1 Purchasing Department 530 Water Street Oakland, CA March 6, 2015 ADDENDUM No. 2 RFP No /27, Oakland Maintenance Center Facility Management Services This Addendum modifies the original RFP Documents for the above RFP. Acknowledge receipt of this addendum in the space provided on the RFP Acknowledgement and Signature Form (Attachment 3). Failure to do so may disqualify your proposal. The following corrections have been made to the above referenced RFP: A. Clarification: Under Section IV. Submission Requirements, Item 5 Proposed Costs, the intent of all-inclusive monthly fee is only for services that are SELF PERFORMED. Contractor is expected to employ staff who can diagnose, operate, repair, monitor, and maintain in good working order and condition the mechanical, plumbing, electrical systems, and other equipment related to building and facility systems. B. Delete/Correction: Under Section IV. Submission Requirements, delete section entitled 5. Proposed Cost in its entirety and replaced with the below language: 5. Proposed Costs: Provide your proposed cost structure for providing those services specified in Section II Scope of Services. The Contractor must provide the annual cost for providing the needed services and the not-to-exceed cost for the five (5) years. The Port intends to pay the Contractor for all services required under the agreement based on a single, all-inclusive monthly fee that will encompass all of the Proposer s SELF PERFORMED costs (including supervising any subconsultant) necessary to perform work specified in this RFP. The all-inclusive monthly fee should include a complete breakdown of costs in accordance with the RFP. The Contractor should submit a complete cost proposal including work breakdown for both the one year not-to-exceed cost and the notto-exceed five (5) year cost. On a separate sheet, provide a list of services that are not typically self-performed and are contracted out by your firm. There are no other changes to RFP No /27. The following questions were submitted by the deadline and are answered in this addendum: 1. Question: Who currently manages the Oakland Maintenance Center Facility? Answer: Ensminger Consulting 14-15/27 Addendum No. 2 Page 1 of 7
2 2. Question: What is the current monthly cost for providing Management Services at the Oakland Maintenance Center and how many employees are under the current contract? Answer: The Port through this competitive RFP process is looking to decrease its Facility Maintenance cost. The current monthly cost is approximately $42,000.00, including reimbursable expenses. There are two on-site employees Monday-Friday each working 8 hours covering the hours of 6:00 AM to 6:30 PM. 3. What is the estimated annual budget for maintenance of the OMC facility? Answer: Approximately $500, Question: Please describe the current responsibilities of the current contractor and what services are being contracted out. Answer: Please refer to RFP Section II, Scope of Services, A. Typical Responsibilities and B. Compensation. It is expected that on-site employees will undertake maintenance, minor repairs and replacements to the best of their abilities and subconsultants/contractors will be used for more significant work. It is anticipated that Fire System servicing, fire bottle servicing, and significant plumbing, HVAC, roofing, mechanical, or electrical repairs will be undertaken by subconsultants/contractors and that these costs, along with the costs of any required parts and materials used by on-site staff or subconsultants will be reimbursed monthly. 5. Question: Is the copy of the OMC Mandatory Pre-proposal attendees available? Answer: Yes. A copy of the sign in sheet is posted on the Port s website. 6. Question: Will bonding be needed as part of the submission requirement of the project? How do we complete forms 4-C and 4-D since we don t know what unpredictable issues the building may have in the future? Are these just to fill out monthly for whoever wins the contract? Is there a specific cost breakdown sheet for having an employee on site every day? Answer: Bonding is not required for a submission. Attachment 4-C and D are required after the contract has been awarded and commencement of services. There is no cost breakdown sheet for on-site employees. Proposers are to submit their proposed cost structure as part of the response to this RFP. (See the Proposed Cost section under Section IV. Submission Requirements) 7. Question: How does OMC expects Proposers to complete mandatory ATTACHMENT 4-A and calculate associated costs, percentage of repairs, and identify sub-contractors and their trades without providing any information on sizes, nature and trades of repairs/service/projects. Answer: Proposers are expected to list the team member s information (prime and subs), and the nature and estimated percentage of the work to be performed by the whole team; the percentage of the work must add up to 100%. No need to provide specific detail information on sizes, trades of repairs/service/projects to Attachment 4-A. 8. As a Proposer on the OMC Maintenance contract, before submitting our proposal, can we review the OMC Maintenance and repair records for the last 2-3 years and the first quarter of 2015 to get an idea of the nature, frequency, scope and costs of work and trades involved? Answer: No, OMC maintenance and repair records are not currently available. 9. Question: Are latest records of Asbestos Containing Materials within the OMC facility maintained and available for review by the Proposer? 14-15/27 Addendum No. 2 Page 2 of 7
