Pipe HA1 ACBM Cape May Armory 1st Boiler Hallway Ceiling tile, 2' x 2' HA7 Cape May Armory 1st Boiler Hallway Wallboard HA5 Cape May Armory 1st Classrooms 1,2 Ceiling tile, 2' x 4' HA2, and 2 Cape May Armory 1st Classrooms 1,2 Floor tile, 9" x 9", dk brown HA3, and 2 Cape May Armory 1st Classrooms 1,2 Chalk Board, and 2 Cape May Armory 1st Classrooms 1,2 Insulation, Pipe HA1 ACBM, and 2 Cape May Armory 1st Club Insulation, Pipe HA1 ACBM Cape May Armory 1st Club Wallboard HA5 Cape May Armory 1st Club Floor tile, 12" x 12", dk red brown Cape May Armory 1st Club Ceiling tile, 2' x 4' HA2 Cape May Armory 1st Club Supply Floor tile Cape May Armory 1st Club Supply Ceiling tile, 2' x 4' HA2 Cape May Armory 1st Club Supply Insulation, Pipe HA1 ACBM Cape May Armory 1st Commander's Ceiling tile, 2' x 4' HM2 Monday, September 27, 2004 Page 9 of 53

Facility Facility Homogenious / Cape May Armory 1st Commander's Insulation, Partitions HM4 ACBM Cape May Armory 1st Commander's Floor tile, 9" x 9", dk brown HM3 Cape May Armory 1st Conference Ceiling tile, 2' x 4' HA2 Cape May Armory 1st Conference Wallboard HM5 Cape May Armory 1st Conference Floor tile, 9" x 9", dk brown HM3 Cape May Armory 1st Conference Hallway Floor tile, 9" x 9", dk brown HA3 Cape May Armory 1st Conference Hallway Insulation, Pipe HA1 ACBM Cape May Armory 1st Conference Hallway Ceiling tile, 2' x 2' HA7 Cape May Armory 1st Distance Learning Center Ceiling tile, 2' x 4' HA2 Cape May Armory 1st Distance Learning Center Wallboard HA5 Cape May Armory 1st Distance Learning Center Insulation, Pipe HA1 Cape May Armory 1st Drill Floor Foyer Plaster, Ceiling HA6 ACBM Cape May Armory 1st Drill Floor Foyer Porch Plaster, Ceiling HA6 ACBM Cape May Armory 1st Kitchen Floor tile, 9" x 9", dk brown HA3 Cape May Armory 1st Kitchen Transite like wallboard None Detected Cape May Armory 1st Kitchen Insulation, Pipe HA1 ACBM Cape May Armory 1st Kitchen Plaster, Ceiling HA6 ACBM Cape May Armory 1st Men's Latrine Hallway Floor tile, 9" x 9", dk brown HA3 Cape May Armory 1st Men's Latrine Hallway Ceiling tile, 2' x 2' HA7 Cape May Armory 1st Men's Latrine Hallway Insulation, Pipe HA1 ACBM Cape May Armory 1st Men's Latrine\Shower Insulation, Pipe HA1 ACBM Cape May Armory 1st Men's Latrine\Shower Plaster, Ceiling HA6 ACBM, Cape May Armory 1st Old Recruiter's Insulation, Pipe HA3 ACBM Cape May Armory 1st Old Recruiter's Floor tile, 9" x 9", dk brown HA3 Cape May Armory 1st Old Recruiter's Plaster, Ceiling HA6 Cape May Armory 1st Recruiter's Wallboard HA5 Cape May Armory 1st Recruiter's Floor tile, 12" x 12", lt green Cape May Armory 1st Recruiter's Insulation, Pipe HA1 ACBM Cape May Armory 1st Recruiter's Ceiling tile, 2' x 4' HA2 Cape May Armory 1st Regional Manager's Floor tile, 9" x 9", dk brown HA3 Cape May Armory 1st Retention Insulation, Partitions HM4 ACBM Cape May Armory 1st Retention Floor tile, 9" x 9", dk brown HM3 Cape May Armory 1st Retention Ceiling tile, 2' x 4' HM2 Cape May Armory 1st Training NCO Ceiling tile, 2' x 4' HM2 Cape May Armory 1st Training NCO Floor tile, 9" x 9", dk brown HM3 Cape May Armory 1st Training NCO Insulation, Partitions HM4 ACBM Cape May Armory 1st Truck Master's Ceiling tile, 2' x 4' HM2 Cape May Armory 1st Truck Master's Insulation, Partitions HM4 ACBM Cape May Armory 1st Truck Master's Floor tile, 9" x 9", dk brown HM3 Cape May Armory 1st Vault Plaster, Ceiling None Detected Cape May Armory 1st Vault Insulation, Fire Door Cape May Armory 1st Women's Latrine Wallboard HA5 Cape May Armory 1st Women's Latrine Insulation, Pipe HA1 ACBM Cape May Armory 1st Women's Latrine Plaster, Ceiling HA6 Cape May OMS 1st Battery Transite Cape May OMS 1st Break Ceiling tile, 2' x 4' Cape May OMS 1st Break Ceiling tile, 2' x 4' Cape May OMS 1st Garage Insulation, Pipe Cape May OMS 1st Latrine Ceiling tile, 1' x 1' Cape May OMS 1st Latrine Floor tile, 12" x 12", white Cape May OMS 1st Parts Floor tile, 12" x 12", white Cape May OMS 1st Parts Ceiling tile, 2' x 4' Cape May OMS 1st Shop Foreman's Floor tile, 12" x 12", blue Cape May OMS 1st Shop Foreman's Ceiling tile, 2' x 4' Cherry Hill Armory 1st Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Floor tile, 12" x 12", lt. green speckled HM6 Monday, September 27, 2004 Page 10 of 53

Facility Facility Homogenious / Cherry Hill Armory 1st Insulation, Partitions HM4 Cherry Hill Armory 1st 112 FA FDC Supply Insulation, Pipe HM3 Cherry Hill Armory 1st 112 FA GUNS Supply Insulation, Pipe HM3 Cherry Hill Armory 1st 112 FA NBC Supply Insulation, Pipe HM3 Cherry Hill Armory 1st 112 FA Supply Insulation, Pipe HM3 Cherry Hill Armory 1st 112 FA Supply Insulation, Pipe HM3 Cherry Hill Armory 1st 1SGT Insulation, Partitions HM4 Cherry Hill Armory 1st 1SGT Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st 1SGT Insulation, Partitions HM4 Cherry Hill Armory 1st 1SGT Floor tile, 12" x 12", lt. green speckled HM6 Cherry Hill Armory 1st 1SGT Pipe Fittings HM7 Cherry Hill Armory 1st 1SGT Floor tile, 12" x 12", lt. green speckled HM6 Cherry Hill Armory 1st 1SGT Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Admin. Pipe Fittings HM7 Cherry Hill Armory 1st Admin. Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Admin. Floor tile, 12" x 12", lt. green speckled HM6 Cherry Hill Armory 1st Armorer's Closet Insulation, Pipe HM3 Cherry Hill Armory 1st Armorer's Closet Floor tile, 9" x 9", dk brown HM1 Cherry Hill Armory 1st Armorer's Ceiling tile, 2' x 2' HM5 Cherry Hill Armory 1st Armorer's Floor tile, 9" x 9", dk brown HM1 Cherry Hill Armory 1st Armorer's Work Shop Floor tile, 12" x 12", lt. green speckled HM6 Cherry Hill Armory 1st Armorer's Work Shop Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Boiler Boiler Jacket, Breeching Cherry Hill Armory 1st Boiler Plaster, Ceiling HM9 Cherry Hill Armory 1st Break Insulation, Partitions HM4 Cherry Hill Armory 1st Break Insulation, Pipe HM3 Cherry Hill Armory 1st Break Floor tile, 9" x 9", dk brown HM1 Cherry Hill Armory 1st Break Ceiling tile, 2' x 2' HM5 Cherry Hill Armory 1st CAP Admin. Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st CAP Admin. Floor tile, 12" x 12", lt. green speckled HM6 Cherry Hill Armory 1st CAP Admin. Insulation, Partitions HM4 Cherry Hill Armory 1st CAP Admin. Insulation, Pipe HM3 Cherry Hill Armory 1st CAP Commander's Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st CAP Commander's Floor tile, 9" x 9", dk brown HM1 Cherry Hill Armory 1st CAP Commander's Insulation, Partitions HM4 Cherry Hill Armory 1st CAP Supply Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st CAP Supply Floor tile, 12" x 12", lt. green speckled HM6 Cherry Hill Armory 1st Chief Armorer's Floor tile, 9" x 9", dk brown HM1 Cherry Hill Armory 1st Chief Armorer's Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Chief Armorer's Insulation, Pipe HM3 Cherry Hill Armory 1st Chief Armorer's Insulation, Partitions HM4 Cherry Hill Armory 1st Classroom 1 Floor tile, 9" x 9", dk brown HM1 Cherry Hill Armory 1st Classroom 1 Insulation, Pipe HM3 Cherry Hill Armory 1st Classroom 1 Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Classroom 2 Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Classroom 2 Floor tile, 9" x 9", dk brown HM1 Cherry Hill Armory 1st Classroom 2 Insulation, Pipe HM3 Cherry Hill Armory 1st Classroom 3 Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Classroom 3 Insulation, Pipe HM3 Cherry Hill Armory 1st Classroom 3 Floor tile, 9" x 9", dk brown HM1 Cherry Hill Armory 1st Classroom 4 Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Classroom 4 Pipe Fittings HM7 Cherry Hill Armory 1st Classroom 4 Floor tile, 9" x 9", dk brown HM1 Cherry Hill Armory 1st Classroom 4 Hallway Insulation, Pipe HM3 Cherry Hill Armory 1st Classroom 4 Hallway Ceiling tile, 2' x 2' HM5 Monday, September 27, 2004 Page 11 of 53

Facility Facility Homogenious / Cherry Hill Armory 1st Classroom 4 Hallway Floor tile, 9" x 9", dk brown HM1 Cherry Hill Armory 1st Classroom 5 Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Classroom 5 Insulation, Pipe HM3 Cherry Hill Armory 1st Classroom 5 Floor tile, 9" x 9", dk brown HM1 Cherry Hill Armory 1st Club Insulation, Pipe HM3 Cherry Hill Armory 1st Club Floor tile, 9" x 9", dk brown HM1 Cherry Hill Armory 1st Club Ceiling tile, 1' x 1' Cherry Hill Armory 1st Club Hallway Floor tile, 9" x 9", dk brown HM1 Cherry Hill Armory 1st Club Hallway Ceiling tile, 2' x 2' HM5 Cherry Hill Armory 1st Commander's Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Commander's Pipe Fittings HM7 Cherry Hill Armory 1st Commander's Insulation, Partitions HM4 Cherry Hill Armory 1st Commander's Floor tile, 12" x 12", lt. green speckled HM6 Cherry Hill Armory 1st Commander's Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Commander's Floor tile, 12" x 12", lt. green speckled HM6 Cherry Hill Armory 1st Conference A Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Conference A Floor tile, 12" x 12", lt. green speckled HM6 Cherry Hill Armory 1st Conference A Pipe Fittings HM7 Cherry Hill Armory 1st Conference A Insulation, Partitions HM4 Cherry Hill Armory 1st Conference A Chalk Board Cherry Hill Armory 1st Conference B Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Conference B Wallboard Cherry Hill Armory 1st Conference B Floor tile, 12" x 12", lt. green speckled HM6 Cherry Hill Armory 1st Conference B Insulation, Partitions HM4 Cherry Hill Armory 1st Copy Floor tile, 12" x 12", lt. green speckled HM6 Cherry Hill Armory 1st Copy Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st DET 1 HHB 3/112 1SGT Ceiling tile, 2' x 2' HM5 Cherry Hill Armory 1st DET 1 HHB 3/112 1SGT Insulation, Partitions HM4 Cherry Hill Armory 1st DET 1 HHB 3/112 1SGT Floor tile, 9" x 9", dk brown HM1 Cherry Hill Armory 1st DET 1 HHB 3/112 Insulation, Partitions HM4 Commander's Cherry Hill Armory 1st DET 1 HHB 3/112 Floor tile, 9" x 9", dk brown HM1 Commander's Cherry Hill Armory 1st DET 1 HHB 3/112 Ceiling tile, 2' x 2' HM5 Commander's Cherry Hill Armory 1st DET 1 HHB 3/112 Insulation, Pipe HM3 Commander's Cherry Hill Armory 1st DET 1 HHB 3/112 Insulation, Pipe HM3 Conference Cherry Hill Armory 1st DET 1 HHB 3/112 Floor tile, 12" x 12", lt. green speckled HM6 Conference Cherry Hill Armory 1st DET 1 HHB 3/112 Ceiling tile, 2' x 4' HM2 Conference Cherry Hill Armory 1st DET 1 HHB 3/112 Medic Floor tile, 9" x 9", dk brown HM1 Supply Cherry Hill Armory 1st DET 1 HHB 3/112 Medic Insulation, Pipe HM3 Supply Cherry Hill Armory 1st DET 1 HHB 3/112 Medic Ceiling tile, 2' x 2' HM5 Supply Cherry Hill Armory 1st Drill Floor Insulation, Pipe HM3 Cherry Hill Armory 1st Foyer Ceiling tile, 2' x 2' HM5 Cherry Hill Armory 1st FTSS Insulation, Partitions HM4 Cherry Hill Armory 1st FTSS Floor tile, 12" x 12", lt. green speckled HM6 Cherry Hill Armory 1st FTSS Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Hallway Pipe Fittings HM7 Monday, September 27, 2004 Page 12 of 53

Facility Facility Homogenious / Cherry Hill Armory 1st Hallway Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Hallway Floor tile, 12" x 12", lt. green speckled HM6 Cherry Hill Armory 1st Heritage Insulation, Pipe HM3 Cherry Hill Armory 1st Heritage Insulation, Partitions HM4 Cherry Hill Armory 1st Heritage Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Heritage Floor tile, 12" x 12", speckled lt. green HM6 Cherry Hill Armory 1st Heritage Insulation, Pipe HM3 Cherry Hill Armory 1st Heritage Ceiling tile, 2' x 2' HM5 Cherry Hill Armory 1st Heritage Ceiling tile, 2' x 2' HM5 Cherry Hill Armory 1st Heritage Floor tile, 12" x 12",white HM8 Cherry Hill Armory 1st Heritage Floor tile, 12" x 12", speckled lt. green HM6 Cherry Hill Armory 1st Kitchen Insulation, Pipe HM3 Cherry Hill Armory 1st Kitchen Wallboard, ceiling HM10 Cherry Hill Armory 1st Kitchen Floor tile, 12" x 12", lt. green speckled HM6 Cherry Hill Armory 1st Latrine Hallway Floor tile, 12" x 12", white HM8 Cherry Hill Armory 1st Latrine Hallway Insulation, Pipe HM3 Cherry Hill Armory 1st Latrine Hallway Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Mail Insulation, Partitions HM4 Cherry Hill Armory 1st Mail Floor tile, 12" x 12", lt. green speckled HM6 Cherry Hill Armory 1st Mail Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Maintenance NCO Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Maintenance NCO Floor tile, 12" x 12", lt. green speckled HM6 Cherry Hill Armory 1st Maintenance NCO Insulation, Partitions HM4 Cherry Hill Armory 1st Men's Latrine Wallboard, Ceiling HM10 Cherry Hill Armory 1st Men's Latrine Floor tile, 9" x 9", dk brown HM1 Cherry Hill Armory 1st Men's Latrine Plaster, Ceiling HM9 Cherry Hill Armory 1st Men's Latrine Insulation, Pipe HM3 Cherry Hill Armory 1st Men's Latrine Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Men's Latrine Insulation, Pipe HM3 Cherry Hill Armory 1st Men's Latrine Plaster, Ceiling HM9 Cherry Hill Armory 1st Men's Latrine Hallway Floor tile, 9" x 9", dk brown HM1 Cherry Hill Armory 1st Men's Latrine Hallway Insulation, Pipe HM3 Cherry Hill Armory 1st Men's Shower Insulation, Pipe HM3 Cherry Hill Armory 1st Men's Shower Plaster, Ceiling HM9 Cherry Hill Armory 1st Network Floor tile, 12" x 12", lt. green speckled HM6 Cherry Hill Armory 1st Network Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Network Insulation, Partitions HM4 Cherry Hill Armory 1st Ceiling tile, 2' x 2' HM5 Cherry Hill Armory 1st Floor tile, 9" x 9", dk brown HM1 Cherry Hill Armory 1st Ceiling tile, 2' x 2' HM5 Cherry Hill Armory 1st Insulation, Pipe HM3 Cherry Hill Armory 1st Floor tile, 9" x 9", dk brown HM1 Cherry Hill Armory 1st Floor tile, 9" x 9", dk brown HM1 Cherry Hill Armory 1st Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Insulation, Pipe HM3 Cherry Hill Armory 1st Insulation, Partitions HM4 Cherry Hill Armory 1st Insulation, Partitions HM4 Cherry Hill Armory 1st Range Insulation, Pipe HM3 Cherry Hill Armory 1st Readiness NCO Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Readiness NCO Floor tile, 12" x 12", lt. green speckled HM6 Cherry Hill Armory 1st Readiness NCO Insulation, Partitions HM4 Cherry Hill Armory 1st Recruiter's Floor tile, 9" x 9", dk brown HM1 Cherry Hill Armory 1st Recruiter's Insulation, Pipe HM3 Cherry Hill Armory 1st Recruiter's Insulation, Pipe HM3 Cherry Hill Armory 1st Recruiter's Insulation, Partitions HM4 Cherry Hill Armory 1st Recruiter's Ceiling tile, 2' x 4' HM2 Monday, September 27, 2004 Page 13 of 53

Facility Facility Homogenious / Cherry Hill Armory 1st Recruiter's Floor tile, 9" x 9", dk brown HM1 Cherry Hill Armory 1st Recruiter's Floor tile, 9" x 9", dk brown HM1 Cherry Hill Armory 1st Recruiter's Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Recruiter's Ceiling tile, 2' x 2' HM5 Cherry Hill Armory 1st Recruiter's Floor tile, 12" x 12", speckled lt. green HM6 Cherry Hill Armory 1st Recruiter's Ceiling tile, 2' x 2' HM5 Cherry Hill Armory 1st Recruiter's Insulation, Partitions HM4 Cherry Hill Armory 1st Recruiter's Insulation, Partitions HM4 Cherry Hill Armory 1st Recruiter's hallway Floor tile, 12" x 12", lt. green speckled HM6 Cherry Hill Armory 1st Recruiter's hallway Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Recruiter's hallway Pipe Fittings HM7 Cherry Hill Armory 1st Recruiter's Supply Insulation, Pipe HM3 Cherry Hill Armory 1st Recruiter's Supply Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Recruiter's Supply Floor tile, 9" x 9", dk brown HM1 Cherry Hill Armory 1st Retention Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Retention Floor tile, 12" x 12", lt. green speckled HM6 Cherry Hill Armory 1st Retention Insulation, Partitions HM4 Cherry Hill Armory 1st Retention Insulation, Partitions HM4 Cherry Hill Armory 1st Retention Floor tile, 12" x 12", lt. green speckled HM6 Cherry Hill Armory 1st Retention Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Retention Supply Insulation, Partitions HM4 Cherry Hill Armory 1st Retention Supply Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Retention Supply Floor tile, 12" x 12", lt. green speckled HM6 Cherry Hill Armory 1st Supply Insulation, Pipe HM3 Cherry Hill Armory 1st Supply Insulation, Pipe HM3 Cherry Hill Armory 1st Supply Insulation, Pipe HM3 Cherry Hill Armory 1st Supply Wallboard, ceiling HM10 Cherry Hill Armory 1st Supply Wallboard, ceiling HM10 Cherry Hill Armory 1st Supply Wallboard, ceiling HM10 Cherry Hill Armory 1st Telecom Equipment Floor tile, 9" x 9", dk brown HM1 Cherry Hill Armory 1st Training NCO Ceiling tile, 2' x 4' HM2 Cherry Hill Armory 1st Training NCO Floor tile, 12" x 12", lt. green speckled HM6 Cherry Hill Armory 1st Training NCO Insulation, Partitions HM4 Cherry Hill Armory 1st Vault Insulation, Fire Door Cherry Hill Armory 1st Women's Latrine Insulation, Pipe HM3 Cherry Hill Armory 1st Women's Latrine Floor tile, 12" x 12",white HM8 Cherry Hill Armory 1st Women's Latrine Plaster, Ceiling HM9 Cherry Hill Armory 1st XO's Insulation, Partitions HM4 Cherry Hill Armory 1st XO's Floor tile, 12" x 12", lt. green speckled HM6 Cherry Hill Armory 1st XO's Ceiling tile, 2' x 4' HM2 Cherry Hill Armory Throughout Caulking, window Addition Cherry Hill Armory Throughout Caulking, window Original Cherry Hill OMS 1st Boiler Pipe Fittings HM1 None Detected Cherry Hill OMS 1st Break Floor tile, 12" x 12", speckled lt green HM2 Cherry Hill OMS 1st Garage Pipe Fittings HM1 Cherry Hill OMS 1st Latrine Floor tile, 12" x 12", speckled lt green HM2 Cherry Hill OMS 1st Shop Foreman's Pipe Fittings HM1 Dover Armory 1st 1\117 Co A Supply Ceiling tile, 2' x 4' Monday, September 27, 2004 Page 14 of 53

