1 SPECIFICATIONS For Sample Customer SCOPE OF WORK: The contractor will provide labor and/or materials for the work as outlined in the estimate and the following specification. The contractor s estimate is based on information provided by the owner, site visit reviews, and the assumption that previous work has been performed following standard building practices, and adequate maintenance has been performed. Unforeseen conditions requiring a change to the original scope of work, may result in a change order, and will be billed accordingly. This may include corrections required to meet codes that were not addressed by the architect, or plan examiner, but were later flagged by the inspector. All items listed as allowances are either items that have not yet be selected, or are otherwise unable to be priced this time. Any item listed as an allowance, will generate a change order that will reflex actual cost once they are determined. Change orders for allowance items will refund the entire allowance amount, and will bill back the actual costs of the items selected. PERMITS: To be supplied by the owner. SITE WORK: The contractor will furnish all equipment and labor to complete the site work relating to this project, and as outlined below. Preparation and Protection: We will provide protection to all finished surfaces prior to the start of demolition. This will include construction paper covering on hard floor surfaces, adhesive carpet masking on any carpeted areas in construction zones and pathways, and plastic tarp walls between work area and remaining living spaces. Demolition: We will demolish and dispose of all materials relating to the deconstruction of the existing structure required to complete improvements. Materials will be reuse, recycled or disposed of as applicable. This will include the complete demolition of the kitchen to studs, and sub-flooring. We will also demolish any parts in the basement necessary to complete the plumbing, electrical, gas line, and framing. We will remove the exterior siding/trim as required to accommodate the new window and door. Excavation: We will provide equipment, operator and any additional labor required to complete the excavation relating to this project as shown on plans. This will include the footing for the new back porch foundation. Backfill: We will backfill new foundation walls with saved material. Backfill will be rough graded, and any finish grading and landscaping is not included in this estimate. Sample kitchen remodel 1 12/2/2003

2 Hauling: We will provide transportation of all incoming and outgoing material relating to the site work. Material will be hauled to approved disposal/recycling sites. CONCRETE: The contractor will furnish all materials and labor to complete the concrete work relating to this project. This will include the construction of the new back porch foundation/slab. Foundation: We will form and pour new foundation walls with 8x16 footings. We will fill and compact the foundation walls, and pour a concrete cap and stairs, to be covered with stairs. Steel: We will provide steel reinforcing bar, as code requires, in the new foundation walls and slab. FRAMING: The contractor will furnish framing materials necessary to complete the construction of all parts relating to this project. Lumber: All framing material to be #2 and better, sub-floor and backing #3 and better, wall sheathing to be ½ CDX plywood, roof sheeting to be 5/8 CDX. All weather exposed and ground/cement contact framing material to be pressure treated. Rough framing: We will complete all framing as per plans/drawings. Framing will be performed following standard building practices, and as existing conditions require. This will include infilling the existing door location, rough opening for the new window, rough opening for the new door, platform for cabinets, the ½ at island, and all blocking, backing and bracing. EXTERIOR FINISH: The contractor will furnish all the labor and materials necessary to complete all parts relating to the exterior finish work on this project. Stitching: Our objective is to stitch the old to new to provide a seamless, as built look. Trim: We will complete all the exterior trim, including window and door casings, which will be match the existing. All trim material to be pre-primed material. Siding: We will cut back existing siding for the new canopy as required, and patch back in either saved or new material. Stucco: We will patch in the old door location, and other areas as shown in drawings, and as necessary with tradition 3-coat concrete plaster stucco finish. The entire wall at new window, and new door will receive a final texture coat to blend new to old, and hide all seems. Latex additives in final coat are available at additional cost. Canopy: We will construct the canopy as shown in the drawing. The support framing will be primed, filled, sanded and painted select pine. The lid will be finger joint hem, spruce, fir v-groove t&g. There is a custom-made metal collar tie, which is included in the metal category as an allowance. A standard wooden design would provide a cost savings. Cedar material can be priced out, and billed Sample kitchen remodel 2 12/2/2003

