Southern California Edison s 2012 Request Window Proposals

Similar documents
California s Energy Future

Memorandum. This memorandum requires Board action. Executive Summary

NTTG Study Plan for the Public Policy Consideration Scenario

Generation Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055

Transmission Planning Study (Year 2022) for Cherokee 4 Replacement Alternatives. Final Report

Voltage Stability Improvement using Static Var Compensator in Power Systems

148 FERC 61,009 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

How To Operate The Williston Uvls

Intentionally left blank

Cross-Tie Transmission Line. Ravikanth Varanasi Principal Transmission Planner

Northport - Norwalk Harbor Cable (NNC) Tie line

BPA Network Open Season 2013 Cluster Study

FRCC Standards Handbook. FRCC Automatic Underfrequency Load Shedding Program. Revision Date: July 2003

CO-ORDINATION OF PARALLEL AC-DC SYSTEMS FOR OPTIMUM PERFORMANCE

Q140 Cluster Addendum

FACT SHEET. BSES, Delhi - Distribution Network. Power Systems Consultancy from ABB

Quail Brush Power Plant is Wrong Approach for San Diego - Local Solar Is the Right Solution. Bill Powers, P.E. Powers Engineering September 21, 2012

Integration Capacity Analysis Workshop 11/10/15 California IOU s Approach

Distribution Operations with High-penetration of Beyond the Meter Intermittent Renewables. Bob Yinger Southern California Edison April 15, 2014

System Protection Schemes in Eastern Denmark

A Tariff for Reactive Power Christopher Tufon, Alan Isemonger, Brendan Kirby, Senior Member, John Kueck, Senior Member, and Fangxing Li, Senior Member

CITY AND COUNTY OF SAN FRANCISCO

Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid

March 14, Subject: Southern California Edison 2014 Annual Progress Report

SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD

Table of Contents. Purpose. Eldorado Intertie and System (Eldorado- Four Corners) Scheduling. Operating Procedure

Transmission Planning Standards for the Baltimore Gas & Electric Company Transmission System

Generator Interconnection and Deliverability Study Methodology Technical Paper

Reactive Power and Importance to Bulk Power System OAK RIDGE NATIONAL LABORATORY ENGINEERING SCIENCE & TECHNOLOGY DIVISION

Preliminary Feasibility Assessment For. The Rio Tinto Alcan to BCH Transfer Limit of 460 MW. With 50% Series Compensation on Both KMO KIT lines

California s Electricity Market. Overview

Construction, Management and Engineering Practices that Lead to Low Losses

Application of SVCs by CenterPoint Energy to Address Voltage Stability Issues: Planning and Design Considerations

16 West Coast Regional Plan

Energy Storage Market Overview MADRI 3/3/2015 John Fernandes Policy & Market Development Manager

Electrical System Studies

Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process

FRCC Coordination Procedure. Title: FRCC Reliability Coordinator Contingency Analysis Monitoring Criteria

Guidelines for Large Photovoltaic System Integration

Pennsylvania Summer Reliability

TRANSMISSION MAINTENANCE COORDINATION COMMITTEE (TMCC) MINUTES January 16, 2014 Meeting from ISO Headquarters Folsom, California

The design and performance of Static Var Compensators for particle accelerators

MINISTERIE VAN ECONOMISCHE ZAKEN GENERAL COST COMPARISON BETWEEN UNDERGROUND CABLES AND O.H. LINE SYSTEMS FOR H.V. TRANSMISSION

5/27/2015. Overview of Energy Storage Value Propositions and Business Cases. Utility Cost-Function: Foundation of Energy Storage Economics.

Distributed Generation: Feeder Hosting Capacity. Dean E. Philips, P.E. FirstEnergy Service Corp Manager, Distribution Planning & Protection

Houston Region Import Capacity Project

Kent Active System Management (KASM) Oct 2015 / Matthieu Michel

SECTION 5.15 ELECTRICITY AND NATURAL GAS

AIS Power Reliability

Microgrids. EEI TDM Meeting Charleston, South Carolina October 7, Neal Bartek Smart Grid Projects Manager

Actual capital expenditure during the current regulatory period. Project summary

Section 1: Executive Summary

This document should be reviewed at least every two years.

