1 4 Interlocking tiles and slates Interlocking tiles 53 Setting out 58 Eaves 59 Verges 60 Hips 61 Valleys 64 Ridges 66 Repair and replacement of broken interlocking tiles 67 Ashmore interlocking tiles 71 Symphony interlocking tiles 80 Domino interlocking tiles Interlocking slates 89 Melbourn interlocking slates 98 Repair and replacement of Melbourn slates
2 4 Interlocking tiles and slates 53 Setting out 75 mm It is important that the tiler should set out the roof prior to fixing. This will help to save time and avoid unequal overhangs at verges and expensive labour costs in cutting tiles at abutments (Fig 1). Position of top and bottom battens 1 Batten gauge required must be worked out on site. Fix eaves course batten first and position using one of the following methods:- 2 Tack a short length of batten into position and locate tile over fascia so it hangs the correct amount into centre of gutter (45 to 55mm for a 100mm gutter) (Fig 2). Fig 1 Setting out Or 3 Position eaves batten and measure distance from top edge to outside edge of fascia. This distance should approximately equal length of tile less nib depth and gutter overhang e.g. (Mendip length 420mm, nib depth 20mm, overhang 50mm hence = 420mm - 20mm - 50mm = 350mm ). 4 Fix top course batten so that ridge tile provides a minimum 75mm cover to top course tile (Fig 3). 75 mm 45-55mm Fig 2 Measuring tile overhang into gutter 75 mm 45-55mm Fig 3 Fixing top (ridge) course batten
3 4 Interlocking tiles and slates 54 Setting out Calculating the batten gauge (Fig 4) 1 Measure distance between top of eaves batten and top of ridge batten. 2 Divide distance by maximum gauge of tile being used. 3 Round figure up to give number of courses up slope as a whole number. 4 Divide measured distance by number of courses to give batten gauge. 5 The practice of adjusting gauge over last few courses at eaves or ridge is technically acceptable, provided maximum gauge for tile is not exceeded. 6 It is important, with deeply profiled tiles, to maintain a fixed gauge up roof to avoid a dog leg diagonal. 7 If necessary, tiles should only be cut in ridge course, drilled and nailed. 75mm 5297mm 350mm 331mm 331mm Example Distance eaves to ridge batten: 5297mm Max. gauge for Mendip tiles: 345mm No. of courses ( ) = rounded up: 16 Batten gauge ( ): 331mm Fig 4 Calculating batten gauge Notes i) The above applies only to a roof pitch with no features such as dormers, chimneys etc. Batten gauges between all such fixed points should be calculated individually. ii) Where two roof slopes of varying pitch intersect, batten gauge should be set to lower or longer rafter pitch.
4 4 Interlocking tiles and slates 55 Setting out Horizontal alignment There are several ways of achieving true horizontal alignment: 1 Strike a chalk/ochre line at 90 to perpendicular line (Fig 5). 2 Measure two pieces of timber, each length of batten gauge minus width of one batten (advantageous for vertical tile hanging). 3 Drive nails through a length of timber the distance of batten gauge apart and protruding approximately 5mm. Scribe required gauge onto underlay. Fig 5 Striking chalk lines Perpendicular alignment 1 Set out roof along eaves starting with correct overhang at right-hand verge. 2 Correct overhang on left-hand verge can be achieved using full tiles by opening or closing side lap between tiles. 3 Marley Eternit interlocking tiles allow a tolerance ( shunt ) of approximately 3mm in side lock for adjustment (Fig 6). 5 Overhang at verges should not be more than 50mm. 5 On a short eaves, tiles may require cutting. Cut tiles at verges should be at least half width of a full tile. Half tiles are available for use at verges with Modern and Edgemere (produced in pairs for cutting on site) to enable broken-bond laying. 6 Strike perpendicular chalk or ochre lines over eaves to ridge at three tile intervals to coincide with edges of tiles. 7 A gauge rod the width of three tiles can be used as an alternative to actual tiles. Fig 6 Interlocking tile 3mm shunt