Facility Facility Homogenious / Dover Armory 1st 1\117 Co A Supply Plaster, Ceiling HM1 Foyer Dover Armory 1st Armorer's Locked, no access Dover Armory 1st Armorer's Supply Locked, no access Dover Armory 1st Boiler Boiler Jacket, Breeching Dover Armory 1st Boiler Plaster, Ceiling HM1 Dover Armory 1st Boiler Hallway Plaster, Ceiling HM1 Dover Armory 1st Classroom 1 Ceiling tile, 1' x 1' HM4 ACBM Dover Armory 1st Classroom 1 Ceiling tile, 2' x 4' HM6 ACBM Dover Armory 1st Classroom 1 Insulation, Pipe HM2 ACBM Dover Armory 1st Classroom 1 Floor tile, 9" x 9", dk brown w/ white HM5 ACBM streak Dover Armory 1st Classroom 1 Chalk Board HM7 Dover Armory 1st Classroom 2 Chalk Board HM7 Dover Armory 1st Classroom 2 Ceiling tile, 1' x 1' HM4 ACBM Dover Armory 1st Classroom 2 Floor tile, 9" x 9", dk brown w/ white HM5 ACBM streak Dover Armory 1st Classroom 3 Floor tile, 9" x 9", dk brown w/ white HM5 ACBM streak Dover Armory 1st Classroom 3 Ceiling tile, 1' x 1' HM4 ACBM Dover Armory 1st Classroom 3 Chalk Board HM7 Dover Armory 1st Classroom Hallway Floor tile, 9" x 9", dk brown w/ white HM5 ACBM streak Dover Armory 1st Classroom Hallway Ceiling tile, 1' x 1' HM4 ACBM Dover Armory 1st Club Wallboard HM3 Dover Armory 1st Club Insulation, Pipe HM2 Dover Armory 1st Club Floor tile, 12" x 12", lt tan w\ white\brown Dover Armory 1st Club Dover Armory 1st Co B 50 th SBM Supply Ceiling tile, 2' x 4', 1' x 1' squares Locked, no access off drill floor Dover Armory 1st Drill Floor Insulation, Pipe HM2 Dover Armory 1st Foyer Ceiling tile, 1'x1.5' Dover Armory 1st Kitchen, Mess Hall Ceiling tile, 1' x 1' HM4 ACBM Dover Armory 1st Kitchen, Mess Hall Floor tile, 9" x 9", dk brown w/ white HM5 ACBM Dover Armory 1st Kitchen, Mess Hall Dover Armory 1st Men's Latrine and Shower Floor tile, 12" x 12", lt tan w/white Plaster, Ceiling HM1 Dover Armory 1st Mortar Plt Supply Insulation, Pipe HM2 Dover Armory 1st Rear Drill Floor Foyer Plaster, Ceiling HM1 Dover Armory 1st Recruiter's Floor tile, 9" x 9", dk brown w/ white HM5 ACBM Dover Armory 1st Recruiter's Dover Armory 1st Supply room off rear drill Ceiling tile, 1' x 1' Locked, no access HM4 ACBM floor foyer Dover Armory 1st Vault Dover Armory 1st VSO Floor tile, 9" x 9", dk brown w/ white HM5 ACBM Dover Armory 1st VSO Ceiling tile, 1' x 1' HM4 ACBM Dover Armory 1st Women's Latrine Plaster, Ceiling HM1 Dover Armory 2nd Admin. s Ceiling tile, 2' x 4' HM6 Dover Armory 2nd Admin. s Insulation, Partitions Dover Armory 2nd Admin. s Floor tile, 12" x 12", white w/black Dover Armory 2nd Admin. s Ceiling tile, 1' x 1' HM4 Dover Armory 2nd Admin. s Floor tile, 12" x 12", lt green w/white Monday, September 27, 2004 Page 15 of 53

Facility Facility Homogenious / Dover Armory Throughout Caulking Dover MVSB 1st Break Wallboard Dover MVSB 1st Break Floor tile, 12" x 12", lt tan w\ black specks Dover MVSB Throughout Caulking Dover OMS 1st Insulation, garage furnace chimneys, air cell Dover OMS 1st Battery Transite ceiling ACBM Dover OMS 1st Men's Latrine Transite urinal partition ACBM Dover OMS 1st Shop Foreman's Wallboard ACBM Dover OMS 1st Shop Foreman's Floor tile, 12" x 12", lt. tan w\ black ACBM specks Dover OMS Roof Roofing Shingles, OMS and MVSB Flemington Armory 1st 50 MSB Wallboard HM5 None Detected Flemington Armory 1st 50 MSB Floor tile,9" x 9", dk brown HM6 ACBM Flemington Armory 1st 50 MSB Supply Ceiling tile, 2' x 4' HM1 None Detected Flemington Armory 1st 50 MSB Supply Floor tile, 12" x 12", white Flemington Armory 1st 50 MSB Supply Wallboard None Detected Flemington Armory 1st 50 MSB Supply Insulation, Fire Door Flemington Armory 1st Admin. Ceiling tile, 2' x 4' HM1 None Detected Flemington Armory 1st Armorer's Closet Floor tile,9" x 9", dk brown HM6 ACBM Flemington Armory 1st Armorer's Floor tile,9" x 9", dk brown HM6 ACBM Flemington Armory 1st Armorer's Ceiling tile, 2' x 4' HM1 None Detected Flemington Armory 1st Armorer's Wallboard HM5 None Detected Flemington Armory 1st Boiler Breeching Flemington Armory 1st Boiler Boiler Jacket Flemington Armory 1st Break Ceiling tile, 2' x 4' None Detected Flemington Armory 1st Classroom Chalk Board Flemington Armory 1st Classroom Ceiling tile, 1' x 1' None Detected Flemington Armory 1st Commander's Wallboard HM5 None Detected Flemington Armory 1st Commander's Ceiling tile, 2' x 4' HM1 None Detected Flemington Armory 1st Commander's Floor tile, 9" x 9", dk brown HM6 ACBM Flemington Armory 1st Drill Floor Foyer Floor tile, 12" x 12", white HM2 Flemington Armory 1st Drill Floor Foyer Ceiling tile, 2' x 2' None Detected Flemington Armory 1st Kitchen Dish Washing Ceiling tile, 2' x 4', solid wallboard HM3 None Detected Flemington Armory 1st Kitchen Foyer Floor tile, 12" x 12", white HM2 Flemington Armory 1st Kitchen Foyer Ceiling tile, 2' x 2' HM4 None Detected Flemington Armory 1st Kitchen Freezer Ceiling tile, 2' x 4', solid wallboard HM3 None Detected Flemington Armory 1st Kitchen Stove/Serving Ceiling tile, 2' x 4', solid wallboard HM3 None Detected Flemington Armory 1st Latrine Wallboard on ceiling Flemington Armory 1st Latrine Suspected pipe insulation behind HM5 None Detected wallboard Flemington Armory 1st Main Foyer Floor tile, 12" x 12", white HM2 Flemington Armory 1st Main Foyer Ceiling tile, 2' x 4' HM1 None Detected Flemington Armory 1st Main Hallway Ceiling tile, 2' x 4' HM1 None Detected Flemington Armory 1st Main Hallway Wallboard HM5 None Detected Flemington Armory 1st Men's Latrine Wallboard on ceiling HM5 None Detected Flemington Armory 1st Range Sound proofing Flemington Armory 1st Recruiter's Ceiling tile, 2' x 4' HM1 None Detected Monday, September 27, 2004 Page 16 of 53

Facility Facility Homogenious / Flemington Armory 1st Recruiter's Floor tile, 12" x 12", white HM2 Flemington Armory 1st Shower Wallboard on ceiling HM5 None Detected Flemington Armory 1st Shower Suspected pipe insulation behind wallboard Flemington Armory 1st Women's Latrine, Shower Wallboard on ceiling HM5 None Detected Flemington MVSB 1st Shop Foreman's Ceiling tile, 2' x 4' Flemington MVSB 1st Shop Foreman's Wallboard Flemington MVSB 1st Shop Foreman's Floor tile, 12" x 12", taupe Flemington MVSB Roof Roof Roofing Shingles Flemington MVSB Throughout Caulking Franklin Armory 1st Armorer's Closet Plaster, Ceiling HM1 Franklin Armory 1st Boiler Plaster, Ceiling HM1 Franklin Armory 1st Boiler Breeching Franklin Armory 1st Classroom A Wallboard, ceiling/wall HM4 Franklin Armory 1st Classroom A Floor tile, 12" x 12", lt green w/ white HM3 Franklin Armory 1st Classroom B Floor tile, 12" x 12", lt green w/ white HM3 Franklin Armory 1st Classroom B Wallboard, ceiling/wall Franklin Armory 1st Classroom C Floor tile, 9" x 9", lt green w/ white HM4 HM5 Franklin Armory 1st Classroom C Wallboard HM4 Franklin Armory 1st Classroom C Ceiling tile,1' x 1' HM6 Franklin Armory 1st Classroom D Floor tile, 9" x 9", lt green w/ white HM5 Franklin Armory 1st Classroom D Wallboard HM4 Franklin Armory 1st Classroom D Ceiling tile,1' x 1' HM6 Franklin Armory 1st Classroom E Ceiling tile, 2' x 4' Franklin Armory 1st Classroom E Floor tile, 12" x 12", lt green w/ white HM3 Franklin Armory 1st Community Center Wallboard Franklin Armory 1st Community Center Floor tile, 12" x 12", lt green w/ white HM4 HM3 Franklin Armory 1st Community Center Ceiling tile, 2' x 4' Franklin Armory 1st Community Center Supply Floor tile, 12" x 12", lt green w/ white HM3 Franklin Armory 1st DOL s Ceiling tile, 1' x 1' HM6 Franklin Armory 1st DOL s Wallboard HM4 Franklin Armory 1st DOL s Insulation, Partitions Franklin Armory 1st Drill Floor Plaster, Ceiling HM1 Franklin Armory 1st Drill Floor Insulation, Pipe HM2 Franklin Armory 1st Kitchen Floor tile, 9" x 9", lt green w/ white HM5 Franklin Armory 1st Kitchen Plaster, Ceiling HM1 Franklin Armory 1st Main Foyer Plaster, Ceiling HM1 Franklin Armory 1st Main Foyer Ceiling tile, 2' x 1' Franklin Armory 1st Men's Latrine, Shower Plaster, Ceiling HM1 Franklin Armory 1st Rear Foyer Insulation, Pipe HM2 Franklin Armory 1st Rear Foyer Plaster, Ceiling HM1 Franklin Armory 1st Women's Latrine Plaster, Ceiling HM1 Franklin Armory Throughout Caulking Franklin MVSB Roof Roofing Shingles Monday, September 27, 2004 Page 17 of 53

Facility Facility Homogenious / Franklin MVSB Throughout Caulking Freehold Armory 1st Armorer's Closet Floor tile, 12" x 12", lt green/tan HM3 w/yellow and brown Freehold Armory 1st Armorer's Floor tile, 9" x 9", dk brown w/white HM1 Freehold Freehold Armory Armory 1st 1st Armorer's Armorer's Ceiling tile, 2' x 4' Insulation, pipe fittings, woven covering HM2 HM8 over fiberglass Freehold Armory 1st Armorer's Workshop Insulation, Block, Pipe HM7 Freehold Armory 1st Armorer's Workshop Insulation, woven covering over HM8 Freehold Armory 1st Armore's Shed Caulking Freehold Armory 1st Armore's Shed Transite Wall Shingles Freehold Armory 1st Boiler Pipe Fittings HM7 Freehold Armory 1st Boiler Insulation, block, pipe HM7 Freehold Armory 1st Boiler Insulation, Pipe, air cell Freehold Armory 1st Boiler Insulation woven covering over HM7 Freehold Armory 1st Boiler Boiler Jacket, Breeching Freehold Armory 1st Boiler Hallway Insulation, block, pipe HM7 Freehold Armory 1st Boiler Hallway Insulation woven covering over HM7 Freehold Armory 1st CAP Floor tile, 12" x 12", lt green/tan HM3 w/yellow and brown Freehold Freehold Armory Armory 1st 1st CAP CAP Ceiling tile, 2' x 4' Insulation, pipe fittings, woven covering HM2 HM8 over fiberglass Freehold Armory 1st Classroom 1 Ceiling tile, 2' x 4', hard board HM10 Freehold Armory 1st Classroom 1 Chalk Board HM5 Freehold Armory 1st Classroom 1 Floor tile, 12" x 12", white w/lt green HM9 Freehold Armory 1st Classroom 2 Insulation, Fire Door Freehold Armory 1st Classroom 2 Floor tile, 12" x 12", white w/lt green HM6 HM9 Freehold Armory 1st Classroom 2 Chalk Board HM5 Freehold Armory 1st Classroom 2 Ceiling tile, 2' x 4', hard board HM10 Freehold Armory 1st Classroom 3 Ceiling tile, 2' x 4' HM2 Freehold Armory 1st Classroom 3 Insulation, pipe fittings, woven covering HM8 over fiberglass Freehold Armory 1st Classroom 3 Chalk Board Freehold Armory 1st Classroom 3 Floor tile, 12" x 12", lt green/tan HM5 HM3 w/yellow and brown Freehold Armory 1st Classroom 4 Floor tile, 12" x 12", lt green/tan HM3 w/yellow and brown Freehold Freehold Armory Armory 1st 1st Classroom 4 Classroom 4 Ceiling tile, 2' x 4' Insulation, pipe fittings, woven covering HM2 HM8 over fiberglass Freehold Armory 1st Classroom 4 Chalk Board HM5 Freehold Armory 1st Classroom 5 Ceiling tile, 2' x 4' HM2 Freehold Armory 1st Classroom 5 Floor tile, 12" x 12", lt green/tan HM3 w/yellow and brown Freehold Armory 1st Classroom 5 Insulation, pipe fittings, woven covering HM8 over fiberglass Freehold Armory 1st Classroom 6 Chalk Board HM5 Freehold Armory 1st Classroom 6 Wallboard HM4 Freehold Armory 1st Classroom 6 Floor tile, 12" x 12", white w/lt green HM9 Freehold Armory 1st Classroom 6 Ceiling tile, 2' x 4', hard board HM10 Freehold Armory 1st Classroom 6 Insulation, woven covering over HM8 Freehold Armory 1st Company B Admin. s Wallboard HM4 Monday, September 27, 2004 Page 18 of 53

Facility Facility Homogenious / Freehold Armory 1st Company B Admin. s Floor tile, 12" x 12", white w/lt green HM9 streak Freehold Armory 1st Company B Admin. s Freehold Armory 1st Company B Maintenance Ceiling tile, 2' x 4', hard board Wallboard, Ceiling HM10 HM4 Supply Freehold Armory 1st Company B NBC Supply Wallboard, Ceiling HM4 Freehold Armory 1st Company B Supply Wallboard, Ceiling HM4 Freehold Armory 1st Company B Supply Floor tile, 12" x 12", lt green/tan HM3 w/yellow and brown Freehold Armory 1st Company D Admin. s Insulation woven covering over HM8 Freehold Armory 1st Company D Admin. s Floor tile, 12" x 12", white w/lt green HM9 streak Freehold Armory 1st Company D Admin. s Pipe Fittings HM8 Freehold Armory 1st Company D Admin. s Wallboard HM4 Freehold Armory 1st Company D Admin. s Insulation, woven covering over HM8 Freehold Armory 1st Company D Admin. s Ceiling tile, 2' x 4', hard board HM10 Freehold Armory 1st Company D Maintenance Wallboard, Ceiling HM4 Freehold Armory 1st Company D Maintenance Insulation, Pipe HM8 Freehold Armory 1st Company D Mess Wallboard, Ceiling HM4 Freehold Armory 1st Company D Mess Insulation, Pipe HM8 Freehold Armory 1st Company D Supply Floor tile, 12" x 12", white, countertop Freehold Armory 1st Company D Supply Insulation, Fire Door HM6 Freehold Armory 1st Company D Supply Chalk Board HM5 Freehold Armory 1st Company D Supply Chalk Board HM5 Freehold Armory 1st Company D Supply Wallboard, Ceiling HM4 Freehold Armory 1st Company D Supply Floor tile, 12" x 12", lt green/tan HM3 w/yellow and brown Freehold Armory 1st Drill Floor Pipe Fittings HM8 Freehold Armory 1st Drill Floor Insulation woven covering over HM8 Freehold Armory 1st Drill Floor Lobby Ceiling tile, 2' x 2', hard Freehold Armory 1st Drill Floor Men's Latrine Plaster, Ceiling Shower Freehold Armory 1st Drill Floor Men's Latrine Insulation, pipe fittings, woven covering HM8 Shower over fiberglass Freehold Armory 1st FTSS Floor tile, 9" x 9", dk brown w/white Freehold Armory 1st FTSS Ceiling tile, 2' x 4', hard board Freehold Armory 1st Hallway Insulation, woven covering over HM10 HM8 fiberglass, Freehold Armory 1st Hallway Floor tile, 12" x 12", lt green/tan HM3 w/yellow and brown Freehold Armory 1st Hallway Insulation, Block, Pipe HM7 Freehold Armory 1st Hallway Ceiling tile, 2' x 2' Freehold Armory 1st Kitchen Plaster, Ceiling Freehold Armory 1st Kitchen Floor tile, 12" x 12", lt green/tan HM3 w/yellow and brown Freehold Armory 1st Kitchen Supply Ceiling tile, 2' x 2' Freehold Armory 1st Kitchen Supply Pipe Fittings HM8 Freehold Armory 1st Kitchen Supply Insulation, woven covering over HM8 Freehold Armory 1st Kitchen Supply Floor tile, 12" x 12", lt green/tan HM3 w/yellow and brown Freehold Armory 1st Lobby Floor tile, 12" x 12", blue w/white Monday, September 27, 2004 Page 19 of 53

Facility Facility Homogenious / Freehold Armory 1st Men's Latrine, Shower Ceiling tile, 2' x 4', hard board HM10 Freehold Armory 1st Recruiter's s Wallboard, wall HM4 Freehold Armory 1st Recruiter's s Ceiling tile, 2' x 4' HM2 Freehold Armory 1st Recruiter's s Insulation, Partitions Freehold Armory 1st Recruiter's s Floor tile, 12" x 12", lt green/tan HM3 w/yellow and brown Freehold Armory 1st Recruiter's Supply Floor tile, 12" x 12", white w/lt green HM9 Freehold Armory 1st Recruiter's Supply Insulation, Pipe, Pipe Fittings HM8 Freehold Armory 1st Recruiter's Supply Ceiling tile, 2' x 4', hard board HM10 Freehold Armory 1st Slop Sink Floor tile, 12" x 12", lt green/tan HM3 w/yellow and brown Freehold Armory 1st Storage area above supply Pipe Fittings HM8 rooms Freehold Armory 1st Storage area above supply Insulation, Block, Pipe HM7 rooms Freehold Armory 1st Women's Latrine Ceiling tile, 2' x 4', hard board HM10 Freehold Armory Roof Roofing Shingles Freehold Armory Roof Freehold Armory Roof Roofing Paper Ft. Dix OMS Ft. Dix UTES 1st Admin. Ceiling tile, 2' x 4' HM3 Ft. Dix UTES 1st Admin. Floor tile, 12" x 12", lt. grey HM4 Ft. Dix UTES 1st Boiler Breeching Ft. Dix UTES 1st Boiler Hallway Ceiling tile, 2' x 2' HM2 Ft. Dix UTES 1st Break Floor tile, 9" x 9", under 12" x 12" tile Ft. Dix UTES 1st Break Floor tile, 12" x 12", lt. grey HM4 Ft. Dix UTES 1st Break Ceiling tile, 2' x 2' HM2 Ft. Dix UTES 1st Break Textured paint on north wall Ft. Dix UTES 1st Commander's Ceiling tile, 2' x 4' HM3 Ft. Dix UTES 1st Commander's Floor tile, 12" x 12", lt. grey HM4 Ft. Dix UTES 1st Commander's Floor tile, 12" x 12", lt. grey HM4 Hallway Ft. Dix UTES 1st Commander's Ceiling tile, 2' x 2' HM2 Hallway Ft. Dix UTES 1st Conference Ceiling tile, 2' x 4' HM3 Ft. Dix UTES 1st Conference Wallboard HM5 Ft. Dix UTES 1st Conference Chalk Board Ft. Dix UTES 1st Men's Latrine Wallboard on ceiling HM5 Ft. Dix UTES 1st Shop Foreman's Ceiling tile, 2' x 4' HM3 Ft. Dix UTES 1st Shop Foreman's Ceiling tile, 2' x 4' HM3 Hallway Ft. Dix UTES 1st Shop Foreman's Wallboard HM5 Hallway Ft. Dix UTES 1st Vault Insulation, Fire Door Ft. Dix UTES 1st Wage Leaders Ceiling tile, 2' x 2' HM2 Ft. Dix UTES 1st Wage Leaders Floor tile, 9" x 9", dk brown cover with HM1 grey paint Ft. Dix UTES 1st Wage Leaders Foyer Floor tile, 9" x 9", dk brown cover with HM1 grey paint Ft. Dix UTES 1st Wage Leaders Foyer Ceiling tile, 2' x 2' HM2 Ft. Dix UTES 1st Women's Latrine Wallboard on ceiling HM5 Ft. Dix UTES Armory 1st Foyer Floor tile, 9" x 9", dk brown painted gray HA1 Ft. Dix UTES Armory 1st Foyer Ceiling tile, 2' x 4' HA2 Ft. Dix UTES Armory 1st Ceiling tile, 2' x 4' HA2 Ft. Dix UTES Armory 1st Floor tile, 9" x 9", dk brown painted gray HA1 Ft. Dix UTES Armory 1st Weight Ceiling tile, 2' x 4' HA2 Monday, September 27, 2004 Page 20 of 53

