Verizon NEBS TM Compliance: Data Center Equipment NEBS Requirements Verizon Technical Purchasing Requirements VZ.TPR.9703 Issue 2, March 2012



Similar documents
Verizon NEBS TM Compliance: HVAC Systems NEBS Requirements Verizon Technical Purchasing Requirements VZ.TPR.9808 Issue 1, April 2014

White paper. Shielded or unshielded network cables A matter of choice, electromagnetic environment and compatibility

EMC Standards: Standards of good EMC engineering

Errata NFPA 70. Proposed 2014 Edition

Test Report. Prepared for: Technologic Systems, Inc. Model: TS-8820

Interfacing electrification and system reliability. Earthing of AC and DC railways 4,10,13

Rated Power(W) 8W 2. EG-LED W 3. EG-LED W

Grounding Demystified

30 In Compliance October

The impact of the New EMC Directive 2004/108/EC

C-Bus. Single Zone Thermostat. 5070THB Series. Installation Instructions REGISTERED DESIGN REGISTERED PATENT

DPS Preliminary Review: Verizon FIOS Customer Premises Installation NEC Compliance Issues

Evaluating Cell Phone and Personal Communications Equipment and their EMC Effects on Automotive Audio and In-Cabin Modules

Telemetry system for cathodic protection equipment of underground metal pipelines

GENERIC REQUIREMENTS FOR UNINTERRUPTIBLE POWER SYSTEMS (UPS) TABLE OF CONTENTS

PRO 5000 CPE 1D Quick Installation Guide

Measurement of RF Emissions from a Final Coat Electronics Corrosion Module

Trial Exams C. Standards and Regulations. Examination No: GH-08-C- 1 hour and 5 minutes plus 10 minutes reading time

Electromagnetic Compatibility and International Regulatory Approvals

White Paper: Electrical Ground Rules

What are the basic electrical safety issues and remedies in solar photovoltaic installations?

Project Name: Nortrax Section Project No: SURGE PROTECTION DEVICES Page 1

How To Test For Premer Retardant

AN Surging Ideas TVS Diode Application Note PROTECTION PRODUCTS. TRANSIENT IMMUNITY STANDARDS: IEC x

Electrical Overstress EOS

TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST

Video Camera Installation Guide

with Component Rating A Simple Perspective

An extended EMC study of an electrical powertrain for transportation systems

Rules for Classification and Construction Additional Rules and Guidelines

HP ProLiant DL380 G6 Carrier-Grade Server Read Before Install

ANSI Watthour Meter Testing & Certification Programs

Session 2; Cabling Technology in the Data Centre Media Choices; Copper Twisted Pair

Arc Terminator Active Arc-Resistant Switchgear

Module 4, Lesson 12 Fire Alarm Systems

Cisco Nexus 7000 Series.

Recommended Practice for Installation of Transit Vehicle Fire Protection Systems

SECTION VIDEO SURVEILLANCE SYSTEMS INFRASTRUCTURE

aseries A13B Mini Bullet Camera User Manual

PXL-250: Network Wiring

Juniper Networks Security Products Safety Guide

Presenters Brett Weiss, Gabe Martinez, Brian Kroeger.

BLACK BOX. T1/E1 Link Extenders OCTOBER 2007 MT195A-T1 MT196A-E1

Structured Cabling, Earthing & Equipotential Bonding

Cable Solutions for Servo and Variable Frequency Drives (VFD)

Solar Panel Installations

AN-3 SEVEN KEY CONSIDERATIONS BEFORE YOU START YOUR SLIC OR FXS PHONE LINE INTERFACE DESIGN

MADRIX NEO Quick Start Guide & User Manual

NEBS 2009 Optimization of Telecom Networks Through Energy Efficiency Eitan Amon Type Approval Team Leader Comverse Ltd.

MCR1900 Media Converter 19-Slot Chassis

Technical Article MS-2443

UNDERSTANDING AND CONTROLLING COMMON-MODE EMISSIONS IN HIGH-POWER ELECTRONICS

TABLE OF CONTENT

CPCI-3U-AC-300W-R. Rugged 300W AC Input 3U CompactPCI Power Supply. Electrical Specification for: Telkoor Part Number:

TEST REPORT EN (1997) +A1 (2001)

EMC STANDARDS STANDARDS AND STANDARD MAKING BODIES. International. International Electrotechnical Commission (IEC)

Technical Description. Transistor D.C. Chopper Controller Type GS 24 S

Cisco Nexus 7000 Series Power Supply Modules

The following document contains information on Cypress products.

