Lift Type: Generally, the University prefers vertical lifts over incline lifts.

Similar documents
Walking and Working Surface Checklist:

Area of Rescue Assistance Communication System ADA Code Applicable excerpts:

Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS

Certification: Building Plans Examiner. Exam ID: B3

Adult Family Home (AFH) LOCAL BUILDING INSPECTION CHECKLIST Code References: 2012 IRC Section R325 (WAC 51-51) APPLICATION NUMBER:

Welcome to the AccessibilityOnline Webinar Series. A collaborative program between the National Network of ADA Centers and the. U.S.

Lori Greene, AHC/CDC, CCPR, FDAI

P.A.L. S SPECIFICATIONS

Classroom Door Security & Locking Hardware

Base Cabinet with Self-storing Folding Doors and Floor

BUILDING INSPECTORS INSPECTION FORM FOR CHILD CARE CENTERS

The replacement or modification of existing windows shall comply with the following requirements:

Fixed Access Ladders. Table of Contents. 1. Legislative Requirements

General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and guards.

AUTOMATIC SWINGING DOOR

Number of Sides Required to Have a Handrail

OPTIONAL INFORMATION GUARDING FLOORS, STAIRS, AND OTHER OPENINGS SELF INSPECTION CHECKLIST

Errata has been identified as follows:

GENERAL + MEANS OF ESCAPE (Part One) By Mdm Eng Yew Hoon (SIA)

NC Rehab Code Case Study Cheerwine Building January 17, 2002; rev 4/12/02

Name Of Occupancy Date. Yes No Describe

How To Protect A Swimming Pool

MEANS OF EXIT / ESCAPE / EGRESS SELF INSPECTION CHECKLIST

ADA Design Guide Washrooms & Showers

GEK-90214B. GE Lift Truck. User s Guide 144D2933G1 144D2912G1 144D2911G5

BUILDING PERMIT SPECIFICATIONS

Bath Planning Guidelines With Access Standards

City of Riverside Building & Safety Division Phone: (951)

Automatic Door Selection Guide

V1504 Vertical Platform Lift OWNER S MANUAL

Guarding Floor and Wall Openings and Holes OSHA Standard

SCOPE This guideline applies to all construction projects on Emory University properties, including renovation projects.

Installation Instructions

Ch. 58 DIVISION D-O 34 CHAPTER 58. DIVISION D-O ORDINARY COMMERCIAL, INDUSTRIAL, OFFICE OCCUPANCY GROUP CONSTRUCTION TYPE MAXIMUM STORY HEIGHT

Electrical. This section applies to the design and installation of building power distribution systems.

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone:

New York City Department of Buildings

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

Residential Plan Review Emergency Vehicle Access and Water Supply Permit Information Packet

DIRECTIONS FOR ASSEMBLING BASE & WALL CABINETS

ELECTRONIC HEALTH RECORDS AND WRITING SURFACES

MINNESOTA DEPARTMENT OF PUBLIC SAFETY State Fire Marshal Division STATEMENT OF POLICY. State Fire Marshal

Ceiling Mounted Folding Attic Ladders Installation Instructions

New York City Department of Buildings

Roped Hydraulic Residential Elevator Specifications

Model No. 4 Vertical Mixer 9 Screw Feeder Inlet H15400, May 1999 (# )

HERNANDO COUNTY FIRE ALARM GUIDELINES

Educational. Educational-Existing 1/28/2014. OCCUPANT LOADS [no change] Application. Application

Compliance Guide. For Title III of the Americans with Disabilities Act

CITY OF TORONTO. BY-LAW No

Current as of 11/10/08 1 of 1

REQUIREMENT 3. Usable Doors

MA BUILDING CODES ON SWIMMING POOLS SECTION 780 CMR 120.M

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

University Design Standard. Fire Alarm Systems

Kitchen Planning Guidelines With Access Standards

City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address

604 Water Closets and Toilet Compartments

Design Options (Tradeoffs) Allowed by the 2012 Building Codes for Properties with Sprinkler Systems. April 2013

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

PUBLIC VERTICAL PLATFORM LIFT PLANNING GUIDE


Video conferencing. solutions. Communication was never that easy,

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

WALKING-WORKING SURFACES (SLIPS, TRIPS, AND FALLS)

All-Season Sunroom Sliding Glass Door Installation Instructions

EXHIBITION DISPLAY RULES

Building Code Clarifications - 7. Fire Resistance

Learn how all this can be achieved. architecture AND save money. exceptional. with the SALT LAKE CITY, UT PERMIT # US POSTAGE PAID FIRST CLASS

10' 16' Maximum. Backwall 5' 5'

SCHOOL FIRE AND LIFE SAFETY INSPECTION CHECKLIST

RZ Guardrail System Installation Manual

LOADING DOCK EQUIPMENT. A. Section Concrete Forms and Accessories: Placement of anchors into concrete.

