PMCap Local Thin Area Repair and Restoration Component. for Pressure Retaining Items
|
|
|
- Godfrey Junior Manning
- 9 years ago
- Views:
Transcription
1 by Paul S. Manzon President and John K. Wiedemann Vice President, Engineering PMC Engineering Solutions, Inc. 272 Grubb Rd. Pottstown, PA ABSTRACT A common method of pressure boundary repair for localized metal loss involves cutting out the affected section and replacing it with new material of equivalent or better erosion/corrosion resistance. New sections are installed using full penetration welds. This type of repair is generally referred to as a flush patch repair. A weld build-up repair can also be performed to restore areas of localized metal loss. In this type of repair, weld metal is deposited on the thin area to restore the profile and thickness to original supplied condition. Other types of repairs occasionally considered include metal build-up on the outer pressure boundary surface using weld overlay or installation of a patch plate overlay. In the patch plate repair, a new plate is fillet welded to the outer surface of the pressure boundary on top of the thin area. However, the National Board Inspection Code (NBIC), which most jurisdictional authorities in the United States follow, does not allow weld overlay on the outer pressure boundary surface or patch plate type repairs. PMC Engineering Solutions, Inc. has developed an alternative repair method that is applied externally, satisfies code requirements, and is acceptable to local jurisdictions. This alternate repair uses a custom designed repair component that encapsulates defective pressure boundaries. The repair component is entitled Local Thin Area Repair and Restoration Component for Pressure Retaining Items (U.S. Patent 8,860,297), and is hereinafter referred to as the PMCap. BACKGROUND The flush patch and cavity weld build-up repair methods are allowed by the National Board Inspection Code (NBIC) and are accepted by jurisdictional authorities. The flush patch repair involves removal of degraded vessel wall and replacement with new material. The weld build-up repair method restores wall profile and thickness to original supplied condition by depositing weld metal to a local thin area. These material replacement repair methods can provide a factor of safety Page 1
2 and erosion/corrosion protection equal to original construction. To maintain the original design factor of safety, nondestructive examination of the new weld, using the same or equivalent NDE method as that used during original construction, is required. For most pressure vessel repairs, ultrasonic examination of the new welds is performed as an alternative to the radiographic examination originally specified. Additionally, the jurisdictional authority may require a hydrostatic test of the vessel after completion of the repair. Material replacement repair methods have several other limitations including: 1. Requires removal and isolation of vessel from service. 2. Requires removal of defective vessel wall. 3. Creates personnel risk of exposure to hazardous vessel contents. 4. Creates environmental risks associated with disposal of vessel contents and job materials. 5. Creates risk of damage to vessel internals. 6. Creates risk of foreign material intrusion. 7. Requires cutting vessel wall for new flush patch. 8. Requires exact fit-up of new flush patch replacement plate into vessel cutout with edge weld joint preparation. 9. May require use of weld joint backing strips to achieve full penetration weld. Note: Backing strips left in place may result in a reduction in weld joint efficiency factor. Also, in high flow regions, backing strips may separate and become loose parts or create new flow turbulence thus accelerates local erosion. 10. Requires welder access inside vessel for weld build-up repair. 11. May expose welder to radiological hazards. 12. Requires equipment downtime to implement repairs. 13. Labor and time intensive repair. ALTERNATIVE REPAIR METHOD PMC Engineering Solutions, Inc. has developed an alternative repair method that satisfies code requirements and is acceptable to local jurisdictions without the limitations identified above. This alternate repair uses a custom designed repair component that encapsulates defective pressure boundaries. The repair component is entitled Local Thin Area Repair and Restoration Component for Pressure Retaining (U.S. Patent 8,860,297) Items, and is hereinafter referred to as the PMCap. The PMCap is a pre-fabricated component used to repair pressure boundaries with local thin areas, cracks or pitting. It is welded onto the outside pressure boundary surface using a full penetration weld and becomes an extension to the pressure boundary. Repairs can be made without removing defects. Degraded wall areas are totally encapsulated by the PMCap which is designed to provide all required structural, pressure integrity, and local area reinforcement. PMCap s allow for quick repairs and rapid return to service with minimal risk by eliminating cutting of the pressure boundary, foreign matter intrusion, and exposing vessel internals or contents to the environment. Page 2