Facility Facility Homogenious / Ft. Dix UTES Armory 1st Weight Floor tile, 9" x 9", dk brown painted gray Hackettstown Armory 1st Armorer's Closet Floor tile, 9" x 9", dk brown w/white HA1 HM2 Hackettstown Armory 1st Armorer's Closet Wallboard HM3 Hackettstown Armory 1st Armorer's Closet Ceiling tile, 2' x 4' HM1 Hackettstown Armory 1st Armorer's Floor tile, 9" x 9", dk brown w/white HM2 Hackettstown Armory 1st Armorer's Ceiling tile, 2' x 4' HM1 Hackettstown Armory 1st Armorer's Wallboard HM3 Hackettstown Armory 1st Boiler Plaster, Ceiling HM1 Hackettstown Armory 1st Boiler Boiler Jacket, Breeching Insulation Hackettstown Armory 1st Breezeway between armory Plaster, Ceiling HM5 and MVSB Hackettstown Armory 1st Classrooms 1, 2, and 3 Ceiling tile, 2' x 4' Hackettstown Armory 1st Classrooms 1, 2, and 3 Floor tile, 9" x 9", dk brown w/white HM1 HM2 Hackettstown Armory 1st Classrooms 1, 2, and 3 Chalk Board Hackettstown Armory 1st Foyer, Hallway Floor tile, 12" x 12", white HM4 Hackettstown Armory 1st Foyer, Hallway Ceiling tile, 2' x 4' HM1 Hackettstown Armory 1st Gym Floor tile, 9" x 9", dk brown w/white HM2 Hackettstown Armory 1st Gym Wallboard HM3 Hackettstown Armory 1st Gym Latrine Plaster, Ceiling HM5 Hackettstown Armory 1st Gym Shower Plaster, Ceiling HM5 Hackettstown Armory 1st Gym Shower Wallboard HM3 Hackettstown Armory 1st Hallway Wallboard HM3 Hackettstown Armory 1st Kitchen Ceiling tile, 2' x 4', hardboard Hackettstown Armory 1st Men's Latrine Plaster, Ceiling HM5 Hackettstown Armory 1st Men's Latrine Wallboard HM3 Hackettstown Armory 1st Orderly Wallboard HM3 Hackettstown Armory 1st Orderly Floor tile, 9" x 9", dk brown w/white HM2 Hackettstown Armory 1st Orderly Ceiling tile, 2' x 4' HM1 Hackettstown Armory 1st Range Acoustic panels Hackettstown Armory 1st Recruiter's Floor tile, 9" x 9", dk brown w/white HM2 Hackettstown Armory 1st Recruiter's Ceiling tile, 2' x 4' HM1 Hackettstown Armory 1st Recruiter's Wallboard HM3 Hackettstown Armory 1st Supply Chalk Board Hackettstown Armory 1st Supply Floor tile, 9" x 9", dk brown w/white HM2 Hackettstown Armory 1st Supply Ceiling tile, 2' x 4' HM1 Hackettstown Armory 1st Supply Wallboard HM3 Hackettstown Armory 1st Training NCO Ceiling tile, 2' x 4' HM1 Hackettstown Armory 1st Training NCO Chalk Board Hackettstown Armory 1st Training NCO Wallboard HM3 Hackettstown Armory 1st Training NCO Floor tile, 9" x 9", dk brown w/white HM2 Hackettstown Armory 1st Vault Hackettstown Armory 1st Women's Latrine/Shower Insulation, Fire Door Wallboard HM3 Hackettstown Armory 1st Women's Latrine/Shower Plaster, Ceiling HM5 Hackettstown MVSB 1st Garage Wallboard Hackettstown MVSB 1st Latrine Ceiling tile, 2' x 2' Hackettstown MVSB Roof Roof Roofing Shingles Monday, September 27, 2004 Page 21 of 53

Facility Facility Homogenious / Hackettstown MVSB Throughout Caulking Hammonton Armory 1st 1SGT Insulation, Partitions HA5 Hammonton Armory 1st 1SGT Ceiling tile, 2' x 2' HA1 Hammonton Armory 1st 1SGT Floor tile, 9" x 9", black HA3 Hammonton Armory 1st Admin. Insulation, Partitions HA5 Hammonton Armory 1st Admin. Floor tile, 9" x 9", black HA3 Hammonton Armory 1st Admin. Ceiling tile, 2' x 2' HA1 Hammonton Armory 1st Armorer's Floor tile, 12" x 12", black HA2 None Detected Hammonton Armory 1st Armorer's Ceiling tile, 2' x 4' HA4 Hammonton Armory 1st Boiler Boiler Jacket, Breeching Hammonton Armory 1st Classroom 1 Floor tile, 9" x 9", black HA3 Hammonton Armory 1st Classroom 1 Chalk Board HA6 Hammonton Armory 1st Classroom 1 Ceiling tile, 2' x 4' HA4 Hammonton Armory 1st Classroom 2 Chalk Board HA6 Hammonton Armory 1st Classroom 2 Floor tile, 9" x 9", black HA3 Hammonton Armory 1st Classroom 2 Ceiling tile, 2' x 4' HA4 Hammonton Armory 1st Classroom 3 Floor tile, 9" x 9", black HA3 Hammonton Armory 1st Classroom 3 Ceiling tile, 2' x 4' HA4 Hammonton Armory 1st Classroom 3 Chalk Board HA6 Hammonton Armory 1st Commander's Insulation, Partitions HA5 Hammonton Armory 1st Commander's Ceiling tile, 2' x 2' HA1 Hammonton Armory 1st Commander's Floor tile, 9" x 9", black HA3 Hammonton Armory 1st Foyer Floor tile, 9" x 9", black and grey Hammonton Armory 1st Foyer Ceiling tile, 2' x 4' HA4 Hammonton Armory 1st Hallway Ceiling tile, 2' x 4' HA5 Hammonton Armory 1st Hallway Floor tile, 9" x 9", black HA3 Hammonton Armory 1st Hallway Floor tile, 9" x 9", brown Hammonton Armory 1st Kitchen Ceiling tile, 2' x 4' HA4 Hammonton Armory 1st Kitchen Floor tile, 9" x 9", green Hammonton Armory 1st Men's Latrine, Shower Plaster, Ceiling HA7 Hammonton Armory 1st Men's Latrine, Shower Ceiling tile, 2' x 4' HA4 Hammonton Armory 1st Orderly Ceiling tile, 2' x 2' HA1 Hammonton Armory 1st Orderly Floor tile, 9" x 9", black HA3 Hammonton Armory 1st Rear s Floor tile, 12" x 12", black HA2 None Detected Hammonton Armory 1st Vault Insulation, Fire Door Hammonton Armory 1st Women's Latrine Ceiling tile, 2' x 4' HA4 Hammonton Armory Throughout Caulking ACBM Hammonton MVSB 1st Latrine Ceiling tile, 2' x 4' HA1 Hammonton MVSB 1st Shop Foreman's Ceiling tile, 2' x 4' HA1 Hammonton MVSB Throughout Caulking Lawrenceville NJDMAVA-HQ 1st Hallway Sprayed on Ceiling ACBM Lawrenceville NJDMAVA-HQ 1st Lobby Sprayed on Ceiling ACBM Lawrenceville NJDMAVA-HQ 1st Men's Latrine Plaster Ceiling Lawrenceville NJDMAVA-HQ 1st Telecom Equipment Plaster Ceiling Lawrenceville NJDMAVA-HQ 1st Women's Latrine Plaster Ceiling Lawrenceville NJDMAVA-HQ 2nd Hallway Sprayed on Ceiling ACBM Lawrenceville NJDMAVA-HQ 2nd HVAC Control Sprayed on Ceiling ACBM Lawrenceville NJDMAVA-HQ 2nd Men's Latrine Plaster Ceiling Lawrenceville NJDMAVA-HQ 2nd Stairwell near men's room Plaster Ceiling Monday, September 27, 2004 Page 22 of 53

Facility Facility Homogenious / Lawrenceville NJDMAVA-HQ 2nd Stairwell near women's Plaster Ceiling Lawrenceville NJDMAVA-HQ 2nd TAG Stairwell Sprayed on Ceiling ACBM Lawrenceville NJDMAVA-HQ 2nd Telecom Equipment Plaster Ceiling Lawrenceville NJDMAVA-HQ 2nd Women's Latrine Plaster Ceiling Lawrenceville NJDMAVA-HQBasement Armorer's near Ceiling Tile HM1 cafeteria Lawrenceville NJDMAVA-HQBasement Armorer's near Brown Floor Tile cafeteria Lawrenceville NJDMAVA-HQBasement Armorer's near Brown Floor Tile loading dock Lawrenceville NJDMAVA-HQBasement Armorer's near Ceiling Tile loading dock Lawrenceville NJDMAVA-HQBasement Armorer's Shop Wallboard Lawrenceville NJDMAVA-HQBasement Armorer's Shop Hallway Plaster, Ceiling Lawrenceville NJDMAVA-HQBasement Armorer's Supply Ceiling tile, 2' x 4' HM1 Lawrenceville NJDMAVA-HQBasement Conference D Wallboard Lawrenceville NJDMAVA-HQBasement Conference D Ceiling tile, 1' x 1' Lawrenceville NJDMAVA-HQBasement DOIM Wallboard Lawrenceville NJDMAVA-HQBasement DOIM Ceiling Tile HM1 Lawrenceville NJDMAVA-HQBasement Loading Dock Plaster Ceiling Lawrenceville NJDMAVA-HQBasement Loading Dock Plaster Wall Lawrenceville NJDMAVA-HQBasement Mess Hall Floor tile, 12" x 12", red brown\white Lawrenceville NJDMAVA-HQBasement Mess Hall Ceiling tile, 2' x 2' Lawrenceville NJDMAVA-HQBasement Network Lt. Green Floor Tile Lawrenceville NJDMAVA-HQBasement Print Shop Ceiling Tile Lawrenceville NJDMAVA-HQBasement Publications Floor tile, 12" x 12", lt brown tan Lawrenceville NJDMAVA-HQBasement Publications Wallboard Lawrenceville NJDMAVA-HQBasement Publications Ceiling tile, 2' x 4' HM1 Lawrenceville OMS 2 1st Break Ceiling tile, 2' x 4' HM1 Lawrenceville OMS 2 1st Break Floor tile, 12" x 12", lt green Lawrenceville OMS 2 1st Latrine Ceiling tile, 2' x 4' HM1 Lawrenceville OMS 2 1st Old Boiler Plaster, Ceiling Lawrenceville OMS 2 1st Shop Foreman's Floor tile, 12" x 12", white Lawrenceville OMS 2 Roof Roofing Paper Lawrenceville OMS 2Throughout Caulking, window\door Lawrenceville OMS 3Throughout Caulking, window/door Lawrenceville OMS 3Throughout Roofing Paper Lawrenceville OMS Concrete Roof Roofing Shingles, Transite Block Haz Mat Shed Lawrenceville State Garage 1st Break Transite on ceiling Lawrenceville State Garage 1st Latrine Ceiling tile, 2' x 2' HM2 Lawrenceville State Garage 1st Latrine Floor tile, 9" x 9", dk brown HM1 Lawrenceville State Garage 1st Latrine Hallway Ceiling tile, 2' x 4' Lawrenceville State Garage 1st Latrine Hallway Floor tile, 9' x 9', dk. brown HM1

Lawrenceville State Garage 1st Parts Supply Wallboard on ceiling\walls Lawrenceville State Garage 1st Shop Foreman's Ceiling tile, 2' x 2' HM1 Lawrenceville State Garage 1st Shop Foreman's Floor tile, 9" x 9", dk brown HM1 Lawrenceville State Supply & 1st Break Wallboard HM3 Maintenance Lawrenceville State Supply & 1st Break Ceiling tile, 2' x 2' HM2 Maintenance Monday, September 27, 2004 Page 23 of 53

Facility Facility Homogenious / Lawrenceville State Supply & 1st Cold Storage Supply Ceiling tile, 2' x 4' HM1 Maintenance Lawrenceville State Supply & 1st Men's Latrine Ceiling tile, 2' x 2' HM2 Maintenance Lawrenceville State Supply & 1st Men's Latrine Floor tile, 9" x 9", dk brown Maintenance Lawrenceville State Supply & 1st Men's Latrine Hallway Ceiling tile, 2' x 2' HM2 Maintenance Lawrenceville State Supply & 1st Men's Latrine Hallway Wallboard HM3 Maintenance Lawrenceville State Supply & 1st Shop Foreman's Floor tile, 12" x 12", dk brown Maintenance Lawrenceville State Supply & 1st Tool Supply Ceiling tile, 2' x 2' Maintenance Lawrenceville State Supply & 1st Tool Supply Floor tile, 12" x 12", lt green white Maintenance Lawrenceville State Supply & 1st Warehouse Manager's Ceiling tile, 2' x 2' HM2 Maintenance Lawrenceville State Supply & 1st Warehouse Manager's Wallboard HM3 Maintenance Lawrenceville State Supply & 1st Wood Storage Wallboard, ceiling HM3 Maintenance Lawrenceville State Supply & 1st Woodshop Wallboard, ceiling HM3 Maintenance Lawrenceville State Supply & Roof Roof Roofing Paper, Roofing Shingles Maintenance Lawrenceville State Supply & Throughout Maintenance Caulking Lodi Armory 1st Armorer's Closet Insulation, Pipe HM1 Lodi Armory 1st Boiler Boiler Jacket, Breeching Lodi Armory 1st Boiler Insulation, Pipe HM1 Lodi Armory 1st Boiler Plaster, Ceiling HM2 Lodi Armory 1st Break Insulation, Pipe HM1 Lodi Armory 1st Break Ceiling tile, 2' x 4', hard HM7 Lodi Armory 1st Classroom Ceiling tile, 2' x 4' HM4 Lodi Armory 1st Classroom Insulation, Pipe HM1 Lodi Armory 1st Classroom Ceiling tile, 1' x 1' HM3 Lodi Armory 1st Club Ceiling tile, 2' x 2' HM5 Lodi Armory 1st Club Floor tile, 9" x 9", black Lodi Armory 1st Club Ceiling tile, 1' x 1' HM3 Lodi Armory 1st Commander's Ceiling tile, 2' x 4', hard HM7 Lodi Armory 1st Commander's Wallboard HM6 Lodi Armory 1st Conference Ceiling tile, 2' x 4', hard HM7 Lodi Armory 1st Conference Insulation, Pipe HM1 Lodi Armory 1st Counter Drug Task Force Insulation, Partitions s Lodi Armory 1st Counter Drug Task Force Ceiling tile, 2' x 4' HM4 s Lodi Armory 1st Counter Drug Task Force Ceiling tile, 2' x 2' HM5 s Lodi Armory 1st Counter Drug Task Force Wallboard HM6 s Lodi Armory 1st Criminal Investigation Wallboard HM6 Lodi Armory 1st Criminal Investigation Ceiling tile, 2' x 4', hard HM7 Lodi Armory 1st Criminal Investigation Plaster, Ceiling HM2 Lodi Armory 1st DA Ammo Locker Ceiling tile, 2' x 4' HM4 Lodi Armory 1st DA Ammo Locker Wallboard HM6 Lodi Armory 1st DA Foyer Wallboard, ceiling HM6 Monday, September 27, 2004 Page 24 of 53

Facility Facility Homogenious / Lodi Armory 1st DA Foyer Ceiling tile, hard, 2' x 4' HM7 Lodi Armory 1st DA Intel Acoustical panels HM8 Lodi Armory 1st DA Intel Ceiling tile, 1' x 1' HM3 Lodi Armory 1st DA Intel Ceiling tile, hard, 2' x 4' HM7 Lodi Armory 1st DA s Wallboard HM6 Lodi Armory 1st Detectives' Wallboard HM6 Lodi Armory 1st Detectives' Ceiling tile, 2' x 4', hard HM7 Lodi Armory 1st Drill Floor Insulation, Pipe HM1 Lodi Armory 1st Drill Floor Foyer Plaster, Ceiling HM2 Lodi Armory 1st Drill Floor Foyer Ceiling tile, 2' x 4' HM4 Lodi Armory 1st Foyer Locker Ceiling tile, hard 2' x 4' HM7 Lodi Armory 1st Foyer Locker Plaster, Ceiling HM2 Lodi Armory 1st HVAC Control Floor tile, 12" x 12", white Lodi Armory 1st HVAC Control Plaster, Ceiling HM2 Lodi Armory 1st HVAC Control Wallboard HM6 Lodi Armory 1st Kitchen Wallboard HM6 Lodi Armory 1st Kitchen Ceiling tile, 2' x 4', hard HM7 Lodi Armory 1st Kitchen Floor tile, 12" x 12", lt blue Lodi Armory 1st Locker Ceiling tile, 1' x 1' HM3 Lodi Armory 1st Locker Ceiling tile, 2' x 4', hard HM7 Lodi Armory 1st Locker Acoustical panels HM8 Lodi Armory 1st Locker Ceiling tile, 2' x 4' HM4 Lodi Armory 1st Main Hallway\Foyer Ceiling tile, 2' x 4' HM4 Lodi Armory 1st Main Hallway\Foyer Ceiling tile, 2' x 4' HM1 Lodi Armory 1st MARS Ceiling tile, 2' x 4', hard HM7 Lodi Armory 1st MARS Insulation, Pipe HM1 Lodi Armory 1st Men's Latrine, Shower Plaster, Ceiling HM2 Lodi Armory 1st Men's Latrine, Shower Insulation, Pipe HM1 Lodi Armory 1st Wallboard HM6 Lodi Armory 1st Ceiling tile, 2' x 4', hard HM7 Lodi Armory 1st Ceiling tile, 2' x 4', hard HM7 Lodi Armory 1st Wallboard HM6 Lodi Armory 1st Prosecutor's Wallboard HM6 Lodi Armory 1st Prosecutor's Ceiling tile, 2' x 4', hard HM7 Lodi Armory 1st Prosecutor's Admin Ceiling tile, 2' x 4', hard HM7 Section Lodi Armory 1st Prosecutor's Admin Wallboard HM6 Section Lodi Armory 1st Pump Wallboard HM6 Lodi Armory 1st Pump Floor tile, 9" x 9", brown HM6 Lodi Armory 1st Rear Foyer, Counter Drug Plaster, Ceiling HM2 Hallway Lodi Armory 1st Rear Foyer, Counter Drug Ceiling tile, 2' x 4' HM4 Hallway Lodi Armory 1st Staff Ceiling tile, 2' x 4', hard HM7 Lodi Armory 1st Staff Wallboard HM6 Lodi Armory 1st Translation 1 Ceiling tile, 2' x 4' HM4 Lodi Armory 1st Translation 2 Ceiling tile, 2' x 4' HM4 Lodi Armory 1st Vault Insulation, Fire Door Lodi Armory 1st Weight Ceiling tile, 2' x 4' HM4 Lodi Armory 1st Weight Floor tile, 9" x 9", brown Lodi Armory 1st Women's Latrine Insulation, Pipe HM1 Lodi Armory 1st Women's Latrine Plaster, Ceiling HM2 Lodi MVSB 1 1st Battery Transite Lodi MVSB 1 1st Break Floor tile, 12" x 12", lt green Monday, September 27, 2004 Page 25 of 53