5 4 Interlocking tiles and slates 56 Setting out Achieving broken bond pattern (Duo Modern and Duo Edgemere) Duo Modern and Duo Edgemere interlocking slates are laid quarter bonded, using half or three-quarter width tiles at verges, cut on site. 1 Ensure that the eaves course right hand or left hand verge starts with either a three-quarter width, half width or standard tile as indicated in Figs 7 and 8. 2 Continue subsequent courses of slates laid in a quarter bond, ensuring that left and right verge tiles are cut as either half tiles, three quarter tiles or standard tiles (see Fig 7). 3 Mechanically fix all verge tiles by either nailing, Left hand verge clipping, Three or nailing quarter tileand clipping in accordance with the recommended fixing specification. 420mm 38mm 32* 292mm 298* cut to size on site 219mm 224* Interlock Mock joint at half cover width Standard tile * dimensions for Duo Edgmere 219mm cut to size on site RH verge tile LH verge tile 224* Standard tile Fig 7 Cutting dimensions for LH and RH verge (Due Modern and Duo Edgemere) Left hand verge Left hand verge Three tile quarter tile Three quarter tile Standard tile Right hand verge Option 1 Left hand verge tile Three quarter tile Right hand verge Option 1 Left hand verge three quarter tile Three quarter tile Right hand verge Left hand verge tile three quarter tile Three Half quarter tile tile Right hand verge Option 2 Fig 8 Two tile laying options to achieve broken bond Left hand verge tile Half tile
6 4 Interlocking tiles and slates 57 Setting out Completion of tiling 1 Load out all tiles on the roof evenly before commencing tiling (see page 11). 2 Work from right to left (Fig 9). Depending on fixing specifications, you may leave out some tiles towards left-hand verge and make use of tile battens as a ladder enabling upper part of roof to be reached for fixing ridges. 3 On a hipped roof, cut tiles so that end tiles of each course align with rake of hip. Good tiling practice check points Setting out check points Never exceed maximum gauge for tile used at recommended pitch. Avoid cutting tiles wherever possible. Never cut bottom edge of a tile. Vertical cuts should never be less than half a tile width. On adjacent roof slopes of varying pitch, set batten gauge to the lower roof pitch to ensure alignment at intersections. Ensure ridge tiles provide a minimum 75mm cover to top course tiles. Eaves tiles should lie over the centre line of the gutter. Fig 9 Completion of tiling
7 4 Interlocking tiles and slates 58 Eaves Interlocking tiles 1 Lay out full course of eaves tiles. 2 Tiles must overhang fascia board so that water discharges into centre of gutter (Fig 10). 3 If gutter is not fixed, an overhang of min. 50mm should be allowed (Fig 11). Note: Fascia heights shown in tables on page 167. Assume the 50mm distance is measured between bottom right corner of tile and fascia board, that is bottom corner of overlock. 4 Fit underlay protector or draw underlay taut over tilting fillet and front edge of fascia board before fixing. 5 Fix eaves course tiles with nail or purpose-made eaves clip nailed to top of fascia board (Fig 12). 6 If fascia board has been fixed at right height, eaves course will automatically be at correct pitch. Note: Sprockets are not recommended with interlocking tiles. 7 Eaves ventilation should be provided for all new projects. 8 For deep profile tiles, nail comb filler to top of fascia board (Fig 13). Note: Eaves ventilation can be achieved unobtrusively by using Marley Eternit Universal eaves ventilation systems (10mm and 25mm). See page 205 for Eaves fascia heights without ventilation. Eaves check points Nail or clip all eaves tiles. Make sure eaves course does not tilt backwards. Where appropriate, fit correct eaves comb filler strip. Use Marley Eternit Eaves Ventilation Systems (10mm continuous ventilation above 15 pitch, or 25mm at 15 and below) and in warm roof constructions. If above is not used, a tilting fillet or fascia must take its place. Ensure bottom tile course overhangs into gutter approx. 50mm. Headlap Margin Overhang Gauge Fig 10 Typical layout at eaves Fig 12 Eaves clip Fig 11 Overhanging tiles ensuring water discharges into the gutter Fig 13 Eave clip and comb fillers for deep profile tiles (> 16mm gap)