3 as an extra, however if the parts will be painted, then this would not be a necessary upgrade. WINDOWS: We will provide all materials and labor necessary to install a new 5 6 x 5 0 Eagle brand window as shown in plans. This will be a metal clad, wood window with double glazed, low-e glass. Interior will be pre-primed, and the exterior will have a bronze cladding to best match existing with standard color. Custom color would be additional. Window hardware is priced in a standard finish, and should be selected by owner. Some finishes may be additional. We will also supply and install a Marvin tilt pack in the other kitchen window location. This window will have low-e glass, with no dividers. This window includes hardware in the standard finish category, and a bronze screen. The sizing is estimated at this time, and will likely vary once the existing window is dismantled, and true measurement can be taken, which may affect the price. Therefore this window is included as an allowance. *Note that this window is not tempered, and would therefore need to be at less 18 to glass off the new floor height. There may be additional costs if this size window will not work in standard glass and either has to be ordered in a different size, or tempered. PLUMBING: The contractor will furnish all labor and materials necessary to complete the plumbing relating to this project. This will include the new kitchen and gas line installation. All plumbing fixtures to be supplied by the owner. The contractor does not cover fixtures supplied by owner against defect, and any call back work resulting from defective fixtures would be billable. ELECTRICAL: The contractor will furnish all labor and materials necessary to complete the electrical work relating to this project, as shown on plans, and outlined below. This will include: - Install 3 recessed can lights in hallway and connect to existing 3-way - Relocate/rewire disposal and dishwasher circuits - Relocate dedicated microwave circuit - Reposition existing oven circuit - Install 7 recessed can lights on single switch in kitchen - Install 3 recessed can lights on single switch over island - Install 6 recessed can lights on 3-way switch in kitchen - Install 1 recessed can light on single switch outside - Install five light outlets for under cabinet lighting - Install counter receptacle circuits and island The homeowner will be supplying all the can lights with trim and bulbs, in the kitchen (13), and the pendant lights over the island (3). If code requires smoke detectors in any locations, this will be billed as an extra. Specialty wiring (TV, stereo, cable): Homeowner to supply new doorbell to be location above kitchen doorway as shown in drawings. It is assumed that the existing wiring is in good working order. Sample kitchen remodel 3 12/2/2003

4 * It is assumed that existing wiring was installed following standard practices, and codes at time of work. If conditions arise that fall outside these standards, additional costs may be billed. Project manager / electrician will discuss any such conditions with homeowner prior to any work being done, and make recommendation. FIXTURES: Homeowner to supply all surface mount fixtures. HVAC: We will provide for all venting relating to this project. This will include connecting the new down draft to existing ducting, extending heat duct to new location, and providing new vent covers, to be approved/selected by the owner. ROOFING: The contractor will furnish all labor and materials necessary to complete the roofing and flashing relating to this project. This will include the new canopy cover over the new back door. The shingle will be split cedar, to match exiting on house. GUTTERS & DOWNSPOUTS: There are NO gutters or downspouts included in the estimate at this time. INSULATION: The contractor will furnish all labor and materials necessary to complete the insulation relating to this project. This will include the existing 2x4 exterior walls in the kitchen, with R-15 fiberglass batts. Should any addition insulation be required to meet code, this would be billed as extra. SHEETROCK: The contractor will provide and install ½ sheetrock on demolished or newly framed walls and ceilings, as shown in plans. We will tape, double, flush and finish smooth. This will include all patchwork resulting from the opening of walls throughout existing building resulting from electrical, plumbing and framing parts. MASONRY: We will cover the new back porch and stairs with owner supplied and new pavers, as shown in the drawings. These pavers will cover all horizontal surfaces. The vertical surfaces will be a stone veneer, for which we have included an allowance until the homeowner makes final material selection. FINISH WORK: The contractor will furnish all labor and materials necessary to complete this project as per plans, and outlined below. All interior casing and trim work will be completed by the homeowner. Exterior doors: We will provide and install a new exterior door in new location as shown in plans. This door will be a 3 0 x 6 8 Fir 7109 Margingal Grid, true divided, with clear glass, with 1 6 x 6 8 fir 5701 full light low-e sidelights. *Note clear glass in the door, which is stock, and available at minimal lead-time. Low-e glass in the door would be special order, and have a 4-5 week lead-time. Hinge color to be selected by owner. Locks: We will supply and install (1) new exterior lockset, and (1) new interior lockset. These will be Schlage A series. Finish to be selected by owner. Sample kitchen remodel 4 12/2/2003

5 CABINETS: All cabinets will be supplied and installed by the homeowner. METAL WORK: We will fabricate and install new railing at new back door location, and front location, as shown in plans. The metal work was estimated for fabrication as per architect details, however will remain an allowance until the fabricator and homeowner meet and approve a final detail specification for both locations. There is also a metal collar tie to be installed in the canopy, for which there is also still an allowance. PAINTING: The contractor will be responsible for all the painting related to this project, which includes interior walls and ceilings in the kitchen and hallway, as well as patch work areas in the basement a required. We will paint exterior stucco, siding and trim. All Sheetrock will have a primer coat of paint followed by two coats flat latex wall or ceiling paint. All wood painted surfaces will have an oil based primer coat, followed by 2 coats semi gloss enamel. Exterior will have a primer coat followed by a coat of Rodda exterior latex or equal. Interior will be caulked with latex based product, and exterior will be caulked with polyurethane based product. We will paint patchwork area surface to stopping points (i.e. inside corners, outside corners, floors, ceilings, etc.) TILEWORK: The contractor will supply and install all the tile relating to this project. This will include the kitchen floor and base. We will install cement board to allow for best elevation consistency, and mortar set tiles on the floor. The base will be installed over framed cabinet platforms, or wall sheetrock with setting adhesive. It is assumed that tile selections will have bull nose, or edge cap availability, and any edging would be additional. The tile costs have been included as an allowance item at this time. Kitchen: Floors: to be selected by owners Base: to be selected by owners SURFACING: The contractor will furnish all labor and materials necessary to complete the surfacing relating to this project. This will include the fabrication and installation of ¾ thick granite slabs on the kitchen, island and cabinet, counter tops and backsplashes, as shown in plans. The edges will be ½ round 1 ½ thick. There will be two undermount sinks cut outs with polished edges. There will be a 7 backsplash over the cook top, to replace the stainless steel, as shown in drawings. Natural stone: Absolute Black Granite (Indian stone) APPLIANCES: We will furnish labor and materials required to assemble and install the following appliances, which will be furnished by the owner. Refrigerator: to be selected by owners Cook top/downdraft: to be selected by owners Dishwasher: to be selected by owners Wall oven: to be selected by owners Microwave: to be selected by owners Sample kitchen remodel 5 12/2/2003