Network Consulting for Power Grid Optimization

Treasure Valley Electrical Plan

Power System review W I L L I A M V. T O R R E A P R I L 1 0,

Request for Payment Instructions Wholesale Distribution Access Tariff (WDAT) Attachment I - GIP

TUCSON ELECTRIC POWER COMPANY TEN YEAR PLAN FOR YEARS

IESO Supply Deliverability Guidelines

Energy Systems Integration

Midwest Reliability Organization Procedure For NERC PRC-012

Rocky Mountain Power Transmission Five Year Study Findings Meeting

(2) Words and expressions used and not defined in these regulations but defined in the Act shall have the meaning assigned to them in the Act.

Topics. HVDC Fundamentals

Integration of Renewable Resources

Tehachapi Renewable Transmission Project (TRTP)

6. The estimated costs here do not include any applicable ITCC tax

Security Policy Review: Credible Event Management. Scope and Methodology Draft for Industry 2014

Full Network Model Scope for FNM DB2015Q4

Transmission Grid Reliability And Performance Monitoring

Bill is the author of 15 papers and lectures on transmission lines and other power system topics.

D.3 South Minneapolis Electric Distribution Delivery System Long-Term Study

Analysis of requirements in selected Grid Codes. Willi Christiansen & David T. Johnsen

REQUIREMENTS FOR A REAL-TIME RISK MONITORING TOOL TO REDUCE TRANSMISSION GRID NUCLEAR PLANT VULNERABILITIES

Advanced Technology Portable End-to-End Test System (PETS) Final Project Report

Evolution of Control for the Smart Transmission Grid

AMI and DA Convergence: Enabling Energy Savings through Voltage Conservation

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114.

ARIZONA PUBLIC SERVICE COMPANY ORDER NO. EA-134

Air Conditioner Stalling Unit Level Solutions Test Report

RELIABILITY PLANNING CRITERIA

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

About Southern California Edison

Risks and Controls for VAR and EOP Richard Shiflett Ruchi Ankleshwaria

EMTP STUDIES PERFORMED TO INSERT LONG AC CABLES IN THE FRENCH GRID

Understanding Power Factor and How it Affects Your Electric Bill. Presented by Scott Peele PE

Impact of Renewable generation

EL PASO ELECTRIC COMPANY (EPE) GENERATOR INTERCONNECTION FEASIBILITY STUDY FOR PROPOSED XXXXXXXX GENERATION ON THE SIERRA BLANCA-FARMER 69 KV LINE

Item 8: Houston Import RPG Project

Distributed Flexible AC Transmission System (D FACTS) Jamie Weber ext. 13

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

State Planning Agency, Tribal Utilities & Renewable Energy Regime in California

Grid Modernization Distribution System Concept of Operations. Version 1.0

Objectives. This paper also presents some improvements in the restoration processes of the São Paulo Area of the NIS.

Dynamic Security Assessment in the Future Grid. Vijay Vittal Ira A. Fulton Chair Professor Arizona State University

Instructions for use:

FULL ELECTRICAL LNG PLANTS: HIGHEST AVAILABILITY AND ENERGY EFFICIENCY THROUGH OVERALL SYSTEM DESIGN

Operating Security Standards

Microgrid Technology: Enabling Energy Reliability and Security Opportunities in Campus, Commercial & Industrial Communities

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, D.C February 1, 2006

Transcription:

Southern California Edison s 2012 Request Window Proposals Arevik Petrosyan Power Systems Planner 2012/2013 ISO Transmission Plan September 27, 2012 Folsom, CA

2012 SCE Area Reliability Projects 1. - 230 kv Reconfiguration (Thermal) 2. & 230 kv Capacitor Banks (Voltage) 3. 230 kv Capacitor Banks (Voltage) 4. Orange County Static VAR Compensator (Voltage) System Scenario: In peak 2013, with Beach 3 & 4 retired, the potential continued unavailability of SONGS 2 & 3 creates reliability violations in Orange County. Page 2