3 The PMCap is designed and fabricated to meet original design and appropriate jurisdictional code requirements. They can be designed to encapsulate shell, head, or nozzle regions in any shape but are commonly supplied as round or obround. The PMCap can be used to repair pressure boundaries in pressure vessels, piping, and tanks. They will restore the structural, pressure retaining integrity, and erosion/corrosion capability to an original or enhanced design condition. PMCap s include a corrosion allowance adequate for the remaining item life or can be supplied with an optional corrosion resistant liner. Design PMCap s can be designed to various codes or standards. Primarily, the ASME Section III, or VIII, Division 1 code is used for components that will be us to repair vessels originally constructed to the ASME code. Details on designing a PMCap for compliance with the ASME VIII, Div. 1 code are provide below. PMCap s are designed for vessel internal and external design pressures, including pressurization of the cavity should the encapsulated wall be breeched. These loadings cause both membrane and bending stresses in the skirt and flat head portion of the PMCap. The PMCap is designed to satisfy these loadings per ASME code rules and stress acceptance criteria. Thickness determination is based on design pressure and area replacement criteria. As a minimum, code criteria, contained in Sections UG-27, Thickness of Shells Under Internal Pressure, UG-28, Thickness of Shells Under External Pressure, UG-34, Unstayed Flat Heads and Covers, and Appendix 13, Vessels of noncircular Cross Section are followed as applicable. Additionally, Code rules contained in Appendix 1, Supplementary Design Formulas, and Appendix 14, Integral Flat heads with a Large, Single, Circular, Centrally Located Opening, as applicable, are considered. The PMCap is designed to integrally reinforce the shell to improve structural and pressure retention integrity. Code rules contained in Section UG-37, Reinforcement Required for Openings in Shells and Formed Heads, are followed to determine the thickness of the flat head portion of the PMCap required for reinforcement of the local thin area. Generally, vessel wall encapsulated by the PMCap is not included in strength or reinforcement design. However, this wall provides an erosion/corrosion barrier that may be used in determining remaining service life. Corrosion allowances for remaining design life are calculated and added to thickness requirements governed by code stress and reinforcement rules. Alternatively, the PMCap can be provided with an erosion/corrosion resistant liner. No strength or reinforcement credit is taken for the encapsulated area or material provided solely for erosion/corrosion protection. Vessels, which have been repaired with PMCap s, meet or exceed original design and have improved erosion/corrosion resistance at the repaired location. Fabrication The PMCap is usually round but can be square, rectangular, obround, oval, Page 3
4 triangular, or any combination of these shapes. They can be constructed to various codes and standards but are generally constructed in compliance with ASME code requirements. Fabrication discussions provide herein are based on ASME code construction. PMCap s are fabricated from a single piece of material or by welding composite pieces. They are rolled, machined, formed, forged, or cast to fit the contour of the outer surface of the pressure boundary they are to be attached to. All internal machined radii are designed to reduce stress concentrations if the cavity is pressurized during operation. The reinforcement plate head weld can be shop pressure tested for fabricated PMCap s. PMCap s can be supplied as either ASME code material or ASME code-stamped U or N components. They can be pre-staged for future repairs and rolled to fit prior to installation. An PMCap package includes hardware, material certifications, examination and test reports, partial data reports, shop fabrication drawings, and certified calculations. A detail of an installed PMCap cross section is shown in Figure 1. Installation The PMCap is attached by a full penetration weld to the pressure boundary outer surface. The internal cavity between the pressure boundary surface and the inner surface of the PMCap allows for volumetric examination of the attachment weld. If pressure testing of the attachment weld is required, the PMCap can be supplied with pressure taps for use in pressurizing the cavity (note: the encapsulated area thickness will need to support hydrostatic testing as well). Alternatively, a small hole can be drilled into the existing pressure boundary for complete vessel hydro and in-service pressure testing.. DESIGN OBJECTIVES AND ADVANTAGES OVER CURRENT REPAIR METHODS The objectives in designing the PMCap were to provide a simple, safe, cost effective method of repairing pressure boundaries in compliance with original design codes. An additional design objective was to provide a repair method that alleviated or eliminated many if not all of the negative aspects of the current common methods of repair using the flush patch or weld buildup type repairs. Various national codes, including but not limited to, the American Society of Mechanical Engineers (ASME), American National Standards Institute (ANSI), Tubular Exchanger Manufacturers Association (TEMA), American Petroleum Institute (API), and National Board Inspection Code (NBIC) govern construction, operation, and in-service inspection. Local jurisdictional authorities may specify combinations of these governing codes for construction, operation, and inspection. The PMCap solves many of the negative aspects of current common methods of repair and offers several advantages. These include but are not limited to: 1. May not require removal of the pressure retaining item from service. 2. Does not require removal of defective section from vessel wall. Page 4