6 MISCELLANEOUS: We will supply all nails, screws, adhesives, caulking, and noncategorical part required to complete this project. CLEAN UP: Contractor will be responsible for all construction related clean up, and debris disposal. We will isolate work areas to minimize impact to non-work related spaces, however some dust and debris propagation should be expected. Sample kitchen remodel 6 12/2/2003

Estimating Database Checklist

Estimating Database Checklist Estimating Database Checklist If you are creating a new estimating database for projects, the following list offers a thorough listing of Main and Sub Categories. You can also use it as a checklist to

More information

Irvinton Village Apartments 2901 Fulton Houston, Texas 77009 Houston Housing Authority J. Allen Management Managing Agent

Irvinton Village Apartments 2901 Fulton Houston, Texas 77009 Houston Housing Authority J. Allen Management Managing Agent Irvinton Village Apartments 2901 Fulton Houston, Texas 77009 Houston Housing Authority J. Allen Management Managing Agent Scope for Irvinton Village Unit #512 Overall Scope: Demolition, Renovation, and

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space) COST OF WORK FORM All costs shown are estimates using base grade materials, taxes, and labor. For houses where a higher quality is indicated, the costs should be increased for work requiring upgraded materials.

More information

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME 1 THE BUILDING PROCESS The focus of Woodland Homes building department is Quality, Service and Predictability. Through

More information

Mike and Jen Sample 111 Main St. Tabb, VA. 23699 888-9999 SPECIFICATION LIST

Mike and Jen Sample 111 Main St. Tabb, VA. 23699 888-9999 SPECIFICATION LIST Mike and Jen Sample 111 Main St. Tabb, VA. 23699 888-9999 SPECIFICATION LIST 10. PLANS AND PERMITS The Contractor shall provide all necessary plans and procure permits for building, plumbing, electrical,

More information

QUOTATION FOR EXAMPLE BATHROOM RENOVATION

QUOTATION FOR EXAMPLE BATHROOM RENOVATION QUOTATION FOR EXAMPLE BATHROOM RENOVATION Prepared For: PEGASUS Client 99 Washington St Melrose, MA 02176 Quotation valid for 90 from: 12/21/10 PEGASUS Design-To-Build is pleased to have the opportunity

More information

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number

More information

Holz Choices & Specifications

Holz Choices & Specifications March 21, 2011 0. SALES AND DESIGN 1. UTILITIES AND PERMITS Holz Choices & Specifications 2. EXCAVATION AND LOT PREPARATION Job Beginning date of Monday May 2 nd, 2011 ALTERNATE: Garage walls as drawn

More information

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C. CLIENT Inspection Report 271 Front St. Alert Bay, B.C. Island Building Inspections 2013 V ANCOUVER I SLAND B. C. Elevation Photos For the Property at 271 Front Street Alert Bay, BC ELEVATION PICTURES Front

More information

Sample Rehabilitation Proposal: Narrative

Sample Rehabilitation Proposal: Narrative Sample Rehabilitation Proposal: Narrative Submitted by Mr. And Mrs. John Doe RE: XXX North Xth St. Paducah, KY To: Urban Renewal and Community Development Agency: We are interested in purchasing the property

More information

The UPLANDS at ORO VALLEY Sterling Features

The UPLANDS at ORO VALLEY Sterling Features The UPLANDS at ORO VALLEY Sterling Features STERLING FEATURES Enhanced Air Quality System 2x6 Exterior Walls in Living Area Engineered Post Tension Concrete Slab Dual Pane Low-E Windows Covered Patio Gated

More information

Home Inspection Report

Home Inspection Report 4949 Brownsboro Rd Suite 293 Louisville, KY 40223 (502) 414-1440 tripleainspections@gmail.com Inspected By: William Carter, HI-1956 Home Inspection Report Prepared For: Edward Cullen Property Address:

More information

RUSS L. ROBINSON ATLANTA COMMUNITIES (770) 335-7677 russ@russlrobinson.com www.russlrobinson.com