8 4 Interlocking tiles and slates 59 Verges Groundwork 1 Form verges by bedding tiles onto undercloak of fibre cement strip (1200mm x 150mm). 2 Lay undercloak rough side upwards, closely butted together, with a slight tilt outwards to provide drip at outside edge. 3 Level off irregularities in brickwork by laying undercloak onto a buttering of mortar, bringing height up to adjacent rafter. 4 Carry roofing underlay over cavity wall and cover by inside edge of undercloak. 5 When laid on boarding, nail each length of undercloak at maximum of 300mm centres. Tiling battens 1 Tiling battens should finish 100mm from edge of brickwork or bargeboard. 2 Place undercloak below battens, overhanging by maximum of 50mm (Fig 14). 3 Provide about 50mm of mortar width. 4 Ensure that batten ends remain clear. 5 Bed all verge tiles and fix either by nailing or clipping. External clipping 100mm 1 When required, nail verge clips to top of battens with upstand level with edge of undercloak (Fig 15). 2 Under normal conditions, set roof out to avoid cutting. Where not possible, ensure that cut tiles are symmetrical at both verges. 3 Remove interlocks where necessary to facilitate the fixing of external verge clips. 4 Strike all mortar bedding off flush and neatly point. Note: It is recommended that tiles are not swept up at verges. Verge at eaves 1 Verges at eaves should overhang by same amount as rest of tiling. 2 Adjust or remove a small piece of undercloak to prevent first tile from riding up. 100mm Fig 14 Fibre cement undercloak fitted over tiling batten Fig 15 Clip all verge tiles Verge check points Nail or clip all verge tiles. Continue underlay across wall cavity and below undercloak (where appropriate). Mortared verges should have an overhang of 38 to 50mm. Undercloak should have an outward tilt on mortared verges. Avoid pointing with a separate mix of mortar.
9 4 Interlocking tiles and slates 60 Hips Groundwork Hips should be weathered by covering the junction of the tiles, often achieved by securing hip tiles along the length of hip. 1 Mitre tiling battens and fix to continuous structural member. 2 Fix a galvanised hip iron minimum 5mm thick at base of hip tree with two 5mm diameter nails, or suitable screws. 3 Cut tiles closely to rake of hip. 4 Edge-bed, hip tiles with solid bedding at butt joints, onto roof tiles. 5 Shape first hip tile at foot to line of tiling at eaves and fill fair end with mortar inset with pieces of tile. Neatly point. 6 Edge and solid bed hip tiles continuing along length of hip (Fig 16). Hip/roof apex junction 1 Mitre junction of hip and roof apex using a standard three-way mitre and solid bed (Fig 17). 2 In exposed situations, it is recommended that a lead saddle Code 4 is used beneath the apex junction. 3 For Mendip, Wessex, Malvern and Anglia, lay a course of dentil slips into pans and bed in mortar. 4 Where a bedded hip tile meets a dry ridge line, height of bedding should be same as that of profiled filler units so that ridge height is even and line continuous. 5 Use Security Hip tiles for a distance of 900mm from face of rigid masonry supports, abutments, or separating walls (see Fig 22, page 64). Fig 16 First hip tile bedded and supported with tile slips and mechanically fixed Fig 17 At ridge hip junction, cut tiles with three-way mitre to ensure continuous line Hip check points Fix a suitable hip iron to the base of rafter. Close mitre roof tiles where they meet hip and ensure each tile is nailed or clipped. Bed and fix all small pieces of tile. Mitre hip tiles at ridge junctions ensuring that the end tile does not ride up. Cut bottom hip tile to align with eaves.