5 3. Does not require vessel shell 9. Eliminates need to breech preparation for PMCap weld attachment. 10. pressure boundary for repairs. Eliminates need for personnel to 4. Does not require weld joint access inside of vessel. backing strips. 11. Eliminates contaminated 5. Eliminates risk of personnel material disposal costs. exposure to lethal or hazardous 12. Allows for hydrostatic or vessel contents. pneumatic testing after repairs. 6. Eliminates environmental risks associated with release of contents. 7. Eliminates risk of damage to vessel internals. 8. Eliminates risk of intrusion of foreign materials. 13. No geometric shape limitations. 14. Quick and simple to install thus reducing costs associated with repair or equipment downtime. PMCap may be drilled & tapped for pressure test (optional) t Hub tcap t Pressure t Area Replacement NEW PRESSURE Chamber Height FULL PENETRATION WELD PER ASME FIG. NC-4244(b)-1(a) ASME FIG. UW 16.1(a) Optional Erosion/Corrosion Liner TORUS WALL Figure 1 Page 5
Oil and Gas Pipeline Design, Maintenance and Repair
Oil and Gas Pipeline Design, Maintenance and Repair Dr. Abdel-Alim Hashem Professor of Petroleum Engineering Mining, Petroleum & Metallurgical Eng. Dept. Faculty of Engineering Cairo University [email protected]
TUBE-TO-TUBESHEET JOINTS: THE MANY CHOICES ABSTRACT KEYWORDS. Seal welding, tube-to-tubesheet welds, heat exchanger, mock-up, tube expansion
B. J. Sanders Consultant 307 Meyer Street Alvin, Texas 77511 TUBE-TO-TUBESHEET JOINTS: THE MANY CHOICES ABSTRACT After a decision has been made to use zirconium as the material of construction for a shell
BODY OF KNOWLEDGE API-653 ABOVEGROUND STORAGE TANK INSPECTOR CERTIFICATION EXAMINATION November 2015, March 2016 and July 2016 (Replaces October 2013)
BODY OF KNOWLEDGE API-653 ABOVEGROUND STORAGE TANK INSPECTOR CERTIFICATION EXAMINATION November 2015, March 2016 and July 2016 (Replaces October 2013) API Authorized Aboveground Storage Tank Inspectors
BODY OF KNOWLEDGE API-510 PRESSURE VESSEL INSPECTOR CERTIFICATION EXAMINATION
BODY OF KNOWLEDGE API-510 PRESSURE VESSEL INSPECTOR CERTIFICATION EXAMINATION May and September, 2016 and January 2017 (Replaces May 2015) API Authorized Pressure Vessel Inspectors must have a broad knowledge
ASTM A860/A860M-09 Standard Specification for Wrought High Strength. Ferritic Steel Butt Welding Fittings. 1. Scope :- 2. Reference Documents :-
Standard Specification for Wrought High Strength Ferritic Steel Butt Welding Fittings 1. Scope :- 1.1 This specification covers wrought high strength ferritic steel butt-welding fitting of seamless and
TITANIUM FABRICATION CORP.
TITANIUM FABRICATION CORP. Titanium, Zirconium, and Tantalum Clad Construction General Considerations In many applications, particularly for large pressure vessels designed for high temperature and pressure,
Heat Exchanger Thin Film Foul Release Applications Corrosion Resistant Protective Coatings Grit Blast Surface Prep of Tubular Equipment
Heat Exchanger Thin Film Foul Release Applications Corrosion Resistant Protective Coatings Grit Blast Surface Prep of Tubular Equipment Non-Destructive Examination Heat Exchanger Mechanical Repair Services
Supporting New Build and Nuclear Manufacturing in South Africa
ASME Nuclear Codes and Standards Supporting New Build and Nuclear Manufacturing in South Africa Sandton, South Africa, October 7-8, 2008 Session 3 Section III - Component Design and Construction Ralph
Pressure vessel basics for all engineers
Pressure vessel basics for all engineers by Sharjeel Aslam Faiz 1. Contents 2. Preliminary Design... 3 3. Loads... 3 4. Detailed design... 3 5. Information in-flow to a fabrication drawing... 4 6. Information
PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta
PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification Number: 3503-11.2.610 Rev. 2 Rubber Lined Steel Pipe and Fittings Mechanically Coupled Plain End Type System Issued Revised Approved
TO TEST OR NOT TO TEST: A COMPARISON OF THE PRESSURE TESTING REQUIREMENTS BETWEEN ASME B31.3 AND ASME SECTION VIII, DIVISION 1
ASSET INTEGRITY INTELLIGENCE Featured Article TO TEST OR NOT TO TEST: A COMPARISON OF THE PRESSURE TESTING REQUIREMENTS BETWEEN ASME B31.3 AND ASME SECTION VIII, DIVISION 1 SERGE BISSON, GCM Consultants,
Pressure Vessel Assessment Report
Project Information Client: Total Energy Location: Blackwell OK Date: 7/23/2013 Contact: Integrity Mgmt. Advisor: Chuck Easterbrooks - API 510 #2212 Cc: API / UT Inspector: Robert Van Pelt-API 510# 40899
Holes & Selective Laser Sintering
SLS is one of the most accurate 3D printing processes. The process has a layer thickness of 0.1mm. This is the thickness with which a new layer is added to each part. In any direction therefore the maximum
TARIFF CODE and updates standard
TARIFF CODE and updates standard No HS CODE AHTN CODE PRODUCT DESCRIPTION PRODUCT TYPE STANDARDS IDENTIFIED 7207 Semi finished products of iron or non alloy steel Containing by weight less than 0.25% of
Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants
Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants Published in the Official State Gazette (BOE) No 283 of November 24 th 2009 Nuclear Safety Council Instruction
Nondestructive Testing: Why, When, What and How?