RUSS L. ROBINSON ATLANTA COMMUNITIES (770) 335-7677 russ@russlrobinson.com www.russlrobinson.com RUSS L. ROBINSON ATLANTA COMMUNITIES (770) 335-7677 russ@russlrobinson.com www.russlrobinson.com 4 Homesites from the $540s n the heart of Roswell, the Hawthorne subdivision is a unique enclave of 14 single-family

More information

ADDENDUM # 1 To: 1112-909-62-3698 RFP for: Various Construction Maintenance & Repair Services

ADDENDUM # 1 To: 1112-909-62-3698 RFP for: Various Construction Maintenance & Repair Services 818 S. FLORES ST. SAN ANTONIO, TEXAS 78204 www.saha.org Procurement Department ADDENDUM # 1 To: 1112-909-62-3698 RFP for: Various Construction Maintenance & Repair Services Remove and replace in their

More information

Chelton. Lower Level. Crescendo Builders. Chelton. Bethesda, Maryland. Elevation A. Elevation A. an award winning homebuilder

Chelton. Lower Level. Crescendo Builders. Chelton. Bethesda, Maryland. Elevation A. Elevation A. an award winning homebuilder Lower Level C ethesda, Maryland Crescendo uilders an award winning homebuilder The builder reserves its right to change, upgrade or alter its plans, specifications and materials without notice or obligation.

More information

Summit Series Single Section and Double Section Homes

Summit Series Single Section and Double Section Homes Single Section and Double Section Homes SM-01 All New 20 Wides Now Available! SM-08 Units shown with optional features SM-01-4814 42 Bedrooms 41 Bathrooms 648 Sq. Ft. SM-01-5214 42 Bedrooms 41 Bathrooms

More information

Estimator: Miami Estimates Business: (305) 395-4362. Date Entered: 04/30/2008

Estimator: Miami Estimates Business: (305) 395-4362. Date Entered: 04/30/2008 Insured: Property: Claim Rep.: Business: Estimator: Miami Estimates Business: (305) 395-4362 Claim Number Policy Number Type of Loss Deductible Dates: Date of Loss: 10/24/2005 Dwelling $0.00 Other structures

More information

Historic Preservation Certification Application Part 2 343-345 Main Street West South Haven, Vermont NPS Project No. 12345

Historic Preservation Certification Application Part 2 343-345 Main Street West South Haven, Vermont NPS Project No. 12345 Exterior Features 1 site and drainage 2 foundation 3 wood siding and trim 4 exterior doors 5 windows / storm windows 6 porches front and rear 7 chimneys 8 roofing Interior Features 9 frame 10 basement

More information

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE - The original section of this building was constructed in 1941. The exterior walls are built of good quality stone. In the early 1980 s a similar addition was added to the north elevation. The exterior

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders INTRODUCTORY INFORMATION TABLE OF CONTENTS 00 0101 PROJECT TITLE PAGE PROCUREMENT REQUIREMENTS (PROJECT MANUAL) Tab A - Invitation for Bids Tab B - Instructions to Bidders Tab C Bid Form for General Bids

More information

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

D Sample Notices to Property Owners, Sample Affidavits, and Other Material D Sample Notices to Property Owners, Sample Affidavits, and Other Material These samples are offered to illustrate specific points in the Desk Reference. States and communities should examine them carefully

More information

IMPROVEMENT COST ESTIMATE powered by HomeFixers

IMPROVEMENT COST ESTIMATE powered by HomeFixers IMPROVEMENT COST ESTIMATE powered by HomeFixers 123 Main St, Anytown, USA 12345 2000 SF $ 45,041.06 100.0% $22.52 per sq. ft. Stage 1: Pre-Construction $ 1,461.00 3.2% 1 House Secured $ 106.00 0.2% Lockbox

More information

Page 1 of 5. Exterior Finish. 1.) 8 textured lap siding. Roofing. 1.) 30-year dimensional shingles over a layer of 30# felt. Color is Weathered Wood.

Page 1 of 5. Exterior Finish. 1.) 8 textured lap siding. Roofing. 1.) 30-year dimensional shingles over a layer of 30# felt. Color is Weathered Wood. Page 1 of 5 Excavation and Foundation 1.) Crawlspace foundation on most Plans with the option of an 8 Unfinished Basement. 2.) Perimeter drain and pit installed. (no pump supplied) Concrete flat work/framing

More information

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN 46787 Phone (260) 723-5131 Sales Fax (260) 723-6396 whitley@whitleyman.

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN 46787 Phone (260) 723-5131 Sales Fax (260) 723-6396 whitley@whitleyman. Building Type Building Code Whitley Classroom Buildings BOCA, UBC, SBCCI, NEC, ADA Structural Support Outrigger construction standard, Whitley model classrooms. Main support beams to be 12 11.8# per lineal

More information

5000 Series House Plans & Pricing

5000 Series House Plans & Pricing 5000 Series House Plans & Pricing (All Neighborhoods) 4701-A Oleander Drive Myrtle Beach, SC 29577 Phone: (843) 449-8900 Fax: (843) 497-5325 2/21/13 Nations Homes II has earned a reputation as one of the

More information

#1) BEFORE Purchasing Land Here Is A Checklist Of Things You Should Check

#1) BEFORE Purchasing Land Here Is A Checklist Of Things You Should Check #1) BEFORE Purchasing Land Here Is A Checklist Of Things You Should Check Zoning laws Deed restrictions on home size, foundation style, roof pitch, etc. Suitability (slope, wetland issues, etc.) Accessibility

More information

Gramercy Place Condo Association, Inc.

