Linear Dry Verge System

Similar documents
Rochdale Building Control Guide. Approved Document C. Site preparation and resistance to contaminants and moisture

CI/SfB (Ff3) January Roofing design guide. Showing you the way. Redefining traditional products

Interlocking tiles and slates

REDLAND DRY BONDING GUTTER. Installation Instructions for Redland Dry Bonding Gutter

Ridge. Hip. Abutment. Eaves. Roof slope. Vertical slating. Clay plain tiles. Valley. Ridge Roll. Verge. Bedded verge.

Fibre cement slates Fixing guide. Call

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035

Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION

How To Build A Gambrel Roof And A Gable End Roof

CI/SfB (4-) Rf9 January Dry fix and ventilation systems including UNIVERSAL accessories. Roofing product catalogue 45

Cupa Natural Slate Roofing design and fixing guide

CARPENTRY - HOUSING. This is the sloping length of a right-angled triangle.

Extension. for. Pretend Customer 123 A Road HA7 9BP. at: 123 A Road HA7 9BP

KAHU RESIDENTIAL ROOFING RRKA DETAIL LIST

Under Tile and Slate Undersheeting System

FUNCTIONAL REQUIREMENTS

Plans will call for one of two soffit/fascia details:

Installing the Sno-free Standing Seam System for Metal Roofs

UBBINK SOLAR IN-ROOF SYSTEM

Installation Instructions

Gerard Installation Manual Shingle Profiles

Ubiflex. Non-lead flashing system

CI SfB. (4-) Nn2. Onduline. Mini Profile. Onduline Garden Roof Range. Onduline Building Products Ltd

(4-) Nh2. CI/SIB July Colorcoat Urban. Installation Guide. Tata Steel Colors

Screw Patterns Roof & Walls TR-36 MD-36 TSM-32. PBR-Panel

Installation Guide. Bath and Wall Surrounds SERIES B

Installation Manual for STANDING SEAM ROOFING

Energy Company Obligation (ECO): Technical Monitoring Questions

AMERICAN GOTHIC PLAYHOUSE

CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS

Good Craftsmanship Guide. Carpentry and Joinery- Carcassing

Multi-layer Insulation Blanket for Roofs

plumbing products guide

BRIDGE & SUPPLY COMPANY. Installation Guide. Ultra Includes:

Asphalt Shingle Application Requirements

Sliding and Folding Door Fittings Sliding Door Accessories

BUILD A CARPORT. 2 - Planning the carport. 3 - Designing the carport

Minimizing Water Intrusion Through Roof Vents in High-Wind Regions

Technology at its best. Benefits

Classic Products, Inc. ClickLock Standing Seam Installation Manual

Best Barns USA Assembly Book

Contents. APA Construction Details. Full fill cavity walls Partial fill cavity walls Solid externally insulated walls 26-37

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

Isola Steel Gutters Strength and design for extreme climate!

PRODUCTBLADEN GT ROCKPANEL STRUCTURE

Building Regulations for the Conservation of Fuel and Power

Clay Roof Tile Council. Vertical Tiling

Composite Stone Veneer

VAIL Metal Shingles. Application Instructions. Custom-Bilt Metals Magnolia Ave. Chino, CA 91710

Marley Double Roman. concrete roof tile. The classic double roman tile with the extra-bold roll. Manufactured in Gauteng and KwaZulu-Natal

Free 12 x 8 Shed Plan With Illustrations, Blueprints & Step By Step Details

Chapter 3 Installing Over-the-Post Railing on an L-Shaped Stair

Roofers Guide to Underslating Membranes

RB271 06/07 R807.1 RB272 06/07 R Public Hearing: Committee: AS AM D Assembly: ASF AMF DF. Proponent: Rick Davidson, City of Hopkins, MN