Industrial-Grade UPS System Heavy-duty power protection for harsh industrial environments

Cisco TelePresence MCU 4500 Series safety and compliance information

Enphase Microinverters and Ungrounded Renewable Energy Systems: Canadian Electrical Code Compliance

Commission communication in the framework of the implementation of the Council Directive 89/336/EEC (2002/C 190/03)

Nexus Technology Review -- Exhibit A

AXIS T81B22 DC 30W Midspan

Standard: EN :1995, EN :1996, ENV :1993, & EN :1995 Solid State Energy Meter

M7250P. PoE Powered. Gigabit Ethernet Media Converter 1000BASE-TX TO 1000BASE-SX/LX. Installation Guide

Telephone- and leased line modem for industrial applications TD-36

Workbench EMC Measurements by Henry W. Ott Henry Ott Consultants

Current Probes. User Manual

SMART SENSOR COLLECTION

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

Fibre Optic Solutions for your Test and Instrumentation needs

EN v1.2.1 TEST REPORT FOR ag/Draft n WLAN PCI-E Mini Card MODEL NUMBER: BCM94322MC REPORT NUMBER: 07U

Kvaser Mini PCI Express User s Guide

SUGGESTED SPECIFICATION for Series 185 Service Entrance Rated Automatic Transfer Switches

Building Technologies

800 Communications Circuits

Dual Chamber Temporary External Pacemaker

Application Bulletin NEC Reference Guide for SolarBridge-Enabled AC Module Installers

12 SOLAR PHOTOVOLTAIC POWER SUPPLY SYSTEMS by John Ware. PV modules are current-limiting

Attachment 9. Trouble signals. Interfaced equipment. Primary (main) power supply

Installation and safety instructions for AC/DC built-in devices

Use of the Signal Reference Grid in Data Centers

Digital Controllers ACTUATOR COMPATABILITY

FN2001-A1 Network module (SAFEDLINK) Mounting Installation

Waveguide Access Point WGA631. Product Guide

EMC TEST REPORT For. Webcam. Model Number: CAM67U

AND9015. A Solution for Peak EMI Reduction with Spread Spectrum Clock Generators APPLICATION NOTE. Prepared by: Apps Team, BIDC ON Semiconductor

W O R L D C L A S S H I F I

SURGE PROTECTIVE DEVICES (SPDs) LOW VOLTAGE AC INTEGRATED SURGE PROTECTION FOR ELECTRICAL DISTRIBUTION SYSTEMS SECTION 16671A SECTION 16671A

TESTING, INSPECTION, AND MAINTENANCE FREQUENCIES FOR FIRE DETECTION AND ALARM SYSTEMS

Integration of a 400W ac dc power supply into a closed system relying only on natural convection cooling

Transcription:

Verizon NEBS TM Compliance: Data Center Equipment NEBS Requirements Verizon Technical Purchasing Requirements VZ.TPR.9703 Issue 2, March 2012

CHANGE CONTROL RECORD: Version Date Action* Reason for Revision 1 12/09/2008 New New document. 2 3/5/12 Add Add VZ.TPR.9205 energy efficiency requirement * New, Add, Delete, Change, Reissue Trademark Acknowledgement NEBS is a trademark of Telcordia Technologies, Inc. VZ.TPR.9703 Page - 2

PREPARED BY: Name, Title, Organization Todd Talbot DMTS Equipment Compliance and Quality Assurance Systems Integration and Testing Verizon Corporate Technology 320 St. Paul Place, Floor 14 Baltimore, MD 21202 Phone: 410-736-5945; Fax: 410-736-5144 E-mail: todd.f.talbot@verizon.com Date 3/5/2012 APPROVED BY: Name, Title, Organization Howard Davis Manager Equipment Compliance and Quality Assurance Systems Integration and Testing Verizon Corporate Technology 320 St. Paul Place, Floor 14 Baltimore, MD 21202 Phone: 410-736-5906; Fax: 410-736-5144 E-mail: howard.davis@verizon.com Date 3/5/2012 VZ.TPR.9703 Page - 3

Table of Contents 1.0 PURPOSE... 5 2.0 SCOPE... 5 3.0 ASSUMPTIONS... 6 4.0 REFERENCES... 6 5.0 ACRONYMS... 7 6.0 DEFINITIONS... 7 7.0 GENERAL REQUIREMENTS... 7 8.0 PASS/FAIL REQUIREMENTS... 11 VZ.TPR.9703 Page - 4