Gramercy Place Condo Association, Inc. Gramercy Place Condo Association, Inc. UNIT MODIFICATION REQUEST Date of Application: Name of Owner (s): Telephone: (Home) (Cell) E-Mail: Anticipated start date: Anticipated ending date: Permission is

More information

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

ST. MONICA FOOD PANTRY HOUSTON, TEXAS PROJECT MANUAL FOR ST. MONICA FOOD PANTRY HOUSTON, TEXAS OWNER: ST. MONICA CATHOLIC CHURCH 8421 W. MONTGOMERY ROAD HOUSTON, TEXAS 77088 ARCHITECT: C SIX ARCHITECTURE, LLC 4606 F.M. 1960 WEST, STE 400 HOUSTON,

More information

Inspection Item COMMENTS

Inspection Item COMMENTS APPENDIX 9 AFFORDABLE HOUSING PROGRAM INSPECTION CHECKLIST Participating Jurisdiction: Homeowner Name: Assisted Property Address: Date of Physical Inspection of Property: Total Square Footage of Property:

More information

WASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST

WASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST 0 RIVERSIDE DRIVE, OTTAWA, ON A0.0 COVER SHEET / DRAWING LIST A0. LEGEND AND GENERAL NOTES A0. GENERAL NOTES A0. GENERAL NOTES A0. TYPICAL WASHROOM WALL/SINK SECTION A0. DETAIL - CONTROL JOINT A0. DETAIL

More information

Borges Construction Company A limited liability Corporation Page1 of 1

Borges Construction Company A limited liability Corporation Page1 of 1 Page1 of 1 The following is a quote to remodel the master bathroom at your home: Materials Labor Demolition 1 Dumpster $ 225.00 $ - 2 Remove existing carpet $ - $ 50.00 3 Remove existing tile $ - $ 80.00

More information

Important Information for Installer & Homeowner

Important Information for Installer & Homeowner Important Information for Installer & Homeowner Homeowner: Please keep this information for your records, do not discard! Installation Instructions for Wood Frame Construction Replacement (See other side

More information

Barewood Octagon and Elongated Windows Installation Instructions

Barewood Octagon and Elongated Windows Installation Instructions Step-by-step instructions to a beautiful window. Measuring and Installation of your new window from Century Specialty Windows couldn't be easier with our step-by-step instructions. Quality, function and

More information

S t e p h e n A l e x a n d e r

S t e p h e n A l e x a n d e r B y S t e p h e n A l e x a n d e r Stephen-757-449-2478 mralexander@stephenalexanderhomes.com www.stephenalexanderhomes.com Cottage Collection The Cottage Collection is a unique group of homes developed

More information

Superform Products Ltd.

Superform Products Ltd. TYPICAL CORNER REINFORCING NOTE : SEE ENGINEERED REBAR SCHEDULES SUPPLIED BY THE MANUFACTURER STEEL REINFORCEMENT WALL CORNER 90 Copyright 2012 Sept. 2012 5.1.1 Rebar Spacing 6" 12" Max. Load LB./FT. 2000

More information

BUILDING PERMIT SPECIFICATIONS

BUILDING PERMIT SPECIFICATIONS BUILDING PERMIT SPECIFICATIONS The below noted requirements are based upon La Plata County Building Code. These specifications are not intended as a complete set of requirements, but are intended to provide

More information

Latigos Trail 911 Latigos Trail ~ Des Peres, Missouri 63131 $428,500

Latigos Trail 911 Latigos Trail ~ Des Peres, Missouri 63131 $428,500 63131 $428,500 4 Bedroom / 3 Bath / 2 Car Garage 1,676 Sq. Ft. of Living Space Includes Finished Lower Level w/ Bedroom, Full Bath, & Recreation Room Large Lot - 105 x 150 (15,750 Sq. Ft.) For More Information

More information

STERLING SPRINGS. Irrigation System Front & 2 Sides Yard 9 Ceiling First Floor

STERLING SPRINGS. Irrigation System Front & 2 Sides Yard 9 Ceiling First Floor STERLING SPRINGS WELCOME We know you will appreciate the complete home buying experience at Sterling Springs Sterling Springs provides 34 lots with 9 ENERGY STAR single-family home models ranging from

More information

NAHB 1-00-0000 PRODUCT DEFINITION

NAHB 1-00-0000 PRODUCT DEFINITION NAHB Standard Homebuilder Cost Codes Cost Code Description 1-00-0000 PRODUCT DEFINITION 1-01-0000 PREAQUISITION COSTS 1-01-0110 Feasibility Study 1-01-0120 Environmental Impact Study 1-01-0130 Option Fees

More information

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264 BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used

More information

Your Basement Remodeling Specialist LLC

Your Basement Remodeling Specialist LLC Your Basement Remodeling Specialist LLC Contents Introduction 3 Remodel Details 4 Basement Bid Scope 5 Financial Arrangements 6 Homeowners Shopping Guide 7 The following is provided with your actual quote:

More information

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses.

