Company Profile. Ár-La Hungary Ltd.

Similar documents
AUSTRALIAN PAVING CENTRE

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

SECTION SELECTIVE DEMOLITION

Flood Damage Report. Central Desert Regional Council Controlled Roads. Yuendumu to Mt Wedge road 57 Kilometre. Yuendumu to Nyirripi road 6 Kilometre

ROAD EQUIPMENT MANAGEMENT: A CHALLENGE FOR CAPACITY BUILDING OF LOCAL CONTRACTORS IN TANZANIA

Safe & Sound Bridge Terminology

Traffic Management Issue 1.0 Revision: v2 October 2014

Contracts Awarded by Gympie Regional Council worth $200, or more

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

GHG Accounting in a Construction Project: The Case of Montréal's Turcot Project. Sylvie Tanguay Research Officer, Ministère des Transports du Québec

B A S I C I N F O R M A T I O N

Premium Conventional. General Tire Information. High quality; low operating cost. Pneumatic ride in extreme conditions.

CITY OF NIAGARA FALLS. By-law No A by-law to regulate the maintaining of land in a clean and clear condition.

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts

Local Road Assessment and Improvement Drainage Manual

Moving Small Mountains Vesuvius Dam Rehab

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW

Permeable Pavement Construction Guide

SECTION EARTH MOVING

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES SITE UTILITIES

COMPANY INFO Petrov & Társa Petrov & Co.

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS

FY08 SEWER POINT REPAIRS BID TABULATION

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

Unit Price Averages Reports

SECTION STORM DRAINAGE TABLE OF CONTENTS

SECTION 4Aggegate Subbase

Introduction of 3E International

AGREGADOS RECICLADOS MITOS Y REALIDADES

Installation PowerPoint for Grasscrete Formers

Contents of the reference list

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions

Permeable Pavers. calstone.com. Permeable Interlocking Concrete Pavements (PICP s)

Household waste & recycling storage requirements

Chapter 9. Steady Flow in Open channels

Government of the People s Republic of Bangladesh Ministry of Communications Roads and Highways Department PAVEMENT INVENTORY SURVEY MANUAL

NIF Insurance Services of California Artisan Pak Land Improvement Contractor Qualifier General Liability ( GL )

Member of the KÉSZ Group

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

CHAPTER NO. 27 QUANTITIES OF MATERIALS

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT

Cat. Sizes to fit Cat Skid Steer Loaders, Wheel Loaders, Telehandlers, Backhoe Loaders, and most other manufacturers models.

BASICS OF SCHEDULING

TOWN OF ALTONA 2016 FINANCIAL PLAN

Rural Road Maintenance Handbook Module 16 Rural Road Maintenance Cost Estimate

720 Contour Grading. General. References. Resources. Definitions

Hydraulic Excavators

Description Quantity Cost Total Cost

PENTA INDUSTRY LTD. Presentation August Mailing address: H-1148 Budapest, Kerepesi út

Substation RTU Reference List 2007

Scope of Civil Engineering

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name

UNIT PRICE LIST January 2009

SACRAMENTO COUNTY SUMMARY OF ZONING CLASSIFICATIONS

Position: HEAVY EQUIPMENT OPERATOR Classification: 3 Highway Personnel Member B & C

ROAD SAFETY GUIDELINES FOR TAH ROAD INFRASTRUCTURE SAFETY MANAGEMENT

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.