Facility Facility Homogenious / Lodi MVSB 1 1st Break Wallboard HM1 Lodi MVSB 1 1st Garage Insulation, Pipe Lodi MVSB 1 1st Medical Records Storage Wallboard HM1 Lodi MVSB 1 1st Parts Wallboard HM1 Lodi MVSB 1 1st Shop Foreman's Floor tile, 12" x 12", white Lodi MVSB 1 1st Shop Foreman's Wallboard HM1 Lodi MVSB 1 Roof Roofing Shingles Lodi MVSB 1 Throughout Caulking Lodi MVSB 2 1st Garage Lodi MVSB 2 Throughout Wallboard Caulking Mount Holly Armory 1st 1SGT Chalk Board Mount Holly Armory 1st 1SGT 12" x 12" lt blue floor tile HM5 None Detected Mount Holly Armory 1st 1SGT 2' x 4' ceiling tiles HM4 None Detected Mount Holly Armory 1st Armorer's Closet 2' x 4' ceiling tiles HM4 None Detected Mount Holly Armory 1st Armorer's Closet Pipe Insulation HM1 ACBM Mount Holly Armory 1st Armorer's Closet 9" x 9" brown floor tile Mount Holly Armory 1st Armorer's 2' x 4' ceiling tiles HM4 None Detected Mount Holly Armory 1st Armorer's Pipe Insulation HM1 ACBM Mount Holly Armory 1st Armorer's 12" x 12" lt brown/tan floor tile Less than 1% asbestos Mount Holly Armory 1st Armorer's Hallway 12" x 12" lt blue floor tile HM5 None Detected Mount Holly Armory 1st Armorer's Hallway Wallboard HM2 Mount Holly Armory 1st Boiler Plaster Ceiling HM3 Mount Holly Armory 1st Boiler Pipe Insulation HM1 ACBM Mount Holly Armory 1st Boiler Boiler Jacket, Breeching HM1 ACBM Mount Holly Armory 1st Boiler Hallway Wallboard HM2 Mount Holly Armory 1st Boiler Hallway Pipe Insulation HM1 ACBM Mount Holly Armory 1st Commander's 12" x 12" lt blue floor tile HM5 Mount Holly Armory 1st Commander's 2' x 2' Ceiling Tile HM6 Mount Holly Armory 1st Commander's Partitions Mount Holly Armory 1st Det 1 HHC 1/114 Supply Wallboard HM2 1 Mount Holly Armory 1st Det 1 HHC 1/114 Supply Pipe Insulation on roof drains HM1 1 Mount Holly Armory 1st Det 1 HHC 1/114 Supply Pipe insulation on roof drain pipc HM1 2 Mount Holly Armory 1st Drill Floor Chalk Board Mount Holly Armory 1st Drill Floor Pipe Insulation on drinking fountain HM1 Mount Holly Armory 1st Foyer Pipe Insulation HM1 ACBM Mount Holly Armory 1st Foyer 2' x 2' ceiling tiles HM6 Mount Holly Armory 1st Kitchen Pipe Insulation HM1 Mount Holly Armory 1st Kitchen Wallboard on ceiling HM2 Mount Holly Armory 1st Kitchen 9" x 9" brown floor tile Mount Holly Armory 1st Men's Latrine Pipe Insulation HM1 ACBM Mount Holly Armory 1st Men's Latrine Plaster Ceiling HM3 Mount Holly Armory 1st Mess Hall 2' x 4' ceiling tiles HM4 Mount Holly Armory 1st Mess Hall Chalk Board Mount Holly Armory 1st Mess Hall 12" x 12" lt blue floor tile HM5 Less than 1% asbestos Mount Holly Armory 1st Orderly 12" x 12" lt blue floor tile HM5 Mount Holly Armory 1st Orderly 2' x 4' ceiling tiles HM4 Mount Holly Armory 1st Recruiter's 2' x 4' ceiling tiles HM4 Monday, September 27, 2004 Page 26 of 53

Facility Facility Homogenious / Mount Holly Armory 1st Recruiter's 12" x 12" lt blue floor tiles HM5 Mount Holly Armory 1st Recruiter's Pipe Insulation HM1 ACBM Mount Holly Armory 1st Recruiter's Chalk Board Mount Holly Armory 1st Vault Fire Door Insulation Mount Holly Armory 1st Women's Latrine Pipe Insulation HM1 ACBM Mount Holly Armory 1st Women's Latrine Plaster Ceiling HM3 Mount Holly Armory Throughout Caulking ACBM Newton Armory 1st Armorer's Closet Insulation covering, pipe HM4 Newton Armory 1st Armorer's Insulation covering, pipe HM4 Newton Armory 1st Boiler Insulation, pipe HM12 Newton Armory 1st Boiler Insulation covering, pipe HM4 Newton Armory 1st Boiler Pipe Fittings HM13 Newton Armory 1st Boiler Boiler Jacket, Breeching Newton Armory 1st Classroom 1 Floor tile, 9"x9" dk brown w/ white HM6 Newton Armory 1st Classroom 1 Ceiling tile, 1' x 1' HM8 Newton Armory 1st Classroom 1 Chalk Board HM9 Newton Armory 1st Classroom 2 Ceiling tile, 1' x 1' HM8 Newton Armory 1st Classroom 2 Floor tile, 9"x9" dk brown w/ white HM6 Newton Armory 1st Classroom 2 Chalk Board HM9 Newton Armory 1st Club Floor tile, 12" x 12", lt green tan w\ dk HM5 brown and yellow Newton Armory 1st Club Insulation covering, pipe HM13 Newton Armory 1st Club Chalk Board HM9 Newton Armory 1st Club Pipe Fittings, roof drains HM7 Newton Armory 1st Co. C 102nd Armor Admin. Floor tile, 12" x 12", white w/black HM2 s Newton Armory 1st Co. C 102nd Armor Admin. Ceiling tile, 2' x 4' HM1 s Newton Armory 1st Co. C 102nd Armor Admin. Wallboard HM3 s Newton Armory 1st Co. C 102nd Armor Admin. Insulation covering, pipe HM4 s Newton Armory 1st Co. C 102nd Armor Admin. Pipe Fittings, roof drains HM7 s Newton Armory 1st Co. C 102nd Armor Supply Insulation, pipe HM12 Newton Armory 1st Co. C 102nd Armor Supply Insulation covering, pipe HM4 Newton Armory 1st Drill Floor Insulation covering, pipe HM4 Newton Armory 1st Electrical Wallboard HM3 Newton Armory 1st Exterior Lobby Transite on ceiling Newton Armory 1st Handicap Latrine Wallboard HM3 Newton Armory 1st Kitchen Insulation covering, pipe HM4 Newton Armory 1st Kitchen Supply Insulation covering, pipe HM4 Newton Armory 1st Kitchen Supply Insulation covering, AC duct work Newton Armory 1st Main Hallway Insulation, pipe HM12 Newton Armory 1st Main Hallway Chalk Board HM9 Newton Armory 1st Main Hallway and Lobby Insulation covering, pipe HM4 Newton Armory 1st Main Hallway and Lobby Ceiling tile, 1' x 1' HM8 Newton Armory 1st Main Hallway and Lobby Ceiling tile, 2' x 2' HM11 Newton Armory 1st Main Hallway and Lobby Floor tile, 12" x 12", lt green tan w\ dk HM5 brown and yellow Newton Armory 1st Men's Latrine Plaster, Ceiling HM10 Newton Armory 1st Mess Section Supply Insulation covering, AC duct work Newton Armory 1st Mess Section Supply Insulation covering, pipe HM4 Newton Armory 1st Range Pipe Fittings, roof drains HM7 Monday, September 27, 2004 Page 27 of 53

Facility Facility Homogenious / Newton Armory 1st Recruiter's Ceiling tile, 1' x 1' HM8 Newton Armory 1st Recruiter's Floor tile, 9"x9" dk brown w/ white HM6 Newton Armory 1st Recruiter's Wallboard HM3 Newton Armory 1st Recruiter's Chalk Board HM9 Newton Armory 1st VSO s Floor tile, 9"x9" dk brown w/ white HM6 Newton Armory 1st VSO s Insulation, Partitions Newton Armory 1st VSO s Ceiling tile, 1' x 1' HM8 Newton Armory 1st VSO s Insulation covering, pipe HM8 Newton Armory 1st Women's Latrine Plaster, Ceiling HM10 Newton Armory Throughout Caulking Newton MVSB 1st Garage Newton MVSB Throughout Breeching Caulking Phillipsburg Armory 1st Armorer's Closet Plaster, Ceiling HM8 None Detected Phillipsburg Armory 1st Armorer's Ceiling tile, 1' x 1' HM2 None Detected Phillipsburg Armory 1st Armorer's Floor tile, 9" x 9", lt grey HM1 ACBM Phillipsburg Armory 1st Boiler Plaster, Ceiling HM8 None Detected Phillipsburg Armory 1st Boiler Breeching None Detected Phillipsburg Armory 1st Classroom 3 Wallboard HM4 None Detected Phillipsburg Armory 1st Classroom 3 Insulation, Pipe, patching HM3 None Detected Phillipsburg Armory 1st Classroom 3 Floor tile, 12" x 12", beige w/ grey HM5 None Detected Phillipsburg Armory 1st Club Insulation, Pipe HM9 ACBM Phillipsburg Armory 1st Club Plaster, Ceiling HM8 None Detected Phillipsburg Armory 1st Club Ceiling tile, 2' x 4' HM7 None Detected Phillipsburg Armory 1st Club Floor tile, 12" x 12", red brown HM10 None Detected Phillipsburg Armory 1st Club Floor tile, 9" x 9", lt grey HM1 ACBM Phillipsburg Armory 1st Club Linoleum Floor, red brown ACBM Phillipsburg Armory 1st Club Ceiling tile, 1' x 1' HM2 None Detected Phillipsburg Armory 1st Club Lobby Floor tile, 12" x 12", red brown HM10 None Detected Phillipsburg Armory 1st Club Lobby Plaster, Ceiling HM8 None Detected Phillipsburg Armory 1st Drill Floor Floor tile, 12" x 12", beige w/ grey HM5 None Detected Phillipsburg Armory 1st GED Classroom Floor tile, 12" x 12", puke green None Detected Phillipsburg Armory 1st GED Classroom Ceiling tile, 1' x 1' HM2 None Detected Phillipsburg Armory 1st Kindergarten Floor tile, 9" x 9", dk brown HM11 Phillipsburg Armory 1st Kindergarten Wallboard HM4 None Detected Phillipsburg Armory 1st Lobby Insulation, Pipe HM9 ACBM Phillipsburg Armory 1st Lobby Ceiling tile, 2' x 4' HM7 None Detected Phillipsburg Armory 1st Lobby Hallway Ceiling tile, 1' x 1', solid type None Detected Phillipsburg Armory 1st Lobby Hallway Floor tile, 9" x 9", lt grey HM1 ACBM Phillipsburg Armory 1st Men's Latrine Plaster, Ceiling HM8 None Detected Phillipsburg Armory 1st Men's Latrine Lobby Plaster, Ceiling HM8 None Detected Phillipsburg Armory 1st Mrs. Brotzman's classroom Wallboard HM4 None Detected Phillipsburg Armory 1st Mrs. Brotzman's classroom Chalk Board HM6 Phillipsburg Armory 1st Mrs. Brotzman's classroom Floor tile, 12" x 12", beige w/ grey HM5 None Detected Phillipsburg Armory 1st Mrs. Brotzman's classroom Insulation, Pipe, patching HM3 None Detected Phillipsburg Armory 1st Mrs. Ricker's classroom Floor tile, 12" x 12", beige w/ grey HM5 None Detected Phillipsburg Armory 1st Mrs. Ricker's classroom Wallboard HM4 None Detected Phillipsburg Armory 1st Mrs. Ricker's classroom Insulation, Pipe, patching HM3 None Detected Phillipsburg Armory 1st Nurse's Floor tile, 12" x 12", tan w/grey specks None Detected Phillipsburg Armory 1st Nurse's Wallboard HM4 None Detected Phillipsburg Armory 1st Recruiter's Floor tile, 9" x 9", dk brown HM11 Phillipsburg Armory 1st Recruiter's Wallboard HM12 Less than 1% asbestos Monday, September 27, 2004 Page 28 of 53

Facility Facility Homogenious / Phillipsburg Armory 1st Recruiter's Hallway Wallboard HM12 Less than 1% asbestos Phillipsburg Armory 1st School Based Youth Insulation, Partitions None Detected Services s Phillipsburg Armory 1st School Based Youth Ceiling tile, 1' x 1' HM2 None Detected Services s Phillipsburg Armory 1st Vault Insulation, Fire Door Phillipsburg Armory 1st Women's Latrine Wallboard HM4 Less than 1% asbestos Phillipsburg Armory Throughout Caulking Less than 1% asbestos Phillipsburg Battery Shed Roof Roofing Shingles None Detected Phillipsburg Mower Shed Roof Roofing panels ACBM Phillipsburg OMS 1st Battery Counter Top Phillipsburg OMS 1st Boiler Boiler gasket None Detected Phillipsburg OMS 1st Break Ceiling tile, 2' x 4' HM1 None Detected Phillipsburg OMS 1st Break Floor tile, 12" x 12", lt grey, w/ black HM3 None Detected specks Phillipsburg OMS 1st Break Wallboard HM2 None Detected Phillipsburg OMS 1st Men's Latrine Ceiling tile, 2' x 4', hardboard None Detected Phillipsburg OMS 1st Men's Latrine Floor tile, 12" x 12", lt grey, w/ black HM3 None Detected specks Phillipsburg OMS 1st Men's Latrine Wallboard HM2 None Detected Phillipsburg OMS 1st Porch Roofing Shingles None Detected Phillipsburg OMS 1st Shop Foreman's Wallboard HM2 None Detected Phillipsburg OMS 1st Shop Foreman's Floor tile, 12" x 12", white HM4 None Detected Phillipsburg OMS 1st Shop Foreman's Ceiling tile, 2' x 4' HM1 None Detected Phillipsburg OMS 1st Tool and Parts Floor tile, 12" x 12", white HM4 None Detected Phillipsburg OMS 1st Tool and Parts Ceiling tile, 2' x 4' HM1 None Detected Phillipsburg OMS Throughout Chalk Board Phillipsburg OMS Throughout Insulation, Fire Door None Detected Phillipsburg OMS Throughout Door caulking ACBM Pitman Armory 1st 1SGT Insulation, Partitions HM4 Pitman Armory 1st 1SGT Ceiling tile, 2' x 2' HM3 Pitman Armory 1st Armorer's Closet Floor tile, 9" x 9", black and white Pitman Armory 1st Armorer's Floor tile, 9" x 9", dk brown HM1 Pitman Armory 1st Armorer's Ceiling tile, 2' x 4' HM2 Pitman Armory 1st Classrooms Chalk Board Pitman Armory 1st Classrooms Ceiling tile, 2' x 4' HM2 Pitman Armory 1st Club Ceiling tile, 2' x 4' HM2 Pitman Armory 1st Club Floor tile, 9" x 9", dk brown HM1 Pitman Armory 1st Club Wallboard Pitman Armory 1st Club Hallway Floor tile, 9" x 9", dk brown HM1 Pitman Armory 1st Commander's Ceiling tile, 2' x 2' HM3 Pitman Armory 1st Foyer Floor tile, 12" x 12", lt red brown Pitman Armory 1st Foyer Ceiling tile, 2' x 4' HM2 Pitman Armory 1st Foyer Breezeway Plaster, Ceiling Pitman Armory 1st Kitchen Floor tile, 9" x 9", green Pitman Armory 1st Kitchen Ceiling tile, 2' x 4' HM2 Monday, September 27, 2004 Page 29 of 53

Facility Facility Homogenious / Pitman Armory 1st Men's Latrine, Shower Plaster, Ceiling HM5 Pitman Armory 1st Readiness NCO Insulation, Partitions HM4 Pitman Armory 1st Readiness NCO Ceiling tile, 2' x 2' HM3 Pitman Armory 1st Supply Floor tile, 9" x 9", dk brown HM1 Pitman Armory 1st Vault Floor tile, 9" x 9", dk brown HM1 Pitman Armory 1st Vault Insulation, Fire Door Pitman Armory 1st Women's Latrine Plaster, Ceiling HM5 Pitman MVSB 1st Garage Wallboard HM1 Pitman MVSB 1st Garage Furnace cement Pitman MVSB 1st Latrine Wallboard HM1 Pitman MVSB 1st Shop Foreman's Floor tile, 9" x 9", dk red brown Pitman MVSB 1st Shop Foreman's Wallboard HM1 Pitman MVSB Roof Roof Roofing Shingles Pitman MVSB Throughout Caulking Plainfield Armory 1st Admin. Plaster, ceiling, walls HM2 Plainfield Armory 1st Admin. Ceiling tile, 2' x 4' HM1 Plainfield Armory 1st Armorer's Closet Plaster, ceiling, walls HM2 Plainfield Armory 1st Armorer's Ceiling tile, 2' x 4' HM1 Plainfield Armory 1st Classroom 1,2, and 3 Ceiling tile, 2' x 4' HM1 Plainfield Armory 1st Classroom 1,2, and 3 Wallboard HM5 Plainfield Armory 1st Classroom 1,2, and 3 Chalk Board Plainfield Armory 1st Classroom 4 Ceiling tile, 2' x 4' HM1 Plainfield Armory 1st Classroom 4 Wallboard HM5 Plainfield Armory 1st Classroom 5 Ceiling tile, 2' x 4' HM1 Plainfield Armory 1st Classroom 5 Wallboard HM5 Plainfield Armory 1st Classroom 6 Wallboard HM5 Plainfield Armory 1st Classroom 6 Ceiling tile, 2' x 4' HM1 Plainfield Armory 1st Classroom 7 Wallboard HM5 Plainfield Armory 1st Classroom 7 Ceiling tile, 2' x 4' HM1 Plainfield Armory 1st Conference Floor tile, 12" x 12", red w/ brown specks Plainfield Armory 1st Drill Floor Insulation, Pipe HM4 Plainfield Armory 1st Foyer Plaster, ceiling, walls HM2 Plainfield Armory 1st Hallway Plaster, ceiling, walls HM2 Plainfield Armory 1st JAG Plaster, ceiling HM2 Plainfield Armory 1st JAG Ceiling tile, 2' x 4' HM1 Plainfield Armory 1st Lounge Wallboard HM5 Plainfield Armory 1st Lounge Ceiling tile, 2' x 4' HM1 Plainfield Armory 1st Mail Ceiling tile, 2' x 4' HM1 Plainfield Armory 1st Men's Latrine Plaster, ceiling, wall HM2 Plainfield Armory 1st Ceiling tile, 2' x 4' HM1 Plainfield Armory 1st Plaster, ceiling, walls HM2 Plainfield Armory 1st Ticket Plaster, ceiling, walls HM2 Plainfield Armory 1st Women's Latrine Plaster, ceiling, walls HM2 Plainfield Armory 2nd 2nd Floor Landing Plaster, Wall HM2 Plainfield Armory 2nd 2nd Floor Landing Ceiling tile, 2' x 4' HM1 Plainfield Armory 2nd Conference Plaster, ceiling HM2 Plainfield Armory 2nd Hallway Plaster, ceiling, wall HM2 Plainfield Armory 2nd Latrine Plaster, ceiling, wall HM2 Plainfield Armory 2nd Plaster, ceiling HM2 Plainfield Armory 2nd Linoleum flooring, green w/ black HM3 Plainfield Armory 2nd Plaster, ceiling HM2 Plainfield Armory 2nd Linoleum flooring, green w/ black HM3 Plainfield Armory Basement AC Equipment Plaster, Ceiling HM2 Monday, September 27, 2004 Page 30 of 53