: Why, When, What and How? Executive Summary Non-destructive testing (NDT) relates to the examination of materials for flaws without harming the object being tested. As an industrial test method, NDT provides
NON-DESTRUCTIVE TESTING LEARNING FROM THE PAST, MAXIMISING FUTURE BENEFITS.
NON-DESTRUCTIVE TESTING LEARNING FROM THE PAST, MAXIMISING FUTURE BENEFITS. Harry Bainbridge, Health & Safety Executive, Bootle Bernard McGrath, AEA Technology plc, Risley Crown Copyright 2001. Reproduced
BODY OF KNOWLEDGE API-570 AUTHORIZED PIPING INSPECTOR CERTIFICATION EXAMINATION
BODY OF KNOWLEDGE API-570 AUTHORIZED PIPING INSPECTOR CERTIFICATION EXAMINATION 2015 (Replaces July 2013) API Authorized Piping Inspectors must have a broad knowledge base relating to maintenance, inspection,
DECIPHERING WELD SYMBOLS
DECIPHERING WELD SYMBOLS When welds are specified on engineering and fabrication drawings, a cryptic set of symbols issued as a sort of shorthand for describing the type of weld, its size, and other processing
Caps STANDARD WEIGHT Inches / Pounds
Standard Caps you are here: Home > Weldbend Catalog > Fittings > Caps Caps STANDARD WEIGHT Inches / Pounds For Metric Units >Click Here Nominal Pipe Size Outside Inside Wall Thickness (T) Length (E) Pipe
3. Inspections performed at Doel 3 in June-July 2012
Flaw indications in the reactor pressure vessel of Doel 3 This note provides a summary of the information available on the 3 rd of September 2012. 1. Purpose Summary of the available information and preliminary
American Petroleum Institute Purchasing Guidelines Purchase API Spec 7K online at www.api.org/publications
Purchase API Spec online at www.api.org/publications 7.9.3 Forgings and Castings All repair welding shall be performed in accordance with the manufacturer s written welding specifications. WPSs shall be
SECTION 02612 NONREINFORCED CONCRETE SEWER PIPE
SECTION 02612 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Furnishing and installing nonreinforced concrete sewer pipe. Provide concrete sewer pipe less than 12 inches in diameter, and in other sizes
SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
www.klmtechgroup.com TABLE OF CONTENT
Page : 1 of 45 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT 1.0 SCOPE 2 2.0 CONFLICTS
NCCER 13614 Progress Blvd., Alachua, FL 32615 Tel: (888) 622-3720 E-mail: [email protected]. Task Number Item Date(s) Recorded By
NCCER 13614 Progress Blvd., Alachua, FL 32615 Tel: (888) 622-3720 E-mail: [email protected] PIPELINE MAINTENANCE On-the-Job Training Level One MODULE 66101-02 INTRODUCTION TO THE PIPELINE INDUSTRY This is
HYLINER AKS HDPE LINING
HYLINER AKS HDPE LINING FOR CONCRETE PIPE Manufactured from HDPE Available in white and black Sheets up to 3 m width D1.12 HyLiner AKS HDPE Lining for Concrete Pipe October 2013 0800 WE PIPE (93 7473)
Summary of Changes in. ASME Section IX, 2000 Addenda
Summary of Changes in ASME Section IX, 2000 Addenda Prepared by Walter J. Sperko, P.E. Sperko Engineering Services, Inc 4803 Archwood Drive Greensboro, NC 27406 USA Voice: 336-674-0600 FAX: 336-674-0600
DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab,
DESIGN OF SLABS Dr. G. P. Chandradhara Professor of Civil Engineering S. J. College of Engineering Mysore 1. GENERAL A slab is a flat two dimensional planar structural element having thickness small compared
Subsection A GENERAL REQUIREMENTS
Subsection A GENERAL REQUIREMENTS PART UG UG-1 Scope... 13 Materials UG-4 General... 13 UG-5 Plate... 13 UG-6 Forgings... 14 UG-7 Castings... 14 UG-8 Pipe and Tubes... 14 UG-9 Welding Materials... 14
3. Inspections performed at Doel 3 in June-July 2012
Flaw indications in the reactor pressure vessels of Doel 3 & Tihange 2 This note provides a summary of the information available on the 12th of October2012. 1. Purpose Summary of the available information
1.2 For piping systems that operate at hoop stress of 20% or more of the Specified Minimum Yield Strength the following shall apply.
