ThermalStar LCi-SS Installation Guide

Similar documents
Comment Form on Proposed Gut Rehabilitation Alternatives

CONSTRUCTION DETAILS & LOAD DESIGN CHARTS

Superform Products Ltd.

THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150

The better way to build TM. Installation Manual. EXTERIOR WALL SIPs

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

September 3, Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901

Chapter 6 ROOF-CEILING SYSTEMS

Standard from CSI Part Section Format For Wood Framing For Metal Framing For Gypsum Sheathing

ISO Types 1-6: Construction Code Descriptions

Best Barns USA Assembly Book

CHAPTER 7: Building Systems ROOFING SYSTEMS

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

March 14, Installation of Bay, Bow and Garden Windows

Continuous Insulation Using Polyiso Wall Sheathing

THE DOW CHEMICAL COMPANY Issued: August 1, LARKIN CENTER 1605 JOSEPH DRIVE MIDLAND MICHIGAN (989)

GreenGuard Housewrap Installation Guide

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

COMMERCIAL BUILDING APPLICATIONS

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

Mark Cramer Inspection Services, Inc.

FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING

The Prefab Package. Modular EIFS construction offers benefits to today s busy jobsites. Building Envelope. Roland Serino, P.E., of Dryvit Systems Inc.

ENERGY STAR Qualified New Homes Thermal Enclosure Checklist. Water Management Checklist. Eli Caudill

The existing roof angle change terminations and flashings when sound and intact can be reused.

AUTHORIZATION TO MARK

Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION

Free 12 x 8 Shed Plan With Illustrations, Blueprints & Step By Step Details

SAMPLE INSTRUCTIONS. Best Barns USA Assembly Book. the Denver. 12'x 12' or 12'x16' Revised November 29, 2010

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

DuPont Tyvek ThermaWrap R5.0 Installation Guidelines for New Construction Using Stone Veneer or Lap Siding, e.g. Fiber Cement and Wood/Cedar

How To Repair A Boat Landing Deck With A Boat Bed

Composite Stone Veneer

2.18 INTERIOR & EXTERIOR FINISHES VAPOR & AIR BARRIERS

Sun Windows General Information Sun New Construction Window Installation Instructions

AMERICAN GOTHIC PLAYHOUSE

Residential Roofing Guide

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES

The WANZ Guide to Window Installation

PANELIZED HOME INSTALLATION GUIDELINE

Third Party Inspection Guidelines For Inspectors As Part of the dryvitcare EIFS Repair/Restoration

DuPont Tyvek ThermaWrap R5.0 Installation Guidelines for New Construction Using Vinyl, Brick and Stone Claddings

ICC-ES Evaluation Report Reissued September, 2010 This report is subject to re-examination in one year.

Avoiding Air Barrier Pitfalls

LEGACY REPORT. (800) (562) A Subsidiary of the International Code Council RETAINED ON U.S.

Barewood Octagon and Elongated Windows Installation Instructions

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. GeneralShale.com

COMMONLY USED RESIDENTIAL BUILDING CODES

application instructions

Walls. Add Strength and Water Resistance When Repairing Your. Replace damaged framing members when walls are open

DuPont Tyvek Water-Resistive and Air Barriers Installation Guidelines

Atlas Roofing Corporation insulating sheathing

Asphalt Shingle Application Requirements

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

K2 STONE NATURAL VENEER

Foundation. Foundation

SUPER SHED. Indoor shelter for your outdoor tools.

INSTALLATION INSPECTION GUIDE FOR 3RD PARTY INSPECTORS FOR PAREX USA EXTERIOR INSULATION AND FINISH SYSTEMS

Building Construction. Lightweight construction. Conventional Construction

Brick Veneer Construction

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

INSTALLATION OF A BAY WINDOW

Important Information for Installer & Homeowner

FLASHMAN WINDOW AND DOOR FLASHING SYSTEM. Product. Scope. Appraisal No. 573 [2013]

MASTERFORMAT SPECIFICATION

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL ROOF PANELS REPORT HOLDER: FIRESTONE BUILDING PRODUCTS COMPANY, LLC

Pre-Drywall Inspection Report

Finegan Inspection Services, Inc.

G VYCOR DECK PROTECTOR

PART 1 GENERAL 1.1 SECTION INCLUDES

Residential Inspection Guidelines

ICC-ES Evaluation Report. ESR-3493 Reissued September 2014 This report is subject to renewal September 2015.

