Rural Road Maintenance Handbook Module 16 Rural Road Maintenance Cost Estimate
|
|
|
- Nigel Daniel
- 10 years ago
- Views:
Transcription
1 After fulfilling Module 16, you will be able to: Understand the structure of cost estimating sheets and the steps to establish a cost estimate for rural road maintenance Establish cost estimate Self - Assessment. The participants are required to have comprehended following modules: - Module 1: "Local Road Network" - Module 2: "The Concepts of Rural Road Maintenance" - Module 4: "Rural Road Defects and the Causes" - Module 11: "Rural Road Maintenance Materials" - Module 12,13,14: "Rural Road Maintenance Techniques" The participants are introduced the structure of cost estimating sheets. The participants are introduced steps to set up a cost estimate The participants practise to set up a cost estimate for rural road maintenance by themselves. Self - Assessment Rural Road Maintenance Handbook Module 16 Rural Road Maintenance Cost Estimate 1. Familiarize with a rural road maintenance estimate - learn about the structure of cost estimate sheets of rural road maintenance and their relations. 2. Find out procedures and necessary data to generate a cost estimate of rural road maintenance 3. Make a cost estimate of road maintenance 4. Self - assessment SEACAP 11 Page 1 Total: 11 pages
2 1. Familiarize with rural road maintenance estimate - learn about structure of cost estimate sheets and their relation Look at the figure below to know the documents that are necessary for road maintenance estimating Maintenance Quantity Maintenance Estimate of Annual Plan Maintenance Work Estimate Material Sheet (Locality) Norm of Road Routine Maintenance Road Defect Surveying Form Road Defect Surveying Form Norm of Repairing Works Estimate Construction Machine and Equipment A6 Basic Salary Regulation Guideline for estimate adjustment SEACAP 11 Page 2 Total: 11 pages
3 Fill in the blanks of the following figure with names of documents (or regulations) used to prepare a rural road maintenance estimate in your local condition. Quantity Make Estimate Look at example 1 of annual plan estimate for maintaining 1.6 km Commune bituminous road Table 1: (Taken from Module 15) maintenance demand of 1.6 km bituminous road No. Descriptions Unit Stipulated Road Maintenance quantity length demand A Management works Inspection, settlement of 1 offences Daywork B Traffic safety Paint and repair guide posts 2 and signs Daywork C Subgrade & drainage 0 3 Grass cutting Daywork Ditch cleaning in wet season Daywork Side drain clearing m/daywork 500/ / Shoulder reshaping m2 400/ / Drain excavating m3 5/ /8 Embankment/ Shoulder 8 replenishing m3 5/ /4 9 Small landslide removal m3 4/ /3.2 Clean tow section (if 10 necessary) Daywork D Pavement 11 Pothole filling m Corrugation grading m Materials refilling m E Soft spot repair m3 14 Pavement watering Daywork Culvert & bridge (less than 10m 15 span) SEACAP 11 Page 3 Total: 11 pages
4 Table 2: Calculation Sheets of some road maintenance items Code Descriptions Unit Quantity Cost Note XR & XR Fill 15cm depth pothole by sqm 1 crushed stone and bitumen sealing Material 34,844 4x6 crushed stone cu.m ,785 2 x 4 crushed stone cu.m x 2 crushed stone cu.m ,575 Bitumen kg ,811 Firewood kg ,316 Tripping or coarse sand cu.m ,045 Labour 2,814 Class 4/7 daywork ,814 XR Crack sealing, bitumen ratio is 2.5kg/m2 XR vµ XR sqm 1 Materials 9,719 1 x 2 crushed stone cu.m , chippings cu.m ,650 Bitumen kg ,554 Labour 514 Class 4/7 daywork Construction Machine 1, tons roller daywork Bitumen heating tank daywork Soft spot/ Settlement Treatment cu.m 1 Material 135, crushed stone cu.m ,643 1 x 2 crushed stone cu.m ,575 Bitumen kg ,811 Firewood kg ,316 Tripping or coarse sand cu.m ,045 Labour 12,533 Class 3.7/7 daywork ,533 *Note: - The unit costs in calculation sheet above are made based on "Norm of Repairing Works Estimate " - Materials unit price are depended on locality - Labour unit cost conforms to A6 Basic Salary Regulation enforced conforming to Decree No. 26/CP dated 23/5/93 and adjusted conforming to the Circular Letter No. 03/2005/TT- BXD dated 4/3/ Machine unit cost is conformed to 1998 Construction Machine Cost and adjusted conforming to Circular Letter No.03/2005/TT-BXD dated 4/3/2005 SEACAP 11 Page 4 Total: 11 pages
