Indiana University-Purdue University Fort Wayne (IPFW)



Similar documents
Indiana University-Purdue University Fort Wayne (IPFW)

Indiana University-Purdue University Fort Wayne (IPFW)

Indiana University-Purdue University Fort Wayne (IPFW)

Indiana University-Purdue University Fort Wayne (IPFW)

University Strategic Alignment Process Report

INTERNAL AUDIT REPORT REVIEW OF PHYSICAL FACILITIES MAINTENANCE AND REPAIRS

ADDENDUM No. 2. RFP No /27, Oakland Maintenance Center Facility Management Services

Facilities Planning, Design & Operations University of Kansas Job Title Definitions Job Family Definition:

Apply at

Facilities Maintenance Standards rev

WYTHEVILLE COMMUNITY COLLEGE

WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT

OCCUPATIONAL GROUP: Facilities Support. CLASS FAMILY: Facility Management CLASS FAMILY DESCRIPTION:

Fund Infrastructure Replacement and Upgrades

Lafayette Parish School System Disaster Recovery Services RFP #15 10

Clean Water: Supply side potable water, not wastewater. Gray Water/Sewage: Wastewater originating from a drain (sink, toilet, urinal).

Business Plan

In Partnership with. TDIndustries Diplomat Drive Dallas, Texas Phone: Fax: Website: TDIndustries.

Planned, Limited Notice and Emergency Outage Guidelines

Data Center Cleaning Services Rev. 0 Bid # Scope of Work

Request for Proposal

EBS Building Operators Standard Operating Procedures BUILDING OPERATION & MAINTENANCE

PROPOSITION M CONSTRUCTION PROJECT MANAGER

SUPPLY CHAIN SERVICES

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion

Model Safety Program

Bridges & Culverts Condition by Quantity

Guam Fire Department. A Report to Our Citizens

STATE OF NEVADA Department of Administration Division of Human Resource Management CLASS SPECIFICATION

GENERAL SERVICES AGENCY GOALS, OBJECTIVES AND ACCOMPLISHMENTS FISCAL YEAR

R000. Revision Summary Revision Number Date Description of Revisions R000 Feb. 18, 2011 Initial issue of the document.

HOUSTON ELEMENTARY SCHOOL

Facilities Operations Customer Service Standards WORK ORDER PRIORITIES

Water Main Breaks After Normal Operating Hours

Housing Division. Mission. Major Functions and Activities. Goals. Objectives. Budget Highlights. 147 FY Adopted

HEATING VENTING AND AIR CONDITIONING (HVAC) SUBCONTRACTING SERVICES FOR THE MACON COUNTY HOUSING DEPARTMENT

Road to Recovery. John G. Forney Executive Director, Facilities/Maintenance and Operations. February 24, District Facts

Mold Management Plan Operations & Maintenance

POLICY AND PROCEDURES OFFICE OF MANAGEMENT CONFERENCE ROOM MANAGEMENT. Table of Contents

How To Improve Your Business

Information Technology Report MTA IT Department. MTA Finance Committee June 2015

APPENDIX III: EMERGENCY SUPPORT FUNCTION 3 - PUBLIC WORKS AND ENGINEERING

Planned and Emergency Utility Outage Guidelines

Handout 1.3 Potential Candidates for Essential Records Status

Refrigerant Compliance Policy

The city of Milwaukee s Sample Preventative maintenance manual for Electronically monitored boilers

How To Plan For A Community College

Functional Title Classification FLSA Status Reports To Team Purpose

Management Company Proposal RFP. Chapman Place Condominiums Date: 6/24/12

Water Main Break During Normal Operating Hours

Energy Efficiency Operations & Maintenance Plan August 25, 2010

Hydraulic Safety Program

REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY:

Wellesley College Asbestos Management Program

Emergency Restoration Specialists. Water Damage TIP SHEET. For Homeowners

Commercial Real Estate Broker bidding Services - Which One is Best

Initiate Rail Yard Infrastructure Rehabilitation Project

Migration Planning Guidance (Draft)

A cure for water damage in real estate

Leadership Competency Self Assessment

LICENSE CATEGORIES. (2) A demolition contractor class II may demolish any building not more than three stories in height.

