Building Excellence IV Capital Levy Projects Under Construction Project Arbor Heights Elementary School Cascadia Elementary School & Robert Eagle Staff Middle School Genesee Hill Elementary School Hazel Wolf K-8 at Pinehurst Olympic Hills Elementary School Seattle New World School at TT Minor New Thornton Creek Building Slide Number 2 14 24 37 49 58 68 April 1, 2016
Building Excellence IV Capital Levy Arbor Heights Elementary School! Site: Maintaining Temporary Erosion Sedimentation Control (TESC) measures. Playfield irrigation installation ongoing, sidewalk grading at SW 105 th Street ongoing, site stair footings formed, reinforced and concrete placed.! South Building: Exterior Mineral wool insulation, siding hardware, and fiber-cement board siding installation ongoing. Interior Gypsum Wall Board (GWB) installation on third floor complete, interior painting in-progress on second floor. Casework and acoustical ceiling grid installation ongoing at first floor. Mechanical, electrical and plumbing (MEP) installation in-progress at second floor mechanical room.! Arbor: Guardrail installed at the stairs and bridge.! North Building: Exterior Air-barrier installation ongoing, masonry complete. Interior Spray applied foam insulation complete at exterior walls, GWB hanging in-progress at library, gymnasium, administrative offices, and kitchen. MEP rough-in ongoing.
Arbor Heights Elementary School Site Plan July 1, 2015 July 10, 2015
Arbor Heights Elementary School Aerial View from the South February 29, 2016
Arbor Heights Elementary School Site Looking North East March 29, 2016
Arbor Heights Elementary School South Building West Elevation March 29, 2016
Arbor Heights Elementary School South Building East Elevation March 29, 2016
Arbor Heights Elementary School South Building First Floor Special Education Classroom March 29, 2016
Arbor Heights Elementary School South Building Second Floor Open Learning Area March 29, 2016
Arbor Heights Elementary School North Building West Elevation March 29, 2016
Arbor Heights Elementary School North Building Kitchen March 29, 2016
Arbor Heights Elementary School North Building Library March 29, 2016
Arbor Heights Elementary School North Building Gymnasium March 29, 2016
Building Excellence IV Capital Levy Cascadia Elementary School and Robert Eagle Staff Midd le School! Site: Maintaining TESC during wet conditions. Parking lot paving on hold pending dry weather window.! ES: Exterior - Sheathing and insulation ongoing, south portions complete. Interior Metal stud framing ongoing. Concrete slab grinding and polishing ongoing on 1st floor. Fall arrest anchor installation ongoing. Poured and stripped mechanical penthouse slabs at roof. Fall arrest anchors 50% complete.! MS: Poured slab-on-metal-deck at Zones 4 and 5, 2nd and 3rd floors. Metal decking ongoing.! Gym: Corrective measure for gym steel framing continues, to be complete within the month of April.
Cascadia Elementary School & Robert Eagle Staff Middle School Site Plan
Cascadia Elementary School & Robert Eagle Staff Middle School Zone Map Middle School Elementary School
Cascadia Elementary School & Robert Eagle Staff Middle School Aerial View from the South February 29, 2016
Cascadia Elementary School & Robert Eagle Staff Middle School Elementary School - Zones 2 & 4 Exterior Framing and Sheathing, Looking East March 22, 2016
Cascadia Elementary School & Robert Eagle Staff Middle School Elementary School - Zone 2 Exterior Sheathing, Looking West March 22, 2016
Cascadia Elementary School & Robert Eagle Staff Middle School Elementary School - Framing at Rooftop Mechanical Penthouse, Looking Southeast March 22, 2016
Cascadia Elementary School & Robert Eagle Staff Middle School Elementary School - Zone 6 Framing, 2nd floor, looking Northwest March 22, 2016
Cascadia Elementary School & Robert Eagle Staff Middle School Middle School - Commons Vapor Barrier Installed, Ready for Concrete Placement March 23, 2016
Cascadia Elementary School & Robert Eagle Staff Middle School Middle School Zones 4 & 5 Slab-on-Metal Decks Poured, Looking North March 23, 2016
Building Excellence IV Capital Levy Genesee Hill Elementary School! Site: Began off-site improvements. Continued placement/finishing concrete at north and south plazas; continued forming sidewalks; completed rain garden structure; constructing planter boxes.! Area 1: Continued final clean; resumed installation of AV equipment; installing door lock cores.! Area 2: Continued installation of ceiling grid; concrete polishing/ staining process to begin at level 1. Continued installation and painting of wall panels at levels 1 and 2. Installed carpet at level 1. Data cabling terminated and power install ongoing at MDF.! Area 3: Carpet and resilient flooring complete. Continued installation of plumbing fixtures. Continued installation of toilet accessories. Continued miscellaneous pick-up work on sprinkler system.! Area 4: Began installation of wood gym floor.
