SLIDING DOORS. 3. For doors fitted to the eave side of the building this header takes the form of an additional eave purlin.

Similar documents
FLAT ROOF BOX SPAN CARPORTS

FLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

STEEL BUILDINGS RECOMMENDED INSTALLATION GUIDE

Instruction Manual 19/9/01. Flat Roof Carport

PANELIZED HOME INSTALLATION GUIDELINE

HORIZONTAL INSTALLATION

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE BUILDINGS CONTRACTOR SERIES 2 X 4 FRAMES

Installation Instructions

POST AND FRAME STRUCTURES (Pole Barns)

Residential Deck Safety, Construction, and Repair

Ceiling Mounted Folding Attic Ladders Installation Instructions

majestic install ation guide barcelona three sided enclosure 24mm surface mounted wall channels and underframe to base

Speed-Mat Rectangle Cutter

Residential Garage Door Terminology

DE Frame with C Series Sidelight

Owner's Manual & Assembly Instructions

BUILD A CARPORT. 2 - Planning the carport. 3 - Designing the carport

All-Season Sunroom Sliding Glass Door Installation Instructions

Installation Instructions For Slider Casement Air Conditioners

LX STEEL BUILDING INSTALLATION MANUAL

Protecting Your Home from Wind Damage

MGB Chrome Bumper Conversion

Installation Instructions

Mark Cramer Inspection Services, Inc.

March 14, Installation of Bay, Bow and Garden Windows

I BEAM TRACK INSTALLATION

Chapter 10 - Scaffolding Systems

Clad Direct Glaze Window Installation Instructions

Owner's Manual & Assembly Instructions

Screw Patterns Roof & Walls TR-36 MD-36 TSM-32. PBR-Panel

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13

Installation Window Building In Details

Premier & Deluxe 3-Season Room Sliding Glass Door

IN00419 (rev A) Aqua 6 Glide Quadrant and Off-set Quadrant Enclosure

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

39HQ Airovision Air Handling Units

Construction Guide. Pitched Roof Patio Pitched Roof Awning

INSTRUCTIONS: LocknCharge Laptop Carts

DIY CABINET REFACING INSTALLATION GUIDE

TYPICAL PATIO COVERS 111

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

Calvert USA, Inc. Attic Stairs

Chapter 3 Pre-Installation, Foundations and Piers

STANDARD OPEN PATIO COVER

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

Installation Instructions

Best Barns USA Assembly Book

Construction Guide Skillion (Flat Roof) Patio Skillion Awning SKILLION CONSTRUCTION GUIDE 1

Installation Instructions

How to secure your property after a disaster

Vinyl Greenhouse Window Page 2 of 6 New Contruction Installation Instructions

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

Chapter 3 Installing Over-the-Post Railing on an L-Shaped Stair

Window Installation Instructions

Pole Building Estimate Number: /2/2010 NORTH SIDE-EAVE SIDE 2 ELEVATION

Installation Instructions

Black Wolf POCKET BILLIARD TABLE INSTALLATION MANUAL. SERVICE DEPARTMENT P.O. BOX 68 BRISTOL, WI 53104

Basic Spring Motor Roller Shades

Cable Support System Guide for Andersen Bow, Bay, and Box Projecting Window Units

Installation Instructions

LG G5 Chassis Brace Gen 5 Camaro THE MOST POWERFUL HEADERS ON THE PLANET Brought to you by LG Motorsports

HfHMD uses LP SmartSide siding and trim.

SERVICE MANUAL. Corpus 3G. Seat system for electric wheelchair

Bungalow. Essential Elements. Prominent porch columns,

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

PITCHED ROOF STRUCTURES

The minimum reinforcement for the stem wall is the placement of:

-1- SPECIFICATIONS CONE SETTER PLATFORM ATTACHMENT INDEX

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

UNIVERSAL RAILING, STEEL

Residential Decks. Planning and Development Services Department

SELF-STEERING AXLE TABLE OF CONTENTS

New method, replacement of window and window lift, front door

STEEL-RITE II or III COMMERCIAL SECTIONAL DOOR Owner s Manual Supplement Model NOTICE TO USER

UBBINK SOLAR IN-ROOF SYSTEM

The Butler MR-24 Standing Seam Roof Difference. A comparison between metal roof systems

INSTRUCTION BOOK FOR. Lace And Grommet Theater-Type Screens

Section A Roof Truss

Residential Foundations and Basements

SUPER SHED. Indoor shelter for your outdoor tools.