ALKS SIDEW II. TK TK TK TK TK TK TK TK 40 BOSTON COMPLETE STREETS GUIDELINES DRAFT - JULY 2011 BOSTON TRANSPORTATION DEPARTMENT

AUTOPOLIS ECONOMY DEVELOPMENT PROGRAM ON LOCAL LEVEL

Customer Place of Installation 0,4 kv AC System

Advancements in GPR for a Sustainable Tomorrow

CIVIL AND MINING CONTRACTORS

Avoiding the Landfill: The Recycling of Vinyl Roof Membranes

2000 Szentendre, Damjanich utca 15/a. Tel.: Fax:

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST BID PROPOSAL

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

IH-635 MANAGED LANES PROJECT, SEG. 3.2

Division 2 Section Section 02795

ITS specification Jointing chambers and pull pits (ITS-02-02)

Solid Waste Treatment Facility Solid Waste Permit Application

DESCRIPTION OF WORK:

SECTION SITE PREPARATION

COST EFFECTIVE ROAD MAINTENANCE MARCH 2015

Construction and Demolition Waste

SUSTAINABLE URBAN DRAINAGE SYSTEMS

Built-up roofing solutions with rigid insulation boards on concrete decks for new-build and refurbishment E-a5

C. Section TESTING LABORATORY SERVICE.

Permeable Pavement Operation & Maintanence Guide

CID STREET INFRASTRUCTURE ASSESSMENT

Guidelines for. Permeable Pavement

Building Your Interlocking Concrete Pavement to Last a Lifetime

H 1027 Budapest Horvát u Tel: Fax: E mail: info@3eintl.hu insurance The. the scope.

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

Porous Pavement Alternatives Cost Analysis

SITE PHOTOGRAPHS (GOOGLE EARTH): ROAD REHABILITATION Refer to Appendix B for a map of the viewpoint locations.

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

REQUIREMENTS FOR REGISTRATION AS A PROFESSIONAL ENGINEER WITH THE PROFESSIONAL ENGINEERS BOARD SINGAPORE

Township of Enniskillen. Asset Management Plan

UNIVERSITY OF MISSISSIPPI FIXED ASSET CAPITALIZATION POLICY

National Archives and Record Administration

SECTION UNI PERMEABLE INTERLOCKING CONCRETE PAVEMENT

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

Construction Equipment Fleet Management

Surface Retexturing Services

CONSTRUCTION EQUIPMENT AND METHODS

Underground Injection Control Storm Water Information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP

Transcription:

Company Profile Ár-La Hungary Ltd. Founded 1992

HIGHWAY Construction COMPANY PROFILE The predecessor of Ár-La Magyarország Ltd. was founded in 1992 with the aim of using our prior construction experiences within a family enterprise. During the past 20 years, the company has gone through a continuous increase and development, so today we offer our Clients a wide spectrum of construction services. We have always believed in balanced and maintainable improvement, therefore our priority is to gain more and more freedom in construction technologies with continuous investments and equipment park extensions. In this way we are able to produce asphalt from partly own-made materials and to build road with our complete chain of mashines. Public utilities and complementary facilities are done by our own construction team with the most professional technologies. When facilities are ready to demolish, the recyclable materials are reused and the non-recyclable ones are placed in own landfill. With the help of a uniqe experts team and their work approach we are able to execute works regarding complex organization, precise delivery and demanding considerable resource and technology. Our company s success lies in its great financial and human resources, in its always up-to-date professional knowledge, in its wide range of machines and in its extensive partner network.

SITE Preparation EARTHWORK, FOUNDATION AND UTILITY PROJECTS We have remarkable references and more than two decades experiences in extremely big earthwork technological processes as general contractor. During the execution and the organization of the projects our aim is to reach the highest quality level of technical execution with the admissible efficiency. Therefore we continuously make effort not to move the materials barycentre more than is needed and to handle them separately. Our company can provide the necessary machines from its own equipment fleet for the constructions, depending on the task volume and type. In need of materials we also deal with mining activities in our operation for gravels, filler material, and sand. Our material transport and work-in capacity can reach a 20000 m 3 in a work shift.