1.0 JOINT FIT-UP AND ALIGNMENT 1.1 For piping systems that operate at hoop stress of less than 20% and the internal adjoining ends do not vary more than 1 / 8 in. and adequate penetration and fusion can
MATHEMATICS FOR ENGINEERING BASIC ALGEBRA
MATHEMATICS FOR ENGINEERING BASIC ALGEBRA TUTORIAL 4 AREAS AND VOLUMES This is the one of a series of basic tutorials in mathematics aimed at beginners or anyone wanting to refresh themselves on fundamentals.
Tentative Interim Amendment NFPA 59A. Standard for the Production, Storage, and Handling of Liquefied Natural Gas (LNG) 2016 Edition
Tentative Interim Amendment NFPA 59A Standard for the Production, Storage, and Handling of Liquefied Natural Gas (LNG) 2016 Edition Reference: Various TIA 16-1 (SC 15-12-4 / TIA Log #1187R) Note: Text
Spill Prevention, Control and Countermeasure Plan (SPCC) Program
United States Environmental Protection Agency Office of Emergency Management August 2013 www.epa.gov/emergencies Spill Prevention, Control and Countermeasure Plan (SPCC) Program Bulk Storage Container
FRICTION MATERIALS & BONDING SERVICES
FRICTION MATERIALS & BONDING SERVICES World Class Friction Materials & Bonding Services The Industry Leader Midwest Brake has been a leading supplier of non asbestos industrial friction material and bonding
Liquid Hydrogen Pressure Vessel Analysis
OAK RIDGE NATIONAL LABORATORY Liquid Hydrogen Pressure Vessel Analysis Claire R. Luttrell 9/18/2007 1.0 INTRODUCTION An SNS experiment is being designed that includes a 20 liter liquid hydrogen (LH2) target.
JIS G3472 Electric Resistance Welded Carbon Steel Tubes for Automobile Structural Purposes
JIS G3472 Electric Resistance Welded Carbon Steel Tubes for Automobile Structural Purposes 1. Scope This Japanese Industrial Standard specifies the electric resistance welded carbon steel tubes, hereinafter
Meeting the Challenge of Pipeline Emergency Repair
Meeting the Challenge of Pipeline Emergency Repair Michael R. McReynolds, PE, SE 1 Tao Peng, PE, SE 2 ABSTRACTS The Metropolitan Water District of Southern California (MWD) is the nation s largest provider
SPECIFICATIONS FOR STEEL PIPE
SPECIFICATIONS FOR STEEL PIPE Published pipe standards serve three functions. 1. They dictate manufacturing and testing requirements and prescribed methods of measuring the required mechanical and physical
WATERPROOFING OF WET ROOMS
WATERPROOFING OF WET ROOMS Waterproofing under tiles For longterm enjoyment of a wetroom area a complete and resistant waterproofing system is an important precondition. Most tiles are by themselves waterproof
6D 23 rd Edition, April 2008 Specification for Pipeline Valves
Handbook API Specification 6D 23 rd Edition, April 2008 National Adoption of ISO 14313 Petroleum and natural gas industries Pipeline transportation systems Pipeline valves API Monogram Required Yes No
ENGINEERING SPECIFICATION FIBERGRATE MOLDED GRATING. January 24, 2014 06610-1
ENGINEERING SPECIFICATION FIBERGRATE MOLDED GRATING January 24, 2014 06610-1 SECTION 06610 FIBERGLASS REINFORCED PLASTICS (FRP) FABRICATIONS MOLDED GRATING PART 1 - GENERAL 1.1 SCOPE OF WORK A. The CONTRACTOR
PART E SPECIFICATIONS
PART E SPECIFICATIONS Page 1 of 5 PART E - SPECIFICATIONS GENERAL E1. APPLICABLE SPECIFICATIONS, STANDARD DETAILS AND DRAWINGS E1.1 The City of Winnipeg Works and Operations Division Standard Construction
June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL
7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction
Gas Turbine Metallurgy, Coatings and Repair Technology Workshop May 2 nd, 2010
Gas Turbine Metallurgy, Coatings and Repair Technology Workshop May 2 nd, 2010 ITSC 2010 Singapore May 3-5, 2010 Fairmont Singapore Raffles City Convention Centre Course Instructors Jeff Smith Materials
Corrugated Tubular Heat Exchangers
Corrugated Tubular Heat Exchangers HEAT EXCHANGERS for the 21st CENTURY Corrugated Tubular Heat Exchangers (CTHE) Corrugated Tube Heat Exchangers are shell and tube heat exchangers which use corrugated
Looking into other Industries Qualification of NDT for Swiss Nuclear Utilities
4th International Symposium on NDT in Aerospace 2012 - Th.2.B.4 Looking into other Industries Qualification of NDT for Swiss Nuclear Utilities Klaus DRESSLER, Daniel ALGERNON, Philip KICHERER SVTI Swiss
Since 1978. HMT Inc. 24 Waterway Avenue, Suite 400 The Woodlands, Texas 77380 Ph: +1.281.681.7000 Fax: +1.281.419.7689
WaTER & wastewater HMT Inc. 24 Waterway Avenue, Suite 400 The Woodlands, Texas 77380 Ph: +1.281.681.7000 Fax: +1.281.419.7689 Locations worldwide to service all your needs. VAPORVAULT and ALUMINATOR are
NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK
ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within
SECTION III, DIVISIONS 1 AND 2
SECTION III, DIVISIONS 1 AND 2 Subject Interpretation File No. Division 1, Appendix I, Fig. I-9.1, Design Fatigue Curve for Martensitic Stainless Steel... III-1-13-48 12-1021 Division 1, NB-2223.3, Coupons
NDT Procedure for Liquid Penetrant Inspection TRINITY NDT. An ISO 9001:2008 Certified Company
NDT Procedure for Liquid Penetrant Inspection A Nondestructive testing (NDT) Procedure suitable for General Liquid/Dye Penetrant Inspections. This is a sample LPT procedure and may be required to be modified
The Augustus Group Products Projects and Engineering Consulting. ASME BOILER AND PRESSURE VESSEL CODE Mike Looram
The Augustus Group Products Projects and Engineering Consulting ASME BOILER AND PRESSURE VESSEL CODE Mike Looram ASME B&PV CODE SECTION VIII DIV. 1 Bolted Flanges With Ring Type Gaskets Stress Calculations
List of Frequently Utilized Storage Tank Standards and Practices
List of Frequently Utilized Storage Tank Standards and Practices Below is a list of frequently used storage tank standards and practices from organizations that are referenced in 25 PA Code, Chapter 245.
Structural Failures Cost Lives and Time
Structural Failures Cost Lives and Time Recent failures of storage bins, silos and other structures highlight the need to increase awareness of hazards associated with these structures. Since 2010, one
Pressure Vessel acc. to PED for Chemical Industry fabricated in China
Pressure Vessel acc. to PED for Chemical Industry fabricated in China Kurt Schumacher ACHEMASIA 2013 Beijing May 14, 2013 Folie 1 Introduction Investment projects in the chemical/petrochemical industry
CURRENT EXPERIENCE IN TYPICAL PROBLEMS AND FAILURES WITH BOILER PIPING COMPONENTS AND SUPPORTS
A DB RILEY TECHNICAL PUBLICATION CURRENT EXPERIENCE IN TYPICAL PROBLEMS AND FAILURES WITH BOILER PIPING COMPONENTS AND SUPPORTS by James P. King, Design Manager DB Riley, Inc. Presented at the 1998 ASME
INSTRUCTIONS FOR COORDINATION SECTION 06651 SOLID SURFACE FABRICATIONS
INSTRUCTIONS FOR COORDINATION SECTION 06651 SOLID SURFACE FABRICATIONS 1. Paragraph 1.02 Provide solid surface countertops at sinks locations. Provide solid surface window sills at drywall framing walls.
WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12
WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 87 88 GOOD INDUSTRY PRACTICES 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12.1 BACKGROUND Most roofs in Singapore are constructed using reinforced
James M. Pleasants Company
James M. Pleasants Company SUBMITTAL DATA GAINESVILLE MECHANICAL DECEMBER 20, 2013 PROJECT: GSU: J-183 HUMANITIES LAW BLDG. QUOTE NO:12116 ENGINEER: STEVENS & WILKINSON GASKETED PLATE HEAT EXCHANGER Tag:
Structural welding is a process by which the parts that are to be connected are heated and
CHAPTER 6. WELDED CONNECTIONS 6.1 INTRODUCTORY CONCEPTS Structural welding is a process by which the parts that are to be connected are heated and fused, with supplementary molten metal at the joint. A
How to Build a Printed Circuit Board. Advanced Circuits Inc 2004
How to Build a Printed Circuit Board 1 This presentation is a work in progress. As methods and processes change it will be updated accordingly. It is intended only as an introduction to the production
www.klmtechgroup.com TABLE OF CONTENT
Page : 1 of 32 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia INSTALLATION, FLUSHING AND TABLE OF
Specification for Pipe Coating Repairs Offshore
Specification for Pipe Coating Repairs Offshore Specification for Pipe Coating Repairs Offshore 1 of 6 Table of Contents 1.0 SCOPE... 3 2.0 REFERENCE DOCUMENTS... 3 3.0 MATERIALS... 3 4.0 EQUIPMENT AND
Testing & Consulting Engineering. NDT Industrial Environmental D.O.T, Construction & Mechanical. www.unifiedtesting.com
Testing & Consulting Engineering NDT Industrial Environmental D.O.T, Construction & Mechanical www.unifiedtesting.com NONDESTRUCTIVE TESTING (NDT) SERVICES UTS Nondestructive Testing (NDT) Services provides
Section 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
Chapter 2 Basis of design and materials
Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural
SPR PE Steel Reinforced Liner
ENGINEERED SOLUTIONS SPR PE Steel Reinforced Liner Reline Done Right Contech is your single source for rehabilitation of sanitary & storm sewers, culverts and bridges. Contech Engineered Solutions has
External Wrapping of Steel Riser Pipe. Case Study HJ3 CS200902
External Wrapping of Steel Riser Pipe Case Study HJ3 CS200902 Introduction Refineries process a wide variety of petroleum products. As part of the process, they rely on cooling towers, which recycle water
Openings in ASME Code Pressure Vessels. Introduction
Copyright 2005-2009 Randall W. Whitesides, P.E. Introduction Working one s way through the ASME Code (hereafter referred to simply as the Code) on the subject of unfired pressure vessel openings has been
SAMPLE TEST PAPER - I
SCHEME E SAMPLE TEST PAPER - I Course Name : Mechanical Engineering Group Course Code : AE/PG/PT/ME/MH/FE Semester : Third Subject : Mechanical Engineering Drawing 12042 Time : 90 Minutes Marks: 25 Instruction:
Technical Report Example (1) Chartered (CEng) Membership
Technical Report Example (1) Chartered (CEng) Membership A TECHNICAL REPORT IN SUPPORT OF APPLICATION FOR CHARTERED MEMBERSHIP OF IGEM DESIGN OF 600 (103 BAR) 820MM SELF SEALING REPAIR CLAMP AND VERIFICATION
Welding of Boilers, Pressure Vessels and Pressure Piping
WELDING OF BOILERS, PRESSURE VESSELS 1 Welding of Boilers, Pressure Vessels and Pressure Piping Repealed by Chapter B-5.1 Reg 1 (effective January 1, 2007) Formerly Saskatchewan Regulation 61/78 (effective
Conceptual Design of Buildings (Course unit code 1C2)
(Course unit code 1C2) Module C Design of Steel Members J.P. Jaspart (University of Liège) 520121-1-2011-1-CZ-ERA MUNDUS-EMMC Bolts are the main type of fasteners used in steel joints. The main geometrical
Solid shape molding is not desired in injection molding due to following reasons.
PLASTICS PART DESIGN and MOULDABILITY Injection molding is popular manufacturing method because of its high-speed production capability. Performance of plastics part is limited by its properties which
Guidelines for Earthquake Bracing Residential Water Heaters
Guidelines for Earthquake Bracing Residential Water Heaters Department of General Services Division of the State Architect In accordance with the Health and Safety Code Section 19215, the Division of the
Qualification of In-service Inspections of NPP Primary Circuit Components
Qualification of In-service Inspections of NPP Primary Circuit Components ABSTRACT Matija Vavrouš, Marko Budimir INETEC Institute for nuclear technology Dolenica 28, 10250 Zagreb, Croatia [email protected],
Turnaround and Maintenance Services
Turnaround and Maintenance Services Reliably providing quality turnaround and maintenance services safely Matrix Safe a cultural mindset For us, safety is more than a core value. It s a way of life. We
