Jemena Electricity Networks (Vic) Ltd

Similar documents
National Electricity Amendment (Network Support Payments and Avoided TUoS for Embedded Generators) Rule 2011

Customer connection enquiry form (For the connection of loads and generators)

Industrial IT for Substation Automation & Protection

Integration Capacity Analysis Workshop 11/10/15 California IOU s Approach

SHE Transmission. 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015

ELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV

Service & Installation Rules 2014

Power products and systems. Intelligent solutions for power distribution Zone concept

Hyperlinks are Inactive

Estimation of electrical losses in Network Rail Electrification Systems

Phase Attribute Identification using GPS Technology

NORTHERN IRELAND ELECTRICITY Ltd STATEMENT OF CHARGES FOR USE OF. THE NORTHERN IRELAND ELECTRICITY Ltd ELECTRICITY DISTRIBUTION SYSTEM

Network Price List and Explanatory Notes

Networks. ESB Networks Ltd Basis of Charges for Connection to the Distribution System. Commercial and Customer Asset Management ESB Networks Ltd.

Siemens Integrated Substation Condition Monitoring System. Circuit Breaker Monitoring

Earthing Guidance Notes

SPECIFICATION COG-2007

ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F

Size template. Grid Connection Masterclass Energex John Lansley Senior Network Solutions Engineer

ABB PSPS Erich Steinmann; Generator control-2013

F.C. Chan General Manager, CLP Engineering Ltd., Hong Kong SAR, China

QUALITY CONTROL Prepared: V. van Gastel / team TenneT Reviewed: M. Müller Approved: F. Wester BACKGROUND MATERIAL...

Electric Power Distribution

TRANSMISSION AND SUBSTATION PROJECTS

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited

Medium Voltage (MV) & High Voltage (HV) Training Module 6. Date of the presentation

HVDC Light Cables. Submarine and land power cables

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114.

Addendum #2 Contract UK-11-13

POWER NETWORKS Electricity Network Tariffs and Charges and Future Price Trends

ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1

Daily Daily Network Network Network Energy Rates Step Rates Capacity. Price Rates Rates

-1- PSEG-LI Update of LIPA SGIP Full Docw-NYISO reqmts above 10 MW

Executive summary 2. 1 Introduction 4

WATER / WASTEWATER & POWER PROJECTS LAST 5 YEARS. No of Staff Provided by BCE. Overall Project Value (SR)

6. The estimated costs here do not include any applicable ITCC tax

Below is an outline of the steps involved in installing Solar (with Red Energy):

SCADA Controlled Multi-Step Automatic Controlled Capacitor Banks & Filter Banks

ES3. PART A Metering Installation Requirements July 2015

Treasure Valley Electric Plan - Community Advisory Committee

Basics in Energy Information (& Communication) Systems Substation Automation

Connecting to the network information pack Version 2

STRATEGIC ISSUES OF THE ELECTRICITY COMPANY OF GHANA PRESENTATION BY MR. WILLIAM HUTTON-MENSAH (AG. MANAGING DIRECTOR) ELECTRICITY COMPANY OF GHANA

SA Power Networks Network Tariffs - Residential APPLIES TO USAGE FROM 1 JULY 2015

South African Distribution Code

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe

VICTORIAN ELECTRICITY DISTRIBUTION NETWORK SERVICE PROVIDERS ANNUAL PERFORMANCE REPORT 2010

PRELIMINARY DECISION CitiPower distribution determination

Smart Grids. MIECF Conference April 2011

Product brochure Multi Functional Switchgear PASS M kv Flexible and compact switchgear solutions for windfarms

Principles of Distribution charging:

FIXED CHARGE: This is a cost that goes towards making the service available, including

APPROVED AMENDED PRICING METHODOLOGY FOR PRESCRIBED SHARED TRANSMISSION SERVICES FOR 1 JULY 2014 TO 30 JUNE 2019.

