Stone Arch Bridges of Washington County, MD
|
|
|
- Arron Armstrong
- 10 years ago
- Views:
Transcription
1 Stone Arch Bridges of Washington County, MD Presentation for the County Engineers Association of Maryland (CEAM) 2009 Spring Conference May 14, 2009 Scott Hobbs, P.E. Capital Projects Engineering John Latimer, IV Gruber-Latimer Restoration, LLC
2 Overview Introduction Washington County Bridges Bridge Inspection Program Funding Decision Making Design Rehabilitation Costs Repairs Closing Questions
3 Introduction Washington County goes to great efforts to preserve and maintain i its infrastructure, including our stone arch bridges. To ensure the maximum useful life of our structures. To provide acceptable service to the public.
4 Washington County Bridges Major Structures - Culverts or bridges with spans of 20 + Minor Structures - Culverts or bridges with spans Major Structures owned and maintained by County 14 Stone Arch Bridges 185 Minor Structures owned and maintained by County 12 Stone Arch Bridges 179 Major Structures owned and maintained by SHA 7 Stone Arch Bridges 215 Minor Structures owned and maintained by SHA 7 Stone Arch Bridges Approx. 580,000 major bridges in U.S.
5
6 Bridge Inspection Program Federal Aid Highway Act of 1968 and Surface Transportation Assistance Act of National Bridge Inspection Standards (NBIS) Primary purpose is to locate and evaluate existing bridge deficiencies to ensure the safety of the traveling public. Stone arch bridges were not built to carry the vehicles of today. Provide a thorough bridge inspection. Document and monitor the deficiencies until appropriate p repairs can be made. In turn, we can adequately preserve and maintain our historic structures.
7 Bridge Inspection Program NBIS require major structures to be inspected at least every 2 years. Set national standards for proper safety inspection and evaluation of bridges Bridge inspection reports Local jurisdictions determine the inspection cycle for minor structures. Every 4 years in Washington County.
8 Bridge Inspection Program From the Inspection Reports, the County evaluates: > Structure Inventory & Appraisal l(si&a)r Ratings, > Bridge Sufficiency Ratings (BSR), > and PONTIS Ratings Based on the numbers, our stone arch bridges are at the top of the priority list for repairs.
9 Bridge Inspection Program Structural Inventory and Appraisal (SI&A) Ratings Each component of a bridge gets a rating value from 0 to 9.
10 Bridge Inspection Program Abid bridge is considered dstructurally deficient if: Deck, Superstructure, Substructure, or Culvert are rated a 4 or less (poor or worse condition). Some of our stone arch bridges needing repairs are considered structurally deficient.
11 Bridge Inspection Program Each bridge has a bridge sufficiency rating (BSR) (100 is new bridge) FHWA tracks each major bridge in the U.S. by this number.
12 Bridge Inspection Program If a bridge has a BSR of less than 50 and has a bridge component rated 4 or less, the bridge qualifies for replacement funding. If the bridge has a BSR from 50 to 80 and dhas a bid bridge component rated d4 or less, the bridge qualifies for rehabilitation funding. 9 stone arch bridges qualify for rehabilitation funding.
13 Bridge Inspection Program Washington County spends $300,000 on major bridge inspections and $90,000 on minor bridge inspections. i Visual (hands-on) inspection and underwater inspection. Written inspection report with documented conditions and photographs. Approx. $40, major arches Approx. $5,000 minor arches
14 Funding Funding is limited. Washington County spends app. $2.5 million per year on maintaining, repairing, rehabilitating, replacing bridges. Average rehabilitation cost for a three span stone arch bridge is app. $1,000,000 dollars.
15 Funding Prioritize funding. Capital Improvement Plan (CIP). 6 major stone arch bridges are scheduled for rehabilitation in the next 10 years. 4 stone arch bridges were rehabilitated since 2000.
16 Decision Making Due to the aging infrastructure and the lack of funding available, Washington County typically follows a Worst-First evaluation. Worst-First - Structures with the lowest ratings are grouped together for review. If a structure is eligible for federal aid funding, it goes to the top of the list for rehabilitation or replacement. Most of our stone arches fall under worst-first criteria.