SITE Preparation EARTHWORK, FOUNDATION AND UTILITY PROJECTS In our projects we do fieldwork, cuts, benches, refilling and attached levelling, we make slopes and transport materials in or out of the site if necessary. In the course of construction, we keep the expectations according to the plan with measurement of geodetic distance, levels, test drilling and boring. We continuously monitoring the quality, do the required soil mechanical exams and measurements. When the filling thickness requires we do the consolidation measures as well. By city constructions we can do customary under surface digging at various depth, area and organization. We do slab, dig under extant buildings, and do earthwork between objects. Certainly during our projects we are capable to do all the related jobs such as: utility, foundation, drainage systems, down piping, placing culvert aqueducts, construct bridges, tunnels, and seeding, planting and filter crops as well. Our major earthworks listed in the reference list.

ROAD Construction ROAD CONSTRUCTION IN CITIES We have references of much different kind of road constructions. We have done projects on outer and municipal area roads building with different characters, different volumes and different layer systems (asphalt, basalt fitting, paving blocks). Our equipment fleet, technical and manpower capacities makes us capable to do general work, foundation-utility and deep structure work, big volume of earthwork and to build complete flexible/solid pavement workmanlike. Our jobs were: new built roads, new junctions while the road is in service, enlargement extension works, highway deep structure work, public procurement procedure for road building and dewatering draining of water, also shopping and logistics centres, depository basis pavement construction with the adequate layer as the bearing force requirements. We make the protective layer according to the definite project plan either with ballast bed, gravel, crashed concrete or CKT and we outwork it by finisher, manpower or machine. We make professional asphalt pavement with hand or machinery outwork for new roads, junctions, and roundabouts or their expansions and intersections. We construct asphalt pavement blocks with different slopes position and footpath with curb stones for pedestrians with joint hard shoulders.

Pavements BASALT BETON PAVEMENT AND HEAVY-DUTY PAVEMENT Special requirements such as high load bearing capacity, abrasion resistance, and durability we are able to make solid pavement concrete, basalt concrete overlay, both reinforced or none reinforced, with complete dilatation as desired. To construct pavement blocks we have trapezoid cross section blade damper system with different thickness, rough or polished. When we make pavement blocks we pay attention to aesthetic and optical surface as well. When there is certain design at the layout of the pavement colour and/or shape- we put down the blocks by hand, in the parking areas of shopping centres, otherwise we use machinery. We are able to make ashlars as part of the general project or even separately, kerbstone from natural material such as basalt or granite as needed. During our projects we are capable to do the additional work also, like water drainage tasks, open ditch or closed drainage system and together with its bridges and tunnels, utility, flood control, acoustical control and dust control, tree planting, filter crop and slope stabilization by seeding grass. You can learn more about our road works from our references.

OUR Fleet CAPACITIES OF MACHINERY AND EQUIPMENT FROM OUR FLEET Excavators - 1 pc Hitachi ZX350 LC-5 35 ton track excavator /2,5 m 3 / - 1 pc Hitachi ZX250 LC-5 25 ton track excavator /1,9 m 3 / - 1 pc Hitachi ZX210 LC 21 ton track excavator - 2 pc Komatsu PC 210 23 ton hydraulic track excavator /1,5 m 3 / with hydraulic breaker - 1 pc Hyundai R200-7A wheel excavator - 1 pc Liebher L544 wheel loader /3 m 3 / - 1 pc Hyundai HL 740 7A wheel loader /2,5 m 3 / - 1 pc Terex 860 backhoe loader - 1 pc Komatsu WB 97 backhoe loader /0,85-1,35 m 3 / - 1 pc FIAT HITACHI FB100 backhoe loader with hydraulic breaker - 1 pc UNC-060 wheel loader, hydraulic breaker /0,3-0,5 m 3 + drilling set/ - 1 pc HITACHI SL 45 wheel loader /0,4 m 3 / - 2 pcs GEHL 5240 wheel loader, hydraulic breaker /0,4 m 3 / - 1 pc New Holland SL 170 wheel loader /0,4 m 3 / - 1 pc LOCUST wheel loader /0,4 m 3 / - 1 pc CASE wheel loader /0,6 m 3 / - 1 pc Komatsu SK 714 wheel loader /0,4 m 3 / - 1 pc Rubber Master RM 80 mobile crusher Vehicles: - 1 pc Mercedes Axor trailer transporter /33 ton/ - 4 pcs Mercedes Axor dump truck - 13 pcs Mercedes Actros 4140, 4 axle, all-terrain (8x6) tipper truck /18 m 3 / - 5 pcs Iveco 4 axle tipper truck /18 m 3 / - 2 pcs MAN TGA (8 4) tipper truck /18 m 3 / - 1 pc Kamaz, 4 axle 8x4 tipper truck /15 m 3 /

