Power Transformers Economics of Refurbishment vs Replacement

Similar documents
TRANSFORMERS AFTERMARKET SPARES, SERVICE & REPAIR

Power transformers. Generator step-up and system intertie power transformers Securing high-quality AC transmission

Power Transformers 10 to 100 MVA

THE VALUE OF POWER FACTOR TESTING

Electrical Maintenance Workshop

ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F

Transforming know-how into solutions. Siemens Transformer Service TLM

Transformer Fleet Management with e-terraassetcare

Power Transmission and Distribution. Shunt reactors for medium and highvoltage. From development to use

GE Energy Transformer Monitoring: How Moving forward from Monitoring to Diagnostics can Positively Impact Indian Business and Industry

ELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV

2013 RESIBLOC transformers Product presentation. ABB Group October 2, 2013 Slide 1

ESCOM BY G.KALINDE SUBSTATIONS ENGINEER

Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components

Smart Asset Management

Modular Systems wind portfolio overview Power Collection and Grid Connection products

Power transformers. Special transformers Railway

PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS

CONNECTING YOU TO SPECIALIST ELECTRICAL SUPPORT services

Modular Systems, PPMV, 2014 UniPack-G Glass Fiber Reinforced Polyester Compact Secondary Substation

Facility Support Services

THE OLTC AS AN "OIL ISOLATED SYSTEM" IN THE TRANSFORMER & OIL ANALYSIS IN OLTC. I Hr. Dr. Hurm, Hr. Dr. Schübel I I

Alstom Grid Services. Transformer lifecycle management GRID

Power Voltage Transformers for Air Insulated Substations. THE PROVEN POWER.

SAUDI ELECTRICITY COMPANY (SEC) SAUDI ARABIA

Global Scope of Hitachi s Power Distribution Systems Business and its Role in Building Strong Grids

Power transformers. Phase shifting transformers Reliable and efficient power flow control

Tamini is the leading Italian company in the world for the design and production of industrial, power and special transformers.

Primary and Secondary Electrical Distribution Systems

Diesel Engine Driven Generators Page 1 of 6

On-line monitoring of substation condition a Romanian experience. V. ZAHARESCU, Vl. ROSCA Nova Industrial SA. CN Transelectrica SA Romania

TYPE TEST CERTIFICATE OF SHORT-CIRCUIT PERFORMANCE. A three-phase outdoor oil-immersed distribution transformer

Metal Clad Indoor Instrument Transformer for Plug-In Systems

ANCILLARY EQUIPMENT AND ELECTRICAL EQUIPMENT Power Supply Systems and Electrical Equipment for Desalination Plants - Y.M. Hamud and A.H.

Distribution Voltage Regulators

ABB Brasil. Power Transformers: Life Cycle and Operational Cost Optimization From Purchase to Minimum Maintenance

Dry-type transformers. Dry-type transformers from ABB The ideal solution for the oil and gas industry

United Arab Emirates Helping to build the future

HI TECH TRANSFORMER MAINTENANCE (PTY) LTD. COMPANY PROFILE AND OVERVIEW 19 March 2012

Takfan Machinery and Mould Co Ltd. Plug in Bushing. LV Monoblock. RMU Bushing. 4 Way CT Terminal.

Monitoring, Diagnostics, or Changing Condition?

Tour of new eircom Data Centre Blanchardstown by Dervan Engineering Consultants 11 th March 2015

Presentation to CIGRE Next Generation Network. Visit of Seine substation

Cooling system components, removing and installing

Draining and filling cooling system

TRANSFORMING THE UTILITY INDUSTRY

Work in Substations - General

2. INDUCTIVE VOLTAGE TRANSFORMERS Oil-paper insulation Gas insulation

Hydro Plant Risk Assessment Guide

WINDING RESISTANCE TESTING

Dead Tank Circuit Breaker 72PM40-C Proven reliability through common platforms

CAPACITOR BANK TESTING SWP

DRY TYPE TRANSFORMER

Discussion on Class I & II Terminology. IEEE PES Transformers Committee Fall Meeting 2011 Boston, MA

Cooling System, Draining and Filling. Special tools, testers and auxiliary items required. Adapter V.A.G 1274/8. Drip tray V.A.

