Operator s Manual Series Medium-Voltage Automatic Transfer Switches 4.76, 15.0, 27 kv; 1200, 2000, 3000 ampere DANGER !

Similar documents
50 Hanover Road, Florham Park, New Jersey USA For sales or service call (ASCO)

DORMA MODEL PS-406BB POWER SUPPLY INSTALLATION INSTRUCTIONS

NELSON VOLTAGE MONITOR INSTALLATION & PROGRAMMING MANUAL

SUGGESTED SPECIFICATION for Series 185 Service Entrance Rated Automatic Transfer Switches

Zenith Controls ISO R-1000C 5/99

Suitable for Emergency, Peak and Prime Power System Applications. Low Voltage Automatic Transfer Switch Systems

5500 Series, Catalog A5510 Thin Web Server software version 5

2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV a. Section INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std.

INSTALLATION INSTRUCTIONS

Medium voltage VCP-W MR2 (integral racking)

GENERATOR START CONTROL MODULE - MINI (2 Wire to 3 Wire)

Continuous Power... Continuous Protection

INSTALLATION & SERVICE MANUAL. Display Panel

Operational Overview and Controls Guide. Two or Three Pump IronHeart Lite with Variable Frequency Drives

Submit shop drawings for equipment provided under this section Shop drawings shall indicate:

AUTOMATIC TRANSFER SWITCH CONTROL UNIT OPERATOR S MANUAL

SECTION LOW VOLTAGE LIGHTING CONTROLS

INSTRUCTIONS FOR MAGNUM DS TRIP UNIT TESTING USING TEST KIT SYLES 140D481G02R, 140D481G02RR, 140D481G03 AND 140D481G04

Diesel Engine Driven Generators Page 1 of 6

SWITCHGEAR. EGP Switchgear

MTS Power Products MIAMI FL ATS-22AG. Automatic Transfer Switch And Control PLC Operator s Manual

HM-W536 Install Guide

Installation and Operation Guide for PD4000 Series Power Control Center

Sentron Series Circuit Breakers

Owner s Manual. For Automatic Transfer Switch Amp, Service Entrance/Non-Service Entrance

TC-9102 Series Surface Mount Temperature Controllers

I nstallation. M100Q Series Proportional Actuator with R81Q Controller Board for Thermistor Sensor Applications. Tools Needed.

Transfer Equipment Controls

Electrical Shore Connections / Cold Ironing

Owner's Manual. Automatic Transfer Switch. This manual should remain with the unit.

Bypass transfer switch mechanisms

This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules.

GTEC transfer switch open transition

Circuit Breaker Accessory

Instruction Bulletin. MCS025 Sync-Check Module Installation Sheet

AMI MARINE (UK) LTD BRIDGE NAVIGATIONAL WATCH ALARM SYSTEM (BNWAS) Operation Manual KW810

Battery Charger For Nickel Cadmium and Nickel-Metal Hydride Rechargeable Batteries Model PSN Series

User s Guide for version 5 Page

Single Day Alarm Clock with. Bluetooth and USB Play-through

ELECTRICAL SAFETY. The standard unit for measuring electrical current.

TSC 800 TRANSFER SWITCH CONTROLLER INSTALLATION, OPERATING & SERVICE MANUAL

Single Phase Soft Starter

ASCO SERIES 185 Power Transfer Switches

PowlVac Vacuum Integrity Tester

IntelliBrite Controller (For IntelliBrite Pool, Spa and Landscape Lighting Fixtures) Installation and User s Guide

Fundamentals of Power

PUSH BUTTON START INSTALLATION MANUAL

CAT AVR V2.3. Instruction Manual. Voltage regulator for generators. March 2008

NEWTECH PRO KVA ONLINE UNINTERRUPTIBLE POWER SUPPLY USER MANUAL

ELECTRICAL SAFETY RISK ASSESSMENT

Installation instructions for Series NRX INCOM communications adapter module

Product Description Full Voltage Starting Electric Fire Pump Controllers FTA1000

Primary and Secondary Electrical Distribution Systems

SUBJECT: How to wire a motor starter Number: AN-MC-004 Date Issued: 2/08/2005 Revision: Original