3 Answer: Yes, these records are available and will be provided to the successful Proposer. 10. Question: Are hazardous waste containers available on site by the Port of Oakland? Answer: No, other than a Port box used for discarded fluorescent lamps, there are no other hazardous waste containers on-site. 11. Question: Are there updated As Built drawings, updated and existing floor plans, specification and MSDS data of all installed materials used and fixtures installed in the building maintained and are they available for review by the Proposers? Answer: All available drawings will be provided to the successful Proposer. 12. Question: The fire sprinkler system is connected to the FCI panel with 393 Sprinkler devices. Are the three-(3) separate floors of OMC tenants on a separate deluge system? Are there plans available for the system? Answer: The A Core offices are on a domestic sprinkler system. No plans are available. 13. Question: Are the three (3) tenants floors on a separately-zoned fire protection system? Are there plans available for the system? Answer: All floors are zoned and identified separately on the Fire Panel. 14. Question: The fire suppression system requires periodic inspection/testing that has costs associated with it basis as a Proposers do we have access to these records? Answer: These records are not available to the Proposers as this will be a reimbursed expense. 15. Question: Fire extinguishers require periodic service that has costs associated with it as a Proposer, do we have access to the service records? Answer: These records are not available to the Proposers as this will be a reimbursable expense. 16. Question: Of the thirteen (13) building restrooms, how many of these restrooms are adjacent to the occupied spaces on the First, Second, and Third occupied floors. Are there plumbing and mechanical plans, fixtures/flushing mechanism spec details, sewer lines, drain lines etc. drawings available for the system? Answer: Eleven (11) restrooms are adjacent to occupied spaces. All available drawings will be provided to the successful Proposer. 17. Question: Are the costs for the supplies used in the restrooms reimbursed on usage basis or should these estimated costs be included in the cost proposal? If the estimated costs are to be included in the proposal as a Proposer, do we have access to the historical costs data? Answer: The cost of janitorial supplies and services if self-performed should be included in the proposal. Currently the supplies are included in the $2, per month third party janitorial services reimbursement. 18. Question: Is there a weekly (or monthly) collection of the trash from the OMC site? Or will the successful Proposer need to take it to the City dump weekly? Answer: Currently Waste Management removes collected trash from the OMC at a reimbursed monthly cost of $ /27 Addendum No. 2 Page 3 of 7
4 19. Question: Will any of the occupied area's floor carpeting need to be shampooed or tile floors waxed on a weekly schedule? What is the scheduled expectation? Answer: Currently carpets are vacuumed weekly by the janitorial service and tile floors are waxed as needed by on-site employees. A similar schedule is expected to be maintained. 20. Question: Are the two (2) generators on site, in good working order, and operated weekly and serviced monthly by any existing maintenance contractor as a Proposer, do we have access to such maintenance/repairs & frequency records? Answer: Both generators are operable but are not currently permitted so they may not be used. 21. Question: Emergency lights require periodic service that has costs associated with it as a Proposers, do we have access to the service/repair records? Answer: There are no repair records available pertaining to the emergency lights. 22. Question: Sample Hot water recirculation pump requires periodic service that has costs associated with it - as a Proposer, how do we have access to the service/repair records? Answer: When this pump fails it has been replaced by on-site employees and the cost of the pump was reimbursed. 23. Question: The roofing membrane on the OMC main structure, near the exhaust fan unit, was very worn. There are obvious areas of water leaks. Is it the Port's intention to repair or replace any areas of this roof within the next three (3) years? Are there any records of recent and/or past repairs? Any warranties in place? Answer: There are no plans to replace this roof and there are no warranties in place. It is intended for on-site personnel to undertake all minor repairs and Port personnel will undertake more serious repairs. 24. Question: The leaking restroom floor drain on the third floor, adjacent to a tenant office space was scheduled to be replaced? Has a new floor drain been already installed? Answer: The floor drain has been repaired and the tiles have been replaced. 25. Question: Are all five (5) of the roof sump pumps presently in working order? Answer: Yes. 26. Question: How many people are currently employed on site from 6:30 A.M. to 6:00 P.M by the present OMC Maintenance Contractor? Answer: See Question #2 response. 27. Question: Is the Water leak in the million gallon deluge tank going to be repaired in the next three- (3) year period? What is the extent of the water leakage from the Deluge Water Tank and what are the plans of OMC to address this issue? Answer: There are no plans to repair the deluge tank. The water level has reached the level of the fracture /27 Addendum No. 2 Page 4 of 7