Facility Facility Homogenious / Plainfield Armory Basement Armorer's Closet Insulation, Pipe HM4 Plainfield Armory Basement Armorer's Closet Plaster, ceiling HM2 Plainfield Armory Basement Armorer's Closet Plaster, Ceiling, Wall HM2 Plainfield Armory Basement Armorer's Supply Insulation, Pipe HM4 Plainfield Armory Basement Armorer's Supply Plaster, Ceiling HM2 Plainfield Armory Basement Armorer's Supply Wallboard, ceiling HM5 Plainfield Armory Basement Armorer's Workshop Insulation, Pipe HM4 Plainfield Armory Basement Armorer's Workshop Plaster, Cieling, Wall HM2 Plainfield Armory Basement Basement Foyer Plaster, ceiling, walls HM2 Plainfield Armory Basement Basement Foyer Insulation, Pipe HM4 Plainfield Armory Basement Basement Foyer Ceiling tile, 2' x 4' HM1 Plainfield Armory Basement Boiler Insulation, Pipe HM4 Plainfield Armory Basement Boiler Boiler Jacket, Breeching Plainfield Armory Basement Boiler Hallway Insulation, Pipe HM4 Plainfield Armory Basement Boiler Hallway Plaster, Cieling, Wall HM2 Plainfield Armory Basement Club Ceiling tile, 2' x 4' HM1 Plainfield Armory Basement Club Plaster, Ceiling HM2 Plainfield Armory Basement Club Insulation, Pipe HM4 Plainfield Armory Basement Club Floor tile, 9" x 9", black w/ white Plainfield Armory Basement Club Floor tile, 12" x 12", green and orange Plainfield Armory Basement Club Closet Floor tile, 9" x 9", black w/ white Plainfield Armory Basement Club Closet Insulation, Pipe HM4 Plainfield Armory Basement Duck Pond Ceiling tile, 2' x 4' Plainfield Armory Basement Duck Pond Plaster, Ceiling HM2 Plainfield Armory Basement Duck Pond Insulation, Pipe HM4 Plainfield Armory Basement Hallway Ceiling tile, 2' x 4' HM1 Plainfield Armory Basement Hallway Wallboard HM5 Plainfield Armory Basement Hallway Floor tile, 9" x 9", dk brown w/ white HM7 Plainfield Armory Basement Hallway Ceiling tile, 2' x 4' HM1 Plainfield Armory Basement Hallway Insulation, Pipe HM4 Plainfield Armory Basement Hallway Plaster, Ceiling, Wall HM2 Plainfield Armory Basement Hallway Insulation, Pipe HM4 Plainfield Armory Basement Kitchen Wallboard HM5 Plainfield Armory Basement Kitchen Floor tile, 12" x 12", black w/ white HM6 Plainfield Armory Basement Kitchen Ceiling tile, 2' x 4' HM1 Plainfield Armory Basement Kitchen Plaster, walls, ceiling HM2 Plainfield Armory Basement Kitchen Floor tile, 12" x 12", green w/ white Plainfield Armory Basement Kitchen Insulation, Pipe Plainfield Armory Basement Kitchen Hallway Floor tile, 12" x 12", black w/ white HM4 HM6 Plainfield Armory Basement Kitchen Hallway Insulation, Pipe HM4 Plainfield Armory Basement Kitchen Hallway Plaster, ceiling, walls HM2 Plainfield Armory Basement Kitchen Hallway Ceiling tile, 2' x 4' HM1 Plainfield Armory Basement Ladies Lounge Ceiling tile, 2' x 4' HM1 Plainfield Armory Basement Ladies Lounge Plaster, ceiling, walls HM2 Plainfield Armory Basement Ladies Lounge Insulation, Pipe HM4 Plainfield Armory Basement Men's Latrine, Shower Insulation, Pipe HM4 Plainfield Armory Basement Men's Latrine, Shower Plaster, Ceiling, Wall HM2 Plainfield Armory Basement NJNM 3rd Battalion Admin Insulation, Pipe HM4 s Plainfield Armory Basement NJNM 3rd Battalion Admin Ceiling tile, 2' x 4' HM1 s Monday, September 27, 2004 Page 31 of 53

Facility Facility Homogenious / Plainfield Armory Basement NJNM 3rd Battalion Admin Plaster, Ceiling HM2 s Plainfield Armory Basement NJNM Master Chief s Wallboard HM5 Plainfield Armory Basement NJNM Master Chief s Insulation, Pipe HM4 Plainfield Armory Basement NJNM Master Chief s Plaster, Ceiling HM2 Plainfield Armory Basement NJNM Master Chief s Ceiling tile, 2' x 4' HM1 Plainfield Armory Basement Operations Center Floor tile, 9" x 9", dk brown w/ white HM7 Plainfield Armory Basement Operations Center Ceiling tile, 2' x 4' HM1 Plainfield Armory Basement Operations Center Ceiling tile, 2' x 4' HM1 Plainfield Armory Basement Operations Center Insulation, Pipe HM4 Plainfield Armory Basement Operations Center Plaster, Ceiling HM2 Plainfield Armory Basement Supply Insulation, Pipe HM4 Plainfield Armory Basement Supply Plaster, Ceiling HM2 Plainfield Armory Basement Supply Wallboard HM5 Plainfield Armory Basement Vault 1 Ceiling tile, 2' x 4' HM1 Plainfield Armory Basement Vault 1 Floor tile, 12" x 12", lt green w/ white Plainfield Armory Basement Vault 1 Insulation, Fire Door Plainfield Armory Basement Vault 2 Insulation, Fire Door Plainfield Armory Basement Vault Foyer Plaster, Ceiling HM2 Plainfield Armory Basement Vault Foyer Insulation, Pipe HM4 Plainfield Armory Basement Vault Hallway Insulation, Pipe HM4 Plainfield Armory Basement Vault Hallway Plaster, Ceiling HM2 Plainfield Armory Basement Women's Shower Plaster, Ceiling, Wall HM2 Plainfield Armory Basement Women's Shower Insulation, Pipe HM4 Plainfield OMS 1st Battery Transite Plainfield OMS 1st Computer Wallboard HM2 Plainfield OMS 1st Computer Floor tile, 9" x 9", dk brown w/ white HM1 Plainfield OMS 1st Garage 1 Insulation, Pipe Plainfield OMS 1st Garage 1 Ceiling tile, 2' x 4' HM3 Plainfield OMS 1st Garage 1 Wallboard HM2 Plainfield OMS 1st Garage 2 Ceiling tile, 2' x 4' HM3 Plainfield OMS 1st Garage 2 Wallboard HM2 Plainfield OMS 1st Kitchen Ceiling tile, 2' x 4' HM3 Plainfield OMS 1st Kitchen Floor tile, 9" x 9", dk brown w/ white HM1 Plainfield OMS 1st Latrine, Shower Floor tile, 9" x 9", dk brown w/ white HM1 Plainfield OMS 1st Latrine, Shower Wallboard, ceiling, wall HM2 Plainfield OMS 1st Latrine, Shower Ceiling tile, 2' x 4' HM3 Plainfield OMS 1st Shop Foreman's s Wallboard HM2 Plainfield OMS 1st Shop Foreman's s Floor tile, 9" x 9", dk brown w/ white HM1 Plainfield OMS Roof Plainfield OMS Throughout Roofing Shingles Caulking Princeton Warehouse 1st Break on State Police 12 x12 white floor tile HM3 side of building Princeton Warehouse 1st Break on State Police 2 x 4 white ceiling tile HM2 side of building Princeton Warehouse 1st Commander's 2 x 4 white ceiling tile HM2 Princeton Warehouse 1st Commander's 12 x12 light blue floor tile HM1 Princeton Warehouse 1st Foyer on State Police side 12 x12 light blue floor tile HM1 of building Monday, September 27, 2004 Page 32 of 53

Facility Facility Homogenious / Princeton Warehouse 1st Foyer on State Police side 2 x 4 white ceiling tile HM2 of building Princeton Warehouse 1st Latrine on State Police side 2 x 4 white ceiling tile HM2 of building Princeton Warehouse 1st Latrine on State Police side 12 x12 white floor tile HM3 of building Princeton Warehouse 1st NJDMAVA Warehouse Wallboard Princeton Warehouse 1st NJDMAVA Warehouse 2 x 4 white ceiling tile Princeton Warehouse 2nd Supply room on State Plaster on pipe insulation Police side of building Princeton Princeton Warehouse Roof Roof Warehouse Throughout Roofing Paper, Roofing Shingles White window/door caulking Princeton Warehouse Throughout s Wallboard HM2 State Police side of building Princeton Warehouse Throughout s Wallboard HM2 State Police side of building Riverdale Armory 1st 1-113 Supply Insulation, Fire Door Riverdale Armory 1st 1-113 Supply Lobby Plaster, Ceiling HM6 Riverdale Armory 1st 1st Floor Hallway Floor tile, 9" x 9", dk brown w/white HM1 Riverdale Armory 1st 1st Floor Hallway Ceiling tile, 1' x 1' HM4 Riverdale Armory 1st 1st Floor Hallway Ceiling tile, 2' x 2' HM3 Riverdale Armory 1st Armorer's Closet Insulation, Pipe HM5 Riverdale Armory 1st Armorer's Floor tile, 9" x 9", dk brown w/white HM1 Riverdale Armory 1st Armorer's Ceiling tile, 1' x 1' HM2 Riverdale Armory 1st Armorer's Supply 1 Insulation, Pipe HM5 Riverdale Armory 1st Armorer's Supply 2 Insulation, Pipe HM5 Riverdale Armory 1st Armorer's Supply 2 Plaster, Ceiling HM6 Riverdale Armory 1st Boiler Plaster, Ceiling HM6 Riverdale Armory 1st Boiler Hallway Insulation, Pipe HM5 Riverdale Armory 1st Boiler Hallway Plaster, Ceiling HM6 Riverdale Armory 1st Classroom 1 Wallboard HM7 Riverdale Armory 1st Classroom 1 Chalk Board HM4 Riverdale Armory 1st Classroom 1 Floor tile, 9" x 9", dk brown w/white HM1 Riverdale Armory 1st Classroom 1 Ceiling tile, 1' x 1' Riverdale Armory 1st Classroom 2 Floor tile, 9" x 9", dk brown w/white HM2 HM1 Riverdale Armory 1st Classroom 2 Chalk Board HM4 Riverdale Armory 1st Classroom 2 Chalk Board HM4 Riverdale Armory 1st Classroom 2 Ceiling tile, 1' x 1' HM2 Riverdale Armory 1st Classroom 3 Ceiling tile, 1' x 1' HM2 Riverdale Armory 1st Classroom 3 Floor tile, 9" x 9", dk brown w/white HM1 Riverdale Armory 1st Classroom 3 Chalk Board Riverdale Armory 1st Club, Old Kitchen Floor tile, 9" x 9", dk brown w/white HM4 HM1 Riverdale Armory 1st Club, Old Kitchen Floor tile, 9" x 9", lt green w/white Monday, September 27, 2004 Page 33 of 53

Facility Facility Homogenious / Riverdale Armory 1st Club, Old Kitchen Ceiling tile, 1' x 1' HM2 Riverdale Armory 1st COMO Supply Insulation, Pipe HM5 Riverdale Armory 1st Drill Floor Insulation, Pipe HM5 Riverdale Armory 1st Drill Floor Vault Insulation, Fire Door Riverdale Armory 1st Kitchen Ceiling tile, 2' x 4' HM8 Riverdale Armory 1st Lobby Ceiling tile, 2' x 2' HM3 Riverdale Armory 1st Lobby Plaster, Wall, textured HM7 Riverdale Armory 1st Lobby Porch Plaster, Ceiling HM6 Riverdale Armory 1st Men's Latrine Plaster, Ceiling HM6 Riverdale Armory 1st Men's Latrine Insulation, Pipe HM5 Riverdale Armory 1st Recruiter's Supply Ceiling tile, 2' x 2' HM3 Riverdale Armory 1st Recruiter's Supply Wallboard HM7 Riverdale Armory 1st Recruiter's Supply Insulation, Pipe HM5 Riverdale Armory 1st Recruiter's Supply Floor tile, 9" x 9", dk brown w/white HM1 Riverdale Armory 1st Storage 4 Ceiling tile, 1' x 1' HM4 Riverdale Armory 1st Water Can Supply Insulation, Pipe HM5 Riverdale Armory 1st Weight Hallway Insulation, Pipe HM5 Riverdale Armory 1st Women's Latrine Plaster, Ceiling HM6 Riverdale Armory 2nd Hallway and offices Floor tile, 12" x 12", lt green w/white specks Riverdale Armory 2nd Hallway and offices Insulation, Partitions Riverdale Armory 2nd Hallway and offices Ceiling tile, 2' x 4' HM8 Riverdale Armory 2nd Hallway and offices Ceiling tile, 1' x 1' HM2 Riverdale Armory 2nd HHC Admin s Ceiling tile, 2' x 4' HM8 Riverdale Armory 2nd HHC Admin s Floor tile, 12" x 12", yellow green w/ white specks Riverdale Armory 2nd HHC Admin s Wallboard HM7 Riverdale Armory Throughout Door caulking Riverdale OMS 1st Break Wallboard, Ceiling Riverdale OMS 1st Men's Latrine Floor tile, 12" x 12", lt green w/ white HM3 specs Riverdale OMS 1st Men's Latrine Ceiling tile, 2' x 4' HM2 Riverdale OMS 1st Men's Latrine Foyer Wallboard, Ceiling HM3 Riverdale OMS 1st Shop Foreman's Floor tile, 12" x 12", lt green w/white HM1 specks Riverdale OMS 1st Shop Foreman's Ceiling tile, 2' x 4' HM2 Riverdale OMS 1st Tool and Parts Wallboard HM3 Riverdale OMS 1st Tool and Parts Ceiling tile, 2' x 4' HM2 Riverdale OMS 1st Tool and Parts Floor tile, 12" x 12", lt green w/ white specs Riverdale Sea Girt OMS Roof State Police Crime 1st Boiler Roofing Shingles Pipe Fittings Lab Sea Girt State Police Crime 1st Laboratory Fume Hood Lab Sea Girt State Police Crime 1st Laboratory Laboratory Countertops Lab Sea Girt State Police Crime 1st Vault Fire Door Insulation Lab Sea Girt State Police Crime Throughout Lab Floor Tile Sea Girt State Police Crime Throughout Window Caulking Lab Monday, September 27, 2004 Page 34 of 53

Facility Facility Homogenious / Sea Girt State Police Crime Throughout Ceiling Tile Lab Toms River Armory 1st Admin. s Insulation, Pipe HM4 Toms River Armory 1st Admin. s Ceiling tile, 2' x 4' HM3 Toms River Armory 1st Admin. s Ceiling tile, 2' x 4' HM3 Toms River Armory 1st Admin. s Floor tile, 12" x 12", tan w/white specks Toms River Armory 1st Admin. s Wallboard HM7 Toms River Armory 1st Admin. s Pipe Fittings HM2 Toms River Armory 1st Admin. s Floor tile, 12" x 12", greenish white w/ HM6 grey/white Toms River Armory 1st Admin. s Floor tile, 9" x 9", dk brown w/white HM8 Toms River Armory 1st Admin. s Wallboard HM7 Toms River Armory 1st Armorer's Closet Plaster, Ceiling HM1 Toms River Armory 1st Armorer's Floor tile, 9" x 9", red w/white Toms River Armory 1st Armorer's Wallboard, ceiling HM7 Toms River Armory 1st Boiler Plaster, Ceiling HM1 Toms River Armory 1st Boiler Breeching Toms River Armory 1st Boiler Foyer Plaster, Ceiling HM1 Toms River Armory 1st Boiler Foyer Floor tile, 12" x 12" HM6 Toms River Armory 1st Boiler Foyer Pipe Fittings HM2 Toms River Armory 1st Boiler Foyer Ceiling tile, 2' x 4' HM3 Toms River Armory 1st Classroom Floor tile, 9" x 9", dk brown w/white HM8 Toms River Armory 1st Classroom Floor tile, 12" x 12", greenish white w/ HM5 grey/white Toms River Armory 1st Classroom Insulation, Pipe HM4 Toms River Armory 1st Classroom Pipe Fittings HM2 Toms River Armory 1st Classroom Ceiling tile, 2' x 4' HM3 Toms River Armory 1st Club Floor tile, 12" x 12", tan w/white specks Toms River Armory 1st Club Pipe Fittings HM1 Toms River Armory 1st Drill Floor Plaster, Ceiling HM1 Toms River Armory 1st Drill Floor Insulation, Pipe HM4 Toms River Armory 1st Family Support Center Chalk Board Toms River Armory 1st Family Support Center Ceiling tile, 2' x 4' HM3 Toms River Armory 1st Family Support Center Floor tile, 12" x 12",white w/ grey/white HM6 Toms River Armory 1st Foyer Insulation, Pipe HM4 Toms River Armory 1st Foyer Ceiling tile, 2' x 4' HM3 Toms River Armory 1st Handicap Latrine Wallboard HM7 Toms River Armory 1st Kitchen Insulation, Pipe HM4 Toms River Armory 1st Kitchen Ceiling tile, 2' x 4', hard board Toms River Armory 1st Men's Latrine Pipe Fittings HM2 Toms River Armory 1st Men's Latrine Plaster, Ceiling HM1 Toms River Armory 1st Range Hallway Floor tile, 12" x 12",white w/ grey/white HM6 Toms River Armory 1st Range Hallway Ceiling tile, 2' x 4' HM3 Toms River Armory 1st Rear Hallway Foyer Ceiling tile, 2' x 4' HM3 Toms River Armory 1st Rear Hallway Foyer Floor tile, 12" x 12",white w/ grey/white HM6 Toms River Armory 1st Rear Hallway Foyer Pipe Fittings Toms River Armory 1st Recruiter's s Floor tile, 12" x 12", greenish white w/ HM1 HM5 grey/white Toms River Armory 1st Recruiter's s Ceiling tile, 2' x 4' HM3 Toms River Armory 1st Recruiter's s Pipe Fittings HM3 Toms River Armory 1st Recruiter's s Insulation, Partitions Toms River Armory 1st Recruiter's s Ceiling tile, 1' x 1' Monday, September 27, 2004 Page 35 of 53

Facility Facility Homogenious / Toms River Armory 1st Supply Pipe Fittings HM1 Toms River Armory 1st Supply Insulation, Fire Door Toms River Armory 1st Supply Insulation, Fire Door Toms River Armory 1st Supply Pipe Fittings HM1 Toms River Armory 1st Supply Pipe Fittings HM1 Toms River Armory 1st Supply Floor tile, 9" x 9", dk brown w/white HM8 Toms River Armory 1st Supply Floor tile, 9" x 9", dk brown w/white HM8 Toms River Armory 1st Supply Wallboard HM7 Toms River Armory 1st Supply Wallboard, ceiling/walls HM7 Toms River Armory 1st Supply Ceiling tile, 2' x 4' HM3 Toms River Armory 1st Women's Latrine Pipe Fittings HM2 Toms River Armory 1st Women's Latrine Plaster, Ceiling HM1 Toms River Armory Throughout Caulking Toms River MVSB Throughout Caulking Toms River OMS 1st Break Floor tile, 12" x 12", tan w/dk brown specks Toms River OMS 1st Break Ceiling tile, 2' x 4' Toms River OMS 1st Foyer Ceiling tile, 2' x 4' Toms River OMS 1st Latrine Ceiling tile, 2' x 4' Toms River OMS 1st Shop Foreman's Floor tile, 12" x 12", tan w/dk brown specks Toms River OMS 1st Shop Foreman's Ceiling tile, 2' x 4' Toms River OMS Roof Roofing Paper Tuckerton Armory 1st Armorer's Closet Floor tile, 12" x 12", lt green HA2 Tuckerton Armory 1st Armorer's Floor tile, 12" x 12", lt green HA2 Tuckerton Armory 1st Boiler Hallway Floor tile, 12" x 12", lt green HA2 Tuckerton Armory 1st Boiler Hallway Ceiling tile, 2' x 2' HA2 Tuckerton Armory 1st Classroom C Chalk Board Tuckerton Armory 1st Classroom C Floor tile, 12" x 12", lt green HA2 Tuckerton Armory 1st Classroom C Ceiling tile, 2' x 2' HA1 Tuckerton Armory 1st Classrooms A and B Chalk Board Tuckerton Armory 1st Classrooms A and B Ceiling tile, 2' x 2' HA1 Tuckerton Armory 1st Classrooms A and B Floor tile, 12" x 12", lt green HA1 Tuckerton Armory 1st Foyer Floor tile, 12" x 12", lt green HA2 Tuckerton Armory 1st Foyer Ceiling tile, 2' x 2' HA2 Tuckerton Armory 1st Kitchen Floor tile, 12" x 12", lt green HA1 Tuckerton Armory 1st Kitchen Wallboard on ceiling Tuckerton Armory 1st Main Hallway Ceiling tile, 2' x 2' HA2 Tuckerton Armory 1st Main Hallway Floor tile, 12" x 12", lt green HA2 Tuckerton Armory 1st Main Hallway Insulation, Pipe ACBM Tuckerton Armory 1st Men's Latrine\Shower Plaster, Ceiling HA3 Tuckerton Armory 1st Orderly and s Ceiling tile, 2' x 2' HA1 Tuckerton Armory 1st Orderly and s Floor tile, 12" x 12", lt green HA2 Tuckerton Armory 1st Vault Insulation, Fire Door Tuckerton Armory 1st Women's Latrine Plaster, Ceiling HA3 Tuckerton Armory Throughout Caulking ACBM Tuckerton MVSB 1st Shop Foreman's Tuckerton MVSB Throughout Caulking Caulking Monday, September 27, 2004 Page 36 of 53

