RAILWAY INFRASTRUCTURE AND SERVICES. April 2nd, 2015



Similar documents
REHABILITATION AND EXTENSION PROJECT FOR PORT OF LOBITO

Intermodal transport of marble from Bulgaria to Italy

We provide international road haulage services all throughout Europe. Our dispatchers have many years of experience and are ready to meet the

SINGAPORE. A PREMIER GLOBAL HUB PORT THE WORLD S BUSIEST PORT

Marine Logistic Network

Interporto Padova SpA

ITREVISAN s.r.l Portogruaro (VE) - Via S. Giacomo, Tel / Fax info@trevisan-srl.it 1. THE ORIGINS ( )

INFORMATION PACK. Venice 20 th May 2014

The LNG supply chain scenarios: the downstream from port to land

ACTION PLAN

Port of Narvik. The Gateway to the Arctic PORT LOGISTICS: RAIL-ROAD-SEA-AIR. No draft restrictions. Sheltered waters. Ice-free all year round

The train-path pricing system. Who pays how much to rail infrastructure?

BULGARIAN RIVER SHIPPING JSC RUSE, BULGARIA. PROJECT : LOGMOS 29 February 2012 Brussels

Marshalling yards Infrastructure Operations. Offer Catalogue 2012.

Crane and Harbor Services Keeping your business moving

Container design and types

Timetable sita bus from the airport Venice (Tessera) Maro Polo to Padova station and back to the airport.

Southern California International Gateway Project Description

Location Our laboratory is located in Basovizza, on the outskirts of Trieste, very close to the border with Slovenia.


Automated Container Handling in Port Terminals

THE LIVORNO PLATFORM

4th European Rail Transport Regulation Forum

THE LOGISTIC PLATFORM ITALIAN - TURKISH

ING FORWARDING & SHIP'S AGEI

Incoterms The latest update of the Incoterms have entered into force on 01 January 2011, known as Incoterms 2010

Fourth Generation Modular Construction

Stevedoring Liability

Mexico s ports. Hub Ports. Altamira. Veracruz. Manzanillo Lazaro Cardenas

HAMBURGER HAFEN UND LOGISTIK AG

ECG Standard Shipping Terms

PRESS KIT OFFICIAL OPENING HUB TERMINAL POZNAN 27. September Hamburger Hafen und Logistik AG

Inland intermodal terminals and freight logistics hubs

chain, a Rotterdam experience

Haven Genk in Limburg, Limburg LOGISTIEKE draaischijf

Short introduction of BILK Kombiterminál Co. Ltd.

The Development & Application of Port Logistics Public Platform

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA

II GULFSTREAM.MOS SPAIN

Cefic Position on Intermodal Transport Network Development

CGR TARIFF NO 01b Supplement 6 CANCELS CGR TARIFF NO. 01b, Supplement 5 IN ITS ENTIRETY. CG Railway, Inc.

ETIHAD RAIL. Corporate Presentation

CUXPORT AUTOMOBILE LOGISTICS

Canadian Rail: Gearing Up in the West

Kansas City Southern. Mike Upchurch Executive Vice President Finance & CFO. Raymond James Institutional Investors Conference March 2 nd, 2015

GLNX Corporation Complete Solutions for Railcar Management

INDUSTRIAS G.E S.A. E n g ineering Solut i o n s

Tariff. Allcargo Logistics Park Pvt. Ltd.

TRANSPORT MODES AND THE CONSOLIDATION OF TRANSPORT LOTS

Benefits of Track and Trace Ecosystems in Italian Railways

TOGETHER! Let s sea more

FREMANTLE PORTS. A Guide to Our Business

BACKGROUND INFORMATION DOCUMENT

APP - Portuguese Ports Association Vítor Caldeirinha Lisbon,

SHIP AGENCY CARGO SERVICES OFFSHORE SERVICES. MARITIME AND LOGISTIC SERVICES IN MEXICAN PORTS

Differences between 2000 and 2010 Incoterms

Fleet management in rail transport: Petroleum rakes in Indian Railways

Intermodal Handling TOP PERFORMANCE WITH SMART SOLUTIONS

SUCCESS HAS A NAME. Hapag-Lloyd AG Ballindamm Hamburg

Recent evolutions in the tank storage sector in the Port of Antwerp. Rose-Marie Pype March 19th, 2013

FRE FRE IFT IFT S.A.