5 28. Question: Are all 176 Electrical Panels, throughout the OMC facility, operating and up to the present electrical code standards? Are there any records available of their service and upgrades? Answer: All panels are operational and met current code when installed. No records are available. 29. Question: Of the 94 HVAC units installed at the building how many are in use and would require service, maintenance and repair? Is the manufacturer technical specifications, structural plans and calculations etc. available? Answer: There are four units typically in use. All available information will be provided to the successful Proposer. 30. Question: HVAC units require periodic service that has costs associated with it as a Proposer, do we have access to the service/repair records. Answer: Service and repair records are currently not available. The Contractor should have a general knowledge in maintaining HVAC systems. Any major service will require pre-approval of repair from the Project Manager and will be reimbursed as part of the monthly reimbursement expense. 31. Question: Are the Water Fountains, adjacent to the occupied spaces, on the first through third floors operational? Answer: Yes. 32. Question: Of the two (2) Elevators, one is out of service. Is it the Port's intention for this elevator to remain out of service? Or is it to be repaired under this OMC contract? Answer: The inoperable elevator is expected to remain out of service. 33. Question: Elevators require periodic service that has costs associated with it as a Proposer, do we have access to the service/repair records. Answer: No service records are currently available. Any major service will require pre-approval from the Project Manager and will be reimbursed as part of the monthly reimbursement expense. 34. Question: The Port of Oakland's scope of service Typical Responsibilities, Section A, requires a very knowledgeable on-site technician to maintain the facility boilers, refrigeration pumps, HVAC equipment, Plumbing lines/fixtures covering most of 23 items, etc. Does the Port expect the daily building attendant to be a qualified Mechanical Engineer, or will the Port accept the attendant to be a maintenance technician/manager with a cell phone? Answer: The Port wants the most qualified on-site employees as possible, however, it is not required that they be certified Mechanical Engineers. 35. Question: Will the successful low Proposer have to pay for parking for company trucks? Or will parking spaces for company vehicles be provided, i.e. parking passes, etc.? Answer: Free parking will be provided for on-site employees and any service vehicles. 36. Question: How long does it take for the Port to process payment on service/repair calls? Answer: Generally within 30 days upon receipt of required documentation /27 Addendum No. 2 Page 5 of 7
6 37. Question: What specific items are to be included in the "all-inclusive monthly fee"? A. Total maintenance manpower and management costs including off-shift call outs? Answer: Yes, to be included in all-inclusive monthly fee. B. Full cost of five day a week Janitorial work and all cleaning and paper supplies? Answer: The Proposer can choose to provide janitorial service with on-site staff and include it in the monthly fee or use a third party janitorial service and include it as a reimbursable expense. C. Cost for removal of all tenant generated trash and recycle materials? Answer: Yes, to be included unless provided by a third party janitorial service as a reimbursable expense for its removal to the trash and recycling bins. Waste Management will remove trash and recycling from the bins as a reimbursed expense. D. Cost for the replacement of all lighting, lamps and ballast? Answer: Any major service will require pre-approval from the Project Manager and will be reimbursed as part of the monthly reimbursement expense. E. Cost for routine Fire System Service and emergency call out? Answer: Any major service will require pre-approval from the Project Manager and will be reimbursed as part of the monthly reimbursement expense. F. Cost for annual and 5 year fire bottle servicing? Answer: Any major service will require pre-approval from the Project Manager and will be reimbursed as part of the monthly reimbursement expense. G. Some level of estimated call out for major plumbing repairs? Answer: Major plumbing will require pre-approval from the Project Manager and will be reimbursed as part of the monthly reimbursement expense, but all minor repairs should be included in all-inclusive monthly fee. H. All costs associated with emergency lighting and emergency exit sign repairs? Answer: It is expected that these repairs will be conducted by on-site staff and the cost of parts and materials will be reimbursed. I. Cost of removal of weeds in close proximity to the facility? Answer: Yes, to be included in all-inclusive monthly fee. J. Repairs to minor roof leaks that could be accomplished with assigned personnel? Answer: Yes, to be included in all-inclusive monthly fee. K. Additional Manpower costs for assisting in other than normal activities, such as Urban Shield, Sherriff training activities, Charter or VIP arrivals? 14-15/27 Addendum No. 2 Page 6 of 7