- 230 kv Reconfiguration Project Background: In addition to mitigating the Category C contingency published by the ISO (N. Gila Imperial Valley 500kV & 230kV No. 1 or 2 lines). This project provides operational flexibility for a forced outage of Beach Units 1 & 2. With Beach Units 1 & 2 at 0 MW, - No. 1 or 2 lines overload under a Category B Contingency. Pre- Mitigation Overloaded Facilities Contingency Performance Category Percentage (4 hr rating) - 230 kv No. 1 or 2-230 kv No. 2 or 1 B (L-1) 111% Del Amo Chino Lewis Villa Park Alamitos Beach 1 & 2 Page 3

- 230 kv Reconfiguration Project Scope: This project will reconfigure the - 230 kv lines from 2 to 4 circuits. The existing - No. 1 & 2 lines are in a box loop configuration, decoupling the box loop provides more lines eliminating category B contingencies. Decoupling No. 1 & 2 box loops A fault on this corridor pre-project would remove 50% of the transmission capacity. Post project, a fault will remove only 25%. Critical Contingency Post-Project: The C.5 contingency does not overload beyond the 15 minute rating and can be addressed by an operating procedure. Expected In Service Date: 06/01/2014 Post-Mitigation Overloaded Facilities Contingency Performance Category - 230 kv No. 1 & 2 or 3 & 4-230 kv No. 3 & 4 or 1 & 2 Percentage (15 min Rating) C.5 (L-2) 92% Page 4

& 230 kv Capacitor Banks Background: The system scenario creates post transient voltage violations for Category C contingencies. Pre-Mitigation Contingency - 230 kv No. 1 & 2 & - 230 kv Performance Category C.3 (L-1-1) C.5 (L-2) Beach 1 & 2 In : 14% : 14% : 14% S.Onofre: 10% : 13% : 12% Voltage Deviation Beach 1 & 2 Out Diverged : 13% : 12% Beach 1 & 2 (430 MW) Beach 1 & 2 (430 MW) Page 5

& 230 kv Capacitor Banks Project Scope: Install one 79.2 MVAR capacitor bank at and Substations for a total of 158.4 MVAR of voltage support in southern Orange County. Expected In Service Date: 08/01/2013 Beach 1 & 2 (430 MW) Post-Mitigation Contingency Performance Category Beach 1 & 2 In - 230 kv No. 1 & 2 C.3 (L-1-1) <10% Voltage Deviation Beach 1 & 2 Out <10% (with - 230 kv Reconfiguration) - & - 230 kv C.5 (L-2) <10% <10% Page 6

230kV Capacitor Banks & Orange County Static VAR Compensator Background: The system scenario creates an interaction between SCE s Orange County area and SDG&E system. Voltage collapse may occur depending on SDGE import levels. Pre-Mitigation (~2100 MW- SDGE IMPORTS) Contingency Imperial Valley Suncrest 500 kv & Imperial Valley- Miguel 500 kv (with a cross trip of Otay Mesa- Tijuana 230 kv) Performance Category Voltage Deviation C.3 (L-1-1) Diverged Beach (430 MW) SDGE San Onofre ( 0 MW) SUNCREST Otay Mesa Miguel IMPERIAL VALLEY Tijuana (Mexico) Page 7

230 kv Capacitor Banks Project Scope: Install two 79.2 MVAR capacitor banks at Substation for a total of 158.4 MVAR of voltage support in southern Orange County. Expected In Service Date: 09/01/2013 Orange County Static VAR Compensator Project Scope: Install +300/-100 MVAR SVC in the electrical vicinity of Switchyard. The final SVC size and a more precise operating date are under development. Expected In Service Date: 06/01/2014 (as early as 2014 but more likely by the summer of 2015) Post-Mitigation (~2200 MW- SDGE IMPORTS) Contingency Imperial Valley- Miguel 500 kv & Imperial Valley Suncrest 500 kv/ (with a cross trip of Otay Mesa- Tijuana 230 kv) Performance Category Voltage Deviation C.3 (L-1-1) <10% Page 8

Summary: Del Amo Lewis Villa Park Alamitos Beach 1. - Reconfiguration 2. & 230 kv Capacitor Banks (2-79.2 MVAR) 3. 230 kv Capacitor Banks (2-79.2 MVAR) 4. Orange County Static VAR Compensator (+300/-100 MVAR) (location and site under development) Page 9