17 Decision Making Capital Projects Engineering Maintains inventory, develops priority list and cost estimates for review Director of Public Works and CIP Budget Committee Review Evaluates list and prioritizes against other project needs (Buildings, Roads, Parks, etc.) Washington County Commissioners Continue to invest in repairing and rehabilitating our stone arch bridges.
18 Design Our stone arch bridges are identified as historic. Eligible for listing in the National Register of Historic Places. Must comply with Section 106 Afforded a degree of protection under historic preservation laws. Must adhere to Secretary of the Interior s Standards for the Treatment of Historic Properties To provide an acceptable rehabilitation or repair.
19 Design
20 Design Major rehabilitation projects are designed by a consultant hired by the County through SHA s open-ended consultant process. $150,000 design cost per bridge Using Federal Aid Funding and SHA Review Process Design and load rating based on finite element analysis modeling of reinforced lightweight fill concrete and stresses on the stone masonry arch. Repair plans are prepared in-house.
21 Design Repairs to the bridges in the late 1970 s and early 1980 s provided a concrete cap over the arches and drainage pipes within the existing soil-gravel fill. Not replacing the soilgravel infill with lightweight concrete has been proven to be an issue with the development of bulging spandrel walls and severe deterioration of mortar joints.
22 Design The concrete cap over the arch has proven to be effective in protecting the arch and has assisted in ensuring the arches remain in tact during construction.
23 Design We use an effective ect technique for rehabilitation that strengthens e s the bridge and does not alter its visual appearance. Replacing the soil-gravel fill with reinforced lightweight concrete and reconstructing the stone masonry spandrel and parapet p walls. The fill of the bridge is not considered a character defining element.
24 Design This type of design follows the Secretary of Interior Standards Deteriorated historic features will be repaired rather than replaced. Where the severity of deterioration requires replacement of a distinctive feature, the new feature will match the old in design, color, texture, and where possible materials. Replacement of missing features will be substantiated ti t by documentary and physical evidence.
25 Design and is considered no adverse effect by the Maryland Historical Trust. Reconstruction of stone spandrel and parapet walls utilize existing salvaged stone or new stone that matches the existing stone as closely as possible. The mortar used for repointing and reconstruction matches MHT s recommendations.
26 Rehabilitation Most major stone arches need to be fully rehabilitated by a Contractor with sufficient resources. $300,000 - $1,500,000, per project $300,000 - $700,000 for two span arch $700,000 - $1,100,000 for three span arch $1,100,000 - $1,500,000 for four span arch 4-8 months per project
27 Rehabilitation General Work Items associated with most bridge rehabilitation projects: Excavate soil-gravel fill and replace with lightweight concrete. Temporary shoring Reconstruct and/or re-point stone spandrel walls and parapet walls. Scaffolding and stream diversion. Construct concrete collars around the pier/abutment. Replace concrete parapet cap.
28 Rehabilitation Excavate soil and gravel fill
29 Rehabilitation
30 Rehabilitation Place epoxy-coated reinforcing
31 Rehabilitation i Replace with lightweight fill
32 Rehabilitation
33 Rehabilitation Reconstruct and/or re-point spandrel walls
34 Rehabilitation Reconstruct and/or re-point parapet walls
35 Rehabilitation Reconstruct pier noses
36 Rehabilitation Types of Mortar Used in Current Construction Lime Mortar (Lime, sand, and water) Used on stone arches in the early 1800 s. No longer used because of durability and strength th issues. Mason s Hydrated Lime (Cement mortar, lime, sand, and water) Used on stone arches today. Better durability and strength. th Masonry Cement Mortar (Portland cement, hydrated lime, plasticizers, air entraining agents, sand, water) Types: M, S, N, O, K Durability, strength, and workability are much better. Type S (1,800 psi).
37 Rehabilitation Mortars White masonry cement Flamingo brand of masonry cement e using the color o C224 (formerly C280). Mason s hydrated lime 1 part white masonry mortar mix. 3 to 3 ½ parts of washed, sharp bank sand. ¼ part of mason s hydrated lime. Masonry cement mortar - Type S Joint Styles Shallow inverted tooled smooth V joint or flat joint.