Product Description Primary Resistance Starting Electric Fire Pump Controllers FTA1500

GENERATOR TRANSFER SWITCH

Electric Panel Pump Control System. Operation, Maintenance and Installation Manual

Application Technique. Safety Function: Magnetic Door Switch Monitoring

Installation and Operation Guide for PD5100 Automatic Transfer Switch

Top Commercial / Residential Electrical Requirements *

USER MANUAL CHARGING STATIONS FOR ELECTRIC VEHICLES

Back-UPS Pro 1300/1500 Installation and Operation

Model 1756 Test Lead Kit

Rain+Birdt. Simple To Set Timer (SST) Setup & Operation Instructions. English RAIN BIRD ( ) or visit

Operating Manual for the Electronic Built-in Interval Timer. Micro II (Countdown Timer)

Installation and Operation Back-UPS 1250, 1300, 1500

AMFA-27 AMFA-29. Operator s Manual & Installation Instructions. Rev. 2.5

*.ppt 11/2/ :48 PM 1

DLP-PU/E Instruction Manual

Troubleshooting and Diagnostics

AUTOMATIC TRANSFER SWITCH. Changeover Type from 250A to 2500A

Specification Guide. for RVAC. Direct Replacement. AC Medium Voltage. Circuit Breakers

How To Operate A Gec Transfer Switch Open Transition Amp Power Supply

SECTION POWER MONITOR FOR ELECTRICAL, STEAM CONDENSATE, AND WATER PART I - GENERAL

Ground Resistance Clamp On Tester

Contractors Guide Central Inverter System Installation

Lighting Controls ! WARNING RISK OF ELECTRIC SHOCK. Installation Instructions DESCRIPTION

G670 Intermittent Pilot Ignition Controls

Limited Service Pump Controllers (Produced after July 18, 2006) Installation- Start Up - Service

A1000 Cheat Sheet (Open Loop Vector)

Bulletin 150 Smart Motor Controllers SMC-3 Smart Motor Controller

WE-350 Series ¼ Turn Electric Actuator

PRODUCT GUIDE. SL Medium Voltage IEC Vacuum Contactors

Replacement of 600-Ampere Bushing and 200-Ampere Bushing-Well Adapters

GPD 506/P5 Start-up Procedure and Checklist

OEM Manual MODEL 2350 ELECTRONIC DUAL CYLINDER SCALE

Dell Line-Interactive Rack UPS 5600W. User's Guide H955N, J731N K812N. w w w. d e l l. c o m s u p p o r t. d e l l. c o m

Analog Control Wiring & Adjustment Manual for Gyro Tech Swing Door Operators

Digi-Motor Installation Guide

HP UPS R1500 Generation 3

FA-300 Series. LCD Fire Alarm Control Panel. User Guide. LT-954 Rev. 0.1 February FA-300 SERIES Fire Alarm Control Panel

MAKING MODERN LIVING POSSIBLE. AK-SC255 On-Site Installation Guide DANFOSS ELECTRONIC CONTROLS & SENSORS

Union County Public Schools. Facilities Department. Electrical. Safe Work Practices

OUTPUT CABLE CONNECTIONS:

D. Infrared scanning reports with pictures printed in a final report with any deficiencies and actions taken to rectify.

I.L T.K. Instructions for Cutler-Hammer MP1 Series Automatic Transfer Switches A

Wiser Panel Meter, Model Number WISERCTPM200 Installer s Guide

FIREDEX Conventional Fire Panels

Model Description / Applications. Intermittent Pilot Gas Ignition Control

0.8 U N /0.5 U N 0.8 U N /0.5 U N 0.8 U N /0.5 U N 0.2 U N /0.1 U N 0.2 U N /0.1 U N 0.2 U N /0.1 U N

Transcription:

Operator s Manual 7000 Series Medium-Voltage Automatic Transfer Switches 4.76, 15.0, 27 kv; 1200, 2000, 3000 ampere DANGER is used in this manual to warn of a hazard situation which, if not avoided, will result in death or serious injury. WARNING is used in this manual to warn of a hazardous situation which, if not avoided, could result death or serious injury. DANGER WARNING CAUTION CAUTION is used in this manual to warn of a hazardous situation which, if not avoided, could result in minor or moderate injury. Refer to the outline and wiring drawings provided with your 7000 Series ATS for all installation and connection details and accessories. Refer to the Group 5 Controller User s Guide 381333-126 for ATS status display messages, time delays, pickup & dropout settings, & adjustments. ASCO 7000 Series Medium-Voltage Automatic Transfer Switches (ATS) are designed to ANSI C37.20.2 standard for metal-clad switchgear and are UL 1008A Listed. Nameplate and Rating Label The nameplate includes data for each specific automatic transfer switch. Use the ATS only within the limits shown on this nameplate. Each ATS has a rating label to define the loads, interrupting, short-time, and close & latch ratings. Refer to the label for specific values. WARNING Do not exceed the values on the rating label. Exceeding the rating can cause personal injury or serious equipment damage. This equipment is designed for use with dangerous levels of power from multiple sources. Additionally, voltage transformers and standby control power sources (i.e. station battery system, UPS) included in the equipment must be disconnected when servicing this equipment. Persons installing, servicing, and operating this equipment must be trained, licensed appropriately, and familiar with medium voltage electrical power equipment and adhere to required apparel, protection, tools, controls, and procedures. Typical 7000 Series MV ATS, 1200 A Table of Contents Catalog No., major components view...i INSTALLATION Mounting, Connections... 1-1 OPERATION Energizing ATS after Installation... 2-1 Controller, Lock-out relay (optional)... 2-2 Transfer Test ATS, ACTS, ADTS..2-3, 2-4, 2-5 TROUBLESHOOTING ATS, ACTS, ADTS...3-1, 3-2, 3-3 INDEX...back page 381333-395 50 Hanover Rd., Florham Park, NJ 07928 USA For sales or service call 800-800-2726 (ASCO) www.ascopower.com

i Catalog Number 381333-395 Catalog Number Identification A typical Catalog Number is shown below with its elements explained. The example is for a 7000 Series Automatic Transfer Switch, class A interrupting rating, automatic, open-transition transfer, dualcircuit breaker, 3 pole, 1200 ampere, 6.6 kv 60 Hz, in a Type 1 enclosure. Fixed elements Product Series 7 = 7000 Device Type M = dual CB transfer Poles 3 = 3 pole Controller 5 = Group 5 Catalog Number A 7 A T M 0 3 1200 6 5 X C Variable elements Interrupting Rating A = 25 kaic B = 40 kaic C = 50 kaic D = 16 kaic Operation Type A = Automatic N = Non-auto NOTE Interrupting rating A (25 kaic) is not available for voltage ratings below 5 kv. Transition Type blank = Open C = Closed D = Delayed S = Soft load Construction T = Transfer (non-soft load) L = Soft load transfer U = Service entrance (Normal) G = Service entrance (Emerg) P = Service entrance (N & E) Neutral Type 0 = None A = Solid Amperes 1200 2000 3000 Voltage T = 2.4 kv U = 4.16 kv V = 11 kv W = 12.47 kv X = 13.2 kv Z = 14.4 kv 3 = 3.3 kv 6 = 6.6 kv 7 = 7.2 kv 8 = 10 kv 9 = 13.8 kv O = Other Accessories X = yes Z = special Enclosure Type C = 1 M = 3R (secure) Transfer Switch (CB SECTION) Controls (CONTROL SECTION) Emergency Source Circuit Breaker Voltage transformer Emergency source Breaker Control switch Transfer control & lights Controller Normal Source Breaker Control switch Transfer Switch control Normal Source Circuit Breaker Customer terminal block Voltage transformer Typical 7000 Series MV ATS with location of major components (1200 amp shown)