FSD35, FSD36 AND FSD37 COMBINATION FIRE and SMOKE DAMPERS

Roll-Up Door Maintenance Guide

Timber Decks. Technical Note. March 2007

PART 1 GENERAL 1.1 SECTION INCLUDES

Wren Kitchens Installation Tips Carefully check your kitchen delivery Measuring out and marking up Fitting the base cabinets...

How to Install UnderDeck The Original.

Rack Installation Instructions

ILLUSION FRAMELESS SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

Modular Locomotive System Instruction Manual for HBK8 George Body Kit

8' W x 8' H or 10' H Peak Style Shelter Assembly Instructions

Structural Assessment Report

Integral Kit Instructions

Table of Contents. Safety... 3 Specifications... 4 Assembly Maintenance Warranty Parts Lists... 30

Awning Instructions. Standard Manual 1.5m to 4.5m

Guidelines for Earthquake Bracing of Residential Water Heaters

Free 12 x 8 Shed Plan With Illustrations, Blueprints & Step By Step Details

Removable Aluminium posts

450 SERIES SLIDING GLASS DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

glass & Glazing Products

Transcription:

1 SLIDING DOORS AGS/DR/03 The aim of this instruction is to guide you through the process of construction and fitting of Sliding Doors. Due to the number of sizes available this instruction is written in a generic form, but should provide sufficient details for you to complete your task successfully. In conjunction with this instruction you should refer to specification sheets and details provided by your local distributor. This instruction is a supplement to the Garage Instruction Manual and should be studied prior to the start of construction. 1. Ensure that you have familiarised yourself with all components, that being the description, function and application of each item. Attached are sketches that will aid with this task. 2. During the construction of the building s frame, you are required to fit headers or door bearers to which the door track support brackets will be fitted. 3. For doors fitted to the eave side of the building this header takes the form of an additional eave purlin. 1

2 4. Where doors are to be fitted to the gable end of your building a sliding door bearer is to be fitted as per the Gable End Sliding Door Detail, a copy of which is available from your Local Distributor. This beam is fitted web side out and connected to the flange of the side wall columns using the same bracket as the column base connecting brackets. Sliding Door Header Hangers 5. Whilst supporting the centre of this beam (ensure it is level and straight) fit the supplied hangers. The hangers are fitted no more than 3000mm apart. 6. Where the entire gable end is to be opened Outriggers may be supplied. This is formed by fixing two columns web to web. A brace is then fitted from half way along the length of the outrigger columns and the other end embedded in the outrigger brace pier. This brace should be at 45 degrees to the outrigger columns. All outrigger columns and braces are embedded in the concrete piers, and have a bracket fitted to the end that prevents the members from sliding when under load once concrete has cured. Further details are available from the structural details sheet. Building Column Side Wall of Building Outrigger Column Outrigger Brace PLAN VIEW ELEVATION 2

3 ASSEMBLY OF DOOR FRAMES 7. Layout the lengths of perimeter door framing and backing rail supports ready for assembly as shown below. 8. Position the perimeter frame sections, check height and width, and fasten with one tek screw in each corner. Square by checking diagonals, and fix with a second tek screw. 9. Position top corner angle braces, then horizontal backing rail supports. Fix with one tek screw only each end. 3

10. Position vertical push rails. Fit carriage mounting blocks. 4 11. Fit door carriages and full length angle door guide. 12. Turn over and check for square again, and place a tek screw in each corner only. Fit cladding within the frame recess, tek screw to the frame and horizontal braces. LARGE DOORS MAY BE TOO HEAVY WHEN CLADDED AND WE WOULD RECOMMEND FITTING THE CLADDING AFTER DOOR FRAMES HAVE BEEN INSTALLED ON THE BUILDING. 4