10 4 Interlocking tiles and slates 61 Valleys Metal valleys Sheet metal valleys can be used at roof pitches down to 15º, and are especially useful where a valley forms a junction between slopes of different pitch. Metal used to form the valley should be not less than 500mm wide, and should extend a minimum of 250mm up each side of the valley (Fig 18). Valley widths A traditional valley gutter width of 125mm is satisfactory for most gutter lengths. For pitches below 35, or valley lengths exceeding 5 metres, valley width may require increasing to cope with the additional flow experienced during storm conditions. Support for metal valley linings 1 Support all metal linings adequately along their entire length. 2 Valley boards for valleys below 30 pitch may be inset into suitably housed traditional rafters, or fitted between trussed rafters. 3 Lay a 4mm thick ply lining board over valley boards to provide a smooth surface for metal lining. 4 If roof pitch is 35 or more, valley boards may be laid on top of the rafters and the tiling battens swept up to valley by packing them with timber firring pieces. (This detail is not recommended for small valleys, such as at dormers, where sweep of tile courses will be clearly visible.) Lead sheet valleys Where lead is used, use minimum Code 4, preferably Code 5. To avoid staining, the Lead Sheet Association recommends an application of patination oil immediately after the lead is fixed. 1 Dress metal lining down tightly onto lay boards and fix in lengths not exceeding 1500mm with copper nails across the top of each piece. 2 Laps should be a min. 150mm although below 30, this increases to 290mm min. at 15 valley pitch (see LSA recommendations). 3 Dress metal lining over tilting fillets at each side of valley and tack to form a welt. 4 Restrict any fixings down sides to top third of each piece of gutter lining. 5 Cut roofing underlay so that it laps over tilting fillets. 6 Cut roof tiles to a rake and bed with mortar onto a suitable undercloak laid onto lead lining. Ensure that tile interlocks are kept free and a gap is maintained between tilting fillets and mortar bedding. 7 Never lay mortar directly onto lead as there is a risk of differential movement causing mortar to crack and lead to split. 8 Nail or clip all tiles adjacent to valley and ensure small tile cuts are well bedded in mortar. Fig 18 Metal valley construction for interlocking tiles
11 4 Interlocking tiles and slates 62 Valleys Marley Eternit GRP valley trough for bedded interlocking tiles Always fit valley troughs over timber valley boards. These should be of sufficient width to provide end support for the tiling battens and outside counter battens. Where rafters are at centres up to 600mm, valley boards should be either a minimum of 19mm softwood (or 12mm ply) lay boards set between the rafters supported on timber noggins, or 6mm continuous ply boards laid over the rafters. 1 Lay a single strip of roofing underlay in accordance with BS 8747 (or suitable breather membrane to EN ), full width of valley boards, up centre of valley, directly on top of valley boards. 2 Counter battens (BS 5534, Clause 4.12 and Table 1) should be same depth as tiling battens and be fitted onto valley boards, (over valley underlay), and nailed through these into main rafter/truss. 3 Where battens are deeper than 25mm, provide packing above valley boards, between counter battens, to provide correct support for GRP Valley Trough whilst accommodating standard 25mm upstand. 4 Firmly locate batten ends onto valley boards with ends supported on lip of GRP Valley Trough (Fig 20). 5 Main roofing underlay can be laid either under or over GRP valley trough. Cut out fascia to allow GRP preformed valley trough to pass through and discharge into gutter without flattening out. 6 Trim end of GRP Valley Trough using a fine toothed hacksaw to the centreline of gutter which normally entails a V shape cut. Note: Where design does not permit cutting to fascia board, a saddle of minimum Code 4 lead should be fitted and dressed into gutter. 7 Fit GRP Valley Trough to ensure centre is located firmly into trough between valley boards, and nail sides into counter battens at maximum 500mm centres, using 25mm clout nails. 8 Lap any additional lengths of valley by a minimum 150mm (300mm minimum at 22.5 rafter pitch see NFRC Technical Bulletin 28 Inclined Preformed GRP valley troughs). Secure overlap with 2 No. nails on each side. Fig 20 Bedded valley with Marley Eternit GRP valley trough Fig 19 Marley Eternit GRP valley trough (Code 30577)