Genesee Hill Elementary School Site Plan
Genesee Hill Elementary School Aerial View from the East
Genesee Hill Elementary School Site Daycare Play Area; North Parking Lot to the East
Genesee Hill Elementary School Site Placement and Finishing Concrete at North Plaza
Genesee Hill Elementary School Area 1 Basement Mechanical Room
Genesee Hill Elementary School Area 1 Final Cleaning is Ongoing
Genesee Hill Elementary School Area 1 Typical Learning Commons
Genesee Hill Elementary School Area 2 Data Cabling Terminated and Power Installation to Racks Ongoing
Genesee Hill Elementary School Area 2 Main Entry and Stair #1to Level 2
Genesee Hill Elementary School Area 2 Library Space Installation of Finishes Ongoing
Genesee Hill Elementary School Area 3 Looking North to the Stage
Genesee Hill Elementary School Area 4 Gym Flooring Installation Ongoing
Building Excellence IV Capital Levy Hazel Wolf K-8 at Pinehurst! Site: Monitoring TESC measures. Side sewer connection lines ongoing. Electrical vault pad prepared for transformer set/install. Grading of loading dock area ongoing.! Building A: Exterior - Masonry complete. Top deck water proofing continues. Interior Gypsum Wall Board (GWB) hanging complete and taping started. Area A2 Exterior - Masonry complete. Window install and storefront windows complete. GWB taping finished on the first floor. Painting continues on first and third floors. Ceiling grid ongoing on the second floor. Elevator install work continues. Area A3 Exterior - Water proof membrane install ongoing, concrete stairs form work ongoing. Exterior sheeting completed with air barrier nearly complete. MEP roughin ongoing.! Building B: Exterior - Placement of concrete slab on grade pending weather. Roofing complete. Interior - Band/choir room metal stud framing ongoing.! Building C: Exterior - Sheeting and Air Barrier complete. Interior - Soffit framing ongoing. GWB started at soffits. MEP at ceiling soffits ongoing.
Hazel Wolf K-8 at Pinehurst Site Plan
Hazel Wolf K-8 at Pinehurst Aerial View from the East March 16, 2016
Hazel Wolf K-8 at Pinehurst Site Looking North West March 23, 2016
Hazel Wolf K-8 at Pinehurst Site Center Courtyard Looking South March 25, 2016
Hazel Wolf K-8 at Pinehurst Area A1 Library Gypsum Wall Board (GWB) Installation March 25, 2016
Hazel Wolf K-8 at Pinehurst Area A1 Library Looking South March 25, 2016
Hazel Wolf K-8 at Pinehurst Area A2 Exterior Insulation, Flashing looking South East March 26, 2016
Hazel Wolf K-8 at Pinehurst Area A2 Exterior Siding Looking South West March 23, 2016
Hazel Wolf K-8 at Pinehurst Area A2 Second Floor Paint, Grid Ceiling Installation March 25, 2016
Hazel Wolf K-8 at Pinehurst Area A3 Final Exterior Sheeting Looking North West March 24, 2016
Hazel Wolf K-8 at Pinehurst Area C Gym/Commons Ductwork at Soffits March 25, 2016
Building Excellence IV Capital Levy Olympic Hills Elementary School! Site: Monitoring TESC measures including use of 3 baker tanks. Geothermal well drilling ongoing; approximately 94% complete.! Building: Started steel erection in Zone A. Completed slab-ongrade in Zones A and B. Ongoing installation of underground MEP in portions of Zones A, B, C and D. Footings and stem walls in Zones A, B, C and D being poured, ongoing.