7 Answer: Yes, up to 4 hours per month. Special requests, in aggregate, exceeding 4 hours per month will be reimbursed. 38. Question: If some are not to be included in the all inclusive pricing in question 37, how will they be reimbursed? Answer: The Port shall reimburse the Contractor the cost of the approved subconsultants which is subject to pre-approval by the Project Manager. Invoices for reimbursable costs will be submitted to the Port on a monthly basis. All invoices shall be documented with receipts and any other customary supporting documentation. 39. Question: Is there a cost of money mark-up that will be allowed (15 to 18%) for subcontractor payments for approved, outside the scope, work required? Answer: No, however reasonable expenses such as miscellaneous parts, supplies, and/or materials required to maintain the OMC s machinery, equipment and process will be reimbursed upon approval of the Project Manager. 40. Question: RFP states payment at 30 days of invoice submittal. Is there a percentage up charge if the Port fails to make payment within the 30 day period? If so, is it 10% incremental fee payment for failure to meet the contract by the Port? Answer: No, late fees will not be accepted. The Port will work with the supplier or contractor to make sure payment is on-time. 41. Question: Can you provide a breakdown of the 393 devices that are tied into your FACP. Does this include the number of audible devices as well? Answer: No, the panel will show an area and then personnel must locate the faulting unit. 42. Question: There are 15 sprinkler control riser, but many are de-commissioned. How many are active, and which area s/building do you need a certified company to inspect annually and quarterly? Answer: Any major service will require pre-approval from the Project Manager and will be reimbursed as part of the monthly reimbursement expense. 43. Question: During the walkthrough, I noted 4 private hydrants that would need testing annually, can you confirm this count? Answer: Fire hydrants outside of the building are maintained by the Port. 44. Question: Are as built and floor layouts as-is available to calculate projected cost associated with maintenance of the area? Answer: The occupied spaces are the Ground, 2 nd, and 3 rd floors of the A Core. See representative plans attached. We are providing these plans without any guarantee of accuracy as they were provided to us by other parties. 45. Question: What are the vacant and occupied areas of the space portion? Answer: See Question #44 response. See representative plans attached. We are providing these plans without any guarantee of accuracy as they were provided to us by other parties /27 Addendum No. 2 Page 7 of 7
8
9
10
11
12
Facilities Maintenance Standards rev 9-1-2015
Facilities Maintenance Standards rev 9-1-2015 Purpose The purpose of these standards is to outline the minimum requirements for maintaining state owned facilities and infrastructures in a manner that will
THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 14-MC-2194 as follows:
Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 14-MC-2194 ADDENDUM NUMBER ONE January 24, 2014 THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM
STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT
STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT The South Carolina Code of Laws (Title 27, Chapter 50, Article 1) requires that an owner of residential real property (single
FIRE ALARM SYSTEM SUBMITTAL CHECKLIST AND APPLICATION
PERMITS AND INSPECTIONS FIRE ALARM SYSTEM SUBMITTAL CHECKLIST AND APPLICATION 911 Assigned PROJECT LOCATION Subdivision: Lot: Blk: Sec: PROJECT New Construction Addition/Remodel Demolition Other: Number
REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT
REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT ATTACHED ARE THE REQUIREMENTS FOR OBTAINING A BUILDING PERMIT INCOMPLETE SUBMISSIONS WILL BE RETURNED IN THEIR ENTIRETY -- NO EXCEPTIONS!!
SUPPLIER COMPLIANCE PACKAGE
SUPPLIER COMPLIANCE PACKAGE GOODS PROVIDERS RELEASE DATE: October 2011 Dear Supplier: In order to promptly register your company as a supplier to Brun-Way Highways Operations Inc. (Brun-Way) and to ensure
CSC-DIVISION 1-MASTER SECTIONS Description
CSC-DIVISION 1-MASTER SECTIONS Description 01 11 00 Summary of Work by Consultant 01 12 00 Multiple Contract Summary by Consultant 01 14 00 Work Restrictions see below 01 21 00 Allowances by Consultant
Number Northern Arizona University Facility Services Section Page. Effective April 1, 2011
Facility Services Section Page Recharge Services, Maintenance and Construction PURPOSE 1 of 6 The purpose of this policy is to set forth standards for chargeable services for maintenance and construction
Roof Maintenance Scope of Work
Roof Maintenance Scope of Work Reviewed By: Approved By: Version 3.0 Date 08-09-07 Author K. Vandenbussche 1 BACKGROUND The Integrated Service Provider s program will provide superior on-site equipment,
Pricing of Construction Contract Change Order Documentation
The contract language contained in this Exhibit will supplement and take precedence over all other change order pricing contract provisions in the Contract Documents provided by the Owner, Design-Builder
Contractors Rules & Regulations
Contractors Rules & Regulations November 2, 2015 (1) Pre-Construction Meeting Pg. 2 (2) Permits and Licensing Pg. 3 (3) Union Affiliated Guidelines Pg. 4 (4) Temporary Provisions Pg. 5 (5) Construction
OFFICE OF PERSONNEL MANAGEMENT ATLANTA OVERSIGHT DIVISION ATLANTA, GEORGIA
OFFICE OF PERSONNEL MANAGEMENT ATLANTA OVERSIGHT DIVISION ATLANTA, GEORGIA CLASSIFICATION APPEAL DECISION Under section 5112(b) of title 5, United States Code Appellant: [the appellant] Position: Engineering
Maintaining Fire Protection Systems
Maintaining Fire Protection Systems Fire continues to be a major threat to your business and your personal safety. Each year several thousand people are injured or killed by fires and billions of dollars
ADDENDUM NO. 1 TO THE BIDDING DOCUMENTS. HVAC SERVICE AND MAINTENANCE Saint Clair County MidAmerica Saint Louis Airport.