ZONE SELECTIVE INTERLOCKING (ZSI) APPLICATION AND TESTING GUIDE SIEMENS WL UL489 AND UL1066 AIR CIRCUIT BREAKERS

Contestability on the Distribution System ESB Networks Key Principles and Processes Paper

A MODERN DISTRIBUTION MANAGEMENT SYSTEM FOR REGIONAL ELECTRICITY COMPANIES

TasNetworks Regulatory Proposal Expenditure Forecasting Methodology

Engineering Specification

Electric Field Operations Organization

Application-oriented testing of line differential protection end to end in the field using the corresponding RelaySimTest template

IESO Supply Deliverability Guidelines

APPENDIX D DISTRIBUTION WIRES ONLY RATE BASE

Quoted Services Application and Price Guide

Asset Management Plan

Non-Network Options Report

CRUISE SHIP SHORE POWER PROJECTS

NETWORK PRICE LIST 2014/2015. Effective 1 July 2014

STATEMENT OF CHARGING METHODOLOGY FOR USE OF ELECTRICITY NORTH WEST LIMITED S ELECTRICITY DISTRIBUTION NETWORK

Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering

Technical Specification Of Substation Protection & Control System with IEC BHEL s Perspective

Becoming an Electricity Retailer

A least-cost electrification proposal for Kisiizi, Uganda Sten Bergman Sr. Energy Specialist, The World Bank

Modular Systems wind portfolio overview Power Collection and Grid Connection products

Pricing Methodology 1. 1 July 2009 to 30 June April 2010

ECE 586b Course Project Report. Auto-Reclosing

What Matters for Successful Integration of Distributed Generation

Jemena Electricity Networks (VIC) Ltd - Network Tariffs For The 2015 Calendar Year (Exclusive of GST)

ESB Networks Ltd Statement of Charges

Updated SCER Demand Side Participation Program December 2013

Distribution Operations with High-penetration of Beyond the Meter Intermittent Renewables. Bob Yinger Southern California Edison April 15, 2014

Utilization of Automatic Meter Management in Smart Grid Development

How the National Grid System Operates. Chris Gorman Lead Account Executive Syracuse

V N ovember Distribution Network Asset Data Available To Third Parties

Relion. Power system protection and automation reference Fast substation busbar protection with IEC and GOOSE

CUSTOMER CHARTER. Small Customer Charter

Rule Fast Track Analysis for National Life Insurance Co.

Vision 2050 An Asset Management Strategy. Jaclyn Cantler Manager, Transmission Planning, PHI

TenneT. Stakeholder engagement and Consultation Process OWFs. Day 1 ONL Michiel Müller / Rob van der Hage

Agenda do Mini-Curso. Sérgio Yoshio Fujii. Ethan Boardman.

SECTION 611 ACCEPTANCE PROCEDURES FOR TRAFFIC CONTROL SIGNALS AND DEVICES

Il Progetto INTEGRIS. Risultati e nuove prospettive per lo sviluppo delle Smart Grid October 2nd 2013 Brescia

DEVELOPERS HANDBOOK. Develop, Design and Construct Work

Transcription:

Jemena Electricity Networks (Vic) Ltd Embedded Generation - Example Charges and Fees Embedded Generation - 5 MW or Greater ELE PR 0007 RG 01 Public 1 October 2014

TABLE OF CONTENTS TABLE OF CONTENTS Abbreviations... iv 1. Introduction... 1 2. Notes and Assumptions... 2 3. Connection Enquiry and Application Assessment Fee Examples... 3 4. Connection Service Charges... 5 4.1 Worked Example of Connection Works for network augmen tation... 5 List of tables Table 1: Example Connection Enquiry and Assessment Fees... 4 iii

ABBREVIATIONS ABBREVIATIONS AEMO CYME DNSP EG MW NER PSS/E RTU SCADA TNSP Australian Energy Market Operator Cooper Power Engineering simulation software package Distribution Network Service Provider Embedded Generator Megawatts National Electricity Rules Power System Simulator for Engineers software package Remote Terminal Unit Supervisory Control and Data Acquisition Transmission Network Service Provider iv