Olympic Hills Elementary School Site Plan
Olympic Hills Elementary School Aerial View from the West March 2, 2016
Olympic Hills Elementary School Zone Map
Olympic Hills Elementary School Site Completed Well #75 March 23, 2016
Olympic Hills Elementary School Conduit Installation in Electrical Room Looking Southeast March 23, 2016
Olympic Hills Elementary School Zone A - Start of Steel Erection, Looking South March 23, 2016
Olympic Hills Elementary School Zone B Concrete Slab-on-Grade Poured, Looking Northeast March 23, 2016
Olympic Hills Elementary School Zone D - Underground Plumbing, Looking East March 23, 2016
Building Excellence IV Capital Levy Seattle World School at T.T. Minor! Area A Administration Office, Student Services, Health Clinic and Library: Administration wood framing complete. GWB installation and taping ongoing. Overhead MEP rough-in work ongoing. Administration addition roof panels complete and roofing material ongoing. Health Clinic HVAC mezzanine floor concrete pour complete. Health Clinic painting in progress.! Area B Multipurpose, Kitchen, Boiler Room: Steel erection complete, structural wood framing of the Kitchen ongoing, SIP roof panel installation complete and roofing material installation ongoing. MEP rough in at mezzanine in progress.! Area C Classrooms: MEP installation ongoing with core drilling of existing concrete beams in progress. Seattle City Light transformer vault installed. GWB installation complete and interior painting ongoing.
Seattle World School at T.T. Minor Site Plan Area C Area B Area A Area C Area B Area A
Seattle World School at T.T. Minor Area A Health Clinic Finish Painting Mock Up March 28, 2016
Seattle World School at T.T. Minor Area A New Administration GWB Installation Ongoing March 28, 2016
Seattle World School at T.T. Minor Area B Kitchen/Commons/Stage HVAC Duct Installation Ongoing March 28, 2016
Seattle World School at T.T. Minor Area B Electrical Switch Gear Delivered March 28, 2016
Seattle World School at T.T. Minor Area B Concrete Footing Pour at Front Entry Vestibule and Fire Rise r Room March 28, 2016
Seattle World School at T.T. Minor Area B Fire Riser Room Footing Concrete Pour March 28, 2016
Seattle World School at T.T. Minor Area B Boiler Room Equipment Pads Concrete Pour March 28, 2016
Seattle World School at T.T. Minor Area B Boiler Room Electrical Installation Ongoing March 28, 2016
Building Excellence IV Capital Levy New Thornton Creek Building! Site: Monitoring TESC measures. Began installing foundations for backstop in the playfield.! Building A: Ongoing structural steel erection east end (Gym and Childcare). Completed placement of steel joist and decking. Ongoing exterior framing and sheathing installation. Ongoing application of fluid applied air barrier. Ongoing roofing the single story north roof on west end of building. Began high roof over Admin Area and Commons. Ongoing installation of interior framing, hollow metal frame doors and relites. Ongoing MEP rough-in.! Building B: Ongoing application of fluid applied air barrier. Ongoing masonry on south (library), west and north elevations. Ongoing installation of sheet metal flashing for window openings. Ongoing windows installation. Ongoing installation and taping of GWB both floors. Ongoing MEP rough-in.! Building C: Ongoing painting of classrooms. Ongoing acoustical ceiling grids installation. Ongoing installation of lighting in hallway and classrooms. Ongoing installation of fiber cement panels on exterior. Ongoing trim of electrical devices. Began installing epoxy flooring in bathrooms.! Off-site Improvements: Installed new gas service connection on NE 77 th St. Began site demolition and preparation for pouring concrete sidewalk in NE 77 th St between 41 st Ave NE and 42 nd Ave NE.
New Thornton Creek Building Key Plan Building C Building B Building A D
New Thornton Creek Building Aerial View from the North March 16, 2016
New Thornton Creek Building Building A Steel Decking on Daycare Roof
New Thornton Creek Building Building A Concrete Slab-on-Grade
New Thornton Creek Building Building A Steel for Wood Seating and Stairs in South Commons
New Thornton Creek Building Building A Framing for Staff Lounge
New Thornton Creek Building Building B Gypsum Wall Board (GWB) Installation
New Thornton Creek Building Building B Gypsum Wall Board (GWB) Installation
New Thornton Creek Building Building B Second Floor Electrical Closet Build-Out
New Thornton Creek Building Building C Sheet Metal Coping on Roof Edge
New Thornton Creek Building Building C Ceiling Grid in Classroom