Guidelines: 1. Inspection Inspection Period

Similar documents
Section 20 TABLE OF CONTENTS Pressurized Equipment and Systems. 20.A General B Compressed Air and Gas Systems

NFPA31FuelOilPiping 1 Revised

Factory owners must ensure the boiler is:

SPECIFICATION TECHNICAL AIR-CONDITIONING UNITS SINGLE AND SPLIT (DUCTED) (AIR COOLED PACKAGED UNIT)

SAFETY AND HEALTH PROGRAM

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

MANAGEMENT AND USE OF WORK EQUIPMENT: PRESSURE SYSTEMS

Routine and Emergency Boiler Operation

Examples of pressure systems and equipment are:

Bradlee Boilers Ltd. Instruction Manual for starting up Bradlee Hire Boiler from Cold

Heating Water by Direct Steam Injection

COMPRESSED GASES. 1.2 The contents of each cylinder and container must be clearly identified (by tag or stamp) on the cylinder.

Important Ontario Fire Code Information for Building Owners in the City of Windsor

Steam System Best Practices Condensate System Piping

Energy Efficient Operations and Maintenance Strategies for Boilers

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

G SPECIFICATION: GAS METER AND REGULATOR INSTALLATION REQUIREMENTS. 3 and Gas Yellow Book. REVISIONS: (See ) 1/15/14 5 Years

Pressure Vessels (Air Compressors) and LPG Tanks

Arrangements for the Maintenance and Testing of Laboratory Autoclaves

TUBE-TO-TUBESHEET JOINTS: THE MANY CHOICES ABSTRACT KEYWORDS. Seal welding, tube-to-tubesheet welds, heat exchanger, mock-up, tube expansion

Spray Booth Guideline

INSTRUCTION MANUAL. Boil-Out TABLE OF CONTENTS SAFETY WARNINGS 2-3 RESPONSIBILITY 3 INTRODUCTION 3 PRE-BOIL OUT PROCEDURES 3-5 BOIL OUT PROCESS 5-9

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

Safe Work in Confined Spaces

6. Principles of effective plumbing systems

Inspections Standard Operating Procedure 5 Aboveground Storage Tanks

Inspection and Testing of Water-Based Systems

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook

Owner-User Pressure Equipment Integrity Management Requirements

CHAPTER 10 BOILERS, WATER HEATERS AND PRESSURE VESSELS

Western Plant Health Association DOT MC 330 & 331 NH3 Cargo Tank Inspection Checklist Form

The following definitions apply with regard to requirements specified in this document:

Guide to the Safety, Health and Welfare at Work (General Application)(Amendment) Regulations 2012 (S.I. No. 445 of 2012) Pressure Systems

GUIDELINES FOR THE APPROVAL OF NATURAL GAS APPLIANCE INSTALLATIONS IN ISRAEL

Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants

Installation of Underground LP-Gas Systems

OREGON FIRE CODE Interpretations and Technical Advisories

Written schemes of examination

NCCER Progress Blvd., Alachua, FL Tel: (888) Task Number Item Date(s) Recorded By

PMCap Local Thin Area Repair and Restoration Component. for Pressure Retaining Items

TABLE OF CONTENT

ALBERTA FIRE CODE SAFETY EQUIPMENT MAINTENANCE REQUIREMENTS

OPERATIONS & MAINTENANCE (O&M) FOR PROPANE STORAGE FACILITIES

Boiler Preparation, Start-Up and Shutdown

Six Monthly Servicing of Fire Extinguisher on Commercial Vessels.

FIRE EXTINGUSIHER INSPECTION, MAINTENANCE, AND TESTING PROCEDURES

LCT 1025 (08/08) Copyright 2008 Harleysville Mutual Insurance Company Page 1 of 5 All rights reserved

North Dakota State Fire and Tornado Fund Providing affordable property insurance coverage for the state and its political subdivisions since 1919.

FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST

IAC 7/2/08 Agriculture and Land Stewardship[21] Ch 44, p.1

Winnipeg Fire Department Fire Prevention Branch

SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN

Oil and Gas Pipeline Design, Maintenance and Repair

Standard Hydraulic Piping Flushing Procedure

PACKAGED FIRE TUBE BOILER

Acumen Enterprises, Inc.

ADMINISTRATIVE SERVICES MANUAL

Chapter Iud L11 BOILER AND UNFIRED PRESSURE VESSEL CODE

Northern Region. Underground Storage Tank

Specific Volume of Liquid (Column 7). The volume per unit of mass in cubic feet per pound.