OUR Fleet CAPACITIES OF MACHINERY AND EQUIPMENT FROM OUR FLEET Work-in equipments: - 1 pc Komatsu D65 21 ton bulldozer - 1 pc Caterpillar D6 TXL bulldozer - 1 pc FIAT-HITACHI FD 175 bulldozer /17 ton, 5,1 m 3 / - 1 pc FIAT-ALIS FD 7 bulldozer - 1 pc grader 20 ton - 1 pc NOBAS 17 ton automotive static rubber roadroller - 1 pc Ammann ASC 150 14 ton vibro pat foot road roller - 1 pc Ammann AP 240 rubble roadroller - 1 pc STA VV 1100 D 11 ton automitive vibro pat foot road roller - 1 pc STA VH 250 automotive vibro road roller - 1 pc Hamm HD + 90VO-S vibro road roller - 1 pc Hamm HD8VV road roller Road construction equipments: - 1 pc Intrame M-120 asphalt mixer plant - 1 pc FB-50/2006 concrete mixer plant - 1 pc Vögele S 1600-2 track asphalt paver - 1 pc Hamm HD-90 tandem roller - 1 pc Hamm HD-8 tandem roller - 1 pc hydraulic pavement layer tool Other equipments: - 1 pc Mogensen sizer - 2 pcs Liaz watering truck - 1 pc SCHÖRLING universal road cleaning truck - 1 pc Csepel service truck - 1 pc Feng-Shou 254-4 tractor - 1 pc BAGOD 2500 trailer- 1 pc RENAULT MASCOT tipper truck /7 ton/ - 1 pc Ford Transit 5 ton pick up - 7 pcs Ford Transit van - 2 pcs Ford Transit bus

STRUCTURAL Engineering REFERENCE HIGHWAYS & STRUCTURAL ARCHITECTURE Structural Architecture 2014 Komposztferm Kft. plant - structural works - Tök 2012 Miskolc, Csorba field reinforced conctrete dam 2010 residential buildings - Csömör 2009 TBG Concrete plant (building at work), Budapest. X. Basa str. 2008 TBG Concrete plant, Csömör Concrete plant, Vecsés structural engineering 2007 Concrete plant Budapest XXII. Bányalég str. 2004 Holcim Concrete plant, Pomáz 2003 Holcim Concrete plant, Kistarcsa 2002 Holcim Concrete plant, Dunaharaszti 2000 Hungarian National Horseracing Field structural engineering Highways 2014 M30 highway - Miskolc - earthwork 2005 M5 highway earthwork 1999-2000 Kaposvár ringroad no 61. 1997-1998 M3 highway - earthwork 1997-1998 M3 highway - earthwork