38 Rehabilitation Repointing stone masonry mortar joints
39 Rehabilitation Access and scaffolding Different methods are used depending on size of bridge. Stream bed make-up effects anchoring of scaffolding. Forklifts with aluminum picks for one and two span arches. Scaffolding for three and four span arches. - System (engineered) - Buck (traditional) - Swing-stage
40 Rehabilitation
41 Stone reconstruction Rehabilitation Stones are removed in an orderly fashion and placed back in an area similar to their original position. Weight considerations of staged material.
42 Rehabilitation Pier nose stones are numbered and photographed to ensure original placement.
43 Rehabilitation Install stream diversion around pier and abutments.
44 Rehabilitation Construct concrete collars around the piers and/or abutments.
45 Concrete pier caps. Rehabilitation
46 Rehabilitation Completed Bridge Rehabilitation Projects Roxbury Mills Bridge W-5371 Rehabilitated in 2002
47 Rehabilitation Prys Mill Bridge W-5652 Rehabilitated in 2003
48 Rehabilitation Completed Bridge Rehabilitation Projects Broadfording Road Bridge W-0821 Rehabilitated in 2005
49 Rehabilitation Funkstown Bridge (No. 2) W-4001 Rehabilitated in 2008
50 Costs Excavation $100 per CY Lightweight Concrete $300 per CY Stone Masonry Reconstruction $1,200 per CY Repointing Masonry Joints $30 per SF Replace Concrete Parapet Cap $2500 per CY Concrete Collar $1000 per CY
51 Flooding damaged pier nose. Repairs Stones recovered from the stream were taken to our Highway Department for storage until bridge can be rehabilitated. A temporary concrete pier nose was constructed in its place.
52 Repairs Underwater inspection discovered undermined pier. New concrete collar was constructed to stabilize the foundation.
53 Vehicle Damage to parapet wall. Repairs Stones from the damaged wall were taken to our Highway Department for storage until the bridge can be rehabilitated. A temporary concrete wall was constructed in its place.
54 Repairs Vehicle Damage to parapet and spandrel wall. Stones were recovered from the stream bank by our Highway Department and reconstructed to closely match their original position.
55 Closing To effectively maintain and preserve our stone arch bridges, we need to continually: Assess our inventory Identify and address our needs Invest in one of our county s greatest treasures. An effective method of rehabilitation, continued federal funding availability, and strong commitment to preservation is key.
56 Questions Contact Information: Scott Hobbs, P.E. 80 West Baltimore Street Hagerstown, MD (240) John A. Latimer, IV P.O. Box 276 Williamsport, MD (301)
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
SECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
IH-635 MANAGED LANES PROJECT, SEG. 3.2
IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,
Wastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
COMMONWEALTH OF VIRGINIA CITY OF RICHMOND REHABILITATION AGREEMENT W I T N E S S E T H:
COMMONWEALTH OF VIRGINIA CITY OF RICHMOND REHABILITATION AGREEMENT THIS AGREEMENT, made and entered into this day of 201_, by and between RICHMOND AFFORDABLE HOUSING, a nonprofit corporation organized
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines
CAPPELEN MEMORIAL BRIDGE REHABILITATION
CAPPELEN MEMORIAL BRIDGE REHABILITATION Owner: Hennepin County Engineering: HNTB with Olson-Nesvold Engineering (ONE) and others Section 106 Historical Committee: Hennepin County, MnDOT Cultural Resources
BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM
BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM Swaminathan Srinivasan, P.E., M.ASCE H.C. Nutting/Terracon David Tomley, P.E., M.ASCE KZF Design Delivering Success for
ESI Consultants, Ltd. PROJECT EXPERIENCE
CRAWFORD COUNTY, ILLINOIS NBIS Program Manager and Bridge Inspection services provided for 123 structures throughout Crawford County. Routine Maintenance/Safety Inspection of existing bridges was performed
Building Condition Assessment: 215-219 West Lexington Street Baltimore, Maryland
KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,
INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.
INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. M.Sc. Gediminas Viršilas Head of Bridge Division, Lithuanian Road Administration Working group 2 of PIARC Technical Committee
STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA
STRUCTURAL ASSESSMENT FOR Full Metal Jacket Building 0 Prince Street, Prepared by: ALPHA CORPORATION (Alpha) 1850 S. Loudoun Street, Suite 200 Winchester, VA 22601 540-723-0704 September 22, 2010 J. Michael
Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training
Foundations 65 5 FOUNDATIONS by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. 66 Foundations Foundations 67 FOUNDATIONS Let's assume that the retrofit has been done correctly from the roofline
~iffiui ~ Bridge Condition Survey. Inspection Date: 21 May 2003 District: San Angelo County: Tom Green Highway:
Texas Depadment of Transpo,tation Bridge Condition Survey Inspection Date: 21 May 2003 District: San Angelo County: Tom Green Highway: Irving Street Facility Name: Lone Wolf Bridge Structure Number: B00315-031
Article 5: Building Regulations
Article 5: Building Regulations Division 37: Additional Building Regulations for Archaic Materials and Methods of Construction (Added Additional Building Regulations for Archaic Materials and Methods of
Pavement Management Implementation: Success Stories for Maryland Counties
Pavement Management Implementation: Success Stories for Maryland Counties September 25, 2015 Aaron D. Gerber, P.E. How Does Your Organization Manage Pavement Assets? By Experience/Past Practice? By Customer
cement Masonry Cement Engineered for quality and reliability, Lafarge cements for masonry deliver consistent performance. page 2 Lafarge Cement
cement Masonry Cement Engineered for quality and reliability, Lafarge cements for masonry deliver consistent performance. page 2 Lafarge Cement Lafarge in North America The Lafarge Group is the world leader
Building Condition Assessment: 109-111 North Howard Street Baltimore, Maryland
KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,
SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or
Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs -
Project Information Existing Conditions Cracked and settled pavement. Structural failure within the asphalt pavement section. Anticipated Project Elements Reconstruction of all asphalt pavement on US Route
How To Check For Scour At A Bridge
Case Studies Bridge Scour Inspection and Repair Edward P. Foltyn, P.E. Senior Hydraulic Engineer ODOT Bridge Unit 2013 PNW Bridge Inspectors Conference April 2013 REFERENCES Stream Stability at Highway
REHABILITATION PACKAGE 1-a
1-a WINONA BRIDGE (BRIDGE 5900) REHABILITATION PACKAGE 1-a Rehab option 1-a is a rehabilitation package whereby all spans of the existing structure would be rehabilitated to the degree feasible and strengthened
2006 ICRI Baltimore Washington Chapter Outstanding Repair Project Award George Washington University Ross Hall Façade Restoration
2006 ICRI Baltimore Washington Chapter Outstanding Repair Project Award George Washington University Ross Hall Façade Restoration 2006 ICRI Baltimore Washington Chapter Outstanding Repair Project Award
The Secretary of the Interior s Standards for Rehabilitation
The Secretary of the Interior s Standards for Rehabilitation What is Rehabilitation? Rehabilitation is defined as the process of returning a property to a state of utility, through repair or alteration,
Catch Basin Rehabilitation Road Commission for Oakland County, Michigan
Date: Location: September 14, 2011, 9:45a.m. start East side of street in front of 4656 Maura Lane, West Bloomfield Participants: Oakland County Michelle Belanger, Rick Hall, Matt Mountain, Gary Flounory,
Inspection Data for Bridge Asset Management
Inspection Data for Bridge Asset Management New York State DOT approach and Practice George A. Christian, P.E. New York State Department of Transportation Vermont AOT Bridge Maintenance and Preservation
Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.
Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir Presented By: Doug Stachler, P.E. Project Organization Owner Delaware County Engineers Office Design Consultant CH2M HILL Contractor Double
201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE
STRUCTURAL INSPECTION REPORT DRAFT 201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE TOWN OF PRESCOTT Date: November 2013 GENIVAR No.: 131-20617-00 2611 Queensview Drive, Suite 300, Ottawa,
Paving Capitalization Work Categories and Treatments
Statement of ODOT Infrastructure Capitalization Policy Government Accounting Standards Board (GASB) 34 requires public agencies to capitalize infrastructure assets on their financial statements for periods
National Archives and Record Administration
National Archives and Record Administration Installation of Self-Closing Flood Barriers and Loading Dock Turntable Removal and Structural Slab Repairs ! 2010 Baltimore Washington Chapter Outstanding Repair
St. Joseph s Apache Mission Restoration Project
St. Joseph s Apache Mission Restoration Project illustrated Progress Report: Spring 2000 The south transept of St. Joseph s Apache Mission. This area has some of the most severe interior deterioration.
