1 Rehabilitation of Locks on the Kentucky River Joshua M. Repp, PE Bergmann Associates
2 Presentation Overview River System History Evolution of Lock and Dams Structures Existing Condition of Structures Lock No. 3&4 Renovation Plan Lock Dewatering System
3 Kentucky River Inland Waterway Relationships Rochester, NY Upper Mississippi Lower Mississippi Ohio River Kentucky River
4 River System Structures 14 Locks and Dams Owners: Kentucky River Authority (KRA) Corps of Engineers Dams fixed crest L&D 3 L4 Frankfort Lexington Jackson Locks Locks 1-4 (open) Locks 5-14 (closed) 145 x38 chamber (Locks 1-5) 147 x52 chamber (Locks 6-14) 8 to18 foot Lifts
5 Kentucky River System History - Timeline 1790 Coal Barges 1812 Steam Boats L&D 1-5 Constructed L&D 6-14 Constructed L&D 6-14 closed due to lack of funding 2007 Plan issued to rehabilitate Locks 1-4 for recreational use 1862 Civil War Damage to Dams 1951 Recommended Closure of Locks Pre-1775 Native Americans occupied land Increase in mining & timbering First Flat Boats Kentucky Railroad Expansion Begins Commercial Navigation Decline due to Railroad Expansion
6 Kentucky River Locks 3 & 4 Project Lock & Dam No. 4 Lock & Dam No. 3 Rehabilitate Locks (Additive Alternative Work) GEST, KY Replace Dam 3 (Base Bid)
7 Evolution of Dam Structures
8 Evolution of Dam Structures
9 Evolution of Dam Structures
10 Evolution of the Kentucky River Dams Concrete Cap - Original Repaired 1950 Dam Sheeting & Resurfacing Repair s Cellular Dam - Ongoing - 2 of 14 dams Timber Crib Dam - Original 1830 s - Replaced in-kind 1910
11 Dam History s Dam Renovation
12 Dam Replacement Cellular Dam No. 9
13 s Existing Conditions - Dam No. 3 Missing Apron Sections Broken Apron Sections
14 Lock Structures Walls 220 long by 30 high Locks 1-8 limestone masonry Locks 9-14 concrete walls Miter Gates Original wooden gates replaced with horizontally framed steel gates. Original hand-operated machinery converted to electric and hydraulic Filling/Emptying System Miter gate valves (filling/emptying) Wall culverts (filling)
15 Existing Lock Conditions - Locks 5-14 Closed to Navigation Concrete Bulkhead Wall Upper Miter Gate Upper Sill Lock 5
16 Existing Lock Conditions Miter Gates Timber Seals (Quoin, Miter, & Sill) Gate Valves Gate Misalignment Pintle Weathered Miter & Quoin Post Weathered Quoin Gate Valve Leakage
17 Existing Lock Conditions Miter Gate Anchorages Miter Gate Failed Anchor Pin 2 Anchor Pins
18 Existing Conditions - Machinery
19 Existing Lock Conditions Preparation of Overtopping Secure of miter gates Removable or collaspable railing, machinery Collapse Machinery Stands Store Rack in-line with Gate Cable Tie-backs Turnbuckle Assembly Remove/ Collapse Wall & Gate Railing
20 River Levels Lock and Dam No.3 Top of Lock 10 yr. Flood 1 yr. Flood 6 mo. Flood mo. Flood T/O Crest EL
21 MAY 2010
22 MAY 2010 Flood Construction at Dam No. 9
23 MAY 2010 Flood Construction at Dam No. 3
24 MAY 2010 Flood Debris at Lock No. 3 Upper Gate
25 MAY 2010 Flood Debris at Lock No. 4 Upper Gate
26 Lock Renovation Plan Rehabilitate Gates Gate Valves Replace Pintle & Bonnet Steel Repairs Diagonal Replacement Quoin, Miter, Sill Seals Masonry Repointing Concrete Overlay on Top of Wall Convert Power Supply from Electric to Pneumatic Various Safety Upgrades
27 Renovation Summary Replace Anchorages Reconstruct Quoin with Quoin Plate Concrete Overlay (6 ) Add Diagonal Strap Repoint Masonry Replace Seals Reconstruct Sill Rehabilitate Valves (3) Rubber Sill Seal Pneumatic Supply Conduit Replace Pintle & Socket
28 Renovation Design Challenges Dewatering of the Lock Wall Stability Analysis Issues Geometry unknown the thickness of the lock walls was determined by the resident engineer during construction No former calculations Wall not theoretically stable with no physical signs of instability