ADDENDUM NO. 1 TO THE BIDDING DOCUMENTS DATE: May 6, 2016 HVAC SERVICE AND MAINTENANCE Saint Clair County MidAmerica Saint Louis Airport BIDS CLOSE: May 12, 2016, at 2:30 p.m., Local Time TO ALL BIDDERS
CITY OF BELL PROFESSIONAL CONSULTING SERVICES FOR ROOF REPAIRS TO CITY OWNED FACILITIES
CITY OF BELL 6330 PINE AVENUE BELL, CA 90201 PH: (323) 588-6211 FAX: (323) 771-9473 CITY OF BELL PROFESSIONAL CONSULTING SERVICES FOR ROOF REPAIRS TO CITY OWNED FACILITIES I. INTRODUCTION City of Bell
9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org. Incidental improvements: improvements that do not qualify as minor or
9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org Construction Permitting Guidelines for Businesses Moving into Existing Buildings in Culver City If your business is moving into an existing
RULES AND REGULATIONS CONTRACTOR WORK
RULES AND REGULATIONS CONTRACTOR WORK CARILLON 227 West Trade Street Suite 330 Charlotte, NC 28202 The following Rules and Regulations shall govern the operation of contractor work in the Building. For
Appendix 11. Property Maintenance Guidelines
Appendix 11. Property Maintenance Guidelines Purpose of Property Maintenance The objective of property maintenance is to contribute to the achievement of the property owner s goals through appropriate
Quality Assurance Calendar Maintenance Responsible Party Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Generator fire up Generator 1 hour load test Generator 4 hour load test Fire extinguisher integrity checks Fire extinguisher certification Fire drills Fire door integrity Fire signage lighting Fire alarm
POSITION OPENING. Interested candidates should submit a resume and a County Employment application to:
POSITION OPENING POSTING DATE: April 1, 2013 DEPARTMENT: POSITION: HOURS: Maintenance Maintenance Coordinator (40 hr/wk) GRADE: 8 HOURLY WAGE: $13.769 - $14.303 APPLICATION DEADLINE: April 5 2013 Interested
CONTRACTORS POLLUTION LIABILITY APPLICATION
CONTRACTORS POLLUTION LIABILITY APPLICATION SECTION I: APPLICANT NAME OF APPLICANT ADDRESS CITY STATE ZIP TELEPHONE WEB ADDRESS DATE Company is an: INDIVIDUAL PARTNERSHIP CORPORATION JOINT VENTURE OTHER
Core & Shell Construction. Rules and Regulations
Core & Shell Construction Rules and Regulations 1. Protection: During the construction Contractor shall endeavor to protect all areas of work from damage caused by workers, weather or equipment. 2. Permits
BUILDING PERMITS. Santa Rosa County Building Inspection
BUILDING PERMITS Calculation Based on Under Roof Area New Construction First 5,000 sq. ft. Each additional hundred sq. ft. up to 10,000 sq. ft. Each additional hundred sq. ft. up to 25,000 sq. ft. Each
6. Q: A: No, however it is anticipated that the PM firm will need to understand FEMA and HUD CDBG compliance as part of the scope of services. 7.
HHC Program Manager Request for Proposals (RFP) for Consulting Services Project # 6161 Questions & Answers Date: October 1, 2015 1. Q: In CR#2017007 would schedule outsourcing be considered as an appropriate
How To Install An Overhead Sewer
Village of Broadview Flood Control Assistance Program Village of Broadview 2350 S. 25 th Avenue, Broadview, IL 60155 INTRODUCTION The Village of Broadview is served by combined sewers which carry sewage
CITY OF LOS ANGELES CALIFORNIA
MERCEDES M. MÁRQUEZ GENERAL MANAGER PUBLIC COUNTERS 3550 WILSHIRE BOULEVARD, 15 TH FLOOR LOS ANGELES, CA 90010 3415 SOUTH SEPULVEDA BOULEVARD, SUITE 150 LOS ANGELES, CA 90034 8475 SOUTH VERMONT AVENUE
EXHIBIT A SCOPE OF WORK
EXHIBIT A SCOPE OF WORK 1. (Contractor) shall provide fire alarm system maintenance/repair/testing services as described herein to the California Department of Veterans Affairs (hereinafter CDVA, CalVet,
PENNSYLVANIA HOUSING FINANCE AGENCY (2015 UNDERWRITING APPLICATION) Tab 34 Physical/Capital Needs Assessment & Energy Audit
Tab 34 Physical/Capital Needs Assessment & Energy Audit All Preservation developments must submit both of the following: A. Physical/Capital Needs Assessment A Physical/Capital Needs Assessment must be
Mechanical Contractor Pre-Qualification Packet. SPSC N180 Computer Data Room Phase II. Project No. CP 159313. Notice No. Notice 13-11.