COMMERCIAL REPORT / STOCK CONDITION SURVEY. Sydenham Hill Estate Sydenham Hill London SE 23

Elgin Fire Department

ASME QRO Certification Program

ELECTRODE BOILERS VAPOR POWER INTERNATIONAL

Compressed Gas Cylinder Program

PLANT LOCATION AND LAYOUT

BODY OF KNOWLEDGE API-653 ABOVEGROUND STORAGE TANK INSPECTOR CERTIFICATION EXAMINATION November 2015, March 2016 and July 2016 (Replaces October 2013)

Installation Manual DIAPHRAGM WELL TANK

Quik Lining Systems Heater Owners Guide

P O B o x S t. L o u i s, M O P h o n e : ( ) ~ E m a i l : w m h u I t a o l.

PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations.

ASME B31.3 Process Piping. Scope of B31.3 Course

Control Device Requirements Charts For Oil and Gas Handling and Production Facilities

Installation Manual DIAPHRAGM WELL TANK

PSAC/SAIT Well Testing Training Program Learning Outcomes/Objectives Level D

Notes. Material 1. Appropriate Flammable Liquids

RULE ORGANIC COMPOUNDS - WASTEWATER COLLECTION AND SEPARATION SYSTEMS

Some Criteria for Choosing a Steam Boiler for a Microbrewery

Chapter 7 Hydraulic System Troubleshooting

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY

MAINTENANCE AND SERVICE OF AUTOMATIC FIRE EXTINGUISHING SYSTEMS

REQUEST FOR QUOTATIONS

TRAINING AND EQUIPMENT MANUAL HOSE PRACTICES EFFECTIVE: OCTOBER 2007

GAS SAFETY PRECAUTIONS

5.2. Vaporizers - Types and Usage

Civil Engineering Sector Labour-Management Health and Safety Committee

APPENDIX 2-3 PCAPP EDS INSPECTION LOG SHEETS

Evaluate, Clean, and Tune Guidance

FPS4 APPENDIX A (INTERIM) SPECIFICATION FOR THE INSPECTION AND TESTING OF AUTOMATIC FIRE SPRINKLER SYSTEMS

Action Plan Template HVAC Page 1

Confined Space Air Monitoring

Second Class Chief Statutes and Rules

This chapter is devided into two sections:

Static Electricity. A Health and Safety Guideline for Your Workplace. What Are Some Sources of Static Electricity? What is Static Electricity?

The Pipelines Regulations, 2000

Safety and Radiation Protection Office Working with X-Ray Equipment

Boiler and Burner Cleaning and Servicing Specifications

Domestic heating Fuel storage tanks

PLEASE NOTE. For more information concerning the history of this Act, please see the Table of Public Acts.

Heating, Ventilation, Air Conditioning and Refrigeration (HVACR)

Transcription:

Background: Boilers and pressure vessels can be found in industry, hotels, workshops, construction sites and commercial buildings. Potential hazards exist from the operation of these boilers and pressure vessels. This guideline describes the requirements of periodical inspection of these pressure vessels by a competent person. Guidelines: 1. Inspection 1.1. Inspection Period Under Dubai Local Order No. 61/1991, the users of boilers and pressure vessels shall ensure safe operation of plant and equipment for the protection of workmen from potential work accidents. To make a meaningful assessment of the pressure vessel to be inspected, the following guide to inspection is intended to provide a broad outline of requirements. The owner and competent person should make such assessments as are necessary to evaluate the condition of the pressure vessel. The inspection of boilers and pressure vessels shall be made at the time of installation and at regular intervals of 12 months thereafter. It is essential that inspections should be thorough and complete. 1.2. Competent Person Only technically qualified and experienced person who have been approved as competent persons to examine and test boilers and pressure vessels by the Public Health and Safety Department, Dubai Municipality shall examine and test boilers, compressor air receives and other pressure vessels. 1.3. The company employing approved competent person seeking approval from Public Health and Safety Department shall comply with the following: i. The company should have a Trade License issued by the Economic Department Government of Dubai and accreditation from Dubai Municipality Central Laboratory. ii. The company should have a insurance coverage for the professional liability. الصفحة: 6/1

iii. The company shall obtain accreditation approval from Dubai central Laboratory. 1.4. Precautions before Entering a Boiler or Pressure Vessels Before a boiler or pressure vessel is entered for inspection, the owner or user shall determine that the vessel may be safely entered by ensuring adequate ventilation inside the vessel and it is free of harmful vapors/gases. 2. Boilers 2.1. External Inspections of Boilers 2.1.1. The general cleanliness and accessibility of the boiler and its auxiliary apparatus should be noted. The boiler fittings, valves and piping should be checked. 2.1.2. Any steam or water leak should be thoroughly investigated and necessary correction measures initiated. 2.1.3. Pressure gauge The pressure indicated on the pressure gauge shall be compared with a standard test gauge. If necessary the pressure gauges should be promptly replaced. 2.1.4. Water Level Gauge The water level gauge should indicate the accurate water level in the boiler. A sluggish response may indicate the obstruction in the pipe connections to the boiler and prompt corrective action should be taken. 2.1.5. Safety Relief Valves The safety valves should be tested by allowing the pressure in the boiler to rise to the popping pressure. When inspections reveals that a safety valve is not operating properly by failure to open and close properly, the boiler shall be taken out of service. The valve shall be replaced or repaired to the correct pressure. 2.1.6. Low water fuel cut off or feed controls The operation of a low water fuel cut off control should be tested ensuring that the water level gauge is indicating correctly. الصفحة: 6/2