Facility Facility Homogenious / Vineland Armory 1st Armorer's Plaster Ceiling, Plaster Wall HM1 None Detected Vineland Armory 1st Chaplin's Plaster Ceiling, Plaster Wall HM1 None Detected Vineland Armory 1st Drill Floor Roto flooring HM2 None Detected Vineland Armory 1st Drill Floor Plaster Ceiling HM1 None Detected Vineland Armory 1st Gym Pipe Insulation HM3 ACBM Vineland Armory 1st HHT Supply Pipe Insulation HM3 ACBM Vineland Armory 1st HHT Supply Pipe Insulation HM3 ACBM Vineland Armory 1st HHT Supply Pipe Insulation HM3 ACBM Vineland Armory 1st North Hallway Plaster Ceiling HM1 None Detected Vineland Armory 1st North Hallway Armorer's Plaster Ceiling, Plaster Wall HM1 None Detected Closet Vineland Armory 1st North Hallway Men's Plaster Ceiling, Plaster Wall HM1 None Detected Latrine Vineland Armory 1st North Hallway Men's Plaster Ceiling, Plaster Wall HM1 None Detected Shower Vineland Armory 1st North Hallway Women's Plaster Ceiling, Plaster Wall None Detected Latrine Vineland Armory 1st North Stairwell Plaster Ceiling HM1 None Detected Vineland Armory 1st North Stairwell Floor Tile HM1 Vineland Armory 1st North Stairwell Pipe Insulation HM3 ACBM Vineland Armory 1st South Stairwell Plaster Ceiling HM1 None Detected Vineland Armory 1st Vault Pipe Insulation HM3 ACBM Vineland Armory 2nd 2nd Floor Stairwell Plaster Ceiling HM1 None Detected Vineland Armory 2nd Bn. Commander's Plaster Ceiling, Plaster Wall HM1 None Detected Vineland Armory 2nd Club Plaster Ceiling HM1 None Detected Vineland Armory 2nd CSM's Plaster Ceiling, Plaster Wall HM1 None Detected Vineland Armory 2nd Hallway Plaster Ceiling, Plaster Wall HM1 None Detected Vineland Armory 2nd HHT Co. Clerk's Plaster Ceiling, Plaster Wall HM1 None Detected Vineland Armory 2nd HHT Co. Clerk's Ceiling Tile HM5 Vineland Armory 2nd HHT Co. Clerk's Pipe Insulation HM3 ACBM Vineland Armory 2nd HHT Commander's Plaster Ceiling, Plaster Wall HM1 None Detected Vineland Armory 2nd HHT1SGT Plaster Ceiling, Plaster Wall HM1 None Detected Vineland Armory 2nd North Hallway Men's Plaster Ceiling, Plaster Wall HM1 None Detected Latrine Vineland Armory 2nd North Hallway Men's Plaster Ceiling, Plaster Wall HM1 None Detected Shower Vineland Armory 2nd North Stairwell Plaster Ceiling HM1 None Detected Vineland Armory 2nd Personnel Sergeant's Plaster Ceiling, Plaster Wall HM1 None Detected Vineland Armory 2nd Recruiter's Plaster Ceiling, Plaster Wall HM1 None Detected Vineland Armory 2nd S1's Plaster Ceiling, Plaster Wall HM1 None Detected Vineland Armory 2nd S2's Plaster Ceiling, Plaster Wall HM1 None Detected Vineland Armory 2nd S3's Plaster Ceiling, Plaster Wall HM1 None Detected Vineland Armory 2nd S3's Training Technician Plaster Ceiling, Plaster Wall None Detected Vineland Armory 2nd S4's Plaster Ceiling, Plaster Wall HM1 None Detected Vineland Armory 2nd South Stairwell Landing 9x9 Brown Floor Tile HM6 Vineland Armory 2nd Training NCO's Plaster Ceiling, Plaster Wall HM1 None Detected Vineland Armory 2nd XO's Plaster Ceiling, Plaster Wall HM1 None Detected Vineland Armory 3rd 3rd Floor Stairwell Plaster Ceiling HM1 None Detected Vineland Armory 3rd Armore's Apartment Plaster Ceiling, Plaster Wall HM1 None Detected Vineland Armory 3rd Armore's Apartment Plaster Ceiling, Plaster Wall HM1 None Detected Vineland Armory 3rd Armore's Apartment Linoleum Floor HM7 Vineland Armory 3rd Armore's Apartment Plaster Ceiling, Plaster Wall HM1 None Detected Vineland Armory 3rd Armore's Apartment Plaster Ceiling, Plaster Wall HM1 None Detected Vineland Armory 3rd Armore's Apartment Plaster Ceiling, Plaster Wall HM1 None Detected Vineland Armory 3rd Armore's Apartment Plaster Ceiling, Plaster Wall HM1 None Detected Vineland Armory 3rd Armore's Apartment Plaster Ceiling, Plaster Wall HM1 None Detected Monday, September 27, 2004 Page 37 of 53

Facility Facility Homogenious / Vineland Armory 3rd Armore's Apartment 12 x 12 Green Floor Tile HM8 Vineland Armory 3rd Armore's Apartment Plaster Ceiling, Plaster Wall HM1 None Detected Vineland Armory 3rd Armore's Apartment Plaster Ceiling, Plaster Wall HM1 None Detected Vineland Armory 3rd Armore's Apartment Plaster Ceiling, Plaster Wall HM1 None Detected Vineland Armory 3rd Classroom Plaster Ceiling, Plaster Wall HM1 None Detected Vineland Armory 3rd Classroom Pipe Insulation HM3 ACBM Vineland Armory 3rd S-3 Operation's Plaster Ceiling, Plaster Wall HM1 None Detected Vineland Armory Basement Boiler Breeching HM3 Vineland Armory Basement Boiler Foyer Pipe Insulation HM3 ACBM Vineland Armory Basement Drill Floor Pipe Chase Pipe Insulation HM3 ACBM Vineland Armory Basement Kitchen Plaster Ceiling HM1 None Detected Vineland Armory Basement Kitchen Pipe Insulation HM3 ACBM Vineland Armory Basement Kitchen Ceiling Tile HM5 Vineland Armory Basement Mess Hall 12 x 12 white Floor Tile 9 Vineland Armory Basement Mess Hall Ceiling Tile HM5 Vineland Armory Basement Mess Hall Pipe Insulation HM3 ACBM Vineland Armory Basement Mess Hall Plaster Ceiling HM1 None Detected Vineland Armory Basement Stairwell 12 x 12 white Floor Tile 9 Vineland Armory Basement Stairwell Pipe Insulation HM3 ACBM Vineland Armory Basement Stairwell Plaster Ceiling HM1 None Detected Vineland Armory Roof Roof Roofing Paper HM10 ACBM Vineland Armory Throughout Pipe Fittings HM3 ACBM Vineland Armory Throughout Pipe Insulation HM3 ACBM Vineland MVSB 1st Garage Pipe Insulation HM1 Vineland MVSB 1st Garage Pipe Insulation HM1 Vineland OMS 1st Armorer's Closet White Ceiling Tile HM1 Vineland OMS 1st Battery Cement on ends of pipe insulation Vineland OMS 1st Battery White Ceiling Tile HM1 Vineland OMS 1st Boiler White Ceiling Tile HM1 Vineland OMS 1st Break White ceiling tile HM1 Vineland OMS 1st Break 12 x 12 white floor tile HM2 Vineland OMS 1st Shop Foreman's White ceiling tile HM1 Vineland OMS 1st Shop Foreman's 12 x 12 white floor tile HM2 Vineland OMS 1st Shower 12 x 12 white floor tile HM2 Vineland OMS 1st Shower White ceiling tile HM1 West Orange Armory 1st Armorer's Supply 2 Floor tile, 9" x 9", dk brown, w/lt brown HM1 West Orange Armory 1st Armorer's Supply 2 Plaster, Ceiling West Orange Armory 1st Armorer's Supply 2 Ceiling tile, 2' x 4', fiberglass w/paper HM1 HM4 covering West Orange Armory 1st Armorer's Closet Plaster, Ceiling, Wall West Orange Armory 1st Armorer's Closet Floor tile, 9" x 9", dk brown, w/lt brown HM3 HM1 West Orange Armory 1st Armorer's Closet 1 West Orange Armory 1st Armorer's Closet, North Plaster, Ceiling, Wall Plaster, Ceiling HM3 HM3 Hallway West Orange Armory 1st Armorer's Closet, North Floor tile, 9" x 9", dk brown, w/lt brown HM1 Hallway West Orange Armory 1st Armorer's Plaster, Ceiling HM2 West Orange Armory 1st Armorer's Ceiling tile, 2' x 4' HM2 West Orange Armory 1st Armorer's Floor tile, 9" x 9", dk brown, w/lt brown HM1 West Orange Armory 1st Armorer's Foyer and Floor tile, 9" x 9", dk brown, w/lt brown Hallways HM1 Monday, September 27, 2004 Page 38 of 53

Facility Facility Homogenious / West Orange Armory 1st Armorer's Foyer and Plaster, Ceiling HM3 Hallways West Orange Armory 1st Boiler Plaster, Ceiling, Wall HM3 West Orange Armory 1st Boiler Hallway Plaster, Cieling, Wall HM3 West Orange Armory 1st Boiler Hallway Wallboard, wall HM5 West Orange Armory 1st Boiler Hallway Floor tile, 9" x 9", dk brown, w/lt brown HM1 West Orange Armory 1st Break Floor tile, 9" x 9", dk brown, w/lt brown HM1 West Orange Armory 1st Break Ceiling tile, 2' x 4' HM2 West Orange Armory 1st Break Plaster, Ceiling HM2 West Orange Armory 1st Co. C 50th MSB Mess Ceiling tile, 2' x 4', fiberglass w/paper HM4 Section Supply covering West Orange Armory 1st Co. C 50th MSB Mess Floor tile, 9" x 9", dk brown, w/lt brown HM1 Section Supply West Orange Armory 1st Co. C 50th MSB Mess Plaster, Ceiling HM1 Section Supply West Orange Armory 1st Communications School Floor tile, 9" x 9", dk brown, w/lt brown HM1 West Orange Armory 1st Communications School Ceiling tile, 2' x 4' HM2 West Orange Armory 1st Communications School Plaster, Ceiling HM3 West Orange Armory 1st CSMS North Hallway Plaster, Ceiling, Wall HM3 West Orange Armory 1st CSMS North Hallway Floor tile, 9" x 9", dk brown, w/lt brown HM1 West Orange Armory 1st Drill Floor Insulation, Fire Door, vault West Orange Armory 1st Drill Floor North Hallway Floor tile, 9" x 9", dk brown, w/lt brown HM1 Stairwell West Orange Armory 1st Drill Floor North Hallway Plaster, Ceiling HM3 Stairwell West Orange Armory 1st GSA Floor tile, 9" x 9", dk brown, w/lt brown HM1 West Orange Armory 1st GSA Ceiling tile, 2' x 4' HM2 West Orange Armory 1st GSA Plaster, Ceiling HM3 West Orange Armory 1st Gym, Shower Mastic, floor tile West Orange Armory 1st Gym, Shower Plaster, Ceiling, Wall HM3 West Orange Armory 1st Lobby Insulation, Pipe HM6 West Orange Armory 1st Lobby Linoleum Floor, telephone booth ceiling West Orange Armory 1st Lobby Transite, telephone booth ceiling West Orange Armory 1st Lobby Plaster, Cieling, Wall HM3 West Orange Armory 1st Men's Latrine Insulation, Pipe HM6 West Orange Armory 1st Men's Latrine Plaster, Cieling, Wall HM3 West Orange Armory 1st North Hallway Plaster, Cieling, Wall HM3 West Orange Armory 1st North Hallway Wallboard, wall HM5 West Orange Armory 1st North Hallway Floor tile, 9" x 9", dk brown, w/white HM7 West Orange Armory 1st North Hallway Closet Floor tile, 9" x 9", dk brown, w/lt brown HM1 West Orange Armory 1st North Hallway Closet Plaster, Ceiling, Wall West Orange Armory 1st North Hallway Stairwell Floor tile, 12" x 12", lt green/tan w/ HM3 white specks West Orange Armory 1st North Hallway Stairwell Plaster, Ceiling West Orange Armory 1st North Hallway Stairwell Floor tile, 9" x 9", dk brown, w/lt brown HM3 HM1 West Orange Armory 1st Radio Floor tile, 9" x 9", dk brown, w/lt brown HM1 West Orange Armory 1st Radio Ceiling tile, 2' x 4' HM2 West Orange Armory 1st Radio Plaster, Ceiling HM3 West Orange Armory 1st Recruiter's Floor tile, 9" x 9", dk brown, w/lt brown HM1 Monday, September 27, 2004 Page 39 of 53

Facility Facility Homogenious / West Orange Armory 1st Recruiter's Plaster, Ceiling, Wall West Orange Armory 1st Recruiter's Ceiling tile, 2' x 4', fiberglass w/paper HM3 HM4 covering West Orange Armory 1st Recruiter's Ceiling tile, 2' x 4' West Orange Armory 1st Soccer Palace Ceiling tile, 2' x 4', fiberglass w/paper HM2 HM4 covering West Orange Armory 1st Soccer Palace Floor tile, 9" x 9", dk brown, w/lt brown HM1 West Orange Armory 1st Soccer Palace Plaster, Ceiling West Orange Armory 1st Stairwell Floor tile, 9" x 9", dk brown, w/lt brown HM1 HM1 West Orange Armory 1st Stairwell Plaster, Ceiling HM2 West Orange Armory 2nd Insulation, Pipe HM6 West Orange Armory 2nd Insulation, Partitions HM10 West Orange Armory 2nd Floor tile, 9" x 9", dk brown, w/lt brown HM1 West Orange Armory 2nd 5\117 Cav. Admin. Plaster, Cieling, Wall HM3 West Orange Armory 2nd 5\117 Cav. Admin. Floor tile, 9" x 9", black w/white HM9 West Orange Armory 2nd 5\117 Cav. Admin. Insulation, Partitions HM10 West Orange Armory 2nd 50th MSB Admin. Insulation, Partitions HM10 West Orange Armory 2nd 50th MSB Admin. Ceiling tile, 2' x 2' HM8 West Orange Armory 2nd 50th MSB Admin. Floor tile, 9" x 9", black w/white HM9 West Orange Armory 2nd 50th MSB Maintenance Ceiling tile, 2' x 2' HM8 NCO West Orange Armory 2nd 50th MSB Maintenance Chalk Board HM11 NCO West Orange Armory 2nd 50th MSB Maintenance Wallboard HM5 West Orange Armory 2nd 50th MSB Maintenance Floor tile, 9" x 9", black w/white HM9 NCO West Orange Armory 2nd 50th MSB Motor Sergeants Ceiling tile, 2' x 4' HM2 West Orange Armory 2nd 50th MSB Motor Sergeants Wallboard HM5 West Orange Armory 2nd 50th MSB Motor Sergeants Chalk Board HM11 West Orange Armory 2nd 50th MSB Motor Sergeants Floor tile, 9" x 9", black w/white HM9 West Orange Armory 2nd 50th MSB Training NCO Wallboard HM5 West Orange Armory 2nd 50th MSB Training NCO Floor tile, 9" x 9", black w/white HM9 West Orange Armory 2nd 50th MSB Training NCO Chalk Board HM11 West Orange Armory 2nd 50th MSB Training NCO Ceiling tile, 2' x 2' HM8 West Orange Armory 2nd 50th MSD 1SGT Chalk Board HM11 West Orange Armory 2nd 50th MSD 1SGT Wallboard HM5 West Orange Armory 2nd 50th MSD 1SGT Ceiling tile, 2' x 2' HM8 West Orange Armory 2nd 50th MSD 1SGT Floor tile, 9" x 9", black w/white HM9 West Orange Armory 2nd Admin., Mail, Plaster, Ceiling, Wall HM3 Men's Latrine West Orange Armory 2nd AFGE Local 371 Floor tile, 9" x 9", black w/white HM9 West Orange Armory 2nd AFGE Local 371 Ceiling tile, 2' x 2' HM8 West Orange Armory 2nd AFGE Local 371 Insulation, Partitions HM10 West Orange Armory 2nd AFGE Local 371 Wallboard, wall HM5 West Orange Armory 2nd Armorer's Closet, North Floor tile, 9" x 9", dk brown, w/lt brown HM1 Hallway Monday, September 27, 2004 Page 40 of 53

Facility Facility Homogenious / West Orange Armory 2nd Armorer's Closet, North Plaster, Ceiling, Wall HM3 Hallway West Orange Armory 2nd Armore's Apartment Floor tile, 9" x 9", dk brown, w/lt brown HM1 West Orange Armory 2nd Armore's Apartment Floor tile, 12" x 12", white West Orange Armory 2nd Armore's Apartment Floor tile, 12" x 12", white w\black diamonds West Orange Armory 2nd Armore's Apartment Plaster, Cieling, Wall West Orange Armory 2nd Beer Locker Floor tile, 9" x 9", dk brown, w/lt brown HM3 HM1 West Orange Armory 2nd Beer Locker Plaster, Ceiling, Wall West Orange Armory 2nd Classroom 2 Floor tile, 9" x 9", dk brown, w/white HM1 HM7 West Orange Armory 2nd Classroom 2 Chalk Board HM11 West Orange Armory 2nd Classroom 2 Ceiling tile, 2' x 4' HM2 West Orange Armory 2nd Classroom 2 Wallboard HM5 West Orange Armory 2nd Classroom 3 Floor tile, 9" x 9", black w/white HM9 West Orange Armory 2nd Classroom 3 Wallboard, wall HM5 West Orange Armory 2nd Classroom 3 Ceiling tile, 2' x 2' HM8 West Orange Armory 2nd Classroom 3 Chalk Board HM11 West Orange Armory 2nd Club Insulation, Pipe HM6 West Orange Armory 2nd Club Plaster, Ceiling HM3 West Orange Armory 2nd Club Latrine Plaster, Ceiling HM3 West Orange Armory 2nd DEA Floor tile, 9" x 9", black w/white HM9 West Orange Armory 2nd DEA Wallboard HM5 West Orange Armory 2nd DEA Chalk Board HM11 West Orange Armory 2nd DEA Ceiling tile, 2' x 2' HM8 West Orange Armory 2nd Drill Plaster, Ceiling HM3 West Orange Armory 2nd Drill Floor tile, 9" x 9", dk brown, w/lt brown HM1 West Orange Armory 2nd Drill Insulation, Pipe HM6 West Orange Armory 2nd Essex Troop Plaster, Cieling, Wall HM3 West Orange Armory 2nd Essex Troop Ceiling tiles, 2' x 4', fiberglass w/paper HM4 covering West Orange Armory 2nd Essex Troop Floor tile, 9" x 9", dk brown, w/lt brown HM1 West Orange Armory 2nd FTSS Floor tile, 9" x 9", dk brown, w/lt brown HM1 West Orange Armory 2nd FTSS Plaster, Cieling, Wall HM3 West Orange Armory 2nd FTSS Insulation, Partitions West Orange Armory 2nd Kitchen Plaster, Ceiling HM3 West Orange Armory 2nd Kitchen Floor tile, 12" x 12", red w\ white specks West Orange Armory 2nd Lobby Plaster, Cieling, Wall HM3 West Orange Armory 2nd Lobby Floor tile, 9" x 9", dk brown, w/lt brown HM1 West Orange Armory 2nd Men's Latrine Plaster, Ceiling West Orange Armory 2nd North Hallway Floor tile, 9" x 9", dk brown, w/ lt brown HM3 HM1 West Orange Armory 2nd North Hallway Plaster, Ceiling, Wall HM3 West Orange Armory 2nd North Hallway Ceiling tile, 2' x 2' HM8 West Orange Armory 2nd Range Insulation, Fire Door West Orange Armory 2nd Range Insulation, Pipe HM6 West Orange Armory 2nd Range Sound Proofing West Orange Armory 2nd Retention Insulation, Partitions HM10 West Orange Armory 2nd Retention Wallboard, wall HM5 West Orange Armory 2nd Retention Floor tile, 9" x 9", black w/white HM9 West Orange Armory 2nd Retention Ceiling tile, 2' x 2' HM8 West Orange Armory 2nd Women's Latrine Wallboard HM5 Monday, September 27, 2004 Page 41 of 53