Enhancements to Streamlined (k) Limited Repair Program

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas Phone: (830) Fax: (830)

bout your house before you start Renovating Your Bathroom

Campus Operations Service Level Agreement

Draft Document STATE OF MICHIGAN. SACWIS Planning Department of Human Services Strategic Implementation Plan: Project Staffing

AGENDA STAFF REPORT. Budgeted: Yes Current Year Cost: $695,000 Annual Cost: N/A

EXHIBIT A SCOPE OF WORK

Work Practice: Wastewater Collection System Maintenance Plan Potential Safety Hazards

Board of Regents Meeting June 16-17, 2005 Agenda Item #11 Arizona State University EXECUTIVE SUMMARY Page 1 of 5

HOWARD UNIVERSITY. I. Policy Statement. II. Rationale. III. Entities Affected by the Policy. IV. Definitions. Policy Number:

Critical Systems Guidelines

University of Northern Iowa Facilities Services

Chris Clement 701 Bayou Lane Thibodaux, LA

ASBESTOS MANAGEMENT PROGRAM

TOWN OF TRUCKEE. Receives general direction from the Director of Public Works/Town Engineer.

Orange County Public Schools Operations Division 2014 Florida Sterling Award Application

Strategic Plan FY FY July 10, 2014

Roof Maintenance Scope of Work

Lauren Sundararajan, CFE, Internal Audit Manager

WHITE PAPERS. Process Safety Management

Dignity through Work. Dignity through Work. Accredited by CARF The Rehabilitation Accreditation Commission

BOMA BESt Assessment Overview

Service Level Agreement (SLA) Education and E & O

OGS LIMITED ASBESTOS & LEAD SURVEY REPORT

Repair Project for April 7, 2009

Compulsive Hoarding Toolbox

Glenwood Telephone Membership Corporation. Broadband / Network Technician POSITION DESCRIPTION

Renovation instructions

Cx for Enhanced Healthcare Project Delivery. Presentation Format. Project features and timeline

THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 14-MC-2194 as follows:

County Council Special Joint Session August 27, :00 P.M.

FACT SHEET Review of Facility Conditions at the Groton, Connecticut, Main Post Office

Real Property Portfolio Optimization

Coosa County School System Request for Proposal Hosted VOIP Solution

ALACHUA COUNTY FLEET MANAGEMENT

State of Montana. Office Of Public Instruction IT Strategic Plan Executive Summary

GENERAL SERVICES ADMINISTRATION Federal Acquisition Service Complete Facilities Maintenance And Management Services SCHEDULE PRICE LIST

Business Plan: Fleet Services

CAPITAL IMPROVEMENT PROGRAM (CIP) MANAGEMENT & TRACKING PROCESS, SYSTEMS, & PEOPLE APPROACH

Transcription:

Program Summary Task Force: Thank you for the work that went into this report. Through the USAP process, we are working to create at IPFW a culture of continuous improvement, and we think that setting specific and measurable goals is an important part of getting individuals and units at IPFW to think differently about planning and the future. #1: Mission - How does your unit support the mission of the university? This may include your mission and vision statements. (no more than 200 words) Question: Mission - How does your unit support the mission of the university? This may include your mission and vision statements. (no more than 200 words) Operations, Maintenance and Building Services is committed to quality and timely service. Our mission is to provide support for the physical environment which enables IPFW to achieve its objectives in instruction, research, and public services. This will be achieved by consistent cleaning, repair and preventative maintenance of the buildings and campus equipment. #2: Accomplishments - Please list significant accomplishments from the last three years as they align with Plan 2020 goals Question: I. Foster Student Success - Please list significant accomplishments from the last three years as they align with Plan 2020 goal area I: Foster student success. Saniglaze Process completed on Kettler restroom floors. Saniglaze Process begun on Neff restroom floors. Initiated full service contract with an elevator maintenance company for better service which will provide better budget control. Initiated PM Service contract on emergency generators for better reliability. Re-organization of the Building Services management staff (created 3 additional Supervisor positions). Training completed on Schooldude PM Work Order System. Question: II. Creation of Knowledge - Please list significant accomplishments from the last three years as they align with Plan 2020 goal area II: Promote the Creation, Integration, and Application of Knowledge. N/A 4/28/2015 7:46:22 AM Prioritization Plus Page 1

Question: III. Regional Hub - Please list significant accomplishments from the last three years as they align with Plan 2020 goal area III: Serve as a Regional Intellectual, Cultural, and Economic Hub for Global Competitiveness. N/A Question: IV. - Create a Stronger Univ - Please list significant accomplishments from the last three years as they align with Plan 2020 goal area IV: Create a Stronger University through Improving the Support of Stakeholders and the Quality and Efficiency of the Organization. Saniglaze Process completed on Kettler restroom floors. Saniglaze Process begun on Neff restroom floors. Initiated full service onctract with an elevator maintenance company for better service which will provide better budget control. Initiated PM Service contract on emergency generators for better reliability. Re-organization of the Building Services management staff (created 3 additional Supervisor positions). Training completed on Schooldude PM Work Order System. Question: Other Accomplishments - Please list any other significant accomplishments from the last three years that do not align with Plan 2020. N/A #3: Accreditations - Program specific accreditation and status Question: Accreditations - What program-specific accreditations and status do you have, if any? We have no specific accreditations in our department, however we are usually involved in other department accreditations where the physical facilities might be involved during the process, either for specific requirements of the facilities or physical changes on the buildings or equipment that are required for accreditation. We do however, have a licensed Plumber, several licensed Electricians, and a certified refrigerant recovery technician. Question: Constraints/Benefits - How do these accreditations constrain or benefit the work of your unit, if applicable? 4/28/2015 7:46:22 AM Prioritization Plus Page 2