Mechanical Contractor Pre-Qualification Packet SPSC N180 Computer Data Room Phase II Project No. CP 159313 Notice No. Notice 13-11 Issued by Department of Facilities Management Delivery address: Research
ACG Commissioning Guideline
ACG Commissioning Guideline Appendix A Sample Commissioning Specification NOTES TO APPENDIX A This appendix contains a sample Request for Proposal (RFP) for Commissioning Services as would be issued by
REPAIRING YOUR HOME CONSTRUCTION LOAN PROCEDURES 1-800-589-8850 WWW.FIRSTFEDLORAIN.COM
REPAIRING YOUR HOME CONSTRUCTION LOAN PROCEDURES 1-800-589-8850 WWW.FIRSTFEDLORAIN.COM FIRST FEDERAL SAVINGS AND LOAN ASSOCIATION OF LORAIN YOUR COMMUNITY BANK SINCE 1921 Toll Free 1-800-589-8850 3721
STCC Contractor/Vendor Rules and Regulations
STCC Contractor/Vendor Rules and Regulations STCC maintains specific rules and regulations that apply to all contractors and vendors who perform work or provide services. It is the responsibility of the
CITY OF KYLE, TEXAS REQUESTS FOR PROPOSAL (RFP) PLUMBING SERVICES: RFP-2015-01-PARD
CITY OF KYLE, TEXAS REQUESTS FOR PROPOSAL (RFP) PLUMBING SERVICES: RFP-2015-01-PARD SPECIFICATIONS AND GENERAL PROPOSAL REQUIREMENTS FOR PLUMBING MAINTEANCE & REPAIR SERVICES FOR THE CITY OF KYLE NOTICE
REQUEST FOR PROPOSAL FOR: Fire and Security Alarm Service and Monitoring
MCC13-04 REQUEST FOR PROPOSAL FOR: Fire and Security Alarm Service and Monitoring Manchester Community College PURPOSE: The purpose of this REQUEST FOR PROPOSAL is to establish a contract for Manchester
A Century of Progress with Pride
The City of Berwyn Engineering Department A Century of Progress with Pride November 12, 2014 Re: Waiting List Application I am interested in the following programs and would like to be added to the waiting
CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP)
Michigan Department Of Transportation 5100B (05/13) CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP) Page 1 of 2 REQUISITION NUMBER DUE DATE TIME DUE MDOT PROJECT MANAGER JOB
PICAC TRAINING SCHEDULE
Plumbing Industry Climate Action Centre 6/306 Albert Street Brunswick VIC 3056 T (03) 9356 8902 F (03) 9356 8929 [email protected] PICAC TRAINING SCHEDULE JANUARY JUNE 2014 2014 22138VIC Certificate
Building Condition Assessment Report
C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses
City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas 78121 Phone: (830)779-4541 Fax: (830) 253-1198 cityoflavernia@lavernia-tx.
[email protected] Commercial New/Remodel Building Requirements This document is not meant to modify any Federal or State laws or City Ordinances. It is intended to be informative and to be
A Best Practices Guide to Writing an RFP for Professional Commercial Cleaning Services
A Best Practices Guide to Writing an RFP for Professional Commercial Cleaning Services 2 Writing a Request for Proposal for Professional Commercial Cleaning Services Developing an RFP is a time-consuming
INSTRUCTIONS FOR COMPLETING THE CITY OF GILLETTE CONTRACTOR LICENSE APPLICATION (RENEWAL)
BUILDING INSPECTION DIVISION P.O. Box 3003, Gillette, WY 82717 201 E. Fifth Street, 2nd Floor Telephone: (307) 686-5260 www.gillettewy.gov INSTRUCTIONS FOR COMPLETING THE CITY OF GILLETTE CONTRACTOR LICENSE
Construction Management At-Risk
Oconee County Schools P.O. Box 146, 34 School Street Watkinsville, GA 30677 706-769-5130 706-769-3513 REQUEST FOR PROPOSALS ISSUE DATE: March 10, 2016 RFP REF: Construction Management At-Risk Construction
SUMMARY OF WORK FOR GENERAL CONTRACTOR
SUMMARY OF WORK FOR GENERAL CONTRACTOR 1. General scope of work A. The work at 163 Seabrook consists of: 1. Finish the kitchen and 1 st floor hallway area 2. Finish 1 st floor bathroom and laundry area
Residential tenancy agreement
Residential Tenancies Regulation 2010 Schedule 1 Stard Form Agreement (Clause 4(1)) Stard form Residential tenancy agreement Llord Name (1): Llord Name (2): Address for services of notices (can be an agent
1. Site plans assist the Fire Department to determine where a potential spill can be contained. The detailed site plan shall include the following:
Secondary Containment, Spill Control and Drainage Guidelines for Hazardous Materials per 2010 CFC PURPOSE The intent of this guideline is to provide the requirements for the design and construction of
SEWER BACKUP PREVENTION PROGRAM
SEWER BACKUP PREVENTION PROGRAM The Village of La Grange Park is pleased to announce a program to assist single-family homeowners with the cost of plumbing improvements to address sanitary sewer related
Project Close Out Summary
Project Close Out Summary 1. Final Cleaning and Inspection 2. Testing and Certification 3. Demonstration of Systems and Equipment 4. Inspections by Authorities Having Jurisdiction 5. O&M Manuals and As
Small Business Permit Service
Small Business Permit Service Building Permit Requirements For a Unit Finish or Interior Alteration Industrial, Commercial or Institutional Occupancies Building Permit Application The following documents
Request for Proposal No. RFP02658. Project Construction Management Services. for. Capital Levy BTA IV Project: Ingraham High School Classroom Addition
Seattle Public Schools Contracting Services 2445 Third Avenue South Seattle, WA 98134 Telephone: (206) 252-0566 Fax: (206) 743-3018 [email protected] Request for Proposal No. RFP02658
Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842
Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842 APPLICATION for ZONING and BUILDING PERMIT APPLICATION INSTRUCTIONS:
COMMERCIAL BUILDING PERMIT INFORMATION
COMMERCIAL BUILDING PERMIT INFORMATION This is a packet of Building, Electrical, Plumbing, HVAC, and Erosion Control permit forms you must complete to obtain the permits necessary for new construction,
This request for qualifications seeks the following type of service providers:
ANNOUNCEMENT REQUEST FOR STATEMENT OF QUALIFICATIONS NOTICE SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES DESIGN AND CONSTRUCTION ARCHITECTURAL SERVICES The San Francisco Unified School District Facilities,
REQUEST FOR PROPOSALS/QUALIFICATIONS FOR. EMERGENCY HOME REPAIR PROGRAM ADMINISTRATOR Community Development Block Grant CITY OF DUNKIRK
REQUEST FOR PROPOSALS/QUALIFICATIONS FOR EMERGENCY HOME REPAIR PROGRAM ADMINISTRATOR Community Development Block Grant CITY OF DUNKIRK CITY OF DUNKIRK 342 CENTRAL AVENUE DUNKIRK, NEW YORK 14048 ATTN: OFFICE
Building Condition Assessment Report
Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.