5 EAVE SIDE SLIDING DOORS 13. As previously detailed, the sliding door header should have been fitted during the construction of the building. 14. Cladding is fitted to the wall prior to the fitting of sliding door track brackets. Do not fit the gutter until sliding door tracks and flashings are in place. 15. Consideration should be given to the location of storm water down pipes. In some cases the sliding door tracks and flashings will extend the full length of the building, if this applies to your building you will be required to stop the tracks and flashings approximately 150mm short of the end of the building. Depending on the number of down pipes required, this could be either or both ends. 16. Single track systems will have a track carrying bracket welded to the track support brackets. Double track systems will have a track carrying brackets that are to be bolted on using dome headed bolts that are supplied. Eltrak Single Track Brkt Eltrak Double Support Brkt Eltrak Bolt On Brkt 17. Sliding door track support brackets are then loosely fitted over the cladding ( pans not ribs ) into the sliding door header prior to the gutter being attached to the building. Each bracket is fitted using bolts supplied and should not be tightened until tracks have been positioned. 18. All brackets are to be evenly spaced and at a maximum of 800mm centre to centre, with the first and last support brackets located approximately 50mm from each end. 19. The height of the brackets can be cross checked by working up from the floor or concrete slab. To the length of the door frame (including the bottom guide angle, but excluding carriage), add 8mm for bottom ground clearance, add 25mm for top clearance, the result of this equation will provide a measurement equal to the distance from the footing to the underside of the assembled sliding door support bracket. 5

20. The following table indicates the position of the track support brackets in relation to C = spacing (centres) of support brackets for double track. For A = height and B = height refer to pages 11 and 12. 6 Eltrak Director 200 Eltrak Matador 450 SINGLE TRACK (mm) DOUBLE TRACK (mm) A = A = B = B = - C = 92-110 A = A = B = B = - C = 92-110 21. After all support brackets have been placed in position slide the door tracks into the support brackets and confirm their location before tightening the track support brackets. Where multiple lengths of track are to be connected, track joining brackets are supplied. 22. ENSURE ALL BOLTS, BRACKETS AND CONNECTORS ARE TIGHT BEFORE PROGRESSING ANY FURTHER. DOUBLE CHECK THAT ALL STEPS IN ASSEMBLING THE DOOR FRAMES HAS BEEN FOLLOWED. 23. With help, stand doors and move into place, you may need two people to lift the doors ( one each end ) and another at the top of the doors to guide the rollers into the tracks. 24. Level and height of the door frame is adjusted using the adjuster nuts on the end of the carriage, leaving the guide at the bottom of the frame 8mm clear of the footing. Once adjusted properly ensure the lock nut is tight against the adjuster nut. 25. Floor Guide Pads are fixed to the footing or concrete floor using 8mm sleeve anchors. A chalk line should be used to mark the line of the door guides. Floor guides are spaced evenly and that spacing should not exceed 50% off the width of the door panels. Floor guides should extend to the extremes of the doors travel ensuring that a block is located at both ends and the centre of the door when it is fully opened or closed. 6

7 26. Where a double track system has been supplied it is advisable to fit the rear door or doors first. The track bolt on brackets may also need minor adjustments, the rear of the front doors must be clear of the front of the rear doors by no less than 15mm, and no greater than 35mm. When a Side Wall Sliding Door uses a Double Track, one more extra Eave Purlin is supplied (in addition to the two already supplied for double headers on those bays). This third Eave Purlin is meant to be cut in half and used to brace the bottom double eave purlin back to the rafter on each side of the door track bay. This applies to both the bay the door opens and the bay it slides over. 27. The over door flashing may now be fitted over the door tracks. This flashing is fixed to the ribs of the wall cladding using pop rivets ( supplied ). One rivet is fitted to every rib ( of the wall cladding ) that this flashing crosses. Multiple lengths of flashing should be lapped no less than 50mm and each lap should be sealed with a bead of sealant and fixed with a minimum of two rivets. 28. Track stops are fitted to both ends of every track. This will stop the doors from rolling off the end of tracks. 29. Install gutter over the door flashing. 7

8 GABLE END SLIDING DOORS 30. As previously detailed, the sliding door header/ bearers and outriggers should be fitted during the construction of the buildings frame. 31. Unlike the eave side application gable end wall cladding is fitted after the installation of the sliding door tracks and flashing. 32. Single track systems will have a track carrying bracket welded to the track support brackets. Double track systems will have a track carrying brackets that are to be bolted on using dome headed bolts that are supplied. Refer diagrams on page 5. 33. A level chalk line mark should be placed across the sliding door header beam to indicate the horizontal position of track support brackets. Chalk Line 35mm 34. Along this chalk line mark positions for the support brackets. These brackets should be evenly spaced at intervals no greater than 800mm. Those brackets at the start and end of the track should be positioned approximately 50mm in from the end of the tracks. 35. Bolt the adjustable flashing brackets (EC50) to the track support brackets. This bracket act as a stiffener of the protective weather flashing. On single track systems this bracket is fixed with one framing tek screw. 36. Support brackets are then bolted to the header beam, remembering that the chalk line indicates the upper most edge of the back of the bracket. Do not tension the bolts at this stage. 37. The height of the brackets can be crosschecked by working up from the floor or concrete slab. To the length of the door frame (including the bottom guide angle, but excluding carriage), add 8mm for bottom ground clearance, add 25mm for top clearance, the result of this equation will provide a measurement equal to the distance from the footing to the underside of the assembled sliding door support bracket. 8