This may constrain us somewhat as we need to provide labor for another department which I cannot back charge in our current system to re-coup costs. #4: Laws and Mandates - Federal and state laws or mandates that your unit addresses Question: Federal and State Laws - What federal and/or state laws or mandates do you address, if any? Meeting requirements and compliance of: American Disabilities Act; IDEM (Indiana Dept. Environmental Management) Elevator Safety regulations, testing, certification OSHA (Occupational Safety Health Administration) regulations Back Flow Preventer certification Boiler operating Certification & Pressure Vessel regulations Boiler Emissions regulations Safety Pressure relief valve regulations Fire & Safety regulations Fire Hydrant flushing and logging Hazmat regulations; PPE regulations Chemical Inventory regulations Lock-out Tag-out procedures manual for emergency shut-down of equipment Hoists inspection & Certification Bucket truck inspection certification Refrigerant Reclaiming and logging regulations Question: Constraints/Benefits - How do these federal and state laws or mandates constrain or benefit the work of your unit? These regulations and compliance each require staff for labor and paperwork submission to government agencies whether federal, state, or local regulated, inspections, fee submissions, materials and money for fees and repairs as deemed necessary by the governing boards. Also, new regulations can result in additional cost and time as required each year. #5: Inefficiencies - Activities that you spend resources on inefficiently or in ways that do not support the mission. Question: Inefficient use of resources - On what activities, if any, do you spend resources (money, time, people, etc.) inefficiently or in ways that do not support the mission of your unit or the university? List as many as apply. 4/28/2015 7:46:22 AM Prioritization Plus Page 3

-Scrap and salvage process; storing and moving process; but mostly the process for evaluation and identifying what is salvage, what is junk, and what is valuable for future use by University. - Maintenance of buildings that are not funded by our Repair & Re-habilitation funding formula or budget; (ie. Crooked Lake Property; Child Care Facility; & Lafayette Medical Center). -Mastodon involvement (moving mastodons from place to place; parade floats, drivers for parades; space for working on floats, etc.). #6: IR and Budget Review - Review of your department profile and budget Question: Contextualize IR data - Upon review of your IR Department Profile (for academic units) and FY 14-15 Budget information, are there any data you want to correct or contextualize? To view your profile or budget visit the Office of Institutional Effectiveness website: http://www.ipfw.edu/offices/ir/profiles/ N/A Task Force: #7: Goal One - In this criterion, you will identify your unit goals and tell us Page 4

1. Comment on the specificity of the goal: Goal is very specific to location and maintenance 2. Comment on the goal's measures: Two specific restrooms were listed for this year. Question: Is this typical for a year? (Understanding that the size and condition of the restroom needing maintenance will vary.) 3. Comment on the unit s ability to achieve the goal (include a consideration of the departmental profile and budget data: Yes However concerns have been raised about the increase of buildings needing this type of maintenance. 4. Comment on the goal s relevance: Yes relevant 5. Comment on the timeline of the goal: Ten years is listed as the timeline to complete the project. Question: At the conclusion of the 10 years would it be time to begin the process again? And how can/will you budget for these kinds of recurring maintenance costs, especially in light of the expanding number of buildings needing maintenance? Possible opportunities for collaboration or suggestions for addressing a gap: Goal #1-Complete Saniglaze process on restroom floors in all campus Buildings. Saniglaze is the process of removing all of most of the grout between the ceramic tile that is damaged or stained and replaces and seals the grout to create a sanitary surface that can be cleaned using normal custodial materials and methods. The process is labor intensive and is normally completed during semester breaks. The process includes an annual evaluation and re-sealing treatment. I Foster student success IV Create a stronger university through improving the support of stake holders and the quality and efficiency of the organization. Page 5

High Continue w/saniglaze Deep Cleaning Process on a couple of restrooms each year. Identify and complete 2 restrooms with Dial One this year in Neff 324 & 356. Yes. N/A Cost escalation of service contracts as we add more restrooms the annual service costs increases. Could take 10 years to complete. Task Force: #8: Goal Two - In this criterion, you will identify your unit goals and tell us Page 6