AUTOMOBILE MECHANIC STUDENT INTERNSHIP SKILLS LIST Provo School District

Saudi Electricity Company (SEC) Restructuring Project

Root-Cause Analysis of Transformer Failure Scenario at Power Sub-Station

Transformers. Special transformers Reactors products

CDS TROUBLESHOOTING SECTION I. VACUUM Weak vacuum at wand. Gauge reads normal (10hg to 14hg)

Siemens presents new DC grid connection for offshore wind farms Siemens AG 2015 All rights reserved. siemens.com/grid-access-solutions

Environmental Product Declaration

RENEWABLE ENERGY SUBSTATIONS SOLAR PHOTOVOLTAIC AND WIND POWER. tgood.com. Energy. Fast.

Volkswagen Golf > VW Rabbit GTI 2006->

Presentation of the France Transfo factories

Cooling system components, removing and installing

ELECTROPUTERE ROTATING ELECTRICAL MACHINES DIVISION

Volkswagen B3 Passat General-Engine 4 CYL. 19 Engine - Cooling System (Page GR-19)

Energy consumption. Environmental indicators

Company Profile. New and overhauled Power Plants for sale

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited

How To Choose A Transformer

ABB turnkey stations ULTRA-MVC-S 770 to 3110 kw

Achieving Operational Efficiencies through On-Line Substation Monitoring. Vince Polsoni Powerstream Inc. Manager Station Sustainment EDIST 2016

Volkswagen New Beetle 2.0 Liter 4-cyl General, Engine (Engine Code AEG) 17 Engine-Lubrication system (Page GR-17)

Hyperlinks are Inactive

ABB Power Systems. Substations References

MINUTES OF MEETING OF THE STANDING COMMITTEE OF EXPERTS TO INVESTIGATE THE FAILURE OF 220 KV AND ABOVE VOLTAGE CLASS SUBSTATION EQUIPMENT HELD ON 04

REMOVAL AND INSTALLATION

MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING

CATHODIC PROTECTION TRANSFORMER RECTIFIER (CPTR)

Unit 6 Transformers. Lead-in. Basic principles. Task 1. Task 2. What applications of transformers do you know?

Together we create reliable products, thus ensuring development of power industry of continents.

Attachment SA Power Networks: Asset Management Plan Substation Transformers 2014 to 2025

Distribution Substation Manual (DSM) Section I - Introduction

DISSOLVED GAS ANALYSIS OF MINERAL OIL INSULATING FLUIDS

2012 Volkswagen CC Sport. ENGINE 2.0 Liter - Cooling System - Engine Code(s): CBFA & CCTA. 2.0 Liter - Cooling System - Engine Code(s): CBFA & CCTA

SIEMENS Transmission and Distribution

Practical Transformers: Operation, Maintenance and Testing

Transformer Design & Design Parameters

Liquid Filled Transformers Load Tap Changing Transformers Three-Phase Voltage Regulators

Transformers: Basics, Maintenance, and Diagnostics

Respecting the environment

MiCAFIL. 1 RIP Technology. Bushings. Z. Zic 09/2003

Product brochure Multi Functional Switchgear PASS M kv Flexible and compact switchgear solutions for windfarms

COMPANY PROFILE. The main markets serviced by Bahra Cables Company are Saudi Arabia and the countries belonging to the Gulf Cooperating Council (GCC).

ABB PSPS Erich Steinmann; Generator control-2013

Power Plant Electrical Distribution Systems

Vision 2050 An Asset Management Strategy. Jaclyn Cantler Manager, Transmission Planning, PHI

Transcription:

Power Transformers Economics of Refurbishment vs Replacement Presenter: Mohammad R Siddiqui National Grid, Saudi Arabia Co Authors: Abdullah O Bamousa National Grid, Saudi Arabia

Introduction This paper is based on Data obtained from the Grid Interaction with some Transformer manufacturers. Technical Papers published on the different components of Power Transformers Ongoing Projects in the Grid

The Need to Refurbish/Renovate In the early seventies, Utilities went for a H V Transmission Level of 110kV/132 kv. In the Western Region Grid, 238 of a total of 730 Transformers were commissioned between 1975 to 1985. They would be 30 to 40 years by the year 2015

Transformers Commissioning Details from 1975 to 1985 in WOA National Grid Year of Commissioning Area From To From To 1975 To 1980 1981 To 1985 Total JEDDAH 79 52 131 MAKKAH 19 27 46 TAIF 10 14 24 MADINAH Nil 25 25 TABOUK Nil 12 12 238

Specific Precedence In 1971 the first four 110/13.8 kv Transformers were put in service. Two each in City Substation and DSP Substation in Jeddah The two Transformers in City Substation were serving on full load and had to be replaced 2 years back near The 2 Transformers in DSP Substation were not fully loaded and are still in service.