5 - Estimate of 1.6 km bituminous road repair Estimation for repairing 1.6 km of road ID Description Unit Qty Unit price Amount Material Labor Machinery Material Labor Machinery A Management works Inspection, settlement of 1 offences daywork ,000 32,000 B Traffic safety Paint and repair guide 2 posts and signs daywork ,000 16,000 C Sub-grade & drainage 3 Grass cutting daywork ,000 48,000 Ditch cleaning in wet 4 season daywork ,000 32,000 5 Side drain clearing m ,000 8,000,000 6 Shoulder reshaping sq.m ,000 6,400,000 7 Drain excavating cu.m 8 10,000 80,000 Embankment/ Shoulder 8 replenishing cu.m 8 10,000 80,000 9 Small landslide removal cu.m ,000 64,000 Clean tow section (if 10 necessary) daywork ,000 32,000 D Pavement 11 Pothole filling sq.m 32 34,844 2,814 1,115,013 90, Corrugation grading sq.m 96 9, , ,000 49, , Materials refilling cu.m ,390 12, ,248 40,107 E Soft spot repair 14 Pavement watering daywork ,000 16,000 Culvert & bridge (less than 15 10m span) daywork ,000 16,000 Total 2,481,261 14,995, ,413 SEACAP 11 Page 5 Total: 11 pages
6 Sample 2: Crushed pavement estimating - the data is taken from Road Defect Surveying Form Maintenance Demand Survey Form (Form 8a-1 that has been improved in comparison with the one in Rural Maintenance Handbook to suit to maintenance demand survey form) - Assumed surveying data Commune: An Son Table 8a - road defect quantity - site surveying results form Road : An Son - An Lac Road length: 2.2 km Road Code: AS01R3.5/5D2.2 Pavement Type: Colluvial Gravel - Road/Pavement Width: 3.5m/5.0m Road Defects and Sphere of Influence Location K0 - K0+500 K K1 K1 - K1+500 K K2 - K2+200 Date: Condition assessment Value Condition Assessment defects quantity Drain cleaning (m) m 315 Bad Drain excavation (m/m3) 20/ / m3 Clearing brush/grass(m2) Bad 72 m2 crushed stone pavement (cm) Reshape & refilling (m3) m3 10 cm deep pothole (m2) m Fairly 12 cm deep pothole (m2) m2 % Good Soft spot (m2)/(m3) 3/ bridge, culvert and other structures Table 1: Road Defects and Maintenance Quantity I II No. Items Unit Maintenance Quantity Road bed and Drainage 1 Brush/Grass Clearing m Side Drain cleaning m Drain excavation m Pavement 4 10 cm deep pothole filling m cm deep pothole filling m Reshape and refilling surface m Soft spot treatment m3 1.9 SEACAP 11 Page 6 Total: 11 pages
7 Table 2: Maintenance Works unit price Code. Description Unit Quantity Unit Cost Note XR.65 Drain cleaning m 1 Labor 454 class 3.5/7 daywork BA.1733 Side drain excavating m3 1 Labor 14,156 class 2.7/7 daywork ,156 XR.66 Vegetation clearing m2 1 Labor 285 class 3.5/7 daywork XR Reshape, refill pavement using m3 1 crushed stone Material 112,728 Crushed stone 4x6 m ,728 Labor 4,059 class 4/7 daywork ,059 Construction Machine 25,085 Hammer daywork ,085 XR cm deep pothole filling m2 1 Material 14,350 Crushed stone 4 x 6 m ,785 Crushed stone 2x 4 m Crushed stone 1 x 2 m Tripping m ,749 Natural gravel m Labor 4,627 class 4/7 daywork ,627 XR cm deep pothole filling m2 1 Material 20,662 Crushed stone 4 x 6 m ,678 Crushed stone 2x 4 m Crushed stone 1 x 2 m Tripping m ,749 Natural gravel m Labor 5,357 class 4/7 daywork ,357 XR Soft spot treatment m3 1 Material 117,391 Crushed stone 0-4cm m ,391 Labor 5,224 class 3.7/7 daywork ,224 Construction Machine 25,771 Water tanker, sprayer ca Hand-held compactor ca ,085 SEACAP 11 Page 7 Total: 11 pages