2.1.7. Piping, connections and fittings Steam and water piping and fittings should be examined for evidence of leakage. To avoid water hammer the location of the various stop and drain valves should be such that waters will not accumulate when the valves are closed. 2.1.8. Blow off piping 2.2. Internal Inspections The blow down of the boiler should be operating normally with freedom of the piping to expand and contract and without excessive vibration. 2.2.1. The owner or user should prepare a boiler for internal inspection under the direct supervision of the competent person, by taking all the safety precautions with reference to fuel supply/ignition system, water side, insulation, pressure gauge, isolation, manhole, entry into boiler. 2.2.2. Where defects or deterioration are suspected or are commonly found in the particular type of boiler being inspected, or evidence of leakage showing on the covering, the insulation, brick work or covering shall be removed. 2.2.3. When a portable extension light is used in a confined space, it shall not be operated at more than 24 volts. 2.2.4. Scale, etc. All surfaces of the metal on the water side of the boiler shall be examined for deposits due to scale formation. The deposits if any should be cleaned. 2.2.5. All openings leading to external attachments such as water column connections, low water fuel cut off devices, openings in dry pipes and openings to safety valves should be examined to ensure they are free from obstructions. 2.2.6. Bulging, blistering caused by overheating, cracks, corrosion and grooving resulting in metal deterioration should be determined and corrective action initiated. 2.2.7. Fire tubes and water tubes The condition of the tubes should be examined for reduction in thickness, pitting, corrosion, bend, cracks etc. الصفحة: 6/3

2.3. Tests 2.3.1. Hydrostatic test The hydrostatic test shall not exceed 1 1/2 times the maximum allowable working pressure. 2.3.2. Steam Test 2.4. Repairs After every repair, a steam test shall be done and the safety valve shall be set to correct popping pressure and sealed. Any repair of boiler or its accessories shall be done under the supervision of the competent person approved by EPSS Dubai Municipality. After repairs, the boiler shall be certified by competent person. 2.5. Boiler Attendant Each boiler shall be operated by a qualified/trained boiler attendant. 3.0. Unfired Pressure Vessels It is known that there are numerous types of pressure vessels in use. The most commonly found pressure vessels in industry are air receivers, process vessels, gas storage tanks etc. operating above atmosphere pressure. The surfaces of shells shall be examined for possible cracks, blisters, bulges and other evidences of deterioration. 3.1. External Inspection of Pressure Vessels External inspection of a pressure vessel is made to determine if its condition is safe for continued operation. 3.1.1. On process vessels where corrosion is a major consideration, the periodical examination will help to determine the reduction in wall thickness, if any. Any leakage of gas, liquid, vapor should be investigated. الصفحة: 6/4

3.1.2. Pressure Gauge The pressure gauge should be in good working condition. The pressure indicated by the pressure gauge installed in the vessel shall be compared with the test gauge and calibrated if necessary. 3.1.3. Pressure relief valves 3.1.4. Drains 3.2. Internal Inspections The pressure relief valves should be in good operating condition. The drain provided in the vessel shall be opened to ensure that it functions properly. 3.2.1. Corrosion is one of the most common conditions found in pressure vessels. When active or excessive corrosion is found remedial action should be taken. 3.2.2. If any distortion is suspected or observed, the overall dimensions of the vessels shall be checked to determine the extent and seriousness of the distortion. 3.3. Pressure Test 3.3.1. The pressure test should not exceed 1 1/2 times the maximum allowable working pressure. 3.3.2. If the pressure vessel cannot be filled with water or liquid or is used in service, when even some traces of water cannot be tolerated, other means of testing such as pneumatically testing, non-destructive testing etc. methods shall be followed. 3.4. Repairs All repairs should be carried out by our under the supervision of competent person to ensure the safe operation of pressure vessel. الصفحة: 6/5

4. Certification by Competent Person The safety certification shall be done by the competent person on satisfactory completion of tests and examination of boilers/pressure vessels. The test certificate shall indicate the repairs/alternations/re-rating of working pressure etc. made to the vessel. It the condition of a boiler or pressure vessel is unsafe for operation, the competent person shall direct the owner or user to remove it from service and send a report to Public Health and Safety Department. The test certificate shall be made available in the workplace and a copy sent to the Public Health and Safety Department. FURTHER INFORMATION IS AVAILABLE FROM PUBLIC HEALTH AND SAFETY DEPARTMENT TEL064244/ 2064282 FAX270160 الصفحة: 6/6