Culvert Rehabilitation A presentation by ms consultants, inc. engineers, architects, planners



Similar documents
June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

Repair or Replacement - Band-Aids vs. Surgery

Safe & Sound Bridge Terminology

Chapter. Restoration of Damaged Structures

SECTION STORM DRAINAGE TABLE OF CONTENTS

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

2015 ODOT Bridge Design Conference May 12, DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement.

Bridge Type Selection

Elevating Your House. Introduction CHAPTER 5

Design of Bridges. Introduction. 3 rd to 4 th July Lecture for SPIN Training at the University of Dar es Salaam

IH-635 MANAGED LANES PROJECT, SEG. 3.2

PRESERVATION PLANNING ASSOCIATES 519 Fig Avenue, Santa Barbara, CA Telephone (805)

ENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE

SECTION STORM DRAIN SYSTEM

SECTION 724 PIPE CULVERTS

FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS

SECTION III DRAINAGE

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST

Building Condition Assessment: West Lexington Street Baltimore, Maryland

Technical Notes 3B - Brick Masonry Section Properties May 1993

BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION

symptoms of a faulty foundation

SECTION STORM DRAINAGE SYSTEM

INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.

CULVERT AND STORM SEWER PIPE MATERIAL POLICY ON FEDERALLY FUNDED LOCAL AGENCY PROJECTS UPDATED March 2013

USE OF MICROPILES IN TEXAS BRIDGES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

SECTION 3 ONM & J STRUCTURAL ANALYSIS

Catch Basin Rehabilitation Road Commission for Oakland County, Michigan

Emergency repair of Bridge B421

Wastewater Capital Projects Management Standard Construction Specification

Chaudière Crossing Bridge Rehabilitation

Photo 2. View showing flour mill, machine shed, veranda and saw mill + storage shed.

Section 2100-Trenching and Tunneling

C-2 Construction, Inc. - NAICS Codes

REHABILITATION OF CONCRETE BEAM BRIDGES IN CROATIAN STATE ROAD NETWORK

Small Dam Repair The Stone Lake Dam Story. Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C.

PERIODIC STRUCTURAL INSPECTION OF EXISTING BUILDINGS GUIDELINES FOR STRUCTURAL ENGINEERS

DESIGNING A RESTORATION PROGRAM FOR THE BOMA A HISTORIC BUILDING IN BAGAMOYO, TANZANIA.

REHABILITATION PACKAGE 1-a

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

Engineers, Civil Structural Survey

Fame Design Ltd (10295) Plot # A-115/116,BSCIC Hosiery I/A, Narayangonj, Bangladesh ( , ) 18.June.2014

The Stabilizer TM. Benefits. Supplemental support system for sagging beams and floor joists within a crawl space

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

Rehabilitation of Locks on the Kentucky River

BRIDGES ARE relatively expensive but often are

Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs -

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

Successful Approach to the Repair of Reinforced Concrete Support Structures in Delayed Coking Units

OVERVIEW OF TMH19: DRAFT STANDARD FOR THE VISUAL ASSESSMENT OF ROAD STRUCTURES

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA

EAST LYME HIGH SCHOOL

Designed and Engineered to Perform

DUDERSTADT FOUNDATION & CONSTRUCTION, LLC.

Building Restoration

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

No allowance will be made for classification of different types of material encountered.

Failing Coastal Wood Infrastructure on the Great Lakes

Structural Failures Cost Lives and Time

INSPECTION FINDINGS. for. Paragon Condominiums 2102 W 31 st Avenue Denver, Colorado. Inspection Date: August 8, Perfonned By: Drew Schneider

Sisal Composite Ltd. Apparel 4 Ltd. JM Knit Ltd. Natun Para, Hemayetpur, Savar, Dhaka-1340 ( N, E)

Stone Arch Bridges of Washington County, MD

Paving Capitalization Work Categories and Treatments

Article 5: Building Regulations

941 Key Street HPO File No CERTIFICATE OF APPROPRIATENESS

Chapter 3 Pre-Installation, Foundations and Piers

Page & Turnbull imagining change in historic environments through design, research, and technology

Project Report. Structural Investigations Hotel del Sol Yuma, Arizona

Repair and Rehabilitation of Nehru Memorial College of K.V.G. Group of Institutions at Mangalore - A Case Study

Design and Construction of Cantilevered Reinforced Concrete Structures

2000 Bachelor of Science in Civil Engineering University of Central Florida, Orlando, Florida

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.

TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09

SECTION 1 GENERAL REQUIREMENTS

How To Repair A House After An Earthquake

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

CHAPTER 5. Storm Sewer

BEST MANAGEMENT STANDARDS FOR FOUNDATION REPAIR MARCH 2003 REVISED JUNE 13, 2012

CONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES

Installation Instructions

Roof Inspection Report 3840 Greenway Circle, Lawrence Kansas, Sauer-Danfoss Building

Section 402. STORM SEWERS

3.1 Historical Considerations

Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling

1.2 Advantages and Types of Prestressing

Criteria for Road Rehabilitation

Virginia Approach Spans

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

October 30, Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr.

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

Section 600 Incidental Construction

Transcription:

Culvert Rehabilitation A presentation by ms consultants, inc. engineers, architects, planners

McConnell Road Culvert Greensboro, North Carolina Fisher Park Circle Culvert Greensboro, North Carolina Shady Run Road Culvert Youngstown, Ohio

McConnell Road Culvert Greensboro, North Carolina Existing Conditions 7 x 4-6 rectangular section with 3-6 clay tile arched top. 8 concrete walls at both ends of culvert; grouted stone walls in remaining section Length = 54 ; Fill height = 4 ; Road width = 24 Bottom is concrete slab, concrete wing walls.