POLICY NUMBER: C450B SUPERSEDES: C450A. Policy to Encourage the Designation and Rehabilitation of Municipal Historic Resources in Edmonton
CITY POLICY REFERENCE: City Council 1988 October 25 Historical Resources Act RSA 2000 ADOPTED BY: City Council 2008 October 29 SUPERSEDES: C450A PREPARED BY: Planning and Development DATE: 2008 September
Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing
1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize
TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09
TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09 PMT GUIDE # 10 Book of Order Section G-10.0102o: "The session is responsible for the mission and government of the particular church. It
CABIN A Restored & Preserved 1850 Slave Cabin
CABIN A Restored & Preserved 1850 Slave Cabin Cabin A has been restored and preserved to reflect its original 1850 construction and utilization as a slave cabin. This cabin had the most intact architectural
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
Heritage Incentive Program Guidelines
Heritage Incentive Program Guidelines Photo: Public Archives of Prince Edward Island City of Charlottetown 2012 Heritage Incentive Program The Charlottetown Heritage Incentive Program includes both monetary
Earth Retaining Structures
Earth Retaining Structures and Asset Management Earth Retaining Structures and Asset Management A Critical Component Tool in Maintaining Public Safety Earth Retaining Structures (ERS) are often an overlooked
2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS
2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS GENERAL 10/16/2008 The listed average unit prices are based on the
Choosing the Right Mortar for the Job
Choosing the Right Mortar for the Job by Michael Schuller, P.E. President, Atkinson-Noland & Associates 2619 Spruce St. Boulder, CO 80302 www.ana-usa.com Modern material technology has given us strong
Historic Preservation Principles and Approaches
Section 4: Historic Preservation Principles & Approaches four section Historic Preservation Principles and Approaches Before any preservation project is begun, a number of fundamental decisions need to
CHAPTER 4 FIELD INSPECTION, DATA COLLECTING, REPORT WRITING AND REPORT REVIEW
Bridge Inspection Handbook 4-1 CHAPTER 4 FIELD INSPECTION, DATA COLLECTING, REPORT WRITING AND REPORT REVIEW 4.1 INTRODUCTION In this chapter, MassDOT policies and procedures for performing bridge inspections
SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE
A local law for Flood Damage Prevention as authorized by the New York State Constitution, Article IX, Section 2, and Environmental Conservation Law, Article 36 1.1 FINDINGS SECTION 1.0 STATUTORY AUTHORIZATION
How To Manage Transportation Asset Management
1 TRANSPORTATION ASSET MANAGEMENT THE NEW BUSINESS MODEL FOR TRANSPORTATION AGENCIES Presented at the AASHTO Subcommittee on Transportation Finance Policy Business Meeting Irvine, California June 26, 2012
Garver Feed Mill Condition Evaluation
Garver Feed Mill Condition Evaluation OUTLINE Brick masonry overview Condition assessment & methodology Project overview Existing conditions Stabilization Probable costs Summary BRICK MASONRY OVERVIEW
June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL
7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction
Public Information & Public Scoping Meeting
Public Information & Public Scoping Meeting William F. Cribari Memorial Bridge Route 136 over the Saugatuck River Review of Rehabilitation Study Report Public Scoping for the gathering and analysis of
CULVERT AND STORM SEWER PIPE MATERIAL POLICY ON FEDERALLY FUNDED LOCAL AGENCY PROJECTS UPDATED March 2013
CULVERT AND STORM SEWER PIPE MATERIAL POLICY ON FEDERALLY FUNDED LOCAL AGENCY PROJECTS UPDATED March 2013 Background Section 5514, a final rule for SAFETEA-LU was issued on November 15, 2006 and became
Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY
Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY Policy: This policy will replace all previous policies regarding the selection of pipe material for cross drains, drive pipe, drop pipe, storm
Culvert Rehabilitation A presentation by ms consultants, inc. engineers, architects, planners
Culvert Rehabilitation A presentation by ms consultants, inc. engineers, architects, planners McConnell Road Culvert Greensboro, North Carolina Fisher Park Circle Culvert Greensboro, North Carolina Shady
MOBILE HOME LAW. Revised November 2001
MOBILE HOME LAW Revised November 2001 TABLE OF CONTENTS: SECTION 1: SECTION 2: SECTION 3: SECTION 4: SECTION 5: SECTION 6: SECTION 7: SECTION 8: SECTION 9: SECTION 10: SECTION 11: SECTION 12: INTENT DEFINITIONS
EAST AYRSHIRE COUNCIL. CABINET 24 April 2013 2013-14 BRIDGE AND CULVERT STRENGTHENING PROGRAMME
EAST AYRSHIRE COUNCIL CABINET 24 April 2013 2013-14 BRIDGE AND CULVERT STRENGTHENING PROGRAMME Report by the Depute Chief Executive/Executive Director of Neighbourhood Services PURPOSE OF REPORT 1 The
EAST LYME HIGH SCHOOL
Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed
Information for Construction Contractors. Terry O Neill Taxpayer Service Specialist
Information for Construction Contractors Terry O Neill Taxpayer Service Specialist Today s Webinar Definitions and details 4 types of contractors Sales tax for each type of contractor Materials, Equipment,
Township of Enniskillen. Asset Management Plan
Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing
The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11
Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;
The unit costs are based on the trend line of the 3 low bids for the average quantity.
Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally
Unit Price Averages Reports
Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation
Value of Instrumentation Systems and Real-Time Monitoring: An Owner s Perspective
Value of Instrumentation Systems and Real-Time Monitoring: An Owner s Perspective FHWA NATIONAL GEOTECHNICAL PROGRAM www.fhwa.dot.gov/engineering/geotech Why Geotechnical Instrumentation? Provide warning
BRIDGES ARE relatively expensive but often are
Chapter 10 Bridges Chapter 10 Bridges Bridg Bridges -- usually the best, but most expensive drainage crossing structure. Protect bridges against scour. BRIDGES ARE relatively expensive but often are the
PERIODIC STRUCTURAL INSPECTION OF EXISTING BUILDINGS GUIDELINES FOR STRUCTURAL ENGINEERS
PERIODIC STRUCTURAL INSPECTION OF EXISTING BUILDINGS GUIDELINES FOR STRUCTURAL ENGINEERS Jan 2012 CONTENTS GENERAL... 1 1 Background... 1 2 Qualifications and Expectations of Structural Engineers... 1
Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
Historic Bridges of Frederick County. Frederick County, Maryland Division of Public Works Department of Highways and Transportation (301) 600-1687
Historic Bridges of Frederick County Frederick County, Maryland Division of Public Works Department of Highways and Transportation (301) 600-1687 Frederick County s Bridges We have 212 bridges over 20
School Construction Authority Architecture & Engineering
SCOPING GUIDELINES 1.0 GENERAL GUIDELINES 2.0 BUILDING ENVELOPE SCOPING GUIDELINES 3.0 CATEGORIES AND COMPONENTS: The Flood Elimination/Below Grade Capital Category may include some or all of the following
Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam
Design of Bridges Introduction 3 rd to 4 th July 2012 1 FUNCTION OF A BRIDGE To connect two communities which are separated by streams, river, valley, or gorge, etc. 2 EVOLUTION OF BRIDGES 1. Log Bridge
Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding
C Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding These guidelines are intended to provide assistance in selecting OFF-SYSTEM
Town of Huntsville Municipal Asset Management Plan
Town of Huntsville Municipal Asset Management Plan Adopted by Council (Resolution 470-13) December 20, 2013 1 P age Table of Contents Executive Summary... 3 Introduction... 4 State of Local Infrastructure...
For Asset Management
For Asset Management By: Larry Weiss SDLTAP It Begins with Accurate Inventory Inventory of existing system: The Local Roads Needs Study conducted in Aug/Sept of 08 indicated by it s results and from LTAP
Tremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete
Tremie Concrete Underwater concrete plays an important role in the construction of offshore structures. It may be used to tie together various elements in composite action (i.e., to tie piling to the footing).