381333-395 Installation 1-1 Installation The ASCO 7000 Series Medium-Voltage Automatic Transfer Switch (ATS) is factory wired and tested. Refer to the manual from the manufacturer of the metal-clad switchgear for section handling, installation, power connections, and testing. Supporting Structure The supporting foundation for the enclosure must be level and straight. Refer to the applicable enclosure outline drawing included with the transfer switch for all mounting details including door opening space. Mounting Refer to the outline and mounting diagram and mount the automatic transfer switch according to details and instructions shown on the diagram. NOTICE Protect the transfer switch from construction grit and metal chips to prevent malfunction or shortened life of the transfer switch. Testing Power Conductors Do not connect the power conductors to the transfer switch until they are tested. Installing power cables in conduit, cable troughs, and ceiling-suspended hangers often requires considerable force. The pulling of cables can damage insulation and stretch or break the conductor s strands. For this reason, after the cables are pulled into position, and before they are connected, they should be tested to verify that they are not defective or have been damaged during installation. Line Connections Refer to the wiring diagram provided with the transfer switch. All wiring must be made in accordance with the National Electrical Code and local codes. DANGER De-energize all conductors, open all circuit breakers, and rack out all voltage transformers before making any connections. De-energize any UPS, station battery system, or any similar system providing standby control power. Be sure that the Normal and Emergency line connections are in proper phase rotation. Place the engine generator starting control in the OFF position. Make sure engine generator is not in operation. Engine-Generator Control Connections All customer connections, including the engine control contact connections, are located on terminal block TB. This terminal block is located on the interior left side of the control section. Refer to the wiring diagram provided with the automatic transfer switch. Connect the engine start wires to the appropriate terminals. See Figure 1-1 and Table A. Table A. Engine-generator control contacts When normal source fails contact closes contact opens enginegenerator control contacts Auxiliary Circuits TB terminals TB1 and TB2 TB1 and TB3 Figure 1-1. Customer terminal block TB in controls section. Connect auxiliary circuit wires to appropriate terminals on terminal block TB as shown on the wiring diagram provided with the automatic transfer switch. 1 2 3

2-1 Operation 381333-395 Configuration of Shipped ATS The MV ATS is shipped with the circuit breakers and controls in the following state: ON CB SECTION(S) - Circuit Breakers, check these items Normal source circuit breaker (CBN) in the OPEN position with the closing spring discharged. Emergency source circuit breaker (CBE) in the OPEN position with the closing spring discharged. Normal source circuit breaker control switch (53CBN) in the TRIP position (green target displayed on control switch) Emergency source circuit breaker control switch (53CBE) in the TRIP position (green target displayed on control switch) ON CONTROL SECTION Controls, check this item Transfer Switch Auto-Man selector switch (53AM) in the MAN (manual) position. Circuit breaker position lights green=cb open red=cb closed (CB SECTION) Emergency source circuit breaker control switch Normal source circuit breaker control switch (CONTROL SECTION) Transfer Switch control switch Figure 2-1. Location of control switches Breaker control target indicator green=tripped red=closed Figure 2-2. Control switches WARNING Energizing the Normal Source, Setting Automatic Operation Mode After the MV ATS is installed, the Normal source can be energized. Then the controls can be set for automatic (standby) operation. The Normal and Emergency sources must be available. Follow this procedure: ON CONTROL SECTION Controls, check these items The transfer control indicator lights Normal Source Accepted and TS Locked Out should be on. The controller display should show that the transfer switch is Locked Out. ON CB SECTION(S) - Circuit Breakers, check these items Normal source circuit breaker control switch should indicate that the circuit breaker is OPEN (green light). Emergency source circuit breaker control switch should indicate that the circuit breaker is OPEN (green light). Energizing procedure 1. On Control Section, turn the Transfer Switch Auto-Man selector switch to the AUTO (automatic) position. 2. On CB Section, turn the Normal source circuit breaker control switch to CLOSE position (red target window). 3. On CB Section, turn the Emergency source circuit breaker control switch to the CLOSE position (red target). 4. On Control Section, press the transfer controls Alarm Reset button. Normal source circuit breaker should close. The Normal source CB control switch should indicate that the circuit breaker is CLOSED (red light). The ATS is now in an automatic (standby) operating mode. Proceed to transfer test. Be sure to close both enclosure doors before proceeding to prevent personal injury in case of electrical system fault.

