SCREAMING REELS III
Working Title SCREAMING REELS III Programme Number 21040 C4 Commissioning Department Daytime C4 Commissioning Editor C4 Commercial Affairs Manager Name of Production Company TEST PRODUCTION Key Production Contact Details a, anemail@in.here b c Pre/PostWatershed Not specified 5 min(s) All episode durations are inclusive of main and end titles 1
a Including whether drama, voiceover etc. a Date(s) for commissioning editor script approvals All relevant creative information eg. style of direction, period, etc. a In the case of all formatted programmes the production company must provide the commissioning editor and where appropriate, the Channel 4 programme lawyer, with the production style bible prior to the commencement of the production together with any subsequent amendments or additions to it, during the production process. - 2
Please list all key personnel that will be working on the project - t all categories will be relevant to you. If a category is t relevant, please insert N/A rather than leave it blank. It may t be possible to confirm every name at this stage; where this is the case please put TBC and the date by which you expect to confirm the name. Key On-Screen Talent Presenter Script Writer Key Advisor / Consultant Key Contributor(s) Executive Producer Series Producer Director Producer Producer/Director Narrator / Voice Over Line Producer (Drama & Comedy) Casting Director (Drama & Comedy) Production Designer (Drama & Comedy) Celebrity Booker (Entertainment) Director of Photography / Cameraman Editor Composer Contributors of 16 or under Including presenter, cast (stars, new talent), on screen portrayal (ethnic mirities, age, disability, other diversity) Inclusion of disabled people - across all programme areas - is a key element of Channel 4's diversity strategy. Please indicate how the project will reflect this. Can include reference to subject matter, on-screen talent (including reality show contributors) or the production team. Cultural diversity is one of Channel 4's key values. Please indicate here how the project will reflect this value. Can include reference to subject matter, on-screen talent or the production team. 3
Pre-production Not specified Shooting Not specified Post-production Not specified Location/Studio Shooting Number of Location Days: Number of Studio Days: Shooting Type Single camera: ne specified Second Unit: ne specified Multi camera: ne specified Live: ne specified As-live: ne specified Videotape/Film NB. If shooting on a n-broadcast quality format eg. DVC, mini-dv or HD you must seek approval from the C4 Engineering department. NB. 16:9 aspect ratio required to be full height anamorphic format unless otherwise agreed. UK London-based (within M25): t specified Non London-based: t specified Foreign Filming NB. If a high risk area, a Hostile Environment Protocol must be completed and approved by Channel 4 before travel. Country High Risk Area?: No Have you received Hostile Environment training?: No 4
A minimum of two viewings is required and the programme needs to be in a potentially transmittable state at the first viewing, subject to mir amendments. If the programme is for the Drama or Entertainment department, the CE must approve picture lock. Date of First Viewing with CE fdgdfgdfgdfg Number of Viewings Schedule for Subsequent Viewings Date of Approval of Fine Cut Programme Delivery Date Episodic Delivery Schedule (if applicable) 5
Please outline any other issues that may affect production. (eg. Acccess requirements, availabilty of talent) Secret Filming/Hidden Camera/CCTV Issues? (If yes, please provide details below) Approximate amount of third party material Range and scale of stunts and effects Topical? eg. does this project tie into any anniversaries, books, exhibitions, DVD releases etc. Please specify Will the production be classed as regional? NB. To be classified as regional a production must meet at least two of the following criteria. Which two criteria does your company meet? The company must have substansive business and production base outside the M25 At least 70% of the production budget must be spent outside the M25 At least 50% of the production staff should be working outside the M25 Please provide details eg. SMS or MMS ne specified 6
Does the Production Company have a Health and Safety Policy? Please indicate who the Health and Safety Officer is for this project Is this person qualified to undertake responsibility for Health and Safety? Has the Production Company ever had a Prohibition Notice against them? Are there any special Health and Safety issues across the production? If yes please provide details below: 7
Delivery date for other technical requirements (eg. on-line, interactive, if applicable) Delivery Date N.B. Please te that you should put in your production company name followed by 'for Channel 4' (for a commission) and production company name followed by 'in association with Channel 4' (for coproductions). N.B. If proposing to deliver in any format other than PAL Digital Betacam 625 line videotape you must secure prior approval from the C4 engineering department. Intervals at which Cost Reports Delivered (where appropriate) Intervals at which Progress Reports Delivered (where appropriate - for fixed price deals) 8
Commissioning Editor Sign-off 28/11/2006 by trainee1 Commercial Affairs Sign-off 28/11/2006 by trainee1 Production Company Sign-off 28/11/2006 by trainer1 9