1. Comment on the specificity of the goal: Yes it is specific to maintenance of roofs and roof structures with focus on preventative maintenance. Question: Is preventative maintenance not within the realm of IPFW expertise and therefore an outside vendor is warranted? Suggestion: In wording this goal, we would recommend you change Initiate to something more along the lines of Put in place or Enter into a contract 2. Comment on the goal's measures: Measureable goal is to have preventative maintenance in program in place in two years. Suggestion: Expand your metric to have check points for where you are in your progress for meeting with, choosing and developing a contract with a vendor. Question: How often will campus roofs be visually inspected for potential issues? 3. Comment on the unit s ability to achieve the goal (include a consideration of the departmental profile and budget data: Yes additional funds are requested. Question: Is the $50,000 to $75,000 per year budget item for this preventative maintenance, or is it also expected to cover any preventative repairs? 4. Comment on the goal s relevance: Yes relevant 5. Comment on the timeline of the goal: Two years for bids and a contract to be issued seems a protracted period of time. Question: Is this industry standard or do roofs and preventative maintenance normally take that much time? Are there any other issues influencing this length of time to enter into a preventative maintenance contract? Possible opportunities for collaboration or suggestions for addressing a gap: Goal # 2 - Initiate a more specified Roofing PM (preventive maintenance) Program with an outside roofing vendor. This program will provide a regular schedule for condition assessments and a protocol for intermediate repair to older roofs to mitigate roof leaks until replacement of the membrane can be funded and scheduled. Page 7

I Foster student success IV Create a stronger university through improving the support of stake holders and the quality and efficiency of the organization. High Identify competent contractor; set up and initiate a PM contract on all campus roofs resulting in a reduction of the number of roof leaks. Identify plan specifics; meet with qualified vendors; choose a vendor bid; and issue a contract. No. May need some additional funding of approximately $ 50-$75K. Contractor schedules do not always match with our needed schedule. The main issue will be funding. Could take 2 years to complete. Task Force: #9: Goal Three - In this criterion, you will identify your unit goals and tell us Page 8

1. Comment on the specificity of the goal: Upgrading building control systems 2. Comment on the goal's measures: It doesn't seem as though there is a specific plan or prioritization for what upgrades are needed. Question: In year 1, where would you begin with upgrades? The metric is to assess what has been done, but what would be the prioritization for campus? 3. Comment on the unit s ability to achieve the goal (include a consideration of the departmental profile and budget data: This is stated as a goal for which funding does not currently exist. Question: Are there steps that can be made front end without the whole system being done, or does this need to be 100% revamp across campus? Can this be funded through the current renovations building $ or does this need to come from another source? 4. Comment on the goal s relevance: Yes relevant 5. Comment on the timeline of the goal: 5-10 year plan seems impractical in that at the end of that time the new system will be out of date. Or maybe they have a longer life? Question: Since this is an issue across the country on campuses, how have other campuses completed upgrades or just maintained competitive technology? Are there resources or insights others can provide? Possible opportunities for collaboration or suggestions for addressing a gap: Many campus constituents would be helpful in looking at how and what to focus on for these upgrades. Some may have special needs for their building environments. Goal # 3 - Upgrade building control system and train staff on system. Much of the current system is an old DOS based system. Components and support are no longer available. A new Direct Digital Control system (DDC) for all campus buildings is needed.. Question: Page 9

Priority Level - Is the unit goal high, medium, or low priority? Limit your high-priority High 3 rd year- 1st year- upgrade on front end of system through Performance Contract. 2 nd year- get staff trained on system. continue upgrade of building specific controls as funding is available. 1st- access what upgrades have been completed. 2nd- implement staff training and document for each staff member necessary. 3rd- measure number of service calls/complaints and compare to the current calls/complaints. Should notice a drop in the number if we are making progress toward desired goals. No-will need some additional funding. Will need some additional funding. Service Contract with competent and responsive vendor; the right training for our staff which will reduce our reliance on an outside vendor. The main issue will always be funding for the upgrades to keep the system current as technology advances. This is a 5 10 year plan that, as with all computer based systems, will have to be upgraded or changed as technology advances to keep a functioning system on campus. This is vital to achieving energy efficiency and resulting in utility savings. Page 10

#10: Goal Four - In this criterion, you will identify your unit goals and tell us #11: Goal Five - In this criterion, you will identify your unit goals and tell us Page 11

#12: Goal Six - In this criterion, you will identify your unit goals and tell us Page 12

#13: Goal Seven - In this criterion, you will identify your unit goals and tell us how they align to Plan 2020, how they are measured, and what resources Page 13

#14: Goal Eight - In this criterion, you will identify your unit goals and tell us Page 14

#15: Goal Nine - In this criterion, you will identify your unit goals and tell us Page 15

#16: Goal Ten - In this criterion, you will identify your unit goals and tell us Question: Page 16

Challenges - What challenges, other than financial resources, might affect your Page 17