8 Table 3: Maintenance Estimate of 2.2 km crushed stone road - the quantity is assumed to take from surveying result. Cost No Items Unit Quanti -ty Material Labor Machine Material Labor Machine I II Road bed and Drainage 1 Brush/Grass Clearing m ,687 2 Side Drain cleaning m ,156 4,076,879 3 Drain excavation m ,196 Pavement 4 10 cm deep pothole filling m ,728 4,059 25,085 8,116, ,226 1,806, cm deep pothole filling m ,350 4,627 1,721, ,230 6 Reshape and refilling surface m ,662 5,357 65,084 16,876 7 Soft spot treatment m ,391 5,224 25, ,043 9,926 48,965 Total 10,126,507 4,987,021 1,855,085 Direct Maintenance Cost VL = 10,126,507 10,126,507 NC = 4,987,021 x 3.36 = 16,756,391 M = 1,855,085 x 1.4 = 2,597,119 T = VL +NC + M = ,756, = 29,480,017 General Cost C = 5.3 % x T = 29,480,017 x 5.3 % = 1,562,441 Maintenance Cost Z = T + C = 29,480, ,562,441 = 31,042,457 Management Cost K = 1% x Z = 31,042,457 x 1% = 310,425 Total Cost: Z + K 31,352,882 *Note: - The estimate above is calculated for maintenance works that is carried by Community Group or Length Person. - If the maintenance works are carried by Contract with Professional Contractor, the total cost should be included payment of interest and VAT. - Other maintenance works as big repair that survey & design works need be carried by professional contractors, surveying, designing and other cost should be included in the total cost conforming to State Regulations. Fill in following lines with relations between data in the table above SEACAP 11 Page 8 Total: 11 pages
9 note Estimate of Annual Maintenance Plan is made with maintenance demand that conforms to Norms of Routine Maintenance. Maintenance Estimate of a road is made with maintenance demand that is defined by road defects surveying 2. Practice making estimate with maintenance demand defined by road defects surveying. Fill maintenance quantity in the table below using surveying data No. Items Unit Maintenance Quantity Make unit price of the maintenance items Code Description Unit Quantity Cost Note SEACAP 11 Page 9 Total: 11 pages
10 Complete estimating table below using the quantity and the unit price from two table above No Items Unit Quantity Cost Material Labor Machine Material Labor Machine Total Direct Maintenance Cost VL = NC = M = T = VL +NC + M = General Cost C = 5.3 % x T = Maintenance Cost Z = T + C = Management Cost K = 1% x Z = Total Cost: Z + K SEACAP 11 Page 10 Total: 11 pages
11 1. Write names of documents that would be used to make road maintenance estimate in the following line a. Estimate of Annual Maintenance Plan b. Estimate of maintenance works for particular roads Good Not Good 2. Fill steps to make road maintenance estimate in the lines below Good Not good SEACAP 11 Page 11 Total: 11 pages
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
4-02 Gravel Base. 4-04 Ballast and Crushed Surfacing
Chapter 4 Bases 4-02 Gravel Base GEN 4-02.1 General Instructions Gravel Base is typically used in the construction of the roadway section and provides support for the pavement. For the pavement to provide
Unit Price Averages Reports
Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation
Pavement Asset Management Guidance Section 5.3: Condition Surveying and Rating - Drainage
Pavement Asset Management Guidance Section 5.3: Condition Surveying and Rating - Drainage December 2014 Document Information Title Author Description Pavement Asset Management Guidance, Section 5.3: Condition
H: Road Asset Management Plan February 2015
H: Road Asset Management Plan February 2015 Document Format This plan forms one part of a suite of Asset Management Plans that have been developed: A. Bridges B. Buildings C. Drainage D. Footpath E. Levee
Local Road Assessment and Improvement Drainage Manual
Local Road Assessment and Improvement Drainage Manual Donald Walker, T.I.C. Director, author Lynn Entine, Entine & Associates, editor Susan Kummer, Artifax, design Transportation Information Center University
COST EFFECTIVE ROAD MAINTENANCE MARCH 2015
COST EFFECTIVE ROAD MAINTENANCE MARCH 2015 According to the University of New Hampshire technology transfer Center the goal of a Road Surface Management Plan should be the following: Maximize Return on
Otta Seal BACKGROUND GENERAL DESCRIPTION DESIGN ASPECTS. Category : Technical Information/On-carriageway/
Otta Seal Category : Technical Information/On-carriageway/ BACKGROUND An Otta seal is a thin bituminous seal comprising graded gravel or crushed aggregate containing all sizes and either a cut-back or
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown
Sub-Saharan Africa Transport Policy Program (SSATP) Output- and Performance-based Road Contracts (OPRC)