This raises the following issues To determine the aging effect on the units Steps to be taken to make a decision whether replace or refurbish the Units.

Aging depends on The loading cycles that the transformers have been subjected to over the years and The Number of Through faults that the Transformer has suffered

Aging is best established by External inspection of the Transformer and its Auxiliary equipment. Insulating Strength of the Transformer Oil. DGA Analysis of the Transformer Oil Frequency Response Test (Previous Reference Results necessary) Bipolar Test

Planned study and timely replacement/refurbishment will prevent sudden deaths of Transformers that result in unplanned outages and possible extended damages.

A Power Transformer is a stationary device and does not contain components that require precision Engineering. Dismantling a Transformer and replacing the components is relatively an easy procedure. The pictures in the following slides show different stages of assembly and dismantling of the Transformer in different locations

In Workshop

In Factory

Generally the components that remain intact over the years are: The Main Tank The Core and Frame The External Metallic fittings Conservator, Piping, Radiator The Mechanical Protection Devices and Control Cubicles

The components that need inspection before deciding replacement / reuse: Tap Changer / Diverter Switch. Cooling Fans. Protection Devices. Bushings. Current Transformers.

Major Components to be replaced: The Coils forming the H V /LV Windings have to be replaced New Gaskets for sealing and consumables Press board material used for insulation and spacing.

Comparison: The cost of a new 40 MVA 110/13.8 kv Transformer, including Design Manufacturing, Transportation, Installation Testing & Commissioning in 2012 is 2.8 to 3.2 msr and a 67 MVA trafo costs 3.5 to 4.0 msr Refurbishment of an existing 40 MVA Transformer will cost about 1.5 msr. The cost of refurbishment of a Transformer is about 50 % as compared to the cost of replacement. Below is a cost comparison Table based on information exchanged with some manufacturers.

as % of total cost Item Description For New Trafo. To Refurbish 1 Design 5 0 2 Project Monitoring, Installation Testing & Commissioning 15 5 3 Transportation + Duty 15 5 4 Transformer Components 4.1 Coil 20 12 4.2 Core 7 0 4.3 Tank, Conservator, Radiators, Piping, Gaskets, Consumables, fans and Control Cubicles 12 2

as % Item Description For New Tr. To Refurbish 4.4 Coolant - Trafo Oil 8 5 4.5 Mech Protections, CTs 5 2 4.6 Tap Changer 10 5 5 Factory Tests 3 3 6 Dismantling and Assembly 0 10 Total 100% 49 %

In 2006 a 100MVA 13.8kV/132kV Transformer had all its Winding HV and LV, replaced for 1.3 msr. The cost of such Transformer then was about 5mSR.

238 Transformers in the Western Region will be 30 40 years old by 2015. If 10 % of these 238 Transformers are identified for refurbishment each year over the next ten years, it will be required to refurbish one Transformer every 2 weeks. If extended to the entire Country that has 4 such Regions in all, the refurbishment rate can be estimated as 4 Transformers in 2 weeks that is 2 Transformers per week. More Transformers will fall in this category with each passing year.

An Assembly plant sponsored by the Utility would be ideal to take up this work as the orderbook will be full for the next so many years. It will be a first step towards indigenous Heavy Industry for production of Transformers and generate employment for skilled and semi skilled workers in the country. A New Team will have to be set up. Alternatively it can be outsourced to one of the companies working with the required facilities within the Kingdom

ADVANTAGES OF REFURBISHMENT: Cost Saving. No design cost. Environment friendly. No Civil Work required. Control and Indications remain unchanged. Short cycle operation Can be aimed for 16 weeks. DISADVANTAGES: The Rating of the Transformer has to be retained, it cannot be increased.

Facilities needed 1. A workshop with suitable untanking facilities of the Live Part and replacement of coils by new ones. 2. Arrangement of Washing and Cleaning of Main Tank and Core and retightening of Core. 3. Oven facility for drying the assembly before sealing for transportation. 4. Testing facilities for the Transformer and its components. 5. Sufficient Storage and handling facility. 6. Oil regeneration unit(at site) with Oil Tanks for treatment and storage.

The Transformer oil will have to be regenerated. The cost of regeneration is about 60 % as compared to the cost of new oil. This is an environmentally friendly procedure and the success rate as experienced in the existing substations is 100%.

Paste picture

Conclusion The refurbished Transformer will have a life nearly as good as that of a new Transformer, as studies of the silicon sheets used to form the core of the Transformers have revealed no aging effect. The purpose of this paper is to initiate a healthy discussion on this subject to take timely steps to tackle the situation that would arise in coming years.