1.0 PURPOSE The purpose of this document is to establish requirements for network equipment that may be installed in data center equipment space. These data centers have certain hardening features such as fire suppression systems and redundant equipment that are used to minimize infrastructure damage, personnel loss, service outages and service degradation. This document is necessary to ensure that all data center locations adhere to a common set of requirements for equipment installed within the equipment space. 2.0 SCOPE The scope of this document addresses the establishment of NEBS requirements for equipment installed in data centers. This document is not meant to address every aspect of a data center, just those NEBS requirements that pertain to product safety, equipment reliability and service performance experienced during abnormal fault conditions. This document shall apply to equipment located in data centers located on Verizon property, which supports the real-time operation of the telecommunications network. This document applies to computing equipment, which supports real time operation of the telecommunications network, that is installed in data centers and which are not located in a Verizon central office building. It provides specific guidelines for testing computing equipment for the purposes of verifying safety and reliability while under the influence of environmentally and electrically induced phenomena. The intended audience for this document is Verizon Information Processing Services, Network Planning, Network Engineering, Technology and Corporate Real Estate. NOTE: Computing Equipment installed or under contract with Verizon before the issuance of this policy is considered widely deployed prior to the policy and no new testing is required to confirm compliance. Products installed after the issuance of this policy shall comply with the directive of this policy. VZ.TPR.9703 Page - 5

3.0 ASSUMPTIONS The following assumptions apply to Data Centers: a) The Corporate Real Estate Group is responsible for all Verizon buildings, b) Smoke Detection Device(s) should be present with the ability to detect the presence of smoke or fire, c) An audible and visible fire alarm should be present with connection to the local fire department if required by authorities having jurisdiction, d) Data Centers shall have twenty-four hour surveillance or human presence, e) Data Centers shall provide a redundant path to centralized remote alarm monitoring systems for HVAC, UPS, generators, and environmental conditions, and f) The remote surveillance system shall have the capability to receive and reset alarms as well as actively monitor the status of key equipment. 4.0 REFERENCES The following documents and publications were used as sources of information and test guidelines for this policy. Note: Refer to www.verizonnebs.com for the latest versions of the TCG Checklist and Verizon s TPRs. GR-63-CORE GR-78-CORE GR-1089-CORE VZ.NEBS.TE.NPI.2004.015 VZ.TPR.9305 VZ/TPR.9205 NEBS Requirements: Physical Protection Generic Requirements for the Physical Design and Manufacture of Telecommunications Products and Equipment Electromagnetic Compatibility and Electrical Safety - Generic Criteria for Network Telecommunications Equipment Telecommunications Carrier Group Network Equipment- Building Systems (NEBS) Compliance Checklist NEBS Compliance Clarification Document Energy Efficiency Requirements for Telecommunications Equipment VZ.TPR.9703 Page - 6

5.0 ACRONYMS CLEC CO CPE EMC EMI EUT FOC GR ITL RFI Competitive Local Exchange Carrier Central Office Customer Premises Equipment Electromagnetic Compatibility Electromagnetic Interference Equipment Under Test Fiber Optic Component Generic Requirement Independent test Laboratory Radio Frequency Interference 6.0 DEFINITIONS This Section Left Intentionally Blank. 7.0 GENERAL REQUIREMENTS a) Flame Spread: Tested products shall comply with all applicable requirements and objectives of GR-63-CORE, section 4.2. Additionally, products shall meet the pass/fail criteria defined in the Verizon NEBS Compliance Clarification Document (VZ.TPR.9305) (i.e., flame and smoke cessation within 15 minutes). Telecommunications service providers require that network equipment be tested to and meet the minimum fire resistance requirements of GR-63-CORE. The requirements apply to the primary supplier and Original Equipment Manufacturer (OEM) of subassemblies that constitute an equipment system when interconnected. The following criteria apply for Equipment Assemblies and Material Selection: Equipment Assemblies: Testing is required to demonstrate that an equipment assembly fire does not spread beyond the structural elements (horizontal and vertical confines) of the equipment, and to ensure that all smoke emitting from the equipment when under test ceases within 15 minutes after the start of test. VZ.TPR.9703 Page - 7

Material Selection: Polymeric materials used in construction of electrical components, equipment cables and wires have differing degrees of flammability and shall be tested by the equipment manufacturer in accordance with GR-63-CORE Section 4.2.3 to help minimize ignition of fires in equipment. The flame spread test methodology defined in ANSI T1.319 as well as Verizon s clarification document shall be used during testing. b) Earthquake: Tested products shall comply with all applicable requirements and objectives of GR-63-CORE, section 4.4. Seismic activity can cause structural damage to buildings and the equipment housed within them. The displacement and torsion movements experienced during an earthquake event can over-stress equipment framework, circuit boards and connectors. The stresses on the equipment depend on the building s construction, the frame in which the equipment is mounted, and the severity of the earthquake. The physical performance criterion of the Earthquake Requirements addresses the equipment shelves, framework and fastening hardware and allows for no deformation to any load bearing element of the equipment being tested or any connection failure. The functional performance criterion addresses the equipment s ability to function immediately before and after each axis of waveform testing without manual rebooting or human intervention. c) Electromagnetic and Radio Frequency Interference: Tested products shall comply with all applicable requirements and objectives of GR-1089-CORE, section 3. Electro-mechanical devices cause EMI emissions that may interfere with nearby equipment or licensed transmitters. To minimize these emissions, products shall be designed, manufactured and tested to pass the FCC s Part 15 emissions criteria which address operating frequencies between 9 khz to 1 GHz. In addition to the FCC criteria, Verizon requires that products deployed in the network shall meet the EMI criteria defined in Telcordia s GR-1089-CORE. This standard addresses frequencies beyond the FCC s frequency limit (up to 10 GHz). Products shall be tested for radiated and conducted emissions by a test laboratory whose test site is approved by the FCC. VZ.TPR.9703 Page - 8