INTRODUCTION 1 1. INTRODUCTION The objective of this document is to provide example estimates of the fees charged by JEN for the assessment of embedded generation connection enquiries and applications and the underlying assumptions. The estimates represent a typical connection with standard commercial terms. To understand JEN s position on technical connection issues and the standard terms and conditions, it is recommended that this document be reviewed by the proponent in conjunction with the following: 1. Embedded Generators greater than 5 MW - Connection Principles and Guidelines (ELE GU 0004); 2. Embedded Generators greater than 5 MW - Technical Access Standards (ELE SP 0003); 3. Embedded Generators greater than 5 MW Description of Connection Process (ELE PR 0007); and 4. Model Embedded Generation Connection Agreement (ELE PR 0007 RF 01). JEN s costs are determined by a range of factors including, but not limited to: the location of the connection point and complexity of the connection proposed; the size of the generation project; technology of generation system; whether it is a new connection or for alteration of an existing generating system; the extent of negotiations on generator access standards; the extent of commercial negotiation required; and the extent of legal drafting required. 1

NOTES AND ASSUMPTIONS 2 2. NOTES AND ASSUMPTIONS JEN has made the following assumptions providing the indicative cost estimates: Cost estimates represent JEN s fees and charges only. Assessment fees and connection service charges as they pertain to the transmission network service provider (TNSP), other distribution network service provider (DNSPs) and AEMO are excluded and will be calculated on a project by project basis. The cost estimates are indicative only and actual costs may be higher or lower than indicated depending on the complexity of the project and the quality of information provided by the connection applicant. These estimates assume that: the connection applicant provides JEN with all relevant technical data, protection and control studies reports, simulation models etc. that meet JEN s requirements at the connection enquiry and application stage; JEN is not required to investigate supplier datasheets or technical manuals on its own accord; the simulation models are provided in PSS/E or CYME format. If models are required to be built for simulation purposes, additional time will be required and additional cost will be incurred. The process clock for enquiry or application stages will be paused during this time; the due diligence assessments of AEMO and any other network service providers are limited in scope and do not require extensive interaction with JEN; and during commissioning or post-commissioning, the generating system performs as originally negotiated, and there is no need to change control system settings or renegotiate agreed performance standards. Extra costs will be incurred if applicants wish to negotiate non-standard commercial terms and conditions and/or raise issues that require the use of external lawyers and additional time for JEN s staff. Work is undertaken in normal working hours only. Extra costs will be incurred for work carried out outside these hours, either overnight or during weekends and public holidays. Estimates do not include: AEMO registration fees; Site visits for witnessing of commissioning tests or monitoring compliance; and Any other JEN tasks not specifically mentioned within this document. Fees and hourly rates will be reviewed periodically. 2

CONNECTION ENQUIRY AND APPLICATION ASSESSMENT FEE EXAMPLES 3 3. CONNECTION ENQUIRY AND APPLICATION ASSESSMENT FEE EXAMPLES Table 1 below lists itemized estimates for JEN s assessment of the proponent s connection enquiry and application. Note that these estimates apply for new connections of greater than 5 MW. Examples are provided below: Connection Type A A 5 MW project connecting to the HV system that meets JEN Automatic Access Standards and requires limited technical analysis by JEN. Minimal negotiations between JEN and the proponent on technical access standards and commercial terms. Also, the connection does not require any network augmentation work. Connection Type B A 10 MW project connecting to the HV system that requires JEN to perform detailed technical analysis and potential negotiation to JEN Access Standards. There are limited one to two rounds of negotiations between JEN and the proponent on technical access standards and commercial terms. The connection does not require network augmentation work. Connection Type C A 30 MW project connecting to the sub-transmission system that requires JEN to perform significant technical analysis and negotiation to JEN Access Standards. There are up to three rounds of negotiations between JEN and the proponent on technical access standards. JEN Legal is extensively involved in negotiation of contractual terms. The connection requires augmentation works to the JEN network. 3