* Any required illumination shall be arranged so that the failure of any single lighting unit shall not leave any area in darkness.

SITE SPECIFIC FALL PROTECTION PLAN

9300BC SERIES Light Commercial Door Closer

Troubleshooting Guide for Jacks Down LED Lights

V1504 Vertical Platform Lift OWNER S MANUAL

Pollution CO CO 2. Carbonaceo us soot H 2 S, NOX, SO2

Fire Pump Plan Review March 2010

ADA Checklist for Polling Places

The KONE Motala 2000 platform lift suits the architecture of any building, thanks to the wide range of car and shaft design options.

ATI Evaluation Service A Division of Architectural Testing Certification Services

COMMONLY USED RESIDENTIAL BUILDING CODES

MEANS OF EGRESS CHAPTER 10

Planning Information. Passenger and Freight Elevators.

17,280 square feet Overview:

I N T E R N A T I O N A L R E S I D E N T I A L CO D E

MEANS OF EGRESS CHAPTER 10

CONSTRUCTION SAFETY. NOTE: Barriers, guards, and warning signs are required to ensure safety against existing hazards.

Exhibit Display Rules and Regulations

Gate Operators and the UL 325 Standard

Solar Panel Installations

SECTION MediaStation Model 125 Electric Lateral Files (ELF)

Roll-Up Door Maintenance Guide

HMMA 830 HARDWARE SELECTION FOR HOLLOW METAL DOORS AND FRAMES HOLLOW METAL MANUAL -02 NAAMM STANDARD METAL DOORS & FRAMES NAAMM 01 NAAMM 01

Residential Deck Safety, Construction, and Repair

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

Supersedes: 10/15/09 (Rev. 5) Preparer: Owner: Approver: Team Member, Occupational Safety/Industrial Hygiene CoE

Breakaway Walls

Transcription:

General In general, follow the guidelines below when designing Wheelchair Lift installations. Unless specifically indicated otherwise, these guidelines are not intended to restrict or replace professional judgment. These guidelines are applicable to permanent wheelchair lift installations. Initial Determination of Suitability In existing structures, wheelchair lifts should be provided as a means of achieving an accessible route only after all other options have been thoroughly considered and rejected. Wheelchair lift installations are difficult to successfully design and construct, and once built are prone to failure and subject to abuse by unauthorized users. The University does not permit the use of wheelchair lifts to meet accessibility requirements in new structures. Code-Recognized Applications: Michigan Barrier Free Rules limit the use of wheelchair lifts to the following applications: To provide an accessible route to a performing area in an assembly occupancy. To comply with wheelchair viewing position line-of-sight and dispersion requirements. To provide access to incidental areas, not open to the general public, that are occupied by not more than 5 persons. Exceptions to these recognized applications may be sought when existing structures make other alternatives impracticable. Inform the University Project Coordinator when an exception will be required. Applicability To Site: Wheelchair lifts are limited by Michigan Elevator and Barrier Free laws and rules to the following: Total Rise: Not more than 72-inches (12 feet has been proposed by the Elevator Board). Number of Stops: Not more than 2. Through-Floor Penetrations: Not permitted. Vertical Wheelchair Lifts Lift Type: Generally, the University prefers vertical lifts over incline lifts. Aesthetics: While full architectural hoistways for lifts are not required, give attention to appropriate placement of the unit and consider including screen walls or other architectural effects. FEBRUARY, 1999 14420 PAGE 1 OF 4