Facilities Operations Customer Service Standards WORK ORDER PRIORITIES
Facilities Operations Customer Service Standards WORK ORDER PRIORITIES In order to provide fair and consistent maintenance service to all University faculty, staff and students, a work priority system
Disaster Prevention and Protection Checklist
Preservation Services Leaflet 1438 West Peachtree Street, Suite 200/Atlanta, GA 30309 Phone: 404-892-0943/Fax: 404-892-7879 Website: Disaster Prevention and Protection Checklist The inspection
WORK RULES AND CONTRACTOR REQUIREMENTS FOR ALL UNIT OWNERS & UNIT OWNER CONTRACTORS PERFORMING WORK ON THE PREMISES AT HAWTHORNE PLACE CONDOMINIUMS
WORK RULES AND CONTRACTOR REQUIREMENTS FOR ALL UNIT OWNERS & UNIT OWNER CONTRACTORS PERFORMING WORK ON THE PREMISES AT HAWTHORNE PLACE CONDOMINIUMS 1) GENERAL GUIDELINES a) The following rules, regulations,
HERNANDO COUNTY FIRE ALARM GUIDELINES
HERNANDO COUNTY FIRE ALARM GUIDELINES To be used for all commercial building fire alarm system plan review. The procedures set forth in this document are the minimum requirements necessary to ensure a
ADDENDUM #1 Issued on May 15, 2015
RFP# PD2015-TP01 JANITORIAL & PEST CONTROL SERVICES ADDENDUM #1 Issued on May 15, 2015 The purpose of Addendum #1 is to provide the following: A. Answer questions that were received by the specified due
In Partnership with. TDIndustries 13850 Diplomat Drive Dallas, Texas 75234 Phone: 1-972-888-6751 Fax: 1-972-888-9621 Website: TDIndustries.
In Partnership with Schedule Contract #GS21F0118X Contract # TXMAS-12-03FAC0110 Schedule 03FAC Facilities Maintenance and Management Federal Supply Service Authorized Federal Supply Schedule Price List
This material is confidential and may not be copied, used or distributed without the written permission of Safeguard Properties LLC.
1 This material is confidential and may not be copied, used or distributed without the written permission of Safeguard Properties LLC. 2 Initial training is expected to be provided by each Vendor participating
ENVIRONMENTAL HEALTH & SAFETY/RISK MANAGEMENT Contractor Management (including Sub-Contractors)
ENVIRONMENTAL HEALTH & SAFETY/RISK MANAGEMENT Contractor Management (including Sub-Contractors) Contractors have the responsibility to ensure the health and safety of their workers and that their work
MAINTENANCE MANAGEMENT
www.thebowquarter.co.uk MAINTENANCE MANAGEMENT Scheduled routine maintenance each year is as follows. Projects classified as exceptional works such as external/internal decorations are excluded, as are
MOVE-IN/MOVE-OUT PROCEDURES
MOVE-IN/MOVE-OUT PROCEDURES PRIOR TO YOUR MOVE - SCHEDULING TO ENSURE PROPER SCHEDULING AND AVAILABILITY OF THE MOVE-IN/MOVE-OUT ELEVATOR DESIGNATED FOR YOUR MOVE, EACH OWNER MUST SCHEDULE THEIR MOVE AT
FIRE SPRINKLER SYSTEM SUPERVISORY SERVICE User s Guide (DamarNet RAR Service)
FIRE SPRINKLER SYSTEM SUPERVISORY SERVICE User s Guide (DamarNet RAR Service) The information provided in this user guide pertains to fire suppression sprinkler system monitoring service provided over
First Addendum RFP for Solar Photovoltaic Generating System RFP Depot Bid Number 0804-001
First Addendum RFP for Solar Photovoltaic Generating System RFP Depot Bid Number 0804-001 1. Section 18, Addenda and Interpretation, of the RFP is deleted in its entirety and replaced with the following:
Spill Control Prevention Plan (SCPP)
Spill Control Prevention Plan (SCPP) FACILITY INFORMATION PLEASE PRINT Facility Name: Mailing Address: Physical address if different: Owner Name: Owner Address: Primary Contact Name: Work Phone Number:
GENERAL SERVICES ADMINISTRATION FEDERAL ACQUISITION SERVICE AUTHORIZED FEDERAL SUPPLY SCHEDULE CATALOG/PRICE LIST
C o n t r a c t o r s MECHANICAL ELECTRICAL PLUMBING GENERAL SERVICES ADMINISTRATION FEDERAL ACQUISITION SERVICE AUTHORIZED FEDERAL SUPPLY SCHEDULE CATALOG/PRICE LIST On-line access to contract ordering
REQUEST FOR QUOTATION RFQ-FH-08-09-10118 ROOF REPAIR