381333-395 Operation 2-2 Controller Settings for MV ATSs Refer to the Group 5 Controller User s Guide 381333-126 for ATS status display messages, time delays, pickup & dropout settings, & adjustments. The Group 5 Controller is factory set for mediumvoltage operation. These are the special settings: Controller Voltage Jumper Blocks The control voltage is typically stepped down to 120V, so the eight jumper blocks are factory arranged horizontally for 120 V input. Controller Menu Settings ATS Information Rating is 1200, 2000, or 3000 A The ATS information rating setting is 1200A, 2000A, or 3000A. ATS Information is Circuit Breaker Non Bypass The ATS information type setting is BRKR NBPS. What to do if a circuit breaker trips 1. Check the protective relay and determine the cause of the trip. Refer to device s instructions. After fault is cleared, reset the protective relay. Lock-Out Relay (optional) If an optional protective relay (device) is ordered for the normal and/or emergency source circuit breaker, a Lock-Out Relay (LOR) is provided on the appropriate circuit breaker compartment door. The LOR responds to a signal from a protective relay and in turn trips the appropriate circuit breaker. The LOR locks out the circuit breaker until the fault is cleared and the protective relay and LOR has been reset. A red light and orange window shows tripped. Lock-Out Relay status lights green=ready to respond red=trip signal sent to CB Status window black=ready to respond orange=trip signal sent to CB Figure 2-3. Lock-Out Relay Breaker Control Tripped Light (opt.) If an optional protective relay (device) is ordered, the BREAKER CONTROL switch has a center amber TRIPPED light. This light comes on if the CB has been tripped by the LOR. Optional circuit breaker tripped light amber=cb tripped open 2. Reset the Lock-Out Relay by turning it to RESET. 3. Turn the Breaker Control switch to CLOSE. 4. Press the Alarm Reset button. The circuit breaker should close if its connected source is selected by the controller to serve the load. Figure 2-4. Breaker Control Tripped light

2-3 Operation 381333-395 Figure 2-5. 7ATS controls and indicators. ATS Electrical Operation This procedure checks the electrical operation of the automatic transfer switch. See Figure 2-5. Transfer Test Both normal and emergency sources must be available and the emergency source generator (if used) must be capable of being started in this procedure. Perform the steps at the right. Observe the status lights. Black square means light is on. White square means light is off. 1 The Transfer Switch Connected to Normal and Normal Source Accepted lights should be on. 2 Turn and hold the Transfer Control switch clockwise to Transfer Test until the engine starts and runs (within 15 sec.). The Emergency Source Accepted light should come on. 3 The transfer switch will operate to the Emergency position after Feature 2B time delay. The Transfer Switch Connected to Emergency light should come on and Load Connected to Normal light goes off. 4 The transfer switch will operate back to the Normal position after Feature 3A time delay. For immediate retransfer turn the Transfer Control counterclockwise to Retransfer Delay Bypass. The Transfer Switch Connected to Normal light should come on; the Transfer Switch Connected to Emergency light should go off. 5 The engine-generator will stop after the Feature 2E time delay (unloaded running engine cooldown). The Emergency Source Accepted light should go off.

381333-395 Operation 2-4 Figure 2-6. 7ACTS controls and indicators. ACTS Electrical Operation This procedure checks the electrical operation of the automatic closed-transition transfer switch. See Figure 2-6. Transfer Test Both normal and emergency sources must be available and the emergency source generator (if used) must be capable of being started in this procedure. Perform the steps at the right. Observe the status lights. Black square means light is on. White square means light is off. ** If you do not want closed-transition transfer, press the Closed Transition Bypass pushbutton while the controller display shows Waiting for In-Sync. This action causes opentransition (momentary load interruption) transfer to the opposite source, if conditions permit. Also refer to the Group 5 Controller User s Guide 381333-126. 1 The Transfer Switch Connected to Normal and Normal Source Accepted lights should be on. 2 Turn and hold the Transfer Control switch clockwise to Transfer Test until the engine starts and runs (within 15 sec.). The Emergency Source Accepted light should come on. 3 The transfer switch will operate to the Emergency position after Feature 2B time delay. The Transfer Switch Connected to Emergency light should come on and Load Connected to Normal light goes off. You might see and hear the brief overlap transfer.** 4 The transfer switch will operate back to the Normal position after Feature 3A time dely. For immediate retransfer turn the Transfer Control counterclockwise to Retransfer Delay Bypass. The Transfer Switch Connected to Normal light should come on; the Transfer Switch Connected to Emergency light should go off. 5 The engine-generator will stop after the Feature 2E time delay (unloaded running engine cooldown). The Emergency Source Accepted light should go off.