29 Wall Geometry Investigations at Lock 3 Esplanade Dam Crest Interpolated Masonry Line Landwall Riverwall Lock Floor & Rock Line Interpolated Rock Line
30 Needle Dam Bulkhead 1 Wall Strut Needle Dam Bulkhead FULL WALL STRUTTING Wall Anchor Needle Dam Bulkhead ANCHOR LANDWALL Needle Dam Bulkhead
31 Needle Dam Bulkhead PHASE 1 - DEWATERING Secure Lower Gate Wall Strut PHASE 2 - DEWATERING Wall Strut Secure Upper Gate Needle Dam Bulkhead
32 Strut System for Dewatering Flanged Adjustment Assembly Struts (7 o incline) Sliding Plane Waler
33 Bulkhead System for Lower Gate Gate Recess Wall Struts Wall Anchors Bulkhead Beam Sheet Piling Anchored Precast Sill Blocks
34 Wall Anchors Lower Gate Bulkhead Reactions Wall Struts Bulkhead Reactions Temporary Survey Marker Wall Anchors
35 PDH Questions Q: When were the first locks and dams constructed on the Kentucky River? 1830 S Q: What were two major factors related to the decline in commercial traffic for the river system? 1. Variable river levels difficult to navigate 2. Unreliability and size of lock and dam structures 3. Advancement of railroads for transport of goods Q: What two advantages did vertical walers offer to the strut system? 1. Improved global stability - Increased the sliding resistance of the lock riverwall by lowering the sliding plane. 2. Better load distribution to the irregular and discontinuous masonry Q: The adjustment assembly in the pipe struts was detailed for what purpose? To ease removal of the strut between grouted walers after use in dewatering.
36 The Rehabilitation of Locks on the Kentucky River System, Kentucky, US Joshua M. Repp, P.E., Bergmann Associates, Rochester, NY, USA The 260 mile long Kentucky River runs from Eastern Kentucky (south around the City of Lexington) through the City of Frankfort (capital city of the Commonwealth) and flows northwest into the Ohio River. The river is divided into navigation and water supply pools by a series of 14 locks and dams, many originally constructed in the 1830 s with stone masonry walls. Due to a decline in commercial navigation over the past few decades, the locks have been closed by the state. Reinforced concrete weir walls have been constructed at locks 5 through 14 as a more permanent closure. Some of the timber crib and sheet pile dams, originally constructed to retain pool for navigation purposes, have been replaced to secure pool for water supply. Recently the KRA/FAC has been evaluating the rehabilitation of Locks 1 through 4, potentially restarting recreational river navigation from the Ohio River to Frankfort, KY. Bergmann Associates has been contracted to evaluate the lock conditions, structural stability and to develop repair plans. Full rehabilitation documents were developed for Locks 3 and 4 and base repair schemes developed for all four of the 38 wide by 175 long locks. The history of this rehabilitation and future repairs plans will be presented. Joshua M. Repp is a Project Engineer and Lead Structural Engineer for Bergmann Associates, a 350 person consulting engineering firm and currently works out of the Buffalo Office. He has been working in the Civil Works Group at Bergmann mostly on waterway structures projects around the eastern US for the past seven years. His roles on the projects for the KRA included Assistant Project Manager, Project Engineer, Structural Designer and Cost Engineer. He is a graduate of the University of Buffalo with a BS in Civil Engineering and a ME in Civil- Structural Engineering. He is a Professional Engineer in New York State.