McConnell Road Culvert Greensboro, North Carolina Primary concern: 85% of grouted joints in arch top deteriorated. Several tiles missing or broken. Goal: Restore culvert integrity Prolong useful life.

McConnell Road Culvert Greensboro, North Carolina Structural Analysis Results: Based on Original Conditions, culvert capacity exceeded stresses by HS-20-44 Design Truck. Based on deteriorating Existing Conditions, corrective measures recommended.

McConnell Road Culvert Greensboro, North Carolina ALTERNATIVE #1 Place 3-4 of shotcrete on arch and walls. 13% reduction in cross-sectional area. Expected service life 15-20 years. No roadway closure. Estimated construction cost $55,500.

McConnell Road Culvert Greensboro, North Carolina ALTERNATIVE #2 Install 8 thick concrete walls in front of existing walls at each end. Construct concrete column and beam bent at each stone wall insert aluminum arch on new walls and beams Fill remaining space with highflowing cementitious grout. 19% reduction in cross-sectional area. Expected service life 30 years. No roadway closure. Estimated construction cost $76,100.

McConnell Road Culvert Greensboro, North Carolina ALTERNATIVE #3 Remove and replace culvert. Expected service life 50 years. No impact on hydraulic capacity. Road closure required. Estimated construction cost $97,600.

McConnell Road Culvert Greensboro, North Carolina ms recommendation: Alternative #2, unless funds are not restricted and detour is not objectionable. The City of Greensboro selected Alternative #2.

McConnell Road Culvert Greensboro, North Carolina

McConnell Road Culvert Greensboro, North Carolina

Fisher Park Circle Culvert Greensboro, North Carolina Culvert opening

The Whomping Willow Harry Potter movies

Fisher Park Circle Culvert Greensboro, North Carolina Existing Conditions 5 wide x 4 high stone box culvert (granite) Stone box section 54 length, transitions to 4 clay tile arch section for 452 length Average fill height = 3 ADT = 4,500; 2% Trucks

Fisher Park Circle Culvert Greensboro, North Carolina Primary concern: Numerous top granite slab are broken and dropped up to 8-10, and have 18 voids between some slabs. Goal: Restore culvert integrity Prolong useful life.

Fisher Park Circle Culvert Greensboro, North Carolina Local Concerns One of the City s oldest residential areas. Community desires no impacts to historical nature of the area. Absolutely no harm to Landmark Tree. City opinion is that the tree is self-supporting. Slabs under tree are in good condition.

Fisher Park Circle Culvert Greensboro, North Carolina Two Alternatives for rehabilitation considered: 1. Jacking the culvert roof and underpin. 2. Open cut 10 x 42 area and replace slabs with reinforced concrete slabs, either poured in place or precast. Precautions made to avoid tree and root system

Fisher Park Circle Culvert Greensboro, North Carolina ALTERNATIVE #1 - Underpin Considered a more short-term solution. Jacking would be more difficult construction. Confined space issues Structural members would reduce hydraulic capacity Use galva.nized steel to avoid corrosion Special attention to remaining voids would be needed. Roadway would be closed during construction. Estimated cost $36,000.

Fisher Park Circle Culvert Greensboro, North Carolina ALTERNATIVE #2 Replace Roof Slabs Considered a more long-term solution. Better structural stability. Eliminates confined space issues. No reduction in hydraulic capacity. Voids can be filled. Roadway would be closed during construction. Estimated cost $21,000.

Fisher Park Circle Culvert Greensboro, North Carolina The City of Greensboro selected Alternative 1 Underpin as there is less impact to surroundings; no risk to landmark tree.

Fisher Park Circle Culvert Greensboro, North Carolina

Fisher Park Circle Culvert Greensboro, North Carolina

Shady Run Road Culvert Youngstown, Ohio EXISTING CONDITIONS 6 x 50 sandstone culvert with concrete slab top. Culvert had not been on inspection inventory. Partial collapse following heavy rain event. City of Youngstown requested ms consultants perform a detailed inspection for emergency repair plans.

Shady Run Road Culvert Youngstown, Ohio

Shady Run Road Culvert Youngstown, Ohio

Shady Run Road Culvert Youngstown, Ohio

Shady Run Road Culvert Youngstown, Ohio

Shady Run Road Culvert Youngstown, Ohio

Shady Run Road Culvert Emergency Repairs - Youngstown, Ohio

Shady Run Road Culvert Emergency Repairs - Youngstown, Ohio

Shady Run Road Culvert Emergency Repairs - Youngstown, Ohio

Shady Run Road Culvert Emergency Repairs - Youngstown, Ohio

Shady Run Road Culvert Emergency Repairs - Youngstown, Ohio

Shady Run Road Culvert Emergency Repairs - Youngstown, Ohio

Shady Run Road Culvert Youngstown, Ohio AS - BUILT Restored integrity of the culvert: Rebuilt catch basins to repair drainage problem Reconstructed wing walls, culvert walls and new top slab Constructed new concrete invert with cutoff wall and stabilized bottom stone Reconstructed outfall channel

Thank you for your time. ms consultants, inc. engineers, architects, planners