2-5 Operation 381333-395 Figure 2-7. 7ADTS controls and indicators. ADTS Electrical Operation This procedure checks the electrical operation of the automatic delayed-transition transfer switch. See Figure 2-7. Transfer Test Both normal and emergency sources must be available and the emergency source generator (if used) must be capable of being started in this procedure. Perform the steps at the right. Observe the status lights. Black square means light is on. White square means light is off. 1 Turn and hold the Transfer Control switch clockwise to Transfer Test until the engine starts and runs (within 15 sec.). The Emergency Source Accepted light should come on. 2 CBN opens and the Transfer Switch Connected to Normal light should go off and the Load Disconnect Active light should come on. Both CBN and CBE contacts are now open. 3 After the delay transition time delay, CBE closes. The Transfer Switch Connected to Emergency light should come on and the Load Disconnect Active light goes off. 4 CBN closes after Feature 3A time delay. For immediate retransfer turn the Transfer Control counter-clockwise to Retransfer Delay Bypass. The Transfer Switch Connected to Normal light should come on; the Transfer Switch Connected to Emergency light should go off. 5 The engine-generator will stop after the Feature 2E time delay (unloaded running engine cooldown). The Emergency Source Accepted light should go off.

381333-395 Troubleshooting 3-1 Troubleshooting for MV ATS DANGER Refer to the Group 5 Controller User s Guide 381333-126 for ATS status display messages, time delays, pickup & dropout settings, & adjustments. Hazardous voltage capable of causing shock, burns, or death is used in the switch. Do not touch the power or load terminal of the transfer switch Problem Gen-Set does not start when the Transfer Control switch is turned and held in Transfer Test position or when the normal source fails. Transfer switch does not transfer the load to the emergency source after the engine-generator set starts. Transfer switch does not transfer the load to normal source when normal returns or when the Transfer Control switch is released. Engine-generator set does not stop after load retransfer to the normal source. Circuit breaker trips (on an ATS without protective relay) Circuit breaker trips (on an ATS with a protective relay) Check in Numerical Sequence 1 Operation 2 Gen-Set Hold Transfer Test switch 15 seconds or the outage must be long enough to allow for Feature 1C time delay plus engine cranking and starting time. Wait for Feature 2B time delay to time out (if used). Wait for Feature 3A time delay to time out (if used). Wait for Feature 2E time delay to time out (if used). Starting control must be in the automatic position. Batteries must be charged and connected. Check wiring to engine starting contacts on customer terminal block TB. Verify on the controller that small plug J3 is connected to receptacle P3. Generator output circuit breaker must be closed. Generator frequency must be at least 95% of nominal (57 Hz for a 60 Hz system.) Starting control must be in the automatic position. 3 Voltage on Display Emergency voltage on controller display should read at least 90% of nominal phase to phase voltage. Normal voltage on controller display should read at least 90% of nominal phase to phase voltage. Check the controller display for error messages and determine the cause of the trip. After the fault is cleared, turn the Breaker Control switch to CLOSE. Press the Alarm Reset button. The CB should close. Check the protective relay and determine the cause of the trip (refer to device s instructions). After fault is cleared, reset the protective relay. Then reset the Lock-Out Relay by turning it to RESET. Next turn the Breaker Control switch to CLOSE. Press the Alarm Reset button. The CB should close.