Electronic equipment is also susceptible to excessive radiated and conducted emissions. To increase EMI immunity, Verizon requires products be designed, manufactured and tested to validate susceptibility thresholds. Metallic interfaces power, and signal leads are tested for radiated and conducted susceptibility in a shielded anechoic chamber. Immunity requirements are not addressed by the FCC but are required by Verizon and other telecommunications service providers. d) Lightning and AC Power Fault: Tested products shall comply with all applicable requirements and objectives of GR-1089-CORE, section 4. Exposed telecommunications conductors (power and signal) are considered susceptible to direct or indirect energy coupling from lightning and AC Power Fault disturbances. Despite the presence of protective devices in the telecommunications network that limit the effects of lightning surge and power surges, a portion of these disturbances is impressed on equipment. Testing is required to verify if products can withstand the 1st and 2nd Level criteria. Equipment that conforms to the 1st Level criteria shall continue to operate as intended during the short-term fault. Equipment that conforms to the 2nd Level criteria can fail to operate but the equipment cannot fail in an unsafe manner, that is, it cannot become a fire, fragmentation, or electrical safety hazard. e) Electrical Safety: Tested products shall comply with all applicable requirements and objectives of GR-1089-CORE, section 7. Electrical safety criteria are intended to protect persons from harm by limiting the voltages and currents that are intentionally applied to communication circuits and to energized parts of network equipment. Energy sources are categorized on the basis of classifications of voltages. Based on the voltage classification, power sources are further categorized as exposed, restricted or inaccessible to finger contact through the use of an accessibility test finger probe. Listing requirements for AC-powered devices and control of leakage currents that may be conducted from exposed ungrounded surfaces of the equipment are also addressed. f) Bonding and Grounding: Tested products shall comply with all applicable requirements and objectives of GR-1089-CORE, section 9. Network equipment shall comply with the test requirements of GR-1089-CORE, section 9, which address bonding and grounding of network equipment and guidance for their usage. The main goals of bonding and grounding are as follows: Provide potential equalization to reduce voltage differences that might harm people or damage equipment or the facility, VZ.TPR.9703 Page - 9

Provide a reliable low-impedance return-path for fault currents to enable rapid operation of over-current devices, Help avert equipment damage from unwanted energy resulting from lightning stroke, lightning-caused surges on metallic communications conductors, or surges on metallic communications conductors caused by commercial AC power, and Help avoid interference and malfunction of equipment. g) Energy Efficiency: Tested products shall comply with all applicable requirements of VZ.TPR.9205. Network equipment shall comply with the test requirements of VZ.TPR.9205, which addresses the energy efficiency of telecommunications equipment used in the Verizon network. Computing equipment installed and operating in Verizon s data centers, which are not part of the Central Office (CO) equipment space, shall meet the following safety, performance, and reliability requirements: GR-63-CORE: Network Equipment Building System (NEBS) Requirements: Physical Protection Section 4.2, Fire Resistance Section 4.4, Earthquake GR-1089-CORE:Electromagnetic Compatibility and Electrical Safety Generic Criteria for Network Telecommunications Equipment Section 3.0, EMI Section 4.0, Lightning and AC Power Fault Section 7.0, Electrical Safety Section 9.0, Bonding and Grounding VZ.TPR.9205: Energy Efficiency Requirements for Telecommunications Equipment All applicable sections VZ.TPR.9703 Page - 10

8.0 PASS/FAIL REQUIREMENTS The EUT shall be configurable as documented in the manufacturer s installation procedures and shall operate reliably over its intended life cycle. The product shall operate as intended during immunity and susceptibility testing (EMI, Operational Temperature and Relative Humidity, Altitude, etc.,) and the test report shall include failure thresholds, if any, for the purpose of risk assessment. The product shall meet all defined limits in the NEBS standards and the references listed above. All products installed in data center facilities shall be tested by a Verizon-approved Independent Testing Laboratory (ITL) using the latest acceptable version of the NEBS test standard. VZ.TPR.9703 Page - 11