Chaudière Crossing Bridge Rehabilitation
Chaudière Crossing Bridge Rehabilitation Douglas K. Lowry P. Eng., Armtec Infrastructure Incorporated David Delicate, P.Eng. Public Works and Government Services Canada (Retired) Prepared for presentation
symptoms of a faulty foundation
symptoms of a faulty foundation How does drought impact your home's foundation? For many Texas families, their home becomes the single largest investment and also the family fortune. The home's foundation
TARRANT COUNTY HISTORIC SITE TAX EXEMPTION POLICY
TARRANT COUNTY HISTORIC SITE TAX EXEMPTION POLICY A. General Purpose and Objectives The purpose of this Policy is to encourage the rehabilitation and restoration of certain historic properties within Tarrant
Remote Monitoring of Soil Pressures on Bridge Footings
More Info at Open Access Database www.ndt.net/?id=18252 Remote Monitoring of Soil Pressures on Bridge Footings Michael DAVIDSON 1, Zhihui ZHU 2, Issam HARIK 3, Charlie SUN 4, Kevin SANDEFUR 5 1 Bridge
The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
CITY OF TRAIL MEMORANDUM
0 C CITY OF TRAIL MEMORANDUM DATE: TO: FROM: SUBJECT: March 24, 2011 FILE NO. 5400-02 DAVID PEREHJJDOFF, CHIEF ADM1NTSTRATIVE OFFICER WARREN PROULX, ENGINEERING TECHMCIAN OLD TRAIL BRIDGE With the interest
Informational Workshop Public Meeting Kanawha Falls Bridge Project
Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal
No allowance will be made for classification of different types of material encountered.
PROJECT : Repair/ Maintenance of Flood Control and Drainage Structures Along Butuan City Cagayan de Oro City Iligan City Road LOCATION : San Antonio, Jasaan, Misamis Oriental SUBJECT : General Notes and
Bridge Structural Rehabilitation Using FRP Laminates
Bridge Structural Rehabilitation Using FRP Laminates South Santiam River Quartzville Road, Linn County Linn County Road Department 2011 Cooperative Partnerships Making Linn County a Better Place to Live
How To Improve Road Quality
A Customer Service Level Approach for Maine DOT s Asset Management System Jeffrey L. Zavitski, B.A. Senior Implementation Specialist Deighton Associates Limited Chip Getchell, P.E. Director, Work Plan
Mortars for Brickwork - Selection and Quality Assurance
TECHNICAL NOTES on Brick Construction 1850 Centennial Park Drive, Reston, Virginia 20191 www.gobrick.com 703-620-0010 Mortars for Brickwork - Selection and Quality Assurance 8B October 2006 Abstract: This
Preservation, Repair and Rehabilitation of Concrete Bridges, Pavements and Tunnels in Virginia
Preservation, Repair and Rehabilitation of Concrete Bridges, Pavements and Tunnels in Virginia International Concrete Repair Institute Spring Convention Reno, Nevada March 20, 2014 Michael Sprinkel, PE.,
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 [email protected]
FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation
644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING
Methodology to Identify Preservation Priority Bridges
Methodology to Identify Preservation Priority Bridges Louisiana Historic Bridge Inventory Task 8 Prepared for Louisiana Department of Transportation and Development Prepared by www.meadhunt.com November
STANDARD SPECIFICATIONS & CONSTRUCTION DETAILS MANUAL SECTION 5 - STORM DRAINAGE. 5.01 Design
SECTION 5 - STORM DRAINAGE 5.01 Design Storm drainage facilities shall be designed in accordance with the goals and guidelines set forth in the Unified Development Ordinance. The goal shall be to collect
FACT SHEET: HYDRATED LIME FOR MASONRY PURPOSES
FACT SHEET: HYDRATED LIME FOR MASONRY PURPOSES Hydrated Masons Lime Characteristics Type S (Special) hydrated lime is a fine, white, high purity product which has been specially hydrated for convenient,
Section 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS
NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS The (NRDCA) has prepared this document to provide customers and installers information that the industry
CHAPTER 7: QUALITY CONTROL/QUALITY ASSURANCE ***DRAFT***
CHAPTER 7: QUALITY CONTROL/QUALITY ASSURANCE ***DRAFT*** CHAPTER 7: QUALITY CONTROL/QUALITY ASSURANCE... 1 SECTION 7.1 INTRODUCTION... 2 Subsection 7.1.1 Purpose... 2 Subsection 7.1.2 Scope... 2 Subsection