9 38. The following table indicates the position of the track support brackets in relation to the top of the header beam; where A = top of purlin to top edge of bracket; B = top of purlin to top of horizontal arm of bracket; C = spacing (centres) of support brackets for double track. Eltrak Director 200 Eltrak Matador 450 SINGLE TRACK (mm) DOUBLE TRACK (mm) A = 35 A = 35 B = B = - C = 92-110 A = 35 A = 35 B = B = - C = 92-110 39. After all support brackets have been placed in position slide the door tracks into the support brackets and confirm their location before tightening the track support brackets. Where multiple lengths of track are to be connected, track joining brackets are supplied. 40. ENSURE ALL BOLTS, BRACKETS AND CONNECTORS ARE TIGHT BEFORE PROGRESSING ANY FURTHER. DOUBLE CHECK THAT ALL STEPS IN ASSEMBLING THE DOOR FRAMES HAS BEEN FOLLOWED. 41. With help, stand doors and move into place, you may need two people to lift the doors (one each end) and another at the top of the doors to guide the rollers into the tracks. 42. Level and height of the door frame is adjusted using the adjuster nuts on the end of the carriage bolt, leaving the guide at the bottom of the frame 8mm clear of the footing. Once adjusted properly ensure the lock nut is tight against the adjuster nut. 43. Floor Guide Pads are fixed to the footing or concrete floor using 8mm sleeve anchors. A chalk line should be used to mark the line of the door guides. Floor guides are spaced evenly and that spacing should not exceed 50% off the width of the door panels. Floor guides should extend to the extremes of the doors travel ensuring that a block is located at both ends and the centre of the door when it is fully opened or closed. 44. Test doors by pushing all frames through the full extent of travel, and make any adjustments that may be required. The action of the door should be smooth and attention should be paid to any bumps that you notice. 9

10 45. Cladding may now be fitted if not done during the assembly of the door frames. Again working on the rear doors first will reduce the risk of damaging cladding. Cladding may need trimming. 46. Once the cladding of doors is complete, retest the action of all doors and make any final adjustments. 47. Fix weather flashing to header beam using 10-16 wall teks. These screws should be fitted no more than 1000mm apart. Where multiple lengths of flashing are used, flashings should be lapped a minimum of 50mm and sealed with a bead of sealant. Each lap should be fixed with no fewer than 2 rivets. 10

11 POSITION OF TRACK SUPPORT BRACKETS IN RELATION TO THE TOP OF THE EAVE PURLIN - To determine the height of the bracket : Director Series = 25mm (Drop to Footing) + 8mm (Base Clearance) +40mm (Bottom Angle) + Door Stile Height +25mm (Top Clearance) + 57mm Track Holder Depth. Director Height to Base of Bracket = 155mm + Door Stile Height. Matador = 25mm (Drop to Footing) + 8mm (Base Clearance) Series +40mm (Bottom Angle) + Door Stile Height +25mm (Top Clearance) + 69mm Track Holder Depth. Matador Height to Base of Bracket = 167mm + Door Stile Height. This Calculation yeilds the Height to the base of the bracket which can then be used with the given details to determine the positioning of hole punchings in the Door Header. GUTTER 2-D10 X 30 ASSEMBLY BOLT CLADDING SEE FLASHING DETAIL DOOR C100 EAVE ARRANGEMENT A.G.&S D.SERIES SLIDING DOOR TOP DETAILS ED20C 11

12 GUTTER D12 X 30 PURLIN ASSEMBLY BOLT FRAME FIXING 'TEK' SEE FLASHING DETAIL CLADDING C150 EAVE ARRANGEMENT A.G.&S M.SERIES SLIDING DOOR TOP DETAILS EH20C 12