Sub-Saharan Africa Transport Policy Program (SSATP) Work in Progress and New Developments in RMF Output- and Performance-based Road Contracts (OPRC) (Based on presentations by Schliessler/Gericke WB) Olav
Status of Asset Management in the Roads Sector. L Kannemeyer
Status of Asset Management in the Roads Sector L Kannemeyer Why Asset Management? Road Condition 100 80 60 40 20 Good Fair Poor B A Very Poor (Typically Designed for Traffic Expected over 20-30 Years)
The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11
Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;
Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.
Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer
PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE
Sl.No. PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE Description of item Qty Unit Rate Amount 1 Demolishing tile work/cement concrete/( carefully taking out the closet and other
Permeable Pavement Construction Guide
Permeable Pavement Construction Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems that reduce
APPENDIX B. I. Background Information
APPENDIX B GUIDELINES FOR IDENTIFYING AND REPAIRING LOCALIZED AREAS OF DISTRESS IN AC PAVEMENTS PRIOR TO CAPITAL PREVENTIVE MAINTENANCE OR REHABILITATION REPAIRS I. Background Information A. AC Pavement
NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW
NOTICE TO CONTRACTORS CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW The Nebraska Department of Roads will receive sealed bids in
SECTION 4Aggegate Subbase
The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages
Section 600 Incidental Construction
Table of Contents 1. Pipe Culverts... 600-1 A. Endwalls, Inlets, Manholes, and Spring Boxes... 600-5 2. Grade Adjustment of Existing Miscellaneous Structures... 600-8 3. Rebuilt Miscellaneous Structures...
Session 7: Retrofitted Edge Drains 7.1
Session 7: Retrofitted Edge Drains 7.1 Learning Outcomes 1. List benefits of drainage 2. List components of edge drain systems 3. Describe recommended installation procedures 4. Identify typical construction
Performance-Based Road Management and Maintenance Contracts Worldwide Experiences
International Seminar on Road Financing and Investment Arusha, Tanzania, April 16 20, 2007 Performance-Based Road Management and Maintenance Contracts Worldwide Experiences by Dr. Gunter Zietlow 1 e-mail:
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT
PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT A. The requirements for construction of permeable interlocking concrete pavement: 1. Install the interlocking
Division 2 Section 32 14 13.19 Section 02795
Note: The text must be edited to suit specific project requirements. It should be reviewed by a qualified civil or geotechnical engineer, or landscape architect familiar with the site conditions. Edit
Structural/Hydrologic Design & Maintenance of Permeable Interlocking Concrete Pavement
Structural/Hydrologic Design & Maintenance of Permeable Interlocking Concrete Pavement David R. Smith, Technical Director Interlocking Concrete Pavement InsCtute, Herndon, Virginia USA William F. Hunt,
PAVER JOB INFORMATION SHEET
PAVER JOB INFORMATION SHEET JOB SITE ADDRESS: Phone # Scheduled Date Directions JOB # OWNERS NAME (S): Phone # (h) (w) GENERAL CONTRACTOR: Contact Phone ARCHITECT: Contact Phone PLANS: Specs Date Pages
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing
WATERPROOFING FOR CONCRETE STRUCTURES
MANUAL OF CONTRACT DOCUMENTS FOR ROAD WORKS VOLUME 1 SPECIFICATION FOR ROAD WORKS SERIES 2000 WATERPROOFING FOR CONCRETE STRUCTURES Contents Clause Title Page 2001 General 2 2002 Protection of Bridge Deck
For Asset Management
For Asset Management By: Larry Weiss SDLTAP It Begins with Accurate Inventory Inventory of existing system: The Local Roads Needs Study conducted in Aug/Sept of 08 indicated by it s results and from LTAP
Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS
TABLE OF CONTENTS 2.18 CONCRETE AND/OR CORRUGATED STEEL STORM SEWER... 1 2.18.1 GENERAL... 1 2.18.2 MATERIALS... 1 2.18.2.1 Storm Sewer Pipe... 1 2.18.2.2 Cement Mortar... 1 2.18.2.3 Granular Materials...