Presented by: William R. Miles, PE Director of Civil Works Bergmann Associates, DPC Jacksonville, FL & Rochester, NY. www.bergmannpc.
our people and our passion in every project Presented by: William R. Miles, PE Director of Civil Works Bergmann Associates, DPC Jacksonville, FL & Rochester, NY Presentation Agenda Facility History Inspections
More informationLockport Pool Chicago Sanitary & Ship Canal Illinois Waterway
Presentation to the Inland Waterways Users Board Lockport Pool Chicago Sanitary & Ship Canal Illinois Waterway by Gary Loss, P.E. Rock Island District July 13, 2006 Chicago Sanitary and Ship Canal A
More informationNashville District Update for Tennessee Tombigbee Waterway Opportunities Conference
Nashville District Update for Tennessee Tombigbee Waterway Opportunities Conference Mike Wilson, P.E. Deputy District Engineer for Project Management Planning, Programs and Project Management Division
More informationSTRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
More informationManaging Our Water Retention Systems
Managing Our Water Retention Systems 29th Annual USSD Conference Nashville, Tennessee, April 20-24, 2009 Hosted by Corps of Engineers On the Cover Wolf Creek Dam is on the Cumberland River in South Central
More informationUS 51 Ohio River Bridge Engineering and Environmental Study
US 51 Ohio River Bridge Engineering and Environmental Study ITEM NOS. 1-100.00 & 1-1140.00 Prepared by: Michael Baker Jr., Inc. 9750 Ormsby Station Rd Louisville, KY 40223 August 16, 2013 Table of Contents
More informationEngineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since.
Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since. Liftech is the structural review engineer of record for most
More informationMoving Small Mountains Vesuvius Dam Rehab
Moving Small Mountains Vesuvius Dam Rehab Susan L. Peterson, P.E., regional dams engineer, Eastern Region, Bedford, IN Note: The following article, Moving Small Mountains Vesuvius Dam Rehab, by Sue Peterson,
More informationChaudière Crossing Bridge Rehabilitation
Chaudière Crossing Bridge Rehabilitation Douglas K. Lowry P. Eng., Armtec Infrastructure Incorporated David Delicate, P.Eng. Public Works and Government Services Canada (Retired) Prepared for presentation
More informationFlood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún
Flood mitigation program for Gatun lake Programa de mitigación de inundaciones del lago Gatún Moffatt & Nichol Engineers 10 de febrero de 2005 Contrato No. 126161 Introducción y Recomendaciones 1 INTRODUCTION
More informationJune 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL
7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction
More informationSafe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
More informationSTRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA
STRUCTURAL ASSESSMENT FOR Full Metal Jacket Building 0 Prince Street, Prepared by: ALPHA CORPORATION (Alpha) 1850 S. Loudoun Street, Suite 200 Winchester, VA 22601 540-723-0704 September 22, 2010 J. Michael
More informationDesigned and Engineered to Perform
History EARTH CONTACT PRODUCTS, L.L.C., is a family owned company, based in Olathe, Kansas. This company was built upon Don May s U.S. Patented fourth-generation Steel Piering System that has led to the
More informationFailing Coastal Wood Infrastructure on the Great Lakes
University of Wisconsin Sea Grant Institute Contact Gene Clark grclark@aqua.wisc.edu 715-392-3246 Failing Coastal Wood Infrastructure on the Great Lakes Gene Clark/UW Sea Grant Institute Introduction Many
More informationFoundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training
Foundations 65 5 FOUNDATIONS by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. 66 Foundations Foundations 67 FOUNDATIONS Let's assume that the retrofit has been done correctly from the roofline
More informationGEORGE J. CAMBOURAKIS, P.E., C. ENG. PRESIDENT & CHIEF STRUCTURAL ENGINEER
GEORGE J. CAMBOURAKIS, P.E., C. ENG. PRESIDENT & CHIEF STRUCTURAL ENGINEER Professional Experience: Pride and Passion in the Art of Structural Engineering since 1979. Professional Registration: Professional
More informationWhat is Seismic Retrofitting?
What is Seismic Retrofitting? SEISMIC RETROFITTING A Seismic Retrofit provides existing structures with more resistance to seismic activity due to earthquakes. In buildings, this process typically includes
More informationTypes of Retaining Walls - Gravity walls - Pre-cast crib walls - Gabion walls - Reinforced concrete walls - Sheet pile walls - MS walls (mechanically
Foundation Engineering Lecture #23 Types of Retaining Walls - Gravity walls - Pre-cast crib walls - Gabion walls - Reinforced concrete walls - Sheet pile walls - MS walls (mechanically stabilized) - Slurry
More informationMark Cramer Inspection Services, Inc.
Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction
More informationHow to Become a Navy Engineer For $78,000 in USD
Presentation to Associated General Contractors COL Mark Deschenes Commander US Army Corps of Engineers Rock Island District February 2014 US Army Corps of Engineers Rock Island District 78,000 Square Miles
More informationTable 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
More informationEmergency repair of Bridge B421
Emergency repair of Bridge B421 over the Olifants River after fl ood damage INTRODUCTION AND BACKGROUND Bridge B421 is located on the R555 at km 5.03 on Section 01E between Witbank (now known as emalahleni)
More informationMicropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 JRHill@HaywardBaker.com
More informationRehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.
Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir Presented By: Doug Stachler, P.E. Project Organization Owner Delaware County Engineers Office Design Consultant CH2M HILL Contractor Double
More informationThe work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
More informationLodge Grass Creek Add-on Project Overview
Crow Tribal Water Rights Settlement Act of 2010 Rehabilitation and Improvement of the Crow Irrigation Project 189 Heritage Road Crow Agency, MT 59022 1 Lodge Grass 1 Headworks Project Description: The
More information2015 ODOT Bridge Design Conference May 12, 2014. DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement.
2015 ODOT Bridge Design Conference May 12, 2014 DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement Mary Ann Triska 2015 HDR, all rights reserved. Presentation Outline Project
More informationCSXT Emergency Response for May 2010 Flood Repairs
CSXT Emergency Response for May 2010 Flood Repairs 11 th Annual Geohazards Forum Chattanooga, Tennessee Christopher Ramsey, PE AMEC Project Overview Record rainfalls affecting greater Nashville. Some areas
More informationATLAS RESISTANCE Pier Foundation Systems
ATLAS RESISTANCE Pier Foundation Systems Foundation Repair Systems for Civil Construction Applications: Residential, Commercial, Industrial Atlas Resistance Piers have been used to restore and/or stabilize
More informationTECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General
More informationChapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
More informationEstabrook Dam A Discussion of Alternatives. Public Scoping Meeting June 5, 2014
Estabrook Dam A Discussion of Alternatives Public Scoping Meeting June 5, 2014 Presenters Kevin Haley, PLA, Milwaukee County Don Pirrung, P.E., PH, AECOM Mike Hahn, P.E., PH, Southeastern Wisconsin Regional
More informationPART E SPECIFICATIONS
PART E SPECIFICATIONS Page 1 of 5 PART E - SPECIFICATIONS GENERAL E1. APPLICABLE SPECIFICATIONS, STANDARD DETAILS AND DRAWINGS E1.1 The City of Winnipeg Works and Operations Division Standard Construction
More informationBuilding Condition Assessment: 215-219 West Lexington Street Baltimore, Maryland
KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,
More informationSection 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
More informationCulvert Rehabilitation A presentation by ms consultants, inc. engineers, architects, planners
Culvert Rehabilitation A presentation by ms consultants, inc. engineers, architects, planners McConnell Road Culvert Greensboro, North Carolina Fisher Park Circle Culvert Greensboro, North Carolina Shady
More information6 RETROFITTING POST & PIER HOUSES
Retrofitting Post & Pier Houses 71 6 RETROFITTING POST & PIER HOUSES by James E. Russell, P.E. 72 Retrofitting Post & Pier Houses Retrofitting Post & Pier Houses 73 RETROFITTING POST AND PIER HOUSES This
More informationHORIZONTAL INSTALLATION
THERMO/SOLAR Žiar s.r.o. MANUAL FOR INSTALLATION PV SUPPORTING FRAMES HORIZONTAL INSTALLATION Technical alternation reserved A1410 1 12/2014 CONTENT ORD.NO. PAGE Mounting information 3 Mounting, flat roof
More informationBRIDGES ARE relatively expensive but often are
Chapter 10 Bridges Chapter 10 Bridges Bridg Bridges -- usually the best, but most expensive drainage crossing structure. Protect bridges against scour. BRIDGES ARE relatively expensive but often are the
More informationPresentation for SAME Industry Day
Presentation for SAME Industry Day COL Mark Deschenes Commander US Army Corps of Engineers Rock Island District April 16, 2014 US Army Corps of Engineers Rock Island District 78,000 Square Miles Operate
More informationTECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines
More informationMuddy River Flood Risk Management & Environmental Restoration Project Phase 1 Construction Activities Next 90 Days August 2015
Muddy River Flood Risk Management & Environmental Restoration Project Phase 1 Construction Activities Next 90 Days August 2015 General: The Muddy River Flood Risk Management (FRM) & Environmental Restoration
More informationRe: Damages to Alaska Building from Legislative Information Office Construction
510 L Street Suite 200 Anchorage, AK 99501-1949 (907) 274-22362236 Phone (907) 274-25202520 Fax www.bbfm.com July 22, 2015 Jim Gottstein Alaska Building 406 G Street, Suite 206 Anchorage, AK 99501 Re:
More informationUSACE EMSWORTH DAM SPILLWAY GATES REHABILITATION. Michael Hanley 1 ABSTRACT
USACE EMSWORTH DAM SPILLWAY GATES REHABILITATION Michael Hanley 1 ABSTRACT The U.S. Army Corps of Engineers (USACE) Pittsburgh District has been gradually replacing aging electro-mechanical drive systems
More informationSTRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM
Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally
More informationStormwater/Wetland Pond Construction Inspection Checklist
: Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials
More informationOutlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
More informationBuilding Condition Assessment: 109-111 North Howard Street Baltimore, Maryland
KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,
More informationSECTION 11014 WINDOW WASHING SYSTEMS
SECTION 11014 WINDOW WASHING SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes, but is not limited to, design and furnishing portable davits, davit sleeves, dvit bases, four (4) removable outriggers,
More informationStructural Failures Cost Lives and Time
Structural Failures Cost Lives and Time Recent failures of storage bins, silos and other structures highlight the need to increase awareness of hazards associated with these structures. Since 2010, one
More informationUS Army Corps of Engineers BUILDING STRONG
Fort Worth District Public Meeting 20 August 2013 US Army Corps of Engineers Lewisville Dam - Authorization Authorized by the River and Harbor Act, approved 2 March 1945 (Public Law 14, 79th Congress,
More informationStainless Steel Perimeter Recirculation Systems Engineered supply and return systems for swimming pools, water features and aquatic facilities.
Stainless Steel Perimeter Recirculation Systems Engineered supply and return systems for swimming pools, water features and aquatic facilities. Whether it is new construction, renovation or operation,
More informationRESUME Lee A. Knuppel, P.E.
RESUME Lee A. Knuppel, P.E. OFFICE: EDUCATION: LEE A. KNUPPEL AND ASSOCIATES, Inc. 7770 Cooper Road, Suite 7 Montgomery, Ohio 45242 (513) 793-4222 Graduate: UCLA, Los Angeles, CA M.S. in Civil Engineering,
More informationElevating Your House. Introduction CHAPTER 5
CHAPTER 5 Elevating Your House Introduction One of the most common retrofitting methods is elevating a house to a required or desired Flood Protection Elevation (FPE). When a house is properly elevated,
More informationAIR RELEASE, CLEANOUT, AND SEWER MANHOLES
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing
More informationMETHOD OF STATEMENT FOR STATIC LOADING TEST
Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents
More informationCity of San Diego, CWP Guidelines
PART 1 -- GENERAL SECTION 08520-1.1 WORK OF THIS SECTION City of San Diego, CWP Guidelines A. The WORK of this Section includes providing aluminum windows with frames, bracing, glazing attachments, screens,
More informationNational Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination
Structural Effective Beginning with the April 2011 The structural engineering exam is a breadth and exam examination offered in two components on successive days. The 8-hour Vertical Forces (Gravity/Other)
More informationRoss River Suspension Bridge Ross River, Yukon. Life Cycle Cost Analysis
DNA project managers planners architects engineers David Nairne + Associates Ltd Suite 250 171 W Esplanade North Vancouver British Columbia Canada V7M 3J9 T 604 984 3503 F 604 984 0627 E dna@ davidnairne.com
More informationResidential Deck Safety, Construction, and Repair
Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the
More informationAmherst Dam. Michael Juris - Village President Joe Behlen, P.E. WDNR Dam Safety Engineer Gerald Krueger, P.E. AECOM