3-2 Troubleshooting 381333-395 Troubleshooting for MV ACTS Refer to the Group 5 Controller User s Guide 381333-126 for ATS status display messages, time delays, pickup & dropout settings, & adjustments. DANGER Hazardous voltage capable of causing shock, burns, or death is used in the switch. Do not touch the power or load terminal of the transfer switch Problem Gen-Set does not start when the Transfer Control switch is turned and held in Transfer Test position or when the normal source fails. Transfer switch does not transfer the load to the emergency source after the engine-generator set starts. Transfer switch does not transfer the load to normal source when normal returns or when the Transfer Control switch is released. Engine-generator set does not stop after load retransfer to the normal source. Failure to Synchronize light comes on. Extended Parallel Time light comes on. TS Locked Out light comes on. Circuit breaker trips (on an ATS without protective relay) Circuit breaker trips (on an ATS with a protective relay) Check in Numerical Sequence 1 Operation 2 Gen-Set Hold Transfer Test switch 15 seconds or the outage must be long enough to allow for Feature 1C time delay plus engine cranking and starting time. Wait for Feature 2B time delay to time out (if used). Wait for Feature 3A time delay to time out (if used). Wait for Feature 2E time delay to time out (if used). Starting control must be in the automatic position. Batteries must be charged and connected. Check wiring to engine starting contacts on customer terminal block TB. Verify on the controller that small plug J3 is connected to receptacle P3. Generator output circuit breaker must be closed. Generator frequency must be at least 95% of nominal (57 Hz for a 60 Hz system.) Starting control must be in the automatic position. 3 Voltage on Display Emergency voltage on controller display should read at least 90% of nominal phase to phase voltage. Normal voltage on controller display should read at least 90% of nominal phase to phase voltage. Conditions of normal or emergency sources not suitable for closed transition transfer. Recheck voltage and frequency of both sources. Press Alarm Reset. CBN and CBE contacts are closed longer than setting in the controller. Open the disconnected source CB, then call ASI for assistance. Transfer lockout operation has occurred; transfer switch is disabled from automatic operation. Open the disconnected source circuit breaker, then call ASI. Check the controller display for error messages and determine the cause of the trip. After the fault is cleared, turn the Breaker Control switch to CLOSE. Press the Alarm Reset button. The CB should close. Check the protective relay and determine the cause of the trip (refer to device s instructions). After fault is cleared, reset the protective relay. Then reset the Lock- Out Relay by turning it to RESET. Next turn the Breaker Control switch to CLOSE. Press the Alarm Reset button. The CB should close.

381333-395 Troubleshooting 3-3 Troubleshooting for MV ADTS DANGER Refer to the Group 5 Controller User s Guide 381333-126 for ATS status display messages, time delays, pickup & dropout settings, & adjustments. Hazardous voltage capable of causing shock, burns, or death is used in the switch. Do not touch the power or load terminal of the transfer switch Problem Gen-Set does not start when the Transfer Control switch is turned and held in Transfer Test position or when the normal source fails. Transfer switch does not transfer the load to the emergency source after the engine-generator set starts. Transfer switch does not transfer the load to normal source when normal returns or when the Transfer Control switch is released. Engine-generator set does not stop after load retransfer to the normal source. Load Disconnect Active light comes on. Load Disconnect Active light stays on longer than 6 min.. Circuit breaker trips (on an ATS without protective relay) Circuit breaker trips (on an ATS with a protective relay) Check in Numerical Sequence 1 Operation 2 Gen-Set Hold Transfer Test switch 15 seconds or the outage must be long enough to allow for Feature 1C time delay plus engine cranking and starting time. Wait for Feature 2B time delay to time out (if used). Wait for Feature 3A time delay to time out (if used). Wait for Feature 2E time delay to time out (if used). Wait for load disconnect time delay to time out. Check load disconnect time delay setting. Call ASI. Starting control must be in the automatic position. Batteries must be charged and connected. Check wiring to engine starting contacts on customer terminal block TB. Verify on the controller that small plug J3 is connected to receptacle P3. Generator output circuit breaker must be closed. Generator frequency must be at least 95% of nominal (57 Hz for a 60 Hz system.) Starting control must be in the automatic position. 3 Voltage on Display Emergency voltage on controller display should read at least 90% of nominal phase to phase voltage. Normal voltage on controller display should read at least 90% of nominal phase to phase voltage. Explanation: Transfer switch in delayed-transition transfer mode. Load disconnect time delay is adjustable from 0 to 5 min. 59 sec. Explanation: Transfer switch contacts are open longer than 5 min. 59 sec (maximum setting). Load remains disconnected. Check the controller display for error messages and determine the cause of the trip. After the fault is cleared, turn the Breaker Control switch to CLOSE. Press the Alarm Reset button. The CB should close. Check the protective relay and determine the cause of the trip (refer to device s instructions). After fault is cleared, reset the protective relay. Then reset the Lock-Out Relay by turning it to RESET. Next turn the Breaker Control switch to CLOSE. Press the Alarm Reset button. The CB should close.