WATERPROOFING OF WET ROOMS
WATERPROOFING OF WET ROOMS Waterproofing under tiles For longterm enjoyment of a wetroom area a complete and resistant waterproofing system is an important precondition. Most tiles are by themselves waterproof
No allowance will be made for classification of different types of material encountered.
PROJECT : Repair/ Maintenance of Flood Control and Drainage Structures Along Butuan City Cagayan de Oro City Iligan City Road LOCATION : San Antonio, Jasaan, Misamis Oriental SUBJECT : General Notes and
Section 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS Research & Development Division RD/GN/033 June 2008 THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE
SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
Building Your Interlocking Concrete Pavement to Last a Lifetime
Building Your Interlocking Concrete Pavement to Last a Lifetime A Guide for Consumers Contents Building Your Interlocking Concrete Pavement to Last a Lifetime.... 3 What Does Installation Involve?....
Township of Enniskillen. Asset Management Plan
Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing
SECTION 13 REPLACEMENT AND CLEANUP 13.01 SCOPE OF WORK
13.01 SCOPE OF WORK Under this item, the Contractor will restore all lawns, trees, gardens, landscape plantings, sidewalks, ramps, trails, fences, commercial signs, water courses and sand, gravel, dirt,
DESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
EQUIPEMENTS DE MAINTENANCE. Road maintenance
EQUIPEMENTS DE MAINTENANCE Road maintenance There are many road maintenance techniques. The treatment of cracks and potholes, the creation of joints are all different works needing specific equipment.
PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS
BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS Check here for Address or phone number change the fiscal year (July 1 June 30), and date(s) maintenance was performed. Under Inspection,
Chapter 22. Lump Sum Project Guidelines
Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11
Permeable Pavement Operation & Maintanence Guide
Permeable Pavement Operation & Maintanence Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant
C. Section 014510 TESTING LABORATORY SERVICE.
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,
Road Maintenance Techniques
COLD CHON (GALWAY) LTD Cold Chon Road Maintenance Techniques Jim Campbell, Chief Engineer, Cold Chon www.coldchon.ie INTRODUCTION The maintenance of roads involves the co-ordination of a wide range of
SOL: Transport Sector Development Project
Transport Sector Development Project (RRP SOL 41171) Scope and Technical Report PART I: Land Transport Infrastructure Subproject (St. Martin Road) Project Number: 41171-02 November 2010 SOL: Transport
Section 402. STORM SEWERS
402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide
SECTION 3.3 - PAVEMENT DESIGN
SECTION 3.3-3.3.1 GENERAL 3.3.2 SUBSURFACE DRAINAGE 3.3.3 DETERMINATION OF DESIGN TRAFFIC 3.3.4 SUBGRADE EVALUATION 3.3.5 PAVEMENT THICKNESS 3.3.5.1 GRANULAR PAVEMENTS WITH THIN BITUMINOUS SURFACING 3.3.5.2
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete
SECTION 1 GENERAL REQUIREMENTS
Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,
550 PIPE CULVERTS, SEWERS AND DRAINS
551.01 550 PIPE CULVERTS, SEWERS AND DRAINS 551 GENERAL 551.01 Description 551.02 Materials 551.03 Excavation 551.04 Protection of Excavation 551.05(a) Bedding for Rigid Pipe 551.05(b) Bedding for Non-Rigid
SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or
PERMEABLE INTERLOCKING CONCRETE PAVEMENT
[NOTE TO SPECIFICATION WRITER: This guide specification for the use of permeable interlocking concrete pavers for pedestrian and vehicular traffic application was developed based on the use of an open-graded
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS Research & Development Division RD/GN/032 June 2007 1. Purpose ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS
Asphaltic Wedge Paving
OFFICIAL NOTICE ADVERTISEMENT FOR BIDS Notice is hereby given by the Town of Oregon, Dane County, Wisconsin, will receive sealed bids for Road Construction as listed in this request until 4:00 P.M., Local
700 Life-Cycle Cost Analysis... 700-1
Table of Contents 700 Life-Cycle Cost Analysis... 700-1 701 Introduction... 700-1 701.1 Discount Rate... 700-1 702 Initial Construction... 700-1 703 Future Rehabilitation... 700-1 703.1 Introduction...