Facility Facility Homogenious / West Orange Armory 2nd Women's Latrine Plaster, Ceiling, Wall HM3 West Orange CSMS 1 1st Allied Trades Foreman Floor tile, 9" x 9", dk brown w/white HM6 West Orange CSMS 1 1st Allied Trades Foreman Ceiling tile, 2' x 4' HM4 West Orange CSMS 1 1st Allied Trades Foreman Wallboard HM7 West Orange CSMS 1 1st Automotive Trade Forman's Wallboard HM7 West Orange CSMS 1 1st Automotive Trade Forman's Floor tile, 12" x 12", white w/green grey HM2 West Orange CSMS 1 1st Automotive Trade Forman's Ceiling tile, 2' x 4' HM4 West Orange CSMS 1 1st Boiler Boiler Jacket, Breeching West Orange CSMS 1 1st Boiler Insulation, Pipe HM5 West Orange CSMS 1 1st Break Floor tile, 12" x 12", white w/green grey HM2 West Orange CSMS 1 1st Break Floor tile, 9" x 9", dk brown w/white HM6 West Orange CSMS 1 1st Break Ceiling tile, 2' x 4' HM4 West Orange CSMS 1 1st Break Wallboard HM7 West Orange CSMS 1 1st Break Insulation, Pipe HM5 West Orange CSMS 1 1st Commander's Ceiling tile, 2' x 2' HM1 West Orange CSMS 1 1st Commander's Ceiling tile, 1' x 1' HM3 West Orange CSMS 1 1st Commander's Floor tile, 12" x 12", white w/green grey HM2 West Orange CSMS 1 1st Commander's Floor tile, 9" x 9", dk brown w/white HM6 West Orange CSMS 1 1st Foyer Ceiling tile, 2' x 4' HM4 West Orange CSMS 1 1st Foyer Insulation, Pipe HM5 West Orange CSMS 1 1st Foyer Plaster, Ceiling HM8 West Orange CSMS 1 1st Fuel and Electric Ceiling tile, 2' x 4' HM4 West Orange CSMS 1 1st Fuel and Electric Floor tile, 12" x 12", white w/green grey HM2 West Orange CSMS 1 1st Fuel and Electric West Orange CSMS 1 1st Fuel and Electric Work Wallboard Ceiling tile, 2' x 4' HM7 HM4 Shop West Orange CSMS 1 1st Fuel and Electric Work Wallboard HM7 Shop West Orange CSMS 1 1st Inspection Section s Floor tile, 12" x 12", dk grey w/lt grey specks West Orange CSMS 1 1st Inspection Section s Ceiling tile, 2' x 4' HM4 West Orange CSMS 1 1st Inspection Section s Wallboard HM7 West Orange CSMS 1 1st Machine Shop Insulation, Pipe HM West Orange CSMS 1 1st Main Garage Bays Wallboard HM7 West Orange CSMS 1 1st Main Garage Bays Insulation, Pipe HM5 West Orange CSMS 1 1st Men's Latrine, Shower Plaster, Ceiling HM8, Locker, West Orange CSMS 1 1st Men's Latrine, Shower Insulation, Pipe HM5, Locker, West Orange CSMS 1 1st Network Floor tile, 9" x 9", dk brown w/white HM6 West Orange CSMS 1 1st Network Wallboard West Orange CSMS 1 1st Production Control Floor tile, 9" x 9", dk brown w/white HM7 HM6 West Orange CSMS 1 1st Production Control Ceiling tile, 2' x 4' West Orange CSMS 1 1st Production Control Floor tile, 12" x 12", lt tan/brown HM4 HM6 w/brown and white specks West Orange CSMS 1 1st Secretary's Insulation, Pipe HM5 Monday, September 27, 2004 Page 42 of 53

Facility Facility Homogenious / West Orange CSMS 1 1st Secretary's Ceiling tile, 2' x 4' HM4 West Orange CSMS 1 1st Secretary's Wallboard, Wall HM7 West Orange CSMS 1 1st Secretary's Floor tile, 12" x 12", white w/green grey HM2 West Orange CSMS 1 1st Secretary's Floor tile, 9" x 9", dk brown w/white HM6 West Orange CSMS 1 1st Tool and Parts Supply Insulation, Pipe HM5 West Orange CSMS 1 1st Tool and Parts Supply Floor tile, 9" x 9", dk brown w/white HM6 West Orange CSMS 1 1st Women's Latrine Floor tile, 9" x 9", dk brown w/white HM6 West Orange CSMS 1 1st Women's Latrine Ceiling tile, 1' x 1' HM3 West Orange CSMS 1 1st Women's Latrine Ceiling tile, 2' x 2' HM1 West Orange CSMS 1 1st Women's Shower Ceiling tile, 2' x 4' HM1 West Orange CSMS 1 1st Women's Shower Wallboard HM7 West Orange CSMS 1 1st Women's Shower Floor tile, 9" x 9", dk brown w/white HM6 West Orange CSMS 1 1st Women's Shower Ceiling tile, 1' x 1' HM3 West Orange CSMS 1Roof Porch Roofing Shingles West Orange CSMS 2 1st Armorerment's Floor tile, 9" x 9", dk brown, w/white HM3 West Orange CSMS 2 1st Armorerment's Ceiling tile, 2' x 4' HM2 West Orange CSMS 2 1st Armorerment's Insulation, Fire Door West Orange CSMS 2 1st Armorerment's Workshop Insulation, Pipe HM1 West Orange CSMS 2 1st Armorerment's Workshop Ceiling tile, 2' x 4' HM2 West Orange CSMS 2 1st Armorer's Garage Insulation, Pipe HM1 West Orange CSMS 2 1st Calibration Workshop Floor tile, 12" x 12", white w/grey HM4 West Orange CSMS 2 1st Calibration Workshop Floor tile, 9" x 9", dk brown, w/white HM3 West Orange CSMS 2 1st Calibration Workshop Ceiling tile, 2' x 4' HM2 West Orange CSMS 2 1st Canvas Workshop Insulation, Pipe HM1 West Orange CSMS 2 1st Canvas Workshop Foyer Insulation, Pipe HM1 West Orange CSMS 2 1st Electronics Garage Insulation, Pipe HM1 West Orange CSMS 2 1st Electronics Workshop Insulation, Pipe HM1 West Orange CSMS 2 1st Electronics Workshop Floor tile, 12" x 12", white w/grey HM4 West Orange CSMS 2 1st Electronics Workshop Ceiling tile, 2' x 4' HM2 West Orange CSMS 2 1st Electronics Workshop Wallboard, wall HM5 West Orange CSMS 2 1st Foyer Insulation, Pipe HM1 West Orange CSMS 2 1st Foyer Floor tile, 12" x 12" West Orange CSMS 2 1st Men's Latrine Insulation, Pipe HM1 West Orange CSMS 2 1st Men's Latrine Wallboard, ceiling HM5 West Orange CSMS 2 1st Old Paint Shop Insulation, Pipe HM1 West Orange CSMS 2 1st TOW Calibration Shop Floor tile, 12" x 12", white w/grey specs HM4 West Orange CSMS 2 1st TOW Calibration Shop Wallboard HM5 West Orange CSMS 2 1st Welding Workshop Insulation, Pipe HM2 West Orange CSMS 2 1st Woodshop Workshop Insulation, Pipe HM1 West Orange OMS 1st Boiler Pipe Fittings West Orange OMS 1st Break Floor tile, 9" x 9", dk brown w/white West Orange OMS 1st Garage Pipe Fittings Westfield Armory 1st 1SGT Ceiling tile, 1' x 1' HM8 Westfield Armory 1st 1SGT Wallboard, ceiling HM4 Westfield Armory 1st 1SGT Floor tile, 9" x 9", dk brown w/ green HM6 Westfield Westfield Armory Armory 1st 1st 1SGT 1SGT Ceiling tile, 2' x 4' Insulation, Partitions HM5 Monday, September 27, 2004 Page 43 of 53

Facility Facility Homogenious / Westfield Armory 1st 1st Floor Armorer's Wallboard, ceiling HM4 Hallway Westfield Armory 1st 1st Floor Armorer's Floor tile, 9" x 9", dk brown w/ green HM6 Hallway Westfield Armory 1st 1st Floor Armorer's Ceiling tile, 2' x 2' HM7 Hallway Westfield Armory 1st Admin. Floor tile, 9" x 9", dk brown w/ green HM6 Westfield Armory 1st Admin. Ceiling tile, 2' x 4' HM5 Westfield Armory 1st Admin. Insulation, Partitions Westfield Armory 1st Admin. Chalk Board Westfield Armory 1st Admin. Ceiling tile, 1' x 1' HM8 Westfield Armory 1st Admin. Wallboard, ceiling HM4 Westfield Armory 1st Armorer's Floor tile, 12" x 12", lt green w/white HM9 Westfield Armory 1st Armorer's Wallboard, ceiling, walls HM4 Westfield Armory 1st Armore's shop Wallboard, ceiling HM4 Westfield Armory 1st Boiler Plaster, Ceiling HM1 Westfield Armory 1st Break Ceiling tile, 2' x 2' HM7 Westfield Armory 1st Break Ceiling tile, 1' x 1' HM8 Westfield Armory 1st Break Floor tile, 9" x 9", dk brown w/white HM3 Westfield Armory 1st Break Wallboard, ceiling HM4 Westfield Armory 1st Break Plaster, Wall HM1 Westfield Armory 1st CE and BMO's s Ceiling tile, 2' x 2' HM7 Westfield Armory 1st CE and BMO's s Floor tile, 9" x 9", dk brown w/white HM3 Westfield Armory 1st CE and BMO's s Ceiling tile, 1' x 1' HM8 Westfield Armory 1st CE and BMO's s Wallboard, ceiling, walls HM4 Westfield Armory 1st CE MNT Wallboard HM4 Westfield Armory 1st Co. B Supply Wallboard, ceiling, walls HM4 Westfield Armory 1st COM SEC Floor tile, 12" x 12", lt green with white Westfield Armory 1st COM SEC Wallboard, ceiling HM4 Westfield Armory 1st COM SEC Storage Wallboard HM4 Westfield Armory 1st Det B Supply Ceiling tile, 2' x 4' HM5 Westfield Armory 1st Distance Learning Center Plaster, Wall HM1 Westfield Armory 1st Distance Learning Center Ceiling tile, 1' x 1' HM8 Westfield Armory 1st Distance Learning Center Wallboard, ceiling HM4 Westfield Armory 1st Distance Learning Center Wallboard, ceiling HM4 Hallway Westfield Armory 1st Distance Learning Center Plaster, Wall HM1 Hallway Westfield Armory 1st Distance Learning Center Ceiling tile, 2' x 2' HM7 Hallway Westfield Armory 1st Distance Learning Center Floor tile, 12" x 12", lt green w/white HM9 Hallway Westfield Armory 1st Eastside northern stairwell Plaster, Ceiling HM1 Westfield Armory 1st Eastside northern stairwell Ceiling tile, 2' x 4' HM5 Westfield Armory 1st Foyer, Stairwell Ceiling tile, 2' x 4' HM5 Westfield Armory 1st Foyer, Stairwell Wallboard HM4 Westfield Armory 1st Foyer, Stairwell Ceiling tile, 2' x 2' HM7 Westfield Armory 1st Foyer, Stairwell Plaster, Ceiling, Wall HM1 Westfield Armory 1st Garage 1 Transite HM2 Westfield Armory 1st Garage 2 Transite HM2 Westfield Armory 1st Garage 3 Transite HM2 Westfield Armory 1st Garage 4 Transite HM2 Westfield Armory 1st Garage 5 Transite HM2 Monday, September 27, 2004 Page 44 of 53

Facility Facility Homogenious / Westfield Armory 1st Garage 6 Transite HM2 Westfield Armory 1st Garage 7 Transite HM2 Westfield Armory 1st Gym Wallboard, wall HM4 Westfield Armory 1st HHC Orderly Ceiling tile, 1' x 1' HM8 Westfield Armory 1st HHC Orderly Wallboard, ceiling HM4 Westfield Armory 1st HHC Orderly Ceiling tile, 2' x 4' HM5 Westfield Armory 1st HHC Orderly Floor tile, 9" x 9", dk brown w/ green HM6 Westfield Armory 1st HHC Orderly Insulation, Partitions Westfield Armory 1st Kitchen Wallboard HM4 Westfield Armory 1st Kitchen Ceiling tile, 2' x 4' HM5 Westfield Armory 1st Men's Latrine Wallboard HM4 Westfield Armory 1st Mess Hall Wallboard, ceiling, walls HM4 Westfield Armory 1st Mess Hall Ceiling tile, 2' x 4' HM5 Westfield Armory 1st Mess Hall Hallway Wallboard, wall HM4 Westfield Armory 1st Mess Hall Hallway Ceiling tile, 2' x 4' HM5 Westfield Armory 1st Mess Section Supply Wallboard, ceiling HM4 Westfield Armory 1st Rear Entrance Foyer Floor tile, 9" x 9", dk brown w/white HM3 Westfield Armory 1st Rear Entrance Foyer Wallboard, ceiling, wall HM4 Westfield Armory 1st Rear Entrance Foyer Plaster, Wall HM1 Westfield Armory 1st Retention and Recruiter's Ceiling tile, 1' x 1' HM8 Westfield Armory 1st Retention and Recruiter's Plaster, Wall HM1 Westfield Armory 1st Retention and Recruiter's Ceiling tile, 2' x 2' HM7 Westfield Armory 1st Retention and Recruiter's Floor tile, 9" x 9", dk brown w/white HM3 Westfield Armory 1st Retention and Recruiter's Wallboard, ceiling, walls HM4 Westfield Armory 1st Storage Ceiling tile, 2' x 2' Westfield Armory 1st Storage Floor tile, 9" x 9", dk brown w/white HM7 HM3 Westfield Armory 1st Storage Plaster, Ceiling, Wall HM1 Westfield Armory 1st Vault Insulation, Fire Door Westfield Armory 1st Westside northern Wallboard, ceiling HM4 Westfield Armory 1st Westside northern Plaster, Ceiling HM1 Westfield Armory 1st Women's Latrine Wallboard HM4 Westfield Armory 1st XO's Plaster, Ceiling, Plaster, Wall HM1 Westfield Armory 1st XO's Floor tile, 9" x 9", dk brown w/white HM3 Westfield Westfield Armory Armory 1st 1st XO's XO's Latrine/Shower Ceiling tile, 2' x 2' Plaster, Ceiling, Plaster, Wall HM7 HM1 Westfield Armory 1st XO's Latrine/Shower Ceiling tile, 2' x 2' HM7 Westfield Armory 2nd 2nd Floor Classroom Wallboard HM4 Hallway Westfield Armory 2nd 2nd Floor Classroom Floor tile, 9" x 9", dk brown w/ white HM3 Hallway Westfield Armory 2nd 2nd Floor Classroom Ceiling tile, 2' x 4' HM5 Hallway Westfield Armory 2nd ADSO s Ceiling tile, 1' x 1' Westfield Armory 2nd ADSO s Floor tile, 12" x 12", lt green w/white HM8 HM9 Westfield Armory 2nd ADSO s Insulation, Partitions Monday, September 27, 2004 Page 45 of 53

Facility Facility Homogenious / Westfield Armory 2nd ADSO s Floor tile, 9" x 9", dk brown w/white HM3 Westfield Armory 2nd ADSO s Wallboard, ceiling HM4 Westfield Armory 2nd AO Section Hallway Ceiling tile, 2' x 2' HM7 Westfield Armory 2nd Armorer's Closet Floor tile, 9" x 9", dk brown w/white HM3 Westfield Armory 2nd Armorer's Closet Wallboard, ceiling Westfield Armory 2nd Armorer's Closet Floor tile, 12" x 12", lt green w/white HM4 HM9 speckle Westfield Armory 2nd Armore's Apartment Wallboard HM4 Westfield Armory 2nd Armore's Apartment Ceiling tile, 1' x 1' HM8 Westfield Armory 2nd Armore's Apartment Ceiling tile, 2' x 4' HM5 Westfield Armory 2nd Armore's Apartment Floor tile, 9" x 9", dk brown w/white HM3 Westfield Armory 2nd BN Commander's Plaster, Ceiling HM1 Westfield Armory 2nd BN Commander's Ceiling tile, 2' x 4' HM5 Westfield Armory 2nd BN Commander's Ceiling tile, 1' x 1' HM8 Westfield Armory 2nd Classroom 1 Wallboard HM4 Westfield Armory 2nd Classroom 1 Ceiling tile, 2' x 4' HM5 Westfield Armory 2nd Classroom 1 Floor tile, 9" x 9", dk brown w/ white HM3 Westfield Armory 2nd Classroom 2 Wallboard Westfield Armory 2nd Classroom 2 Floor tile, 9" x 9", dk brown w/ white HM4 HM3 Westfield Armory 2nd Classroom 2 Ceiling tile, 2' x 4' Westfield Armory 2nd Classroom 3 Floor tile, 9" x 9", dk brown w/ white HM5 HM3 Westfield Armory 2nd Classroom 3 Ceiling tile, 2' x 4' HM5 Westfield Armory 2nd Classroom 3 Wallboard HM4 Westfield Armory 2nd Classroom 4 Floor tile, 9" x 9", dk brown w/ white HM3 Westfield Armory 2nd Classroom 4 Wallboard HM4 Westfield Armory 2nd Classroom 4 Wallboard HM4 Westfield Armory 2nd Classroom 4 Ceiling tile, 2' x 4' HM5 Westfield Armory 2nd Classroom 5 Ceiling tile, 2' x 4' HM5 Westfield Armory 2nd Classroom 5 Wallboard HM4 Westfield Armory 2nd Classroom 5 Floor tile, 9" x 9", dk brown w/ white HM3 Westfield Armory 2nd Classroom I Ceiling tile, 2' x 4' HM5 Westfield Armory 2nd Classroom I Ceiling tile, 1' x 1' HM8 Westfield Armory 2nd Classroom I Wallboard HM4 Westfield Armory 2nd Classroom I Floor tile, 12" x 12", lt green w/white HM9 Westfield Armory 2nd Classroom J Floor tile, 12" x 12", lt green w/white HM9 Westfield Armory 2nd Classroom J Ceiling tile, 2' x 4' HM5 Westfield Armory 2nd Classroom J Ceiling tile, 1' x 1' HM8 Westfield Armory 2nd Classroom J Wallboard HM4 Westfield Armory 2nd CSM 's Latrine, Plaster, Ceiling HM1 Shower Westfield Armory 2nd CSM 's Latrine, Ceiling tile, 2' x 2' HM7 Shower Westfield Armory 2nd CSM's Ceiling tile, 1' x 1' HM8 Westfield Armory 2nd CSM's Ceiling tile, 2' x 4' HM5 Westfield Armory 2nd CSM's Plaster, Ceiling HM1 Westfield Armory 2nd Foyer, Stairwell Floor tile, 12" x 12", lt green w/white HM9 Westfield Armory 2nd Foyer, Stairwell Wallboard HM4 Monday, September 27, 2004 Page 46 of 53

Facility Facility Homogenious / Westfield Armory 2nd Heritage Ceiling tile, 2' x 4' HM5 Westfield Armory 2nd Heritage Ceiling tile, 1' x 1' HM8 Westfield Armory 2nd Heritage Plaster, Ceiling, Wall HM1 Westfield Armory 2nd Heritage Floor tile, 12" x 12", lt grey w/gold brown Westfield Armory 2nd Heritage Linoleum Floor, red brown Westfield Armory 2nd Heritage Hallway Floor tile, 12" x 12", lt green w/white HM9 Westfield Armory 2nd Heritage Hallway Wallboard, ceiling, walls Westfield Armory 2nd Retention Floor tile, 9" x 9", dk brown w/white HM4 HM3 Westfield Armory 2nd Retention Wallboard, ceiling, wall, HM4 Westfield Armory 2nd Retention Ceiling tile, 2' x 4' HM5 Westfield Armory 2nd S2\S3 s Floor tile, 12" x 12", lt green w/white HM9 Westfield Armory 2nd S2\S3 s Insulation, Partitions Westfield Armory 2nd S2\S3 s Wallboard HM4 Westfield Armory 2nd S2\S3 s Ceiling tile, 1' x 1' HM8 Westfield Armory 2nd S2\S3 s Ceiling tile, 2' x 4' HM5 Westfield Armory 2nd Supply Ceiling tile, 2' x 4' HM5 Westfield Armory 2nd Supply Floor tile, 12" x 12", lt green w/white HM9 Westfield Armory 2nd Women's Latrine Plaster, Cieling, Wall HM1 Westfield Armory 3rd Tower Plaster, Ceiling, Wall HM1 Westfield Armory 3rd Tower Ceiling tile, 2' x 4' HM5 Westfield Armory Basement Men's Latrine, Shower Plaster, Cieling, Wall HM1 Westfield Armory Basement NCO Club Floor tile, 9" x 9", dk brown w/white HM3 Westfield Westfield Armory Armory Basement NCO Club Basement Old Boiler, Telecom Floor tile, 9" x 9", solid black and red tile Plaster, Ceiling HM1 Equipment Westfield Armory Basement Sprinkler Valve Floor tile, 9" x 9", solid black and red tile Stairwell Westfield Armory Basement Sprinkler Valve Ceiling tile, 2' x 4' HM5 Stairwell Westfield Armory Basement Sprinkler Valve Plaster, Wall HM1 Stairwell Westfield Armory Basement Stairwell near men's Plaster, Cieling, Wall HM1 latrine/shower room Westfield Armory Roof Westfield Armory Throughout Roofing Shingles Caulking Westfield OMS 1st Battery Wallboard, ceiling, walls HM1 Westfield OMS 1st Boiler Wallboard, ceiling, walls HM1 Westfield OMS 1st Break Floor tile, 9" x 9", dk brown with white HM2 Westfield OMS 1st Break Wallboard, ceiling, walls HM1 Westfield OMS 1st Latrine, Shower s Ceiling tile, 2' x 2' Westfield OMS 1st Latrine, Shower s Wallboard, ceiling, walls HM1 Westfield OMS 1st Latrine, Shower s Floor tile, 12" x 12", lt grey Westfield OMS 1st MVSB Wallboard, ceiling, walls HM1 Westfield OMS 1st Shop Foreman's Floor tile, 12" x 12", white Westfield OMS 1st Shop Foreman's Wallboard, ceiling, wall HM1 Westfield OMS 1st Tool and Parts Wallboard, ceiling, walls HM1 Westfield OMS 1st Tool and Parts Floor tile, 9" x 9", dk brown with white HM2 Westfield OMS Roof Roofing Shingles Monday, September 27, 2004 Page 47 of 53