DEPARTMENT OF CENTRAL SERVICES REQUEST FOR QUOTATION RFQ-FH-08-09-10118 ROOF REPAIR 1. GENERAL CONDITIONS A. The City of Farmington Hills DPW is requesting quotes to repair the existing flat roof on the
IFB 10-017 Alarm Monitoring ADDENDUM NUMBER ONE
IFB 10-017 ADDENDUM NUMBER ONE ADMINISTRATIVE CLARIFICATIONS CERTIFICATION REQUIRED - Central Station (Monitoring Station) need to be UL Certified and alarm equipment must be UL Certified. REVISED PRICING
Request for Qualifications 2015-162
Kitsap County Human Services Department Request for Qualifications 2015-162 Architectural and Project Management Services - Kitsap County Work Release Facility Remodel Response Deadline: November 17, 2015
RESIDENTIAL PROPERTY DISCLOSURE FORM
STATE OF OHIO DEPARTMENT OF COMMERCE 2013 RESIDENTIAL PROPERTY DISCLOSURE FORM Purpose of Disclosure Form: This is a statement of certain conditions and information concerning the property actually known
Invitation to Bid and Instructions to Bidders (This is Phase I of the project please note on any Bid that it Applies to Phase I only) May 1, 2015
Invitation to Bid and Instructions to Bidders (This is Phase I of the project please note on any Bid that it Applies to Phase I only) May 1, 2015 For PROJECT : Renovation and Repair of Atlanta Jewish Academy
REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER
RFP #2016-02 REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES FOR SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER RELEASE DATE: January 29, 2016 DUE DATE: February
Program No. 1.6.1. Section Heading
ENVIRONMENTAL HEALTH AND SAFETY EHS PROGRAM MANUAL Program Title 1.0 INTRODUCTION The New York City Fire Department (FDNY) is responsible for approving and/or inspecting fire alarm systems, buildings,
Sample Company SECTION 019113 GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES
SECTION 019113 GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES A. The Owner will contract separately and directly for the majority of the commissioning work
GUIDANCE FOR DEVELOPMENT OF SPILL AND SLUG PREVENTION CONTROL PLANS AND FACILITIES FOR THE CITY OF ATTLEBORO SEWER USERS
Company Name: Address: The City of Attleboro s Rules and Regulations for the use of Wastewater Facilities require each user to provide protection from accidental discharge of prohibited materials and substances
CITY OF PHILADELPHIA DEPARTMENT OF LICENSES AND INSPECTIONS ANNUAL CERTIFICATION FOR FIRE ALARM SYSTEMS
CITY OF PHILADELPHIA DEPARTMENT OF LICENSES AND INSPECTIONS ANNUAL CERTIFICATION FOR FIRE ALARM SYSTEMS PROPERTY ADDRESS (BRT Address Required) TESTING CONTRACTOR (Name and Address) License No. ANNUAL
REQUEST FOR QUOTATION
REQUEST FOR QUOTATION RFQ number/date RFQ Collective Number Q15M029 Contact person/telephone Mitchell Crowell/902 490-4207 This number must appear on all invoices lading bills, containers and correspondence.
EDUCATION SERVICE CENTER REGION 19 RFP AWARD SUMMARY
EDUCATION SERVICE CENTER REGION 19 RFP AWARD SUMMARY RFP TITLE: Fire Extinguishers, Fire Suppression Systems, and Related Purchases, Installations, and Inspections ESC Region 19 Allied States Cooperative
All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.
2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other
HEATING VENTING AND AIR CONDITIONING (HVAC) SUBCONTRACTING SERVICES FOR THE MACON COUNTY HOUSING DEPARTMENT
REQUEST FOR PROPOSALS RFP#06 4004p HEATING VENTING AND AIR CONDITIONING (HVAC) SUBCONTRACTING SERVICES FOR THE MACON COUNTY HOUSING DEPARTMENT ISSUE DATE: MAY 14, 2014 PROPOSALS WILL BE RECEIVED UNTIL
WHITE PLAINS PLUMBING CODE PART 1. GENERAL REQUIREMENTS
WHITE PLAINS PLUMBING CODE PART 1. GENERAL REQUIREMENTS a. New Plumbing and Gas Piping Systems. This code in conjunction with the Plumbing and Fuel Gas Codes of the State of New York shall apply to plumbing
STANDARD FORM OF CONTRACT FOR DESIGN-BUILD CONSULTANT SERVICES
STANDARD FORM OF CONTRACT FOR DESIGN-BUILD CONSULTANT SERVICES Document No 501 Second Edition, 2010 Design-Build Institute of America Washington, D.C. TABLE OF CONTENTS Article Name Page Article 1 Consultant