Renovating Your Basement

DuPont Tyvek ThermaWrap R5.0 Installation Guidelines for New Residential Single Family Houses Using Vinyl, Brick and Stone Claddings VERSION 10/13

2.9 WINDOW & DOOR BUCKS

NEW ELECTRICAL SUBSTATION Building 300 SECTION ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

Gypsum Board Systems Manual

CLOSED-CELL SPRAY FOAM Resisting Wind Uplift in Residential Buildings

Basements are Changing. Basements Part of the Enclosure. Basements. Energy Efficient, Durable, Healthy. Below grade enclosure

10DBMC International Conference On Durability of Building Materials and Components LYON [France] April 2005

Most of my work is in exterior remediation, both as a builder. Adhered Concrete Masonry Veneer To avoid water damage, treat faux stone like stucco

8/18/14. Introduction to. Framing. Terminology and Concepts

RESIDENTIAL MASONRY A BEST PRACTICES GUIDE

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: ICYNENE, INC.

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

ROOFS, SNOW AND ICE DAMS

LP OSB Sheathing & Structural 1 Sheathing

Block Lofts Condominiums

Repairs, Remodeling, Additions, and Retrofitting

Weather Resistive Barriers: Building Science Makes a Case for Two Layers by Dave Olson Technical Services Manager, Fortifiber Building Systems Group

Manufactured Stone Veneer Installation Instructions

SECTION 3 ONM & J STRUCTURAL ANALYSIS

DEFAULT HEAT LOSS COEFFICIENTS

DETAILED INSTALLATION GUIDE

Window Installation Instructions

MUNICODE SERVICES LTD.

Transcription:

ThermalStar LCi-SS Installation Guide Exclusive distribution by the Companies of Universal Forest Products www.ufpi.com/thermalstar For nearest dealer, call (800)598-9663

Designing and building instructions for ThermalStar LCi-SS are described in the following manual. These instructions can be considered general and for more detailed questions, please contact Atlas EPS. General installation, fastening details and instructions must be followed for applicable warranties. Please consult with local building official or code compliance officers for further compliance questions. ThermalStar LCi-SS is both easy to design with and install. It was developed with code compliance in mind and offers the best price and performance combination you can assemble. Safety: Follow all OSHA regulations, safety guidelines and practices. LCi-SS is to be used as exterior sheathing and only as prescribed. Keep away from flame sources and intense heat. Product Description and Overview: Patent pending LCi-SS is an insulated structural sheathing product with a distinctive orange color. Unlike other nailbase products, the OSB of LCi-SS faces inward, with the insulation on the exterior side. Standard features include: Expanded polystyrene bonded to the exterior side of 7/16 Exposure I PS2-10 OSB with permanent adhesive Polymeric film facer on the exterior side of the EPS Manufactured with EPS x Technology to provide a wax matrix and 2nd generation EPA registered termiticide to assure long term performance Meets R5 assembly rating for IRC prescriptive +5 use and is designed to be used in conjunction with the IRC designation of the 13+5 wall design Qualifies as a water resistant barrier and does not typically need an additional layer of felt paper or house wrap LCi-SS can be considered continuous sheathing (CS) in braced wall design LCi-SS is available in 4 x8 or 4 x9 sheets, with 4 x10 sheets available upon request Limitations: For external walls only Moisture sensitive claddings should be installed with a ventilation gap, as is best practice for OSB sheathing LCi-SS is to be installed in dry conditions and tape at temperatures above 0 F LCi-SS has not been tested for use in exterior walls of IBC Types I-IV construction. Storage and Handling : Standard LCi-SS is packaged in 4 x8, 4 x9 or 4 x10 bundles. R3 LCi-SS is packaged with 42 sheets to the bundle, R5 LCi-SS is packaged with 28 sheets, and R7.5 is packaged with 22 sheets. LCi-SS is factory packaged with a poly shroud and can be stored outside as long as the shroud is intact and leak proof. Store LCi-SS elevated from the ground and moist conditions. Do not stack master bundle. Designing with LCi-SS : A key feature of LCi-SS is the ability to cover the rim joist. LCi-SS is available in 8 and 9 lengths, with 10 as a special order option. An 8 high room will typically need a 9 LCi-SS panel to cover the rim joist. The developed wall thickness for a 2 x4 wall built with LCi-SS is 5-5/8 thick when used with a common 2 x4, including interior gypsum in the calculation Windows can be installed directly over LCi-SS following the flashing and nailing details (see Detail 15). Most window manufacturers now accommodate continuously insulated wall thicknesses with return extension jambs. These jams are typically available in various sizes depending on wall thickness. For homes built with drywall returns, it is simple to adjust the drywall return on the site. When using full size brick veneer, an 8 foundation can be used (see Detail 11). Be sure to insulate the interior of the rim joist which will not be covered with LCi-SS with this detail. With cladding designs that require multiple layers of water resistive barriers, such as 3 part or traditional hard coat stucco and adhered stone veneers, LCi-SS may be considered the first layer of two water resistive barriers. Follow all additional flashing directions for the applied exterior cladding