Presentation of the Shift2Rail Multi-Annual Action Plan

Railway Demand Forecasting and Service Planning Processes. Prepared for: Rail Freight Service Review

REGISTRATION & HOTEL FORM

India s Infrastructure - Trends, Projections, Requirements

HOW TO REACH VENICE CONTENTS:

Diagram: International Commercial Terms

Logistics and Infrastructure

13/11/2013. Logistics Day 2013

Abu Dhabi Ports Operating Company Abu Dhabi Terminals PJSC

Your Multimodal Partner. IBS, the 08/10/10

A comprehensive information system for railway networks

Optimising a LNG supply chain and its assets through performance prediction studies

APRIL 2014 PORT OF ITAQUI

TOWARD A SUSTAINABLE MOBILITY

INTERFERENCE AVOIDANCE IN INTERMODAL SUPPLY CHAIN OF SOUTH- EASTERN FINNISH PORTS

Port of Beira. 22/06/12, Pretoria. Félix Machado Sales & Marketing Manager

IN DEFENSE OF THE JONES ACT

4D ENGINEERING S.r.l. COMPANY PROFILE

Trans-European Transport Network

A Simulation Tool for Combined Rail-Road Transport in Intermodal Terminals

Service Network Design for Consolidation Freight Carriers

LOGISTICS SOLUTION FOR NUSTAR ENERGY

Abu Dhabi Ports Operating Company Abu Dhabi Terminals PJSC

KALMAR RTG - FOR HIGHER PRODUCTIVITY

main type of locomotive in use, but over half of those had surpassed their durable lifespan. China Afghanistan Project Sites Nepal

Railway Reform in South East Europe and Turkey: On the Right Track?

Part 0 - Classification and Surveys Classification and Surveys I

18.1 million people 1 billion tons of goods moved 2.5 billion dollars of trucking congestion costs

Logistical Information

Watco Companies. Sandhouse Gang - Northwestern University November 1, 2012

INCO Terms. The seven rules defined by Incoterms 2010 for any mode(s) of transportation are:

Transcription:

RAILWAY INFRASTRUCTURE AND SERVICES April 2nd, 2015

Index 1 2 3 4 5 International, national and local rail network The Marghera Scalo Station The port shunting company: ERF Rail and Port traffic details Present and future plan

MARGHERA SCALO A STATION OF THE NATIONAL RAILWAY NETWORK MARGHERA SCALO 1.1 MARGHERA Scalo is a cargo station located on the national network.

VENICE PORT RAILWAY NETWORK PARCO NUOVO serving the west-south industrial area PARCO BREDA serving the north-east industrial area All terminals in Porto Marghera are equipped with railway sidings Legenda 1.2 Port Railway infrastructure MARGHERA SCALO STATION Arrival and departure (12 tracks) from/to main network and exchange (17 tracks) from/to commercial area The rail infrastructure servicing the port area of Marghera, about 45km, consists essentially of: - the freight station of MARGHERA SCALO (with its exchange track and reception and departure siding); - the fan of sidings of Parco Breda (serving the north-east industrial area); - the fan of sidings of Parco Nuovo (serving the west-south industrial area); - Raccordo Base, branching from the station of Venezia-Mestre; - railway sidings, with tracks and sidings, within each area of the port.

RAIL FREIGHT YARDS OF THE PORT AREA Double track Single track 1.3

VENEZIA MARGHERA SCALO STATION New Venezia Marghera Scalo Freight Station capacity : -Up to 50 trains per day -Train lenght up to 700 m Railway Undertakings stop and start traction services from FASCIO BASE Exchange sidings (FASCIO RIORDINO) Reception and departure sidings (FASCIO BASE) New exchange sidings (FASCIO OVEST) The station at which stops are made consists essentially of three fans of sidings: - Fascio Riordino, dedicated to the exchange track and stabling of a train for customs clearance from/to crossing; - Fascio Base, equipped for the operations of reception and departure (trains up to 750m length) and with static and dynamic Weighing wagons service; - Fascio Ovest, consisting of 4 tracks with a length of 390 m, with functions similar to set of sorting sidings. 2.1