DEMOLITION Work REFERENCE ROAD CONSTRUCTION 2015 roundabout Bag no. 3. main road - no. 2105 road - NIF Zrt. 2014 road reconstruction no. 31. main road JNSZ country 2013 Fót road reconstruction no 2012. 2012 Decathlon store-house, parking lot extension Water flood reservoir Hany-Tiszasüly, road construction - 32 km Budapest road reconstruction(xv. Újszász str.) 2011 Budapest road reconstruction of 2011. Budapest XVII. Pesti str. cycle track Budapest. XV. Zsókavár str. 2. - 44. reconstruction of service road and its environment 2010 Tahitótfalu, road construction of Rózsa str., Koós K., Visegrádi, Kertész str. Csömör, road construction of Táncsics, Mező and József A. str. Budapest XVII. Késmárk str. 11-13. service road construction 2009 Páty reconstruction of mainroad and drainage system 2008 Kecskemét, Auchan shopping centre infrastructure development main road no. 52 and subsidiary roads 2007 Vecsés Concrete plant s pavement 2006 Auchan Shopping centres landscape architecture road construction and parking site Csömör, Dunakeszi, Solymár, Soroksár, Székesfehérvár, Kecskemét road construction

ENVIRONMENTAL Work REFERENCE ROAD CONSTRUCTION 2005 Farkasréti Cemetery road and environmental construction Csömör Dechatlon road construction 2004 Óbudai Auchan shopping centre, Jégtörő str. road construction Csömöri regional waste plant Hungarian National Horseracing Field MAHART-Port high load bearing capacity pavement 2002-2003 Budaörs Trend Centre subsidiary roads 2002 Csömör innercity area road construction 2001 Csömör Palotai road construction Budapest. XVI. Feldebrő str. road construction Budapest. XVI. Tiszakömlő str. road construction 2000 Kaposvár Damjanich str. road construction MAHART Port asphalt pavement by F2 building 1999-2000 Kaposvár road construction no 61. 1999 South-Pest cleaning plant Tök Compost plant road and pavement 1997 Csepel Szabadkikötő Rt. 1996 Várpalota Compost plant

CONSTRUCTION OF Dams REFERENCE EARTHWORKS 2014 no. 55. main road, earthwork 10 km M30 Miskolc, highway earthwork 200.000 m 3 2013 Abony no. 3122. road substructrure 4 km using recycling 2012 Csömör, Rét str. 2011-2012 Water flood reservoir, Hany-Tiszasüly 500.000 m 3 2010 Makó Béta projekt, plant 560.000 m 3 Csongrád, Dunakeszi Tesco 62.000 m 3 Pécs, Tesco 44.000 m 3 2009 Pécs Málom Industrial Park 1.100.000 m 3 2008 Miskolc Auchan, shopping centre 350.000 m 3 2007 Maglód Auchan 1.336.000 m 3 2006 Budapest Central Waste Plant 400.000 m 3 Budapest XVIII. Szent László st.immunization of mazout lakes 210.000m 3 Hankook Tyre Factory, Dunaújváros 400.000 m 3 2005 Auchan Csömör Budapest XII.Farkasréti Cemetery changing of material ground 2004 Kecskemét, Malom Center 56.000 m 3 2003 Samsung Göd 30.000 m 3 2002 Budapest IX. Millenium Center 100.000 m 3 2000 Hungarian National Horseracing Field 250.000 m 3 Kaposvár - no. 61. main ringroad 117+250-119+262 320.000 m 3 1999 OBI Store /Budapest., IX./ changing of material ground and earthwork 70.000 m 3 1996-1998 Csepel - filling of low terrain area 500.000 m 3 1996 Ford plant expansion, cut works 120.000 m 3 1995 Expo Hungarian Pavilon 100.000 m 3

STRUCTURAL Architecture REFERENCE STRUCTURAL ARCHITECTURE 2014 Komposztferm Kft. plant structural works - Tök 2010 residential building - Csömör 2005 2006 Farkasréti Cemetery supporting wall system and crypts 2005 Jászberény commercial park 2004 Százhalombatta commercial park Hungarian National Horseracing Field stables 2003 Logistic Park 1999 OBI Store Várpalota Compost plant Tök Compost plant 1997 M7 highway segment km 33,7 OMV filling station Várpalota Compost plant