ATI 2205 ATI 2205. Technical Data Sheet. Duplex Stainless Steel GENERAL PROPERTIES. (UNS S31803 and S32205)
ATI 2205 Duplex Stainless Steel (UNS S31803 and S32205) GENERAL PROPERTIES ATI 2205 alloy (UNS S31803 and/or S32205) is a nitrogen-enhanced duplex stainless steel alloy. The nitrogen serves to significantly
Chapter 5 - Aircraft Welding
Chapter 5 - Aircraft Welding Chapter 5 Section A Study Aid Questions Fill in the Blanks 1. There are 3 types of welding:, and, welding. 2. The oxy acetylene flame, with a temperature of Fahrenheit is produced
American Petroleum Institute Purchasing Guidelines Purchase API Spec 5CT online at www.api.org/publications
API Specification 5CT ISO 11960:2011 Petroleum and natural gas industries Steel pipes for use as casing or tubing for wells 9th Edition, June 2011 Table of Contents 1.0 Product 1.1 Products 1.2 Casing
Lecture slides on rolling By: Dr H N Dhakal Lecturer in Mechanical and Marine Engineering, School of Engineering, University of Plymouth
Lecture slides on rolling By: Dr H N Dhakal Lecturer in Mechanical and Marine Engineering, School of Engineering, University of Plymouth Bulk deformation forming (rolling) Rolling is the process of reducing
725-R-599 PIPE LINING. (Revised 05-01-12) SECTION 725, BEGIN LINE 1, INSERT AS FOLLOWS: SECTION 725 SLIP LINING OF EXISTING PIPE
PIPE LINING (Revised 05-01-12) The Standard Specifications are revised as follows: SECTION 725, DELETE LINES 1 THRU 317. SECTION 725, BEGIN LINE 1, INSERT AS FOLLOWS: SECTION 725 SLIP LINING OF EXISTING
DEPARTMENT OF DEFENSE ALLIED NATIONS TECHNICAL CORROSION CONFERENCE. November 15-19, 2015 Pittsburgh, PA, USA. Technical Program
DEPARTMENT OF DEFENSE ALLIED NATIONS TECHNICAL CORROSION CONFERENCE November 15-19, 2015 Pittsburgh, PA, USA Technical Program Corrosion Policy Track: Topic: Corrosion Management T.S. NAVAIR Corrosion
ME 111: Engineering Drawing
ME 111: Engineering Drawing Lecture # 14 (10/10/2011) Development of Surfaces http://www.iitg.ernet.in/arindam.dey/me111.htm http://www.iitg.ernet.in/rkbc/me111.htm http://shilloi.iitg.ernet.in/~psr/ Indian
NDT Procedure for Liquid Penetrant Inspection
NDT Procedure for Liquid Penetrant Inspection A Nondestructive testing (NDT) Procedure suitable for General Liquid/Dye Penetrant Inspections. This is a sample LPT procedure and may be required to be modified
Seawater corrosion resistant piping systems for large diameters up to 100 / 2.5 metres O.D.
OSNA -10 Copper-Nickel Lined Pipes Seawater corrosion resistant piping systems for large diameters up to 100 / 2.5 metres O.D. KME Germany AG & Co. KG Copper-Nickel Lined Pipes [GB] Member of the KME Group
Flowserve - Edward Valves Development of the Flowserve Edward Equiwedge Gate Valve
Flowserve - Edward Valves Development of the Flowserve Edward Equiwedge Gate Valve Problem Gate valves in severe service applications that experience premature trim wear from seat guided discs or leakage
DTU Animal Cart Programme
DTU Animal Cart Programme TECHNICAL 21 RELEASE PIPE AND ROLLER DONKEY CART AXLES Development Technology Unit, Department of Engineering, University of Warwick, Coventry, CV4 7AL UK, tel: +44 (0)1203 523523
API Upstream Standard Development Update - Supply Chain Management. Rick Faircloth
API Upstream Standard Development Update - Supply Chain Management Rick Faircloth o Overview of API 20 Series Supply Chain Management Overview of API 20 Series Supply Chain API formed in 1919 as a national
SIDE SEWER CONDITION ASSESSMENT AND REPAIR RECOMMENDATIONS
SIDE SEWER CONDITION ASSESSMENT AND REPAIR RECOMMENDATIONS Introduction City of Tacoma property owners are responsible for the construction, maintenance and repair of private side sewers, which connect
Bending, Forming and Flexing Printed Circuits
Bending, Forming and Flexing Printed Circuits John Coonrod Rogers Corporation Introduction: In the printed circuit board industry there are generally two main types of circuit boards; there are rigid printed
Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.
CI/SfB Tn6 L6813 September 2013 RIW CAVITY DRAIN R20 R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high. Other systems are available for specific uses,
FPO. Meeting and Exceeding API Standards: How Much Testing Do Pumps Really Need? White Paper
White Paper Meeting and Exceeding API Standards: How Much Testing Do Pumps Really Need? John Bailey, API Global Product Manager Marc DeSilva, Global Product Director, Oil & Gas Plant Performance Services
GENERAL RUBBER LINING PRINCIPLES
GENERAL RUBBER LINING PRINCIPLES I. METAL PREREQUISITES Metal to be lined should meet the requirements as stated in section 8 Metal Fabrication and section 12 Blasting and Cementing Procedures. The surface