Fastening Details for LCi-SS : LCi-SS is installed with a patent pending SENCO nailer. This nailer, and the specified SENCO nails, must be used for installation in order for the limited lifetime warranty to apply. This nailing system ensures that the sheathing nails are secured with the head seated on the surface of the OSB. STANDARD NAILERS MAY NOT BE USED FOR INSTALLATION OF LCI-SS. Consult with Atlas EPS for other approved models. Only use SENCO SCN63LDXP nailer for LCi-SS R3 and R5. Use the 3/8 thick R3 spacer on the SENCO SCN63LDXP nailer when fastening LCi-SS R3. Only use SENCO SCN75LDXP nailer for LCi-SS R7.5 Only use SENCO 2-3/8 x 0.113 15 GL24APBF nails for installation Detail 1: LCi-SS Horizontal Nailing Pattern (Top Plate) Detail 2: LCi-SS Horizontal Nailing Pattern (Base Plate)

Detail 3:Standard Vertical Nailing Pattern Braced Wall Framing Design: Use of LCi-SS with the patent pending nailing system provides for IRC prescribed use as continuous insulation. LCi-SS can be used with most mechanical bracing and strapping that is often required for high wind zone and seismic zone design, provided that the instructions for those attached are followed. Stucco and Faux Stone: Traditional or 3 coat stucco, faux thin set stone veneers, and other exterior finishes, are typically installed with 2 layers of felt paper. This design prescription should be followed and LCi-SS can be considered the first WRB layer. Install the second WRB layer (typically 15# felt paper) and metal lathe layers with prescribed fasteners (see Detail 14). Exterior Insulation Finish Systems (EIFS, STO, DRYVIT): EIFS cannot be applied directly to LCi-SS. EIFS requires a continuous WRB to be installed behind the EPS layer for the EIFS warranty to apply. It is suggested that if EIFS is specified on a home that uses LCi-SS, loose EPS, 1-3/16 thick, can be ordered as a separate sheet and applied over the OSB under the installation instructions of the EIFS supplier. Construction and Installation of LCi-SS : No requirement to tape the nail holes LCi-SS is to be installed with ThermalStar 007 seam tape or equivalent. The following areas required seam tape: Vertical and horizontal seams Vertical and horizontal butt joints All corners Large bruises and field damage (cuts in the exterior water resistant barrier) should be repaired with seam tape. Large field damage can be repaired with the application of loose foam secured with seam tape. LCi-SS cuts with common circular saws- same as OSB. Panels may be installed either vertically or horizontally. All structural and mechanical connections such as hurricane/uplift straps and connections, as well as ledger boards, must have the EPS layer removed with a razor and scraper to provide structure to structure connection. Replace the foam if possible and tape or flash as required. Brick Veneer: Brick veneer can be easily installed with LCi-SS. LCi-SS is a WRB, but all other flashing details need to be followed, as well as weeps and brick ties. Brick ties are to be installed per manufacturers instructions (remove EPS layer for direct attachment) or use a barrel type brick tie development specifically for use with a continuous insulation. Flush Details: Not all parts of a structure are insulated, such as garage walls or gable walls. In these cases, it is not necessary to install LCi-SS, but it is necessary to provide a flush surface for exterior finishes to mate. Typical Structural Attachments (Hurricane Straps, Portal Framing, Ledger Boards): All structural attachments require direct contact and attachment to the OSB component of the LCi-SS. For these details, remove the EPS where the attachment occurs with a razor, secure the attachment, replace the EPS if possible, and seal with tape.

Detai 4: Typical Wall Section at Roof Truss with Siding Detail 5: Typical Wall Section at Floor Deck with Siding

Detail 6: Typical Wall Section at Foundation Siding Flush with Foundation Detail 7: Typical Wall Section at Foundation with Siding

Detail 8: Optional Wall Sections Gable End Wall At Roof Truss with Siding Insulated Gable Un-Insulated Gable

Detail 9: Typical Wall Section at Roof Truss with Brick Detail 10: Typical Wall Section at Floor Deck with Brick

Detail 11: Typical Wall Section at 8 Foundation with Brick Detail 12: Typical Wall Section at Foundation with Brick

Detail 13: Typical Wall Section at Exterior Deck Detail 14: Typical Wall Section at Foundation - 3 Coat Stucco

Detail 15: Typical Wall Section at Foundation - Stone Veneer

Detail 16: Typical Taping and Window Installation Guide

ATLAS, the Globe Logo, Solutions. Delivered., the color Pale Creamy Orange and ThermalStar are registered trademarks of Atlas Roofing Corporation. Atlas EPS, a Division of Atlas Roofing Corporation 8240 Byron Center Ave SW, Byron Center, MI 49315 (800) 917-9138 www.atlaseps.com LIT 1052 Rev 04-21-2016