Excavation PIT REFERENCE PIT EXCAVATION 2013-2014 Váci Green B. C. buildings 150.000 m 3 2011 Budapest XIII. Kassák L. str. Green House Office 35.000 m 3 Budapest XVIII. Forgó str., Air Traffic Contol building ANS III. 18.000 m 3 2009 Pécs, Conference and Concerthall 13.500 m 3 2007-2008 Corvin Átrium 228.000 m 3 2007 Spirál Office, Budapest, Dózsa Gy. str 40.000 m 3 2005 Budapest XIII. Kassák L. u. 24. 16.000 m 3 CASTRUM House 25.000 m 3 2004 Budapest. XIII. Váci str. GTC II. 60.000 m 3 Budapest VI. Király str. block of flats 35.000 m 3 2003 Budapest IX. Páva str. block of flats 30.000 m 3 Budapest VII. Elisabeth Center 30.000 m 3 HOMASÍTA Store 15.000 m 3 2002 Budapest XIII. ASTRON HOTEL 30.000 m 3 2001 Budapest. XI. Irinyi J. u. SKANSKA Office 65.000 m 3 2000 on the area GANZ in Buda, garage C2 earthwork with Milano method 40.000 m 3 LEHEL Market 80.000 m 3 1998 AKADÉMIA BANK CENTER Arany János str. 55.000 m 3

UTILITY Building REFERENCE UTILITY BUILDING 2013 Pilisvörösvár, public utilities 2011 Tahitótfalu, innercity drainage system works Budapest XVIII. Forgó str., Air Traffic Control building ANS III. drainage system 2008 Vecsés Concrete plant infrastructural development 2007 Budaörs Concrete plant moderning of drainage system Csömör, Gárdonyi and Széchenyi str. 2006 Csömör innercity drainage system works Csömör, Dunakeszi, Solymár, Soroksár, Székesfehérvár, Kecskemét drainage system works 2005 Óbuda Auchan-Aquincum - drainage system AUCHAN Csömör drainage system 2004 Hungarian National Horseracing Field stables, drainage system 2003-2004 Budafok, drainage system works 2003 Auchan Óbuda, drainage system Holcim, Dunaharaszti Concrete plant utility building Holcim, Budapest. X. Concrete plant utility building 2002 Csömör utility building works Holcim Budapest XV. Concrete plant utility building 2001 Dömsöd drainage system 2000 Csömör drainage system works Hungarian National Horseracing Field drainage system Csepeli Szabadkikötő Rt. site building, South-Pest Waste plant 1999 Csepeli Szabadkikötő Rt. utility building Tök Compost plant

LANDSCAPE Architecture REFERENCE LANDSCAPE ARCHITECTURE 2009. Pécs Málom Industrial Park 2008. Kecskemét, Auchan 2005 2006. RKB RT. 2000. South-Pest Waste plant 1997. Csepel-island water cleaning plant 1998. Budapest VIII. Fiumei str, Cemetery 1997-2011. Budapest X. Újköztemető Cemetery maintenance works 90 ha 1996. Budapest VIII. Fiumei Temető Funária Garden

INFRASTRUCTURAL Developement INFRASTRUCTURAL DEVELOPEMENT 2015 roundabout Bag no. 3. main road - no. 2105 road - NIF Zrt. 2014-2015 Komposztferm Kft earthwork, foundation, public utilities and pavement 2013-2014 Auchan - Budaörs, Debrecen, Fót, Miskolc, Szeged, Szolnok, Budakalász petrol stations, public utilities 2013 Immochan M5 Commercial Centre infrastructural development, railway-crossing, pulic utilities, road contruction 2012 Auchan Budapest, Szemere field, infrastructural development 2008 Kecskemét, Auchan shopping centre infrastructural development

SPECIAL Earthwork CONTACT US CONTACT US: Ár-La Magyarország Kft. 0036 1 409 36 19 tel 0036 1 409 36 20 fax titkarsag@ar-la.hu mail 1162 Budapest, Istráng str. 88. Hungary www.ar-la.hu