Amherst Dam Public Informational Meeting Michael Juris - Village President Joe Behlen, P.E. WDNR Dam Safety Engineer Gerald Krueger, P.E. AECOM April 3, 2014 Welcome Michael Juris Village President Introduction
More informationReport on. Wind Resistance of Signs supported by. Glass Fiber Reinforced Concrete (GFRC) Pillars
Report on Wind Resistance of Signs supported by Glass Fiber Reinforced Concrete (GFRC) Pillars Prepared for US Sign and Fabrication Corporation January, 2006 SUMMARY This study found the attachment of
More informationComparison of Seismic Retrofitting Methods for Existing Foundations in Seismological Active Regions
Comparison of Seismic Retrofitting Methods for Existing Foundations in Seismological Active Regions Peyman Amini Motlagh, Ali Pak Abstract Seismic retrofitting of important structures is essential in seismological
More informationBuilding, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements
Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements Charles County Government Planning and Growth Management P.O. Box 2150, La Plata, MD 20646 (301) 645-0692 Schedule
More informationPro-Lift Steel Pile Foundation Repair
Pro-Lift Steel Pile Foundation Repair Pro-Lift Steel Pile Foundation Repair System Pro-lift steel piles are designed for the stresses of Texas soils. They can have multiple steel walls, depending on the
More informationWORK SCOPE. Domains in which we work:
WORK SCOPE Engineering consulting, technical office, assistance and supervision in industrial works. We specialize in structures, civil works and industrial equipment. Domains in which we work: Industrial
More informationClad Direct Glaze Window Installation Instructions
Clad Direct Glaze Window Installation Instructions Sill flashing and sealing: 2. An overview of the proper flashing sequence is shown in figure 1. Please read entire installation instructions carefully
More informationIndex. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
More informationJay R. Smith Mfg. Co.
Jay R. Smith Mfg. Co. Automatic Backwater Valve SMITH CUSTOMER DRIVEN FLOOD-GATE FEATURES Index Page Flood-Gate Features and Applications 2 How Flood-Gate Works 3 Flood-Gate Operation & Approvals 4 Valve
More informationFoundation Experts, LLC Specializes in Foundation Repair and Waterproofing
1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize
More informationVirginia Approach Spans
Virginia Concrete Conference 2009 Woodrow Virginia Approach Spans David Tackoor, HNTB Formerly of URS Corp for Potomac Crossing Consultants Woodrow 1 Second Severn Crossing 2 Medway Crossing (Channel Tunnel
More informationDiscussion on Products under the Scope of EN 1090-1 and proposed CEN/TR to clarify the scope
CEN/TC 135 N 686 European Committee for Standardization Comité Européen de Normalisation Europäisches Komitee für Normung CEN/TC 135 Execution of steel structures and aluminium structures N 686 Secretariat:
More informationSchlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing
Substrate, structural panel, bonded waterproofing The universal substrate for tiles Perfect covering No matter whether you work with mosaics or large format tiles, an absolutely level substrate with straight
More informationDavit Systems and Outriggers
Safety From The Top Down Davit Systems and Outriggers Suspended Access Systems and Fall Protection Davits Overview Standards in the United States and Canada require a building to provide certified anchorages
More informationDesign of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam
Design of Bridges Introduction 3 rd to 4 th July 2012 1 FUNCTION OF A BRIDGE To connect two communities which are separated by streams, river, valley, or gorge, etc. 2 EVOLUTION OF BRIDGES 1. Log Bridge
More informationShower and Floor Gullies Channel Drain and Tile Drain SECTION
Shower and Floor Gullies Channel Drain and Tile Drain SECTION 2 Shower and Floor Gullies, Channel Drain and Tile Drain 29 General Information Shower and Floor Gullies McAlpine has responded to market conditions
More informationSECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
More informationProduct Catalogue HW-B150H
Product Catalogue Content 1 Coverage and Terminology... 4 1.1 Design Standards... 4 1.2 Load Criteria... 5 1.3 Definition of Terms... 6 1.3.1 Flood Barrier... 6 1.3.2 Flood Height, effective Flood Height,
More informationGeotechnical Building Works (GBW) Submission Requirements
Building Control (Amendment) Act 2012 and Regulations 2012: Geotechnical Building Works (GBW) Submission Requirements Building Engineering Group Building and Construction Authority May 2015 Content : 1.