Facility Facility Homogenious / Woodbridge Armory 1st Admin. Foyer Floor tile, 12" x 12", lt brown w/white HM7 Woodbridge Armory 1st Admin. Foyer Ceiling tile, 2' x 4' HM4 Woodbridge Armory 1st Admin. Foyer Insulation, Pipe HM2 Woodbridge Armory 1st Admin. s Floor tile, 12" x 12", lt brown w/white HM7 Woodbridge Armory 1st Admin. s Wallboard HM3 Woodbridge Armory 1st Admin. s Ceiling tile, 2' x 4' HM4 Woodbridge Armory 1st Admin. s Insulation, Partitions Woodbridge Armory 1st Admin. s Insulation, Pipe HM2 Woodbridge Armory 1st Admin. s Floor tile, 12" x 12",white w/green HM1 Woodbridge Armory 1st Agent Orange Floor tile, 12" x 12", lt green w/white dk HM9 green Woodbridge Armory 1st Agent Orange Insulation, Pipe HM2 Woodbridge Armory 1st Agent Orange Ceiling tile, 2' x 4' HM4 Woodbridge Armory 1st Agent Orange Insulation, Pipe HM2 Woodbridge Armory 1st Agent Orange Floor tile, 12" x 12", lt green w/white dk HM9 green Woodbridge Armory 1st Agent Orange Wallboard, wall HM3 Woodbridge Armory 1st Agent Orange Ceiling tile, 2' x 4' HM4 Woodbridge Armory 1st Agent Orange Chalk Board HM10 Woodbridge Armory 1st Armorer's Closet Wallboard, ceiling HM3 Woodbridge Armory 1st Armorer's Closet Floor tile, 12" x 12", lt brown w/white HM7 Woodbridge Armory 1st Armorer's Closet Insulation, Pipe Woodbridge Armory 1st Armorer's Floor tile, 12" x 12", white w/green HM2 HM1 Woodbridge Armory 1st Armorer's Wallboard, Ceiling Woodbridge Armory 1st Armorer's Kitchen Insulation, Pipe HM3 HM2 Hallway Woodbridge Armory 1st Armorer's Kitchen Ceiling tile, 2' x 4' HM4 Hallway Woodbridge Armory 1st Armorer's Kitchen Wallboard Ceiling HM3 Hallway Woodbridge Armory 1st Armorer's Kitchen Floor tile, 12" x 12", lt brown w/white HM7 Hallway, hallways Woodbridge Armory 1st Armorer's Work Shop Ceiling tile, 2' x 2' HM5 Woodbridge Armory 1st Armorer's Work Shop Floor tile, 9" x 9", dk brown w/ white and HM6 lt brown Woodbridge Armory 1st Armorer's Work Shop Insulation, Pipe HM2 Woodbridge Armory 1st Boiler Insulation, Pipe HM2 Woodbridge Armory 1st Boiler Breeching, Boiler Jacket Woodbridge Armory 1st Boiler Plaster, Ceiling HM11 Woodbridge Armory 1st Boiler Foyer Plaster, Ceiling HM11 Woodbridge Armory 1st Classrooms 1&2 Floor tile, 12" x 12",white w/green HM1 Woodbridge Armory 1st Classrooms 1&2 Ceiling tile, 2' x 4' HM4 Woodbridge Armory 1st Classrooms 1&2 Chalk Board HM10 Woodbridge Armory 1st Classrooms 1&2 Insulation, Pipe HM2 Woodbridge Armory 1st Club Chalk Board HM10 Woodbridge Armory 1st Club Wallboard, wall HM3 Woodbridge Armory 1st Club Floor tile, 12" x 12" HM9 Woodbridge Armory 1st Club Insulation, Pipe HM2 Woodbridge Armory 1st Club Ceiling tile, 2' x 4' HM4 Woodbridge Armory 1st Club Hallway Ceiling tile, 2' x 4' HM4 Woodbridge Armory 1st Club Hallway Floor tile, 12" x 12", lt green w/white dk HM9 green Woodbridge Armory 1st Club Hallway Insulation, Pipe Woodbridge Armory 1st Drill Floor Foyer Insulation, Pipe HM2 HM2 Monday, September 27, 2004 Page 48 of 53

Facility Facility Homogenious / Woodbridge Armory 1st Drill Floor Foyer Ceiling tile, 2' x 2' HM5 Woodbridge Armory 1st Drill Floor Foyer Porch Plaster, Ceiling HM8 Woodbridge Armory 1st Drill Floor Rear Foyer Wallboard, ceiling HM3 Woodbridge Armory 1st Kitchen Floor tile, 12" x 12", white w/green HM1 Woodbridge Armory 1st Kitchen Plaster, Ceiling HM8 Woodbridge Armory 1st Kitchen Insulation, Pipe HM2 Woodbridge Armory 1st Men's Latrine, Shower Insulation, Pipe HM2 Woodbridge Armory 1st Men's Latrine, Shower Plaster, Ceiling HM8 Woodbridge Armory 1st Insulation, Pipe HM2 Woodbridge Armory 1st Ceiling tile, 2' x 4' HM4 Woodbridge Armory 1st Insulation, Partitions Woodbridge Armory 1st Insulation, Pipe HM1 Woodbridge Armory 1st Floor tile, 12" x 12", lt brown w/white HM7 Woodbridge Armory 1st Wallboard Woodbridge Armory 1st Floor tile, 12" x 12", white w/grey HM3 Woodbridge Armory 1st Ceiling tile, 2' x 4' HM4 Woodbridge Armory 1st Radio Ceiling tile, 2' x 4' HM4 Woodbridge Armory 1st Radio Floor tile, 12" x 12",white w/green HM1, kitchen, Woodbridge Armory 1st Recruiter's Ceiling tile, 2' x 4' HM4 Woodbridge Armory 1st Recruiter's Insulation, Pipe HM2 Woodbridge Armory 1st Recruiter's Floor tile, 12" x 12",white w/green HM1, kitchen, Woodbridge Armory 1st Recruiter's Floor tile, 12" x 12", lt brown w/white HM7 Woodbridge Armory 1st Recruiter's and Rear Insulation, Pipe HM2 Entrance Hallway Woodbridge Armory 1st Recruiter's and Rear Ceiling tile, 2' x 4' HM4 Entrance Hallway Woodbridge Armory 1st Recruiter's and Rear Floor tile, 12" x 12", lt brown w/white HM7 Entrance Hallway Woodbridge Armory 1st Supply Insulation, Pipe HM2 Woodbridge Armory 1st Supply Insulation, Pipe HM2 Woodbridge Armory 1st Supply Insulation, Pipe HM2 Woodbridge Armory 1st Supply Insulation, Pipe HM2 Woodbridge Armory 1st Supply Foyer Wallboard, ceiling HM3 Woodbridge Armory 1st Supply Hallway Insulation, Pipe HM2 Woodbridge Armory 1st Supply Hallway Floor tile, 12" x 12", lt green w/white dk HM9 green Woodbridge Armory 1st Telecom Equipment Insulation, Pipe HM2 Woodbridge Armory 1st Women's Latrine Insulation, Pipe HM2 Woodbridge Armory 1st Women's Latrine Ceiling tile, 2' x 2' HM5 Woodbridge Armory 1st Women's Latrine Plaster, Ceiling HM8 Woodbury Armory 1st Attrition Management Ceiling tile, 2' x 4' HM6 Woodbury Armory 1st Attrition Management Floor tile, 12" x 12", white with tan HM2 Woodbury Armory 1st Classroom 2 Ceiling tile, 2' x 4' HM6 Woodbury Armory 1st Classroom 2 Chalk Board Woodbury Armory 1st Classroom 3 Ceiling tile, 2' x 4' HM6 Woodbury Armory 1st Classroom 3 Chalk Board Woodbury Armory 1st Foyer Plaster, Ceiling HM1 Monday, September 27, 2004 Page 49 of 53

Facility Facility Homogenious / Woodbury Armory 1st Hallway Floor tile, 12" x 12", white with tan HM2 Woodbury Armory 1st Hallway Ceiling tile, 2' x 4' HM6 Woodbury Armory 1st Heritage Caulking Woodbury Armory 1st Heritage Wallboard HM7 Woodbury Armory 1st Heritage Ceiling tile, 2' x 4' HM6 Woodbury Armory 1st Kitchen Ceiling tile, 2' x 4', wallboard style HM8 Woodbury Armory 1st Medic Ceiling tile, 2' x 4' HM6 Woodbury Armory 1st Medic Linoleum Floor Woodbury Armory 1st Men's Latrine Ceiling tile, 2' x 4', wallboard style HM8 Woodbury Armory 1st NCO Club Floor tile, 12" x 12", white with brown HM2 Woodbury Armory 1st NCO Club Ceiling tile, 2' x 4' HM6 Woodbury Armory 1st NCO Club Ceiling tile, 1' x 1' Woodbury Armory 1st NCO Club Linoleum Floor Woodbury Armory 1st NCO Club Wallboard Woodbury Armory 1st Orderly Ceiling tile, 2' x 4' HM6 Woodbury Armory 1st Orderly Floor tile, 12" x 12", white with brown HM2 Woodbury Armory 1st Recruiter's Plaster, Cieling, Wall HM1 Woodbury Armory 1st Recruiter's Ceiling tile, 2' x 4' HM6 Woodbury Armory 1st Recruiter's Floor tile, 12" x 12", white with brown HM2 Woodbury Armory 1st Recruiter's Supply Plaster, Cieling, Wall HM1 Woodbury Armory 1st Recruiter's Supply Plaster, Cieling, Wall HM1 Woodbury Armory 1st Retention and Recruiter's Plaster, Cieling, Wall HM1 Woodbury Armory 1st Retention and Recruiter's Floor tile, 12" x 12", white with brown HM2 Woodbury Armory 1st Retention and Recruiter's Chalk Board Woodbury Armory 1st Retention and Recruiter's Ceiling tile, 2' x 4' HM6 Woodbury Armory 1st Weight Chalk Board Woodbury Armory 1st Women's Latrine Ceiling tile, 2' x 4', wallboard style HM8 Woodbury Armory Basement 1/114 Hallway Ceiling tile, 2' x 4' HM6 Woodbury Armory Basement 1/114 Hallway Plaster, ceiling, walls HM1 Woodbury Armory Basement 1/114 Hallway Floor tile, 12" x 12", white with tan HM2 Woodbury Armory Basement Armorer's Plaster, Ceiling HM1 Woodbury Armory Basement Armorer's Hallway Floor tile, 12" x 12", white w/ HM2 Woodbury Armory Basement Armorer's Hallway Plaster, popcorn ceiling Woodbury Armory Basement Armorer's Hallway Insulation, Pipe HM3 Woodbury Armory Basement BN Commo Supply Floor tile, 12" x 12", dark brown HM5 Woodbury Armory Basement BN Commo Supply Plaster, Ceiling HM1 Woodbury Armory Basement BN Commo Supply Insulation, Fire Door Woodbury Armory Basement BN Commo Supply Plaster, Ceiling HM1 Woodbury Armory Basement Boiler Boiler Jacket, Breeching Woodbury Armory Basement Boiler Plaster, Ceiling HM1 Woodbury Armory Basement Boiler Hallway Plaster, Ceiling HM3 Woodbury Armory Basement Boiler Hallway Plaster, Ceiling HM1 Woodbury Armory Basement Boiler Hallway Floor tile, 12" x 12", white with tan HM2 Woodbury Armory Basement Conference Wallboard HM7 Woodbury Armory Basement Conference Ceiling tile, 2' x 4' HM6 Woodbury Armory Basement HHC Supply Floor tile, 12" x 12", white w/ HM2 Monday, September 27, 2004 Page 50 of 53

Facility Facility Homogenious / Woodbury Armory Basement HHC Supply Plaster, ceiling HM1 Woodbury Armory Basement HHC Supply Floor tile, 12" x 12", dark brown HM5 Woodbury Armory Basement HHC Supply Plaster, walls\walls HM1 Woodbury Armory Basement Kitchen Stairwell Ceiling tile, 2' x 4' HM6 Woodbury Armory Basement Men's Latrine Insulation, Pipe HM3 Woodbury Armory Basement Men's Latrine Plaster, Ceiling HM1 Woodbury Armory Basement Range Plaster, Ceiling HM1 Woodbury Armory Basement Range Sound proofing panels Woodbury Armory Basement Range Stairwell Ceiling tile, 2' x 4' HM6 Woodbury Armory Basement Rear Exit Hallway Floor tile, 12" x 12", white w/ HM2 Woodbury Armory Basement Rear Exit Hallway Plaster, ceiling HM1 Woodbury Armory Basement Rear Exit Stairwell Ceiling tile, 2' x 4' HM6 Woodbury Armory Basement S1 Shop Wallboard HM7 Woodbury Armory Basement S1 Shop Ceiling tile, 2' x 4' HM6 Woodbury Armory Basement S2 Shop s Wallboard HM7 Woodbury Armory Basement S2 Shop s Floor tile, 12" x 12", white with tan HM2 Woodbury Armory Basement Scout Supply Insulation, Fire Door Woodbury Armory Basement Scout Supply Floor tile, 9" x 9", dk brown HM4 Woodbury Armory Basement Scout Supply Plaster, Ceiling HM1 Woodbury Armory Basement Sprinkler Valve Plaster, Ceiling HM1 Woodbury Armory Basement Staff s Wallboard HM7 Woodbury Armory Basement Staff s Chalk Board Woodbury Armory Basement Staff s Ceiling tile, 2' x 4' HM6 Woodbury Armory Basement Support Plt. Supply Plaster, ceiling HM1 Woodbury Armory Basement Telecom Equipment/Air Ceiling tile, 2' x 4', wallboard style HM8 Conditioner Woodbury Armory Basement Training s Wallboard HM7 Woodbury Armory Basement Training s Ceiling tile, 2' x 4' HM6 Woodbury Armory Basement Vault Insulation, Fire Door Woodbury Armory Roof Roofing Shingles Woodbury MVSB 1 Roof Roofing Paper Woodbury MVSB 1 Throughout Plaster, Wall, Exterior Woodbury MVSB 1 Throughout Caulking, window Woodbury MVSB 2 Roof Woodbury MVSB 2 Throughout Roofing Paper Plaster, Wall, Exterior Woodbury MVSB 2 Throughout Caulking, windows Woodbury OMS 1st Battery Plaster, Ceiling HM3 Woodbury OMS 1st Boiler Plaster, Ceiling, walls HM3 Woodbury OMS 1st Break Ceiling tile, 2' x 4' HM2 Woodbury OMS 1st Break Floor tile, 12" x 12", white HM1 Woodbury OMS 1st Latrine Ceiling tile, 2' x 4' HM2 Woodbury OMS 1st Shop Foreman's Floor tile, 12" x 12", white HM1 Woodbury OMS 1st Shop Foreman's Ceiling tile, 2' x 4' HM2 Woodbury OMS Throughout Caulking, windows Woodbury OMS Throughout Plaster, Wall, Exterior Monday, September 27, 2004 Page 51 of 53

Facility Facility Homogenious / Woodstown Armory 1st 1SGT Ceiling tile, 2' x 4' HM4 Woodstown Armory 1st 1SGT Floor tile, 12" x 12", red\brown HM3 Woodstown Armory 1st Armorer's Closet Floor tile, 9" x 9", dk brown Woodstown Armory 1st Armorer's Floor tile, 12" x 12", red\brown HM3 Woodstown Armory 1st Boiler Breeching None Detected Woodstown Armory 1st Boiler Plaster, Ceiling HM2 None Detected Woodstown Armory 1st Boiler Hallway Floor tile, 12" x 12", yellow/brown HM1 ACBM Woodstown Armory 1st Classroom 1 Ceiling tile, 2' x 4' HM4 Woodstown Armory 1st Classroom 1 Floor tile, 12" x 12", red\brown HM3 Woodstown Armory 1st Club Ceiling tile, 2' x 4' HM4 Woodstown Armory 1st Club Floor tile, 12" x 12", lt green Woodstown Armory 1st Commander's Ceiling tile, 2' x 4' HM4 Woodstown Armory 1st Commander's Floor tile, 12" x 12", red\brown HM3 Woodstown Armory 1st Kitchen Floor tile, 12" x 12", red\brown HM3 Woodstown Armory 1st Kitchen Ceiling tile, 2' x 4' HM4 Woodstown Armory 1st Main Foyer Ceiling tile, 2' x 4' HM4 Woodstown Armory 1st Main Foyer Floor tile, 12" x 12", yellow/brown HM1 ACBM Woodstown Armory 1st Maintenance Ceiling tile, 2' x 2' Woodstown Armory 1st Men's Latrine, Shower Plaster, Ceiling HM2 Woodstown Armory 1st Orderly Ceiling tile, 2' x 4' HM4 Woodstown Armory 1st Orderly Floor tile, 12" x 12", red\brown HM3 Woodstown Armory 1st Recruiter's Floor tile, 12" x 12", red\brown HM3 Woodstown Armory 1st Recruiter's Ceiling tile, 2' x 4' HM4 Woodstown Armory 1st South foyer Floor tile, 12" x 12", yellow/brown HM1 ACBM Woodstown Armory 1st South foyer Ceiling tile, 2' x 4' HM4 Woodstown Armory 1st Training NCO Floor tile, 12" x 12", red\brown HM3 Woodstown Armory 1st Training NCO Ceiling tile, 2' x 4' HM4 Woodstown Armory 1st Vault Insulation, Fire Door Woodstown Armory 1st Weight Floor tile, 12" x 12", red\brown HM2 Woodstown Armory 1st Weight Ceiling tile, 2' x 4' HM4 Woodstown Armory 1st Women's Latrine Plaster, Ceiling HM2 Woodstown Armory 1st Women's Latrine Foyer Ceiling tile, 2' x 4' HM4 Woodstown Armory Throughout Window caulking on panes Woodstown Armory Throughout Insulation, Pipe None Detected Monday, September 27, 2004 Page 52 of 53

Facility Facility Homogenious / 1. In accordance with 40 CFR 763, et. al, this inventory only includes materials identified during a VISIBLE inspection. Therefore, materials behind walls, ceilings, or areas not accessible at the time of the inspection were not identified. It is recommend that the proponent of any action that involves the demolition of a portion or all of a wall or ceiling that is thought to have asbestos building materials behind it or if the action will disturb any of the above listed building materials please call (609) 530 7133, (609) 530 7134, (609) 530 7135, or (609) 530 7136 during the inital plaaning of the action. 2. In accorance with 40 CFR 763, simillar materials may be grouped together and considered homogeneous materials for sampling purposes. Simillar materials are identified with the same Homogenious Material ID (i.e. HM 1 all pipe insulation in a particular building). The process of grouping simillar materials and/or buidling areas is left up to the assessor. Therefore, the Homogeneous Material IDs may be blank. 3. Due to funding limitations, this report may not include all facilities in the NJARNG inventory. If your facility is not listed above, please contact (609) 530 7133, (609) 530 7134, (609) 530 7135, or (609) 530 7136 for additional information.