Approach: The approach path to the lift must be accessible, including the areas in front of both doors. Lifting device under-structures cause the platforms to be elevated about 3-inches above the finish floor level. Wherever practicable, depress the slab beneath the units to permit them to be accessed without a ramp at the lower landing. Where a depressed slab cannot be provided and a ramp is needed, the ramp must meet all relevant Michigan Barrier Free Rules and ADA/UFAS requirements, including those for landings at doors. Hoistway, General: Hoistways may be either site-built architectural hoistways or manufacturer s standard hoistways that meet Michigan Barrier Free and Elevator Rules. Hoistways are required to be solid, with the lift-side smooth. If the hoistway is full height to the ceiling, a light must provided in the hoistway, along with a sprinkler head in buildings with automatic fire suppression. Lights and sprinkler heads must comply with University standards for these devices, including provision of sprinkler head shut-off valve. Lights must be fed from a night-light circuit. Additional requirements include: Minimum Hoistway Height (Upper Landing): 42 inches above the upper landing. Minimum Hoistway Height (Bottom Landing): Total rise plus 42 inches. Shaft Clearance At Platform Sides: 2 inches minimum. 3 inches maximum. Shaft Clearance At Platform Ends: 3/8-inch min. running clearance. 3/4-inch max. running clearance. 3-inches max. at door. Site-Built Architectural Hoistways: Drawbacks of site-built architectural hoistways include the coordination and code compliance problems associated with custom construction. Site-built hoistways include full or partial height doors on openings into the shaft. Highlights of code requirements and related University requirements for shaft door openings include: Doors must be swinging type and of solid construction. Lights in doors are permitted and the University encourages their inclusion. Doors must be self-closing, which may be accomplished by spring-hinges on partial height doors. On full height doors, the University encourages the inclusion of power-assisted operators. Where standard closers are included on full height doors, specify delayed-action type units. Door width should not be wider than the platform plus sidewalls. 36 inches is acceptable. The University requires push/pull type hardware. No hazardous protrusions are permitted. Special attention may be necessary regarding the interlock device. Manufactured Hoistways: Manufactured hoistways have the benefit of single-source responsibility for operation and code compliance. The requirements for door openings of manufactured units are the same as those for site-built hoistways, but since manufactured units are supplied with their own 14420 PAGE 2 OF 4 FEBRUARY, 1999

doors, the level of specification detail required is lower. Usually, inclusion of requirements to comply with the Michigan Elevator Rules is sufficient. The following is a list of University-required options for manufactured units: Doors must be self-closing, swinging type. The University requires doors to operate quietly. Specify some combination of sound-deadened door construction, door silencers, and hydraulic closers (as opposed to spring hinges), as necessary. Power-assisted operators are not required on light-weight doors. Lights in doors are permitted and the University encourages their inclusion. The University requires push/pull type hardware. If provided, hoistways around the tower (lifting mechanism) must be designed for easy removal for access to machinery. Lifting Devices: The lifting device consists of a platform with guards, a lifting mechanism on one side of the platform, and various electrical devices. Platform size, gate and guardrail configuration and height, control locations and type, safety devices, and other features are regulated by the Michigan Elevator Rules. Some of the lifting devices shown in manufacturer s literature do NOT comply with the Michigan Elevator Rules, even though they may comply with ANSI requirements. The following highlights of the Michigan Elevator Rules and University requirements are intended to assist the design effort, but are not a substitute for an understanding of the Rules: The University accepts only roped hydraulic lift mechanisms. Screw drive type units are not acceptable. A safety device is required at both platform ends. The only code-approved safety device approved by the University is the electric-eye type. The University requires that platform guards on both sides of the platform be equipped with handrails. The University requires paddle-type switch controls (as opposed to push buttons) for easier use. The Elevator Rules require a fused safety disconnect. Locate the disconnect near the lift mechanism, but not in the shaft itself, and not in a location not accessible to the public. Locate the device as unobtrusively as possible. The University requires that lift platforms include a side-panel-mounted, spring-loaded seat that, in retracted position, does not impinge on the required clear width of the platform. The University requires that lifting device structures be securely fastened to the floor, in accordance with manufacturer's recommendations. The University requires a load capacity of 750 pounds. The University requires that the minimum platform size should be 13 square feet. Reference Codes: The following codes and rules affect wheelchair lift installations: FEBRUARY, 1999 14420 PAGE 3 OF 4

Americans with Disabilities Act, Uniform Federal Accessibility Standards (ADA/UFAS). Michigan Department of Labor Building Code Rules, Chapter 11 - Accessibility. Michigan Department of Labor Elevator Rules. 01/14/00 11:14 AM 14420 PAGE 4 OF 4 FEBRUARY, 1999