More informationSANITARY SEWER SPECIFICATIONS
SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,
More informationVOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10
VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1
More informationMultiPost-AP anchorage device
MultiPost-AP anchorage device MultiPost anchorage point Type 1 Fixing on reinforced concrete with large, 360 rotating stainless steel lifting eye for the simultaneous securing of max. 2 persons. This can
More informationInvestigation of the November 2, 2013 collapse of concrete beams at Fort Lauderdale-Hollywood Airport runway project
Investigation of the November 2, 2013 collapse of concrete beams at Fort Lauderdale-Hollywood Airport runway project U.S. Department of Labor Occupational Safety and Health Administration Directorate of
More informationMANUFACTURED HOUSING USED AS DWELLINGS
MANUFACTURED HOUSING USED AS DWELLINGS SECTION AE101 SCOPE AE101.1 General. These provisions shall be applicable only to a manufactured home used as a single dwelling unit and shall apply to the following:
More informationEXAMPLE 1 DESIGN OF CANTILEVERED WALL, GRANULAR SOIL
EXAMPLE DESIGN OF CANTILEVERED WALL, GRANULAR SOIL A sheet pile wall is required to support a 2 excavation. The soil is uniform as shown in the figure. To take into account the friction between the wall
More informationINMET Konstrukcje sp z o.o. Leading steel forms for prefabrication manufacturer in Poland
The INMET Konstrukcje company is a leading manufacturer of the steel forms in Poland. On the basis of individualised projects the company manufactures modern and complex steel forms for the prefabrication
More informationResidential Foundations and Basements
Residential Foundations and Basements Disclaimer All of the following information is based on the 2006 International Residential Code with Kentucky Amendments. As some information is paraphrased, article
More information5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES
5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES Flood damage reduction consists of two basic techniques structural and non-structural. Structural methods modify the flood and take the flood away from people
More informationREPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA
1 REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA Verners Straupe, M.sc.eng., Rudolfs Gruberts, dipl. eng. JS Celuprojekts, Murjanu St. 7a, Riga, LV 1024, Latvia e-mail:
More information423 NORTH HOWARD ST. VISUAL STRUCTURAL ASSESSMENT
Urgent Needs II City of Baltimore No. 1099 423 NORTH HOWARD ST. 423 North Howard Street (circa 1880) is a multi-story building constructed second in row south of Franklin Street and between the vacant
More informationTruss Bridges of Kentucky
ACEC Partnering Conference 2012 Truss Bridges of Kentucky 1899 Amanda Abner Rebecca Turner 1893 Truss Bridges of Kentucky Truss Bridges of Kentucky Vincennes Bridge Company Champion Bridge Company Empire
More informationFacility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components
Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development
More informationSECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
More informationGuide for SOLID CONCRETE BLOCK SEALS
Guide for SOLID CONCRETE BLOCK SEALS July, 2006 Mine Safety and Health Administration SOLID CONCRETE BLOCK SEAL Formersection 30 CFR 75.335(a)(1) specifies requirements for seals constructed using solid
More informationHYDRAULICS. H91.8D/C - Computerized Open Surface Tilting Flow Channel - 10, 12.5, 15 and 20 m long
HYDRAULICS H91.8D/C - Computerized Open Surface Tilting Flow Channel - 10, 12.5, 15 and 20 m long 1. General The series of channels H91.8D has been designed by Didacta Italia to study the hydrodynamic
More informationEAST LYME HIGH SCHOOL
Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed
More informationBasement & Foundation Damage
Basement & Foundation Damage Please note-this presentation is only intended to be used as a basic educational tool and is by no means all encompassing. Each property should be treated on a case by case
More informationKOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER
KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER The New York State Department of Transportation (NYSDOT) is preparing an Environmental Impact Statement (EIS) to evaluate alternatives for the rehabilitation or
More informationInland Marine Transportation System Capital Investment Strategy
Inland Marine Transportation System Capital Investment Strategy Jeanine Hoey, PE, PMP Program Manager 13 April 2010 US Army Corps of Engineers 1 Inland Marine Transportation System (IMTS) Capital Investment
More information