CONNECTION ENQUIRY AND APPLICATION ASSESSMENT FEE EXAMPLES 3 Table 1: Example Connection Enquiry and Assessment Fees Connection Type A Connection Type B Connection Type C Enquiry - Stage 1 (Preliminary) Client Liaising and Clock Management Review of Enquiry Form / Identify Deficiencies Prepare Preliminary Response $ - $ - $ - Enquiry - Stage 2 (Detailed) Client Liaising and Clock Management Project Management Review of Customer Data / Identify Deficiencies Prepare generator technical access standards Prepare Detailed Response $ 8,850 $ 12,450 $ 20,850 Application Stage Client Liaising and Clock Management Project Management Review of Customer Data / Identify Deficiencies Review Customer Technical reports Negotiate and finalize generator technical access standards Liaise with third parties (AEMO / NSP) Develop tariff, pricing and commercial contracts Negotiate commercial contracts $ 25,400 $ 39,800 $ 80,800 Pre-Commissioning Activities Review of EG Detailed Design / Compliance Review of of EG Test Plan and Commissioning Plan Witness Commissioning Tests Review Commissioning Test Report $ 7,200 $ 10,200 $ 15,600 Jemena Cost Estimate $ 32,600 $ 50,000 $ 96,400 4

CONNECTION SERVICE CHARGES 4 4. CONNECTION SERVICE CHARGES The National Electricity Rules define Connection Service as An entry service (being a service provided to serve a Generator or a group of Generators, or a Network Service Provider or a group of Network Service Providers, at a single connection point) or an exit service (being a service provided to serve a Transmission Customer or Distribution Customer or a group of Transmission Customers or Distribution Customers, or a Network Service Provider or a group of Network Service Providers, at a single connection point). The charges associated with connection services vary on a project by project basis. JEN s experience is that there is significant variation in charges based on a number of factors including, but not limited to: the location of the connection point and complexity of the connection proposed; the existing network infrastructure to support the new connection (e.g fault level limitations) and extent of network augmentation required; requirement for review of JEN s existing protection and control systems; and requirement for and nature of network augmentation works. As prescribed within Chapter 5 of the NER, so far as is relevant and in relation to the services that JEN intends to provide, JEN will provide in its response to the customer s detailed enquiry an itemised estimate of connection costs including: connection services charges; costs of any network extension; details of augmentation required to provide the connection and associated costs; details of the interface equipment required to provide the connection and associated costs; details of any ongoing operation and maintenance costs and charges to be undertaken by the Distribution Network Service Provider; and other incidental costs and their basis of calculation. 4.1 WORKED EXAMPLE OF CONNECTION WORKS FOR NETWORK AUGMEN TATION A generic example of a 5 MW embedded generator proposed to connect to JEN HV network is provided below. A 5 MW synchronous gas turbine generator project is connecting to the JEN HV network with 100% export capability. The proposed location of the generator connection requires 500m of new HV overhead lines to be extended on the closest HV 22kV feeder. A high level example on the scope of works and indicative cost for this connection is provided below. Install 500m of new 19/3.25AAC HV (22kV) overhead conductor on existing LV pole line (require replacement of LV poles to HV poles) to extend the existing HV feeder to the generator point of connection; Install a new HV switching cubicle; Install 80m of 240mm2 XLPE Al cable to generator HV metering cubicle including cable termination at both ends; 5

CONNECTION SERVICE CHARGES 4 Review and if required revise the feeder and zone substation bus protection settings and coordination; Installation of hard wire remote inter-trip protection scheme between the feeder circuit breaker and the generator main incoming circuit breaker (cost assume relay upgrade at zone substation is not required); Installation of 3km of new optic fiber cabling for the remote inter-trip protection; Upgrade to zone substation RTU with installation of additional RTU cards; At zone substation, provide communications to the JEN Coordination Centre for remote monitoring of the generator status and loading which involves hard wire from primary devices to RTU (customer RTU to JEN RTU) and RTU configuration including point to point testing; Updates to JEN SCADA master host to show generator status and loading. Indicative cost estimate for the above JEN network augmentation related works is $700,000. Note: customer site works has not been included. 6