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses. The Townhouses Park View Place A A Compass House A T T T Royal Wharf Gardens Endeavour House T A A Thameside House T Sienna House A A A A T Apartments Townhouses River Thames Compass House Compass House

More information

8629 S. Kimbark, Chicago, IL PROJECT SPECIFIC SCOPE:

8629 S. Kimbark, Chicago, IL PROJECT SPECIFIC SCOPE: 8629 S. Kimbark, Chicago, IL PROJECT SPECIFIC SCOPE: General: Remove existing base molding and install new 4-1/4 base molding throughout and spray white Remove existing window and door trim and install

More information

Acceptable Donations List

Acceptable Donations List Acceptable Donations List Thank you so much for you donation to Habitat for Humanity, through your contribution Habitat is able to fund house construction and continue to follow our mission as a non-profit

More information

Stanley Neighborhood Series

Stanley Neighborhood Series Stanley Neighborhood Series On the Outside - Appealing Exteriors Maintenance Free Double 5 Siding Per Design 25Year Shingles New and Appealing Exterior Elevations Portico, Porches and Covered Entry Per

More information

PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY

PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY GENERAL SPECIFICATIONS These specifications are intended to cover the construction of the

More information

HOMEOWNER S PERMIT GUIDE

HOMEOWNER S PERMIT GUIDE HOMEOWNER S PERMIT GUIDE WHEN IS A PERMIT REQUIRED? Department of Development and Permits 306 Cedar Road, City Hall 2 nd Floor P.O. Box 15225 Chesapeake, VA 23328 Phone: (757) 382-6018 Fax: (757) 382-8448

More information

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION

More information

Open House and Home Tour Checklist

Open House and Home Tour Checklist 1 The House Address: Number of floors: Listing price: Basement? Property tax: Outdoor space? Eugh closet space? Style: Eugh storage space? Square footage: Room for expansion? Number of bedrooms: What appliances

More information

CONDITION OF QUALITY ITEMS

CONDITION OF QUALITY ITEMS CONDITION OF QUALITY ITEMS FOUNDATION Always look for moisture problems and any bulges or irregularities in the walls. Lines on the walls or floors may indicate water problems. Have these been cured? If

More information

VILLAGEBUILDERS.COM. 550 Greens Pkwy, Ste. 200, Houston, TX 77067. Designer Tile Flooring

VILLAGEBUILDERS.COM. 550 Greens Pkwy, Ste. 200, Houston, TX 77067. Designer Tile Flooring Designer Tile in Kitchen and Breakfast Area 42 Stained Cabinets Electric and Gas Dryer Connections Designer Tile in Foyer Designer Tile on Bath Floor, Shower Walls, and Tub Surround Recessed Shower with

More information

Rehab Inspection Report Page 1

Rehab Inspection Report Page 1 Rehab Inspection Report Page 1 Home Address: Construction Style: Number of bedrooms Square footage: Value of offer: Estimated rehab cost: Value of resale: Orientation of house: N S E W Note: orientation

More information

Building Permits: When are they required?

Building Permits: When are they required? Building Permits: When are they required? Generally, you need to obtain a building permit from the City whenever you construct, enlarge, alter, repair, move, remove, improve, convert, or demolish a building

More information

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT

More information

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer

More information

www.citiesinspection.com October 5, 2015 Dear Client,

www.citiesinspection.com October 5, 2015 Dear Client, www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.

More information

APPENDIX A BUILDING MAINTENANCE MECHANIC D.O.T. CODE 899.381-010 O*NET CODE 49-9042.00

APPENDIX A BUILDING MAINTENANCE MECHANIC D.O.T. CODE 899.381-010 O*NET CODE 49-9042.00 APPENDIX A BUILDING MAINTENANCE MECHANIC D.O.T. CODE 899.381-010 O*NET CODE 49-9042.00 This training outline is the current standard for Work Processes and Related Instruction. Changes in technology, regulations,

More information

Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10

Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10 Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10 PROPERTY DESCRIPTION PROPERTY INSPECTED: INSPECTION ADDRESS: 4722 Baltimore Avenue

More information

Name of course: Residential Construction Site Management (RCSM) Level 1

Name of course: Residential Construction Site Management (RCSM) Level 1 Name of course: Residential Construction Site Management (RCSM) Level 1 Core (required courses) or Optional (elective course): Required Delivery Method: This is an online course only with no classroom