Work Type Definition and Submittal Requirements
Work Type: Geotechnical Studies Soils Analysis & Recommendations The first section, Work Type Definition, provides a detailed explanation of the work type. The second section, Work Type Submittal Requirements,
Appendix D:When to Pave a Gravel Road
Appendix D:When to Pave a Gravel Road D1 Appendix D: When to Pave a Gravel * Road by Kentucky Transportation Center, University of Kentucky at Lexington,KY Contents A Word About the Term Paved Introduction
SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES
SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES 1. DESCRIPTION. Asphalt Waterproofing Mix (AWM) is a highly elastomeric, polymermodified, impermeable asphalt
Guidelines for. Permeable Pavement
What is permeable pavement? Guidelines for Permeable Pavement When rainwater falls on conventional pavement, such as concrete, it accumulates and then flows across and off of this impervious surface as
SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP)
SPECIFICATIONS INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP) Part 1 General 1.1 CONFORMITY Conforms to the requirements of the general conditions of the contract.
SECTION 02795 UNI PERMEABLE INTERLOCKING CONCRETE PAVEMENT
SECTION 02795 UNI PERMEABLE INTERLOCKING CONCRETE PAVEMENT Note: This guide specification is intended for use in the U.S. It describes construction of permeable interlocking concrete pavers on a permeable,
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial
Chapter 5: Drainage, Ditches, and Culverts
Chapter 5: Drainage, Ditches, and Culverts chapter contents Characteristics of Good Drainage 82 Elements of Good Surface Drainage 82 Crown 82 Shoulders 82 Slope 82 Ditches 83 Culverts 83 Inlets 83 Optimal
FDOT Specifications List
FDOT Specifications List TABLE OF CONTENTS DIVISION II CONSTRUCTION DETAILS CLEARING CONSTRUCTION SITE 110 Clearing and Grubbing... 152 EARTHWORK AND RELATED OPERATIONS 120 Excavation and Embankment...
SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS
1 SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS TABLE OF CONTENTS I. Introduction II. General Information and Requirements A. Applying for Sewer connection B. Excavation C. Cutting Concrete and Asphalt
Helen Mercury Mine EE/CA OPINION OF PROBABLE COST
G Cost Estimates Helen Mercury Mine EE/CA Alternative 2: Limited Action 3 Minor Road Improvements 4 Clear & Grub diversion channel areas 5 Surveying 6 Cleanup & Demobilization 7 Pull back of material 8
Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005
Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005 Purpose The purpose of this review is to capture for technical deployment the most advanced
Storm Drain Inlet Protection for Construction Sites (1060)
Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain
CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS
December 2014 CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications...
Quality control: Annex-A.
