Blocking is lumber installed within framing meant to be a nailer for something else later in the build.

Similar documents
8/18/14. Introduction to. Framing. Terminology and Concepts

Free 12 x 8 Shed Plan With Illustrations, Blueprints & Step By Step Details

DETAILED INSTALLATION GUIDE

Typical Finished Basement Details

HfHMD uses LP SmartSide siding and trim.

Typical Finished Basement Details

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES

PDmB, Inc. Definitions

HOW TO INSTALL A BEAUTIFUL NEW KITCHEN

Best Barns USA Assembly Book

Section A Roof Truss

FORM DESIGN. easy to work with, and generally available.

Borges Construction Company A limited liability Corporation Page1 of 1

March 14, Installation of Bay, Bow and Garden Windows

Superform Products Ltd.

Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION

FINISHED BASEMENT REQUIREMENT GUIDE

Texas Deparmtment of Housing and Community Affairs Community Development Block Grant (CDBG)

INSTALLATION OF A BAY WINDOW

Summit Series Single Section and Double Section Homes

New Ontario Building Code Highlights

House Design Tutorial

POST AND FRAME STRUCTURES (Pole Barns)

Chapter 10 - Scaffolding Systems

Taking Wainscot Up Stairs

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

CALIFORNIA BUILDING CODE

Electrical Wiring Technical Bulletin

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE

SUPER SHED. Indoor shelter for your outdoor tools.

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN Phone (260) Sales Fax (260)

Mark Cramer Inspection Services, Inc.

Adult Family Home (AFH) LOCAL BUILDING INSPECTION CHECKLIST Code References: 2012 IRC Section R325 (WAC 51-51) APPLICATION NUMBER:

Installing Housed Treads and Risers

DE Frame with C Series Sidelight

Chapter 6 ROOF-CEILING SYSTEMS

Irvinton Village Apartments 2901 Fulton Houston, Texas Houston Housing Authority J. Allen Management Managing Agent

OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION

Your Basement Remodeling Specialist LLC

Page 1 of 6 COMPLIANCE CHECKLIST. > Long Term Care Facility - Nursing Unit

PANELIZED HOME INSTALLATION GUIDELINE

4. ANCHOR BOLTS AND STRAPS a. ½" anchor bolts shall be embedded 7" into concrete a maximum of 6' on center and 12" from corners and ends of plates.

Installing Window and Door Mouldings

QUOTATION FOR EXAMPLE BATHROOM RENOVATION

HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/20/2009)

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

TREX SELECT RAILING Installation Instructions

Stair Parts Installation. Tricks

Residential Deck Safety, Construction, and Repair

CONSTRUCTION DETAILS & LOAD DESIGN CHARTS

DuPont Tyvek ThermaWrap R5.0 Installation Guidelines for New Construction Using Vinyl, Brick and Stone Claddings

Inspection Item COMMENTS

How To Repair A House

Building Department John Fiedler Construction Official Ext SAMPLE GUIDE FOR 1&2 FAMILY DWELLING BASEMENTS Rev

Brick Veneer Construction

9.0 Strengthening and Bracing Gable End Walls

How To Build A Basement House

INSTALLATION. General. Important Note. Design. Transport

Ceiling Mounted Folding Attic Ladders Installation Instructions

Building Condition Assessment Report

Residential Building Inspection Policies

3D Drawing. Single Point Perspective with Diminishing Spaces

Residential Decks. Planning and Development Services Department

Page 1 of 5. Exterior Finish. 1.) 8 textured lap siding. Roofing. 1.) 30-year dimensional shingles over a layer of 30# felt. Color is Weathered Wood.

The better way to build TM. Installation Manual. EXTERIOR WALL SIPs

Wren Kitchens Installation Tips Carefully check your kitchen delivery Measuring out and marking up Fitting the base cabinets...

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Custom 30 x 20-8 Garage Plan Plan #g233 By SDS-CAD Specialized Design Systems

By SP Partners, LLC. INSTALLATION GUIDE. Prestige

Single Family Residential Basement Finish

How to Install GoBoard:

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS

Sun Windows General Information Sun New Construction Window Installation Instructions

RESIDENTIAL ROOF TRUSS INSTALLATION PROCEDURES

SAMPLE INSTRUCTIONS. Best Barns USA Assembly Book. the Denver. 12'x 12' or 12'x16' Revised November 29, 2010

Sample Drawing Package for One and Two Family Dwelling Applications

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA

A Simple Approach to Raised-Panel

17,280 square feet Overview:

Common Errors in Truss Design

Build a kids playhouse

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

Cost Estimate. Page 1. Description Qty Price UM Draw Me Total. LAND 5 Lot Price 6 Closing Costs on Lot 7 Interest On Lot 8 9

DuPont Tyvek ThermaWrap R5.0 Installation Guidelines for New Construction Using Stone Veneer or Lap Siding, e.g. Fiber Cement and Wood/Cedar

Cut Construction Costs: 20 Proven Techniques

TREX SELECT RAILING. Installation Instructions BUY TREX PARTS G * I ** H *

NAVAJO COUNTY ADDENDA & ADDITIONS TO THE INTERNATIONAL BUILDING CODES. Public Works/Planning & Zoning Building & Safety AMENDED ( )

Roof Tutorial. Chapter 3:

3D Drawing. Single Point Perspective with Diminishing Spaces

Lesson Plan Course Title: Construction Technology

Residential Fall Protection Case Study: Habitat for Humanity St. Louis

LIGHT FLOOR AND WALL FRAMING

TYPICAL PATIO COVERS 111

City of St. Charles Basement Finish or Remodel

Breakaway Walls

Schedule of Maintenance Fees

Kitchen and Bath Design Tutorial

Transcription:

3/23/15

Blocking is lumber installed within framing meant to be a nailer for something else later in the build. Types of Blocking we install: Ladder blocking Deadwood (drywall nailers) Fire blocking Kitchen cabinet blocking Bathroom vanity & cabinet blocking Bathroom grab blocking Electrical box blocking Stair handrail blocking Closet shelf blocking Permanent Bracing is lumber installed within framing specifically to stabilize or strengthen that framing. Types of Bracing we install: Drop studs (for half walls) Squash blocks

Install Ladder Blocking everywhere an interior wall intersects an exterior wall. Measure and mark center of blocking: From single top plate: measure down 46 ½. From double top plate: measure down 48. Best Practice: Install ladder blocking before standing interior walls to help tie them securely to exteriors.

Best Practice: Where two walls are within 2 of each other, ladder blocks will fill two adjacent bays. To make installation easier, alternate 2x4 and 2x6 blocks. Install the 2x4 block first, sinking nails through studs and into block. Install the 2x6 block second, angling nails slightly over 2x4 block if necessary.

Plan ahead for baseboard installation: Install baseboard blocking everywhere that a baseboard end is not otherwise supported. Note: These blocks don t have to span the entire bay; they can be shorter scraps nailed securely to the top of the bottom plate. Install at all interior corners where there s no stud to catch edges of baseboard. OK, but this won t catch the top of the baseboard. Best Practice Install at doors, to catch the bottom of casing and the end of baseboard that butts into it.

Deadwood is scrap material (dimensional lumber or OSB) installed in ceilings to support drywall installation. Install drywall nailers above walls which are parallel to joists/trusses. Nail into top plate with 16d nails every 2, min. Walls within 3 of a parallel truss/joist don t need deadwood installed. Best practice: Use scrap ¾ subfloor. Okay to use scrap 2x lumber. Don t use ½ OSB unless you double it up (two layers). Install all deadwood before electrical rough!

In order to hang drywall under stairs, you ll need to first install deadwood: The span between stringers is too wide (can t be more than 2 ) so add a strip of deadwood down the center. Add strips of deadwood to underside of stringers to build them down to the same level as the strip down the center. Make sure this creates an even plane across the underside of the stair.

Install fire-blocking in any areas where fire could spread between floors or between vertical and horizontal framing sections. Most commonly: Along stair stringers and stair platforms. Cut and install blocks to fit tightly between vertical framing, with minimal gaps. Any gaps will have to be filled later with foam. Blocking must be installed on both sides of stairs (along both stringers) and fully surrounding any stair platforms. Alternate heights to make installation and nailing easier, as long as block is still alongside the stringer (not above or below it). Double check: Make sure blocking is installed between the top and bottom of stair stringer / stair platform. If it s too high or low, it s not actually serving its purpose.

W1230 Install ladder blocking in all kitchen walls where cabinets will be mounted. Heights of blocks are determined by the size and style of cabinet to be mounted. Install blocking at the top of all base cabinets, and at top and bottom of all wall cabinets. W3015 WA2430 W3030 WA2430 BLS36 RANGE BD18 BLS36

Standard Heights for Kitchen Cabinet Blocking W3030 W3015 Remember: Installation is easier when you alternate 2x4 and 2x6 blocks. B30 To avoid confusion about the tops/bottoms of the different block sizes, mark the center of the heights.