More information

SUMMARY OF WORK FOR GENERAL CONTRACTOR

SUMMARY OF WORK FOR GENERAL CONTRACTOR SUMMARY OF WORK FOR GENERAL CONTRACTOR 1. General scope of work A. The work at 163 Seabrook consists of: 1. Finish the kitchen and 1 st floor hallway area 2. Finish 1 st floor bathroom and laundry area

More information

C31 Property Damage Appraisal

C31 Property Damage Appraisal C31 Property Damage Appraisal Sample Exam IMPORTANT The time allowed for this exam is 3 hours. Total marks: 200 You must hand in this paper and any paper used for rough work to the supervisor when you

More information

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit. Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden

More information

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER NOTICE TO PROPERTY OWNER Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule. If your home or business is below

More information

Does Wall Township require an inspection by the building department on resale of a home?

Does Wall Township require an inspection by the building department on resale of a home? Selling your home Does Wall Township require an inspection by the building department on resale of a home? No. We do not require a Certificate of Continued Occupancy on the resale of home. A Smoke Detector,

More information

Additions and Alterations

Additions and Alterations Additions and Alterations Addition and alteration construction is a miscellaneous grouping of home improvement and renovation projects that are generally geared toward the enhancement of an existing principal

More information

A.C.E. Home Inspection Service www.acehomeweb.com St. Peters, MO 63376 (636) 978-9111

A.C.E. Home Inspection Service www.acehomeweb.com St. Peters, MO 63376 (636) 978-9111 A.C.E. Home Inspection Service www.acehomeweb.com St. Peters, MO 63376 (636) 978-9111 Inspector Name: Tim Knight, ASHI Member 202490 Inspection No: 12121212 Inspection Date: 1/1/2012 Client: Address: John

More information

Welcome To Mallard Park

Welcome To Mallard Park Welcome To Mallard Park Plan Number Sales Price 1360 $118,490 1465 $124,990 1520 $126,990 1600 $127,990 1650 $129,490 1715 $130,490 1782 $132,490 1824 $133,990 1865 $136,990 2125 $151,490 2210 $154,490

More information

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS St. Louis County Department of Public Works Division of Code Enforcement KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS This guideline is intended to provide the homeowner/contractor with the

More information

Substantial Improvement/Damage (FEMA 50% Rule) Frequently Asked Questions and Information

Substantial Improvement/Damage (FEMA 50% Rule) Frequently Asked Questions and Information SUBSTANTIAL IMPROVEMENT/DAMAGE WORKSHEET (FEMA 50% RULE) South County: Development Services North County: Development Services 4000 Tamiami Trail S. Room 122 1001 Sarasota Center Blvd Venice, Florida 34293-5076

More information

KITCHENS REMODELED Before and After

KITCHENS REMODELED Before and After KITCHENS REMODELED and The following pages show kitchens that were recently remodeled by Rogers Residential Remodeling. photos kitchens are provided where available, as well as the photos. Some kitchens

More information

PROPOSAL. Prepared for: Craig Mottram & Family, 118 Rangoon Rd. Prepared by: Carlos Andrade, Owner & Operator. Brandon Andrade, Project Coordinator

PROPOSAL. Prepared for: Craig Mottram & Family, 118 Rangoon Rd. Prepared by: Carlos Andrade, Owner & Operator. Brandon Andrade, Project Coordinator PROPOSAL Prepared for: Craig Mottram & Family, 118 Rangoon Rd. Prepared by: Carlos Andrade, Owner & Operator Brandon Andrade, Project Coordinator t. 416.652.6424 f. 416.652.3234 May 1 st, 2012 Craig Mottram

More information

HomeTech Kitchen & Bath Cost Estimator

HomeTech Kitchen & Bath Cost Estimator HomeTech Kitchen & Bath Cost Estimator MD 02 Summer / Fall 3rd Quarter 203 The data contained in this manual has been researched for the following area: MARYLAND 2 Baltimore and Surrounding Areas Copyright

More information

RESIDENTIAL MASONRY A BEST PRACTICES GUIDE

RESIDENTIAL MASONRY A BEST PRACTICES GUIDE RESIDENTIAL MASONRY A BEST PRACTICES GUIDE Build With Brick Build With Boral CONTENTS BRICK :01 MASONRY CEMENT :03 MASONRY SAND :04 WALL TIES :05 STEEL LINTELS :07 DRAINAGE WALL SYSTEM :09 FLASHING :11

More information

Electrical Wiring Technical Bulletin

Electrical Wiring Technical Bulletin Electrical Wiring Technical Bulletin Overview In general, SIP construction is easier and more cost effective when things are planned and thought out before the panels are manufactured. This process will

More information

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans Brochure More information from http://www.researchandmarkets.com/reports/2214808/ Repair and Remodeling Estimating Methods. 4th Edition. RSMeans Description: This estimating guide for repair and remodeling

More information

March 14, 2007. Installation of Bay, Bow and Garden Windows

March 14, 2007. Installation of Bay, Bow and Garden Windows March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed

More information

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: 123 MAIN ST MIAMI, FL CLIENT: BUYER ID No: 2014193 DATE: 5/13/2014 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792

More information

REQUEST FOR PROPOSALS. Unit Make Ready Services for Public Housing for HOUSING AUTHORITY OF THE CITY OF MCKINNEY, TEXAS

REQUEST FOR PROPOSALS. Unit Make Ready Services for Public Housing for HOUSING AUTHORITY OF THE CITY OF MCKINNEY, TEXAS REQUEST FOR PROPOSALS Unit Make Ready Services for Public Housing for HOUSING AUTHORITY OF THE CITY OF MCKINNEY, TEXAS Date: 2/17/2015 (MHA) requests proposal for Unit Make Ready Services. All interested

More information

How To Insure Against Problems With Your Home Warranty

How To Insure Against Problems With Your Home Warranty Subcontractor Warranty Policy ALL WARRANTY REQUESTS MUST BE IN WRITING. Please submit all warranty requests online by visiting: www.rigginscustomhomes.com/customerservice.html Please fill out the form

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised November 27, 2013 the Easton - R 12'x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

How To Repair A House

How To Repair A House Assessing Structural Damages Please note-this presentation is only intended to be used as a basic educational tool and is by no means all encompassing. Each property should be treated on a case by case

More information

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic

More information

Window Installation Instructions

Window Installation Instructions Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for

More information

2. What building projects are exempted? (permit not required)

2. What building projects are exempted? (permit not required) BUILDING AND SAFETY DEPARTMENT 1. What building projects require a permit? Following is a list of projects that require building permits based on Appendix chapter 1 of the California Building Code and

More information

How to secure your property after a disaster

How to secure your property after a disaster How to secure your property after a disaster The Red Guide to Recovery HOuse secured properly Board-Up of Windows, Doors and Roof Hole. Lot secured with Perimeter Fencing. Fires, floods, tornadoes, hurricanes,

More information

GENERAL WIRING RULES FOR HOUSES

GENERAL WIRING RULES FOR HOUSES GENERAL WIRING RULES FOR HOUSES 1. Romex has to be installed in drilled holes in joists or studs even above suspended ceilings - No stapling to bottom edges of joists or studs. You may staple wire to flat

More information

Mark Cramer Inspection Services, Inc.

Mark Cramer Inspection Services, Inc. Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction

More information

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are: When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory

More information

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances. Basement Finishing Guide Community Development Department Building Inspections Division 5200 85 th Avenue North / Brooklyn Park, MN 55443 Phone: (763) 488-6379 / Fax: (763) 493-8171 6/15 www.brooklynpark.org

More information

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW Parcel Number: Owner s Name: Co-Owner s Name: Owner s Mailing Address: Owner Phone Number: FIRM Panel: Lowest Floor Elevation (excluding garage):

More information

Texas Deparmtment of Housing and Community Affairs Community Development Block Grant (CDBG)

Texas Deparmtment of Housing and Community Affairs Community Development Block Grant (CDBG) Texas Deparmtment of Housing and Community Affairs Community Development Block Grant (CDBG) Subrecipient Name: Homeowner Name: Home Address: Homeowner Signature: Building Contractor Name and Address: Work

More information

Cost Estimate. Page 1. Description Qty Price UM Draw Me Total. LAND 5 Lot Price 6 Closing Costs on Lot 7 Interest On Lot 8 9

Cost Estimate. Page 1. Description Qty Price UM Draw Me Total. LAND 5 Lot Price 6 Closing Costs on Lot 7 Interest On Lot 8 9 Page 1 1 2 3 4 IMPORTANT: BE SURE TO INCLUDE SALES TAX AND DELIVERY CHARGES LAND 5 Lot Price 6 Closing Costs on Lot 7 Interest On Lot 8 9 TOTAL LAND (LINES 5-7) 10 11 DESIGN 12 * Architecture 13 Engineering

More information

The Carriage Homes at Woodland Pond Phase III & IV

The Carriage Homes at Woodland Pond Phase III & IV The Carriage Homes at Woodland Pond Phase III & IV Phase I & II (completed 2009) Phase III & IV (completed Summer 2012) The Carriage Homes are one of five distinctive condominium communities that comprise

More information

PANEL CONCEPTS LLLP.

PANEL CONCEPTS LLLP. The Small Cottage Company DO-IT-YOURSELF CABINS & COTTAGES PANEL CONCEPTS INC. PANEL CONCEPTS LLLP. 2826 Gold 331 Creek N. M-33, Road Mio, Gold Michigan Creek, Montana 4864759733 (989) 826-6511 (406) 288-8585

More information

Construction Technologies Career Field Pathways and Course Structure

Construction Technologies Career Field Pathways and Course Structure Courses in Structural Systems (DD) Construction Technologies Career Field Pathways and Course Structure PATHWAY COURSES SUBJECT CODE Construction Technology-Core and Sustainable Construction 1 178000 Carpentry

More information