Shingle Installation Guide

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

PANELIZED HOME INSTALLATION GUIDELINE

How to build a Pizza Oven in 4 days

Be Proud of What You Build Available from

Fixing guide April 2016

Cedar Cottage Doghouse Plans

Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1

CI/SfB. (4-) Rf9. October Choosing & using AS3 & AS6

majestic install ation guide barcelona three sided enclosure 24mm surface mounted wall channels and underframe to base

HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY

Integral Kit Instructions

The WANZ Guide to Window Installation

INSTALLATION MANUAL For Grand Rib-3 / Multi Purpose / & Classic Rib Roofing Panels

CI/SfB. September Roofing Pocket Guide. A comprehensive range of products under one roof P L U S

NRG 75 CRF NRG GREENBOARD WALL SYSTEM

Western Red Cedar Shingles & Shakes

How to Install Hardwood Flooring Over a Sub Floor

CI/SfB 2- Rj7 December 2010

Window Installation Instructions

8/18/14. Introduction to. Framing. Terminology and Concepts

UNIT 4: SHEATHING AND SHINGLING THE ROOF

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE

ROOFING ACCESSORIES GENERAL References. England and Wales

DIY CABINET REFACING INSTALLATION GUIDE

to encourage high quality tropical vernacular Queensland architecture throughout the Shire;

Management Consultancy Training. Asbestos Materials. Residential Guide

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

Installation Manual. Toilet Partitions, Dressing Compartments & Shower Stalls

HfHMD uses LP SmartSide siding and trim.

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

Mark Cramer Inspection Services, Inc.

IN00378 (rev A) Corner Entry

Repairing storm damaged roofs

SUPER SHED. Indoor shelter for your outdoor tools.

Lindab Seamline Application guide. Lindab Seamline TM. Lindab Standing Seam Roofing Application guide

VM ZINC : standing seam Guidelines for specification and installation

THE DEWALT RAFTER SQUARE

These instructions will show you how to install an internal door into a non-loadbearing partition wall. The instructions are split into three parts.

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

PITCHED ROOF STRUCTURES

How to Install UnderDeck The Original.

Timber Decks. Technical Note. March 2007

Stair Parts Installation. Tricks

TP10. Insulation RAFTER LEVEL INSULATION FOR TILED OR SLATED PITCHED WARM ROOF SPACES BBA BRITISH

Transcription:

SmartVerge Linear Dry Verge System Fixing Instructions MBP 8249d MBP-0708-00-D

Typical Verge Details Fig A. Flush Verge Detail roof tile felt linear dry verge timber batten strip wall rafter Fig B. Overhanging Verge Detail roof tile felt linear dry verge timber batten strip fascia rafter Compatibility The SmartVerge Linear Dry Verge System is compatible with most Fibre Cement Slates, Natural Slates and Interlocking Plain Tiles including: - Marley Rivendale, Birkdale, Garsdale, Thrutone, Edgemere, Duo Edgemere, Melbourn, Marquess, Duo Marquess, Monarch Slates & Ashmore Interlocking Plain Tiles. Lafarge Cambrian, Landmark, Saxon, Richmond, Natural Slates & DuoPlain Interlocking Plain Tiles. Sandtoft Cassius, Balmoral, BritLock, BritSlate, Pennine Slates & 20/20 Interlocking Plain Tiles. Forticrete Minislate Slates & Gemini Interlocking Plain Tiles. Lagen Elite Slates. The Linear Verge units will fit over a verge detail if the maximum depth does not exceed 100mm, this depth wiill include the roof covering at its largest thickness at the overlap, any undercloak construction and the fixing batten strip. For all other tile enquiries please contact us.