A ATS, i, 2-3, 3-1 ATS INFORMATION, screen, 2-2 ACTS, i, 2-4, 3-2 ADTS, i, 2-5, 3-3 Alarm Reset, i. 2-1, 2-2, 3-1, 3-2, 3-3 ASI 800-800-2726(ASCO), customercare@asco.com Auto, Transfer Switch, 2-1 auxiliary circuits, i, 1-1 B batteries, 3-1, 3-2, 3-3 Breaker Control, i. 2-1, 2-2, 3-1, 3-2, 3-3 connections, 1-1 controller, Group 5 refer to User s Guide 381333-126 C catalog number, i CBE, CBN circuit breakers, 2-1, 3-2 circuit breaker, i, 2-1, 2-2, 2-5, 3-1, 3-2, 3-3 close, circuit breaker, 2-1, 2-2, 2-5, 3-1, 3-2, 3-3 closed transition alarms, 2-4 Closed Transition Bypass, 2-4 configuration of shipped ATS, 2-1 connections, 1-1 contacts, engine control, 1-1 controller, Group 5, 2-2 refer to User s Guide 381333-126 D DANGER statement, cover device, i, 2, 3-1, 3-2, 3-3 DIP switch settings, 2-2 refer to User s Guide 381333-126 doors, section, i, 2-1 WARNING close all doors before operating the ATS INDEX E Emergency Source Accepted, 2-3, 2-4, 2-5 enclosure, i, 1-1 energizing the normal source, 2-1 engine-generator control, 1-1 Extended Parallel Time, 2-4, 3-2 F Failure To Synchronize, 2-4 frequency, 3-2 H HELP 800-800-2726(ASCO), ASI customercare@asco.com help, troubleshooting, 3-1, 3-2, 3-3 installation, 1-1 I L lights, i, 2-1 through 2-5, 3-2, 3-3 line connections, 1-1 Load Disconnect Active, 2-5, 3-3 Lock-Out Relay, optional, 2-2, 3-1, 3-2, 3-3 M Man, Transfer Switch, 2-1 messages, 3-1, 3-2, 3-3 mounting, 1-1 N Normal Source Accepted, 2-3, 2-4, 2-5 O open, circuit breaker, 2-1, 2-2 operation, 2-1 through 2-5 closed-transition, 2-4 delayed-transition, 2-5 open-transition, 2-3 WARNING close all doors before operating the ATS optional accessories, 2-2 R rating, cover, i Retransfer Delay Bypass, 2-3, 2-4, 2-5 S sections, i, 2-1 settings, controller, 2-2 supporting structure, 1-1 T TB customer terminal block, 1-1 testing power conductors, 1-1 time delays 1C, 2-3, 2-4, 2-5, 3-1, 3-2, 3-3 2B, 2-3, 2-4, 2-5, 3-1, 3-2, 3-3 2E, 2-3, 2-4, 2-5, 3-1, 3-2, 3-3 3A, 2-3, 2-4, 2-5, 3-1, 3-2, 3-3 load disconnect, 3-3 Transfer Control, 2-3, 2-4, 2-5 Transfer Switch Connected To Emergency, 2-3, 2-4, 2-5 Transfer Switch Connected To Normal, 2-3, 2-4, 2-5 Transfer Switch, 2-1 Transfer Test, 2-3, 2-4, 2-5 trip, circuit breaker, 2-1, 2-2, 3-1, 3-2, 3-3 troubleshooting, 3-1, 3-2, 3-3 TS Locked Out, 2-1, 3-2 V voltage, i, 3-1, 3-2, 3-3 voltage jumper blocks, 2-2 refer to User s Guide 381333-126 W Waiting for In-Sync, 2-4 WARNING statement, cover 381333-395 Printed in U.S.A. ASCO Power Technologies, L.P. 2013 All Rights Reserved.