Quality control: Quality of the constructed work has been checked by our staff as per frequency and provision mentioned section 900 in MoRT&H and as per provision mentioned in Concession Agreement. The
WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued)
BIDDER'S PROPOSAL (continued) Item Estimated No. Description Quantity Unit Unit Cost Total Cost BASE BID 1 Traffic Control 1 LS $ $ 2 Construction Area Signs 1 LS $ $ 3 Excavation Safety 1 LS $ $ 4 Reset
CHAPTER 7: SUBDIVISION CONSTRUCTION, INSPECTION AND BONDING. 7.05 Subdivision Improvement Performance Bond Requirements
CHAPTER 7: SUBDIVISION CONSTRUCTION, INSPECTION AND BONDING 7.00 Construction 7.01 Inspection and Testing of Improvements 7.02 Approval of Improvements 7.03 City Engineer s Acceptance of All Improvements
SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE
PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE 311.1 DESCRIPTION: This item shall consist of a cement treated subgrade base course composed of a mixture of local soil, portland
CID STREET INFRASTRUCTURE ASSESSMENT
ABSTRACT An evaluation of the street infrastructure in Foxberry Estates Phase 1, including pavement condition, verification of construction techniques, and subgrade quality. Recommendations and costs for
Republic of Zambia Ministry of Works and Supply Roads Department Labor-based Routine Maintenance Contract Agreement. C. Kalangwa - Box 33545, Lusaka
August 2000 1) Parties to the Agreement Republic of Zambia Ministry of Works and Supply Roads Department Labor-based Routine Maintenance Contract Agreement 1.1 The Employer: The Roads Training School for
Commercial Roof Inspection Form
Inspection Date: Inspector: Building Information Building ID: No.: Used For: Year Roof Applied: Building Description: Permanent Temporary Building Type: Retail Industrial Residential Building Name: Building
COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2
(PREVIEW) SP 36 (Part 2) : 1988 COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2 IS 1893 : 1979 (Reaffirmed 1987) CODE OF PRACTICE FOR SUBSURFACE INVESTIGATION FOR FOUNDATIONS 1.1 This code deals
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of
SECTION 701 CULVERT PIPE, ENTRANCE PIPE, STORM SEWER PIPE, AND EQUIVALENTS
SECTION 701 CULVERT PIPE, ENTRANCE PIPE, STORM SEWER PIPE, AND EQUIVALENTS 701.01 DESCRIPTION. Furnish and install culvert pipe, entrance pipe, and storm sewer pipe. Use units conforming to the dimensions,
Cost components. Why estimate? You may ask; why do we need estimates? Estimating can help to: Total project costs. Profit added FINAL BID
Estimating costs for infrastructure projects is a very complex task which requires a lot of experience. It is important that you understand at least the principles of costing. Why estimate? You may ask;
Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
SECTION 7- STORM SEWER
SECTION 7- STORM SEWER 7.1. STORM SEWERS.... 7-1 7.2. SUMP DRAINS... 7-3 7.3. CATCH BASINS... 7-3 7.4. MANHOLES... 7-4 7.5. STORM SEWER CALCULATIONS... 7-4 7.6. CULVERTS AND BRIDGES... 7-5 7.7. OPEN CHANNELS...
Concrete Waste Management
Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category
DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION MATERIALS CONSTRUCTION REQUIREMENTS
304.06 DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION 304.01 This work consists of furnishing and placing one or more courses of aggregate and additives, if required, on a prepared subgrade.
Your guide to home maintenance. Flat Roofs
Your guide to home maintenance Flat Roofs Your guide to home maintenance is a series of information leaflets that gives you all the information you need to keep your home in tiptop condition. Flat Roofs
PAVEMENT REHABILITATION using BITUMEN STABILISATION STATE OF THE ART
PAVEMENT REHABILITATION using BITUMEN STABILISATION STATE OF THE ART 23 rd Road Pavement Forum Fern Hill Hotel, Tweedie, KZN Wednesday 9 th May 2012 Dave Collings UCD Technology LOUDON INTERNATIONAL THE
Thoughts on Warm Mix Asphalt production (..among other things!)
Thoughts on Warm Mix Asphalt production (..among other things!) Even K. Sund Senior Principal Engineer Roads and Traffic Department, Road Directorate Contents of presentation Brief status for road maintenance
Engineering Policy 146. Severe Weather Management Plans
Engineering Policy 146 Severe Weather Management Plans January 2014 Contents Engineering Policy... 1 1 Policy statement... 1 2 Applicability... 1 3 Context... 1 4 Objectives and benefits... 1 5 Consultation...
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection
The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries
Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Introduction Wastewater of petrochemical industries and refineries contains high amounts of emulsified aliphatic or
SECTION 32 14 00 PERVIOUS INTERLOCKING CERAMIC PAVERS
SECTION 32 14 00 PERVIOUS INTERLOCKING CERAMIC PAVERS Pervious interlocking pavers.doc Note: This guide specification for U.S. applications describes construction of permeable interlocking ceramic pavers