Installation 1. In a new build situation, saw the tiling battens off square so that they overhang the gable wall or bargeboard by 30mm. Lay the right hand and left hand tiles flush with the end of the battens. For refurbishment situations, continue to step 2. 2. Securely plug and screw as necessary (at approx. 500mm centres) a length of 25mm x 38mm timber batten to the brickwork or bargeboard as shown in Fig A and Fig B overleaf. Continue this on both sides of the roof running from the eave to the ridge. This is used for nailing each Linear Verge Unit to the verge of the roof. 7. Hook the Linear Verge Unit over the top of the Fixing Clip and press firmly until it engages. While pressing the verge unit down against the tiles, nail the tail end of the linear verge unit using stainless steel, 3.35mm annular shank nails, 38mm in length (not provided), through an appropriate hole so that the nail penetrates the centre of the batten strip. 8. Continue on up the run of the verge, clipping and fixing each Linear Verge Unit consecutively at the toe and head to ensure a secure fit. Leave a 3mm gap between each Linear Verge Unit to allow for expansion of the product in warmer temperatures.

3. Alternatively, each unit can be nailed to the ends of the tiling battens. To achieve this, each Linear Verge Unit may have to be shortened so as to allow the nail holes to line up with the ends of the tiling battens. Saw each unit square using a hacksaw or fine tooth saw then debur with a scraper. 4. Using stainless steel, 3.35mm annular shank nails, securely fix a GLV-FC Fixing Clip to the end of the fixing batten at the eaves. It is important to ensure that the flange of the fixing clip that is labelled top faces upwards. Nail through an appropriate hole so that the nail penetrates the centre of the batten. For straight verge runs continue to step 7. 9. For roofs where the bottom course tiles are tilted upwards, cover the nail head and joint using a Verge Union. Hook the Verge Union around the top flange between the Linear Verge Unit and the tiles, then firmly push the Verge Union onto the joint until the clip engages with both Linear Verge Units. 10. Continue to fit full lengths of the linear units up the run of the verge until all tiles have been covered or no full legnths can be fitted as shown. Once one hand of the verge is completed repeat steps 4 to 9 on the opposing verge, this time using the other hand of Linear Verge Units.

5. For roofs with a change in pitch at the eaves, use three fixing clips as shown. Saw a length of the Linear Verge Unit down to cover the full length of the tilted section of the verge. Hook the shortened Linear Verge Unit section over the top of both Fixing Clips and then push it on to the verge until it engages with both clips. 6. To prevent the shortened Linear Verge Unit from sliding down the verge, drill and nail the unit 10mm from the edge into the batten strip as shown above. Proceed to fit the straight run of verge as detailed from step 7 onwards. Detail on how to mask the join at the change of pitch is shown in step 9. 11. At the apex of the verge, shorten the last two Linear Verge Units as shown above to fit the remainder of the verge. To shorten the Linear Verge Units, measure and saw each unit square using a hacksaw or fine tooth saw then debur with a scraper. 12. To finish the roof at the apex, place a Ridge End Cap over the end of the ridge tile so that it sits over both Linear Verge Units. Using the screws provided, screw into the Ridge End Cap through the desired blind nail hole and into the end of the ridge batten, or, if this is not available, into the top tiling battens.

The Complete System Right Hand Dry Verge Unit (Code: GLV-RH) Left Hand Dry Verge Unit (Code: GLV-LH) Round Ridge End Cap (Code: GDV-END-R) Angled Ridge End Cap (Code: GDV-END-A) Fixing Instructions Fixing Clip (Code: GLV-FC) Verge Union (Code: GLV-VU) S/S Screws S/S A.R.S. Nails Note: careful attention should be taken when specifying Right & Left. Right Hand Verge Left Hand Verge Colours: GR - Slate Grey BL - Black BR - Dark Brown TR - Terracotta WH - White Other products from Manthorpe include Cavity Trays, Cavity Closer, Loft Doors, Linear Drainage, Access Panels, Roof Ventilation, Through Wall & Underfloor Ventilation, Joist Seals and Dry Roofing Products. Manthorpe Building Products Limited Manthorpe House, Brittain Drive, Codnor Gate Business Park, Ripley, Derbyshire DE5 3ND T: (01773) 514200 F: (01773) 514262 E: bpsales@manthorpe.co.uk W: http://www.manthorpe.co.uk