To make marking blocking locations in areas like kitchens and baths easier and more accurate, build and use a Story Pole. Mark on a piece of 96 material the standard heights of kitchen and bath blocking. Consult floorplans for locations of blocking, then hold story-pole to those locations and mark heights.

30 x30 Tri-View Bathroom vanity base cabinets (anything starting with VSB) are shorter than kitchen bases. VSB30 30 78 Bathroom vanities will have a medicine cabinet above them. For each size of medicine cabinet, center blocking 78 above floor. Top of medicine cabinet should be secured to blocking. Bottom of cabinet can be secured to a stud.

Grab blocking is installed in case any grab-bars need to be installed later in the build or later in the home s life. If the family needs any grab bars, or the townhome complex requires certain units to be handicap accessible, the size and location of these bars should be clearly called out on the plan (usually on a page dedicated to accessibility elevations). Grab bars above toilet and at shower faucet Grab bars adjacent to toilet Grab bars within shower surround

Our Advanced Framing techniques eliminate the trimmer (jack stud) in non-structural interior doors. So: Where a light switch will be mounted next to any of these doors, we need to fir out the receptacle box to make room for the door s casing. When the Electrical Team preps for rough installation they will make a mark on any king studs where they intend to mount a box. Install two scrap pieces of 2x4 at this mark. Note: Some electrical team members install these blocks as they install boxes but don t count on it. Double check doors before the full team arrives for rough electrical installation.

36 32 30 Top of handrail needs to be between 34 and 38 from nosing (overhanging edge of stair tread). So we mount the bottom of the bracket at 30 from the top of the nosing. Center of handrail blocking should be 32 from nosing. Best Practice: Mark 32 from nosing at the top and bottom of stairs, then snap a chalkline to connect. Install blocking centered on chalkline in each stud bay.

Consult the floorplans for locations and styles of closet shelving. Shelves that will have a closet rod and which are longer than 4 will also need a cleat and rod support. For a cleaner finished look, we want that cleat and rod support to be centered in the closet. 5 So install a 2x6 or 2x8 block centered 5 from the floor between the two center studs.

Advanced Framing depends on stacked framing, which means we need to make sure all exterior wall component weight is directly transferred down to the foundation. So: Install 2x4 Squash Blocks in the subfloor system directly under the Kings/Trimmers of all windows. Where there is a joist under the king/trimmer, install a single 2x4 squash block tight to the joist. Where there is no joist directly under king/trimmer, install (2) 2x4 blocks, nailed together.

Squash Blocks are also needed directly under all girder trusses, in all subfloor systems below. In two-story homes, install double studs directly under the girder on all floors, and squash blocks directly below in all subfloor systems. Remember: Any double trusses (girders) need double studs; any double studs need squash blocks, all squash blocks should transfer weight directly down to foundation.

All edges of wall sheathing must be supported by and nailed to framing. So any sheathing edges that don t land on standard framing (studs, plates, windows/doors) need to be supported by blocking. (Outside view) (Inside view) This edge didn t land on plates, so install blocking to support it. This also includes: Flat edges of subflooring that don t land on joists/framing. (The tongue/groove edges don t need additional support.) Vertical edges of roof sheathing. (Horizontal edges don t need additional support.)

Installing ceiling blocking to permanently brace peninsula walls: Walls that don t terminate into another wall need bracing to strengthen and keep them plumb. 1) Install a block between the joists/trusses directly above the end of the wall, with its bottom flush with the bottom of the joists/trusses. 2) Plumb the wall and nail its top securely into the block.

Installing dropped studs to permanently brace half-walls: The top of a half-wall isn t tied to trusses/ceiling joists like other interior walls, so the ends of half-walls should be braced down into the floor below to strengthen. Where to install? Half-walls at stairs should always get a dropped stud. Half-walls in kitchens will have cabinets to support them; dropped studs are not necessary.

Cap plate 1) Plan for it: Subtract 1 ½ from the end of your wall/plates to account for the dropped stud to be attached at the end. If you don t, the wall may encroach on necessary hallway clearance. 2) Frame and stand the wall just like any other. Temporarily brace the end of the wall to keep it perfectly plumb. Framed wall Dropped stud 3) Cut the subfloor at the end of the wall for a stud to pass through. 4) Install a cut stud tight to the end of the wall. The top should be flush with the single top plate of the wall. The bottom should be flush to bottom of the joists underneath. From bottom, between joists From top

5) Install a block between two closest joists, tight to the dropped stud. 6) Fasten dropped stud to this block. (Always double-check that the wall above is perfectly plumb before fastening.) 7) Install double top plate over dropped stud. Dropped studs at stairwell openings can often be mounted directly to rimboard/lvl.