VENEZIA MARGHERA SCALO STATION TRACK DIAGRAM 2.2

TRAFFIC 2012-31,000 wagons -1,5 million tons -48 load average tons -2,000 exchange train -4,000 trains SHUNTED LOAD WAGONS 2012/2013/2014 TRAFFIC 2013-40,500 wagons - 2 millions tons -50 load average tons -2,500 exchange train -5,000 trains 2.3 TRAFFIC 2014-35,500 wagons - 1,7 millions tons -48 load average tons -2,200 exchange train -4,400 trains

PORT SHUNTING COMPANY In the whole port area, ERF Esercizio Raccordi Ferroviari Company operates shunting since 1973. In order to ensure the correctness and safety of operations in both the base track and industry track, ERF is the only operator in charge of the shunting in port of Venice areas. The service shunting at Venezia Marghera Scalo station is provided h 24. ERF company has: - 45 employees; - 10 shunting gang of qualified and certificated personnel; - 10 shunting diesel locomotive with power 700-1000 cv; -Static and dynamic Weighing wagons service -vehicle maintenance and repair locomotive shop. -Certification ISO:9001 Esercizio Raccordi Ferroviari S.p.A. v. della Pila 119/5 Venezia (VE) (30175) Tel. 0039 041 921855 erf.spa@libero.it http://www.erf-spa.it Further development services: wagons checking, inspections and maintenances 3.1

RAILWAY CONNECTED TERMINALS AND TYPE OF CARGO 2015 Agribulk Chemical products Steel products Grandi Molini Cereal Docks CIA Transped Arkema ILVA Multiservice VECON Eni Containers Crude oil and refined products Ro-Ro TIV Solvay TRI San Marco Petroli Demont 4.1 RO-PORT MoS

4.2 VENICE PORT AND RAIL TRAFFIC 2014 Port of Venice_Cargo 2014

Oil/ Container/Marble VENICE PORT RAILWAY TRAFFIC 2014 Steel products Brennero Tarvisio Chiasso Cervignano Verdello Ospitaletto Vicenza Domegliara Verona Venezia Lonato Venezia Cavatigozzi Rubiera Chemical Products Agribulk Brennero Tarvisio Tarvisio Cervignano Villa Opicina Rho San Pietro in Gu Spinetta Venezia Acquanegra Venezia 4.3 Scarlino Ferrara Cavatigozzi Fiorenzuola

THE NEW PORT OF VENICE Venice Marghera Scalo Onshore Container Terminal 90ha Offshore Terminal Terminal offshore 1.04 1.35 million of TEUs Terminal onshore 1.48 1.89 million of TEUs Traffic to Onshore (0.94 1.35 mln of TEUs) 5.1 RO-PORT MoS MoS Terminal (Operational from 31/05/2014) 36 hectar, 2 docks with 4, a logistic platform (100.000 mq), open and parking area (40.000 mq), 2 track directly linked with Marghera Scalo.

RAILWAY CAPACITY OF FUSINA RO PORT MOS 5.2 Fusina railway yard: composed by 4 sidings up to 650m. Sidings will be served by gantry cranes. Marghera Scalo station is actually able to manage the foreseen traffic due to fusina operations. The total round trip time (Marghera Scalo Fusina) is about 4 hours. The unloading plus loading time per train is about 2/3 hours. Whit the current infrastructure it is possible to serve up to 6 pair of trains a day. With the railway infrastructure upgrading (completed within the beginning of 2018) it will be possible to serve up to 10 pairs of trains a day

RAILWAY NETWORK PLANNED MID TERM (WHITIN 2018) Progetto preliminare insula marzo 2015 Marghera Scalo STATION New tracks Existing tracks (year 2015) GMI Cereal Docks CIA Arkema Transped Solvay ILVA Marghera Scalo Multiservice VECON TIV TRI Eni San Marco Petroli Demont 5.3 RO-PORT MoS

SHIPPING LINES CALLING AT PORT OF VENICE Venice 5.4 Container Break-bulk Ro-Ro/Ro-Pax