12 4 Interlocking tiles and slates 63 Valleys 9 Where tiles require bedding, lay them dry, mark desired cut line, then remove and cut away from the roof. 10 Re-lay tiles, mechanically fix and bed onto sanded strip on GRP valley trough with correct mortar mix and point off. 11 At head of valley, fix a saddle of minimum Code 4 lead. Length of lap of saddle over GRP Valley Trough should be the same as required by the lap of two GRP valley trough units at same pitch. 12 Where ridge intersects a roof slope, step the ridge back where it meets head of intersecting GRP Valley Troughs; dress a saddle of minimum Code 4 lead under adjacent tiling, and over both valley troughs. 13 When a valley discharges onto a roof slope (e.g. at dormers), a lead saddle will be required at base of GRP valley trough to dress onto adjacent tiling. Valley check points Keep an open channel between cut edges of roof tiles (125mm minimum). Do not block interlock laps of tiles with mortar since this may cause water damming. Do not lay bituminous underlay directly beneath a lead valley; heat causes underlay to expand. This may split lead. Do not apply mortar direct to lead. Tile slips or undercloak beneath mortar bedding is generally recommended to prevent differential movement between the mortar and lead lining. Mechanically fix all tiles either side of valley.
13 4 Interlocking tiles and slates 64 Ridges Duo-pitch ridges The apex of the roof should be covered using ridge tiles of complementary colour, or contrasting, and texture to that of main roof tiles. Always check that the ridge tile design suits the pitch and type of roof tile being used. (See Marley Eternit Roofing Product Catalogue). 1 Edge-bed ridge tiles onto the top course tiles with solid bedding at butt joints (Fig 21). 2 Support mortar at these butt joints using pieces of tile. Fig 21 Bedded ridge with tile slips to support mortar at butt joints 3 A minimum of 75mm cover should be provided over top course tiles. 4 Exposed mortar should be neatly pointed. Ridges at gable ends 5 Allow for mechanically fixing of two ridge tiles at gable ends, abutments, above separating walls, or for a minimum distance of 900mm (whichever is greater). 6 For trussed rafter roofs, fix a length of batten approximately 2m long at the apex or wall and adjacent trusses. 7 Drive a nail into batten and attach a Security Ridge tile to it using the galvanised wire provided in tile (Fig 22) (concrete ridges), or security strap (clay ridges). 8 Fill fair ends of ridges with mortar inset with pieces of Plain tile and neatly point. Dentil slips 9 For Mendip, Wessex, Anglia, Malvern or Double Roman (optional) tiles, lay dentil slips into pans of top courses. 10 A mortar bed approx 10mm thick should be provided to bed the dentil onto (Fig 23). Fig 22 Security Ridge fixing at gable ends (concrete ridges) Fig 23 Mortar bedded ridge using dentil slips for deep profiled tiles
14 4 Interlocking tiles and slates 65 Ridges Mono-ridge 1 Carry roofing underlay over ridge line and cut below vertical leg of mono-ridge tile. 2 Lay mono-ridge tiles for Interlocking profiles as standard ridge tiles and mechanically fix each by using 2 No. 50mm x 10g stainless steel screws (supplied) to timber fascia behind vertical leg (Fig 24) (concrete mono-ridge tiles only). Fig 24 Bedded mono-ridge tile with two screw fixings (concrete) Ridge check points Nail and/or clip all top course tiles either side of ridge. Bed dentil slips in mortar in pans of deep profile tiles. Overlap ridge underlay by minimum 150mm. Ensure minimum 75mm cover by ridge tile over top course. Keep ridge tiles set in a true line. Do not over-tighten screws to fix mono-ridge tiles.
15 4 Interlocking tiles and slates 66 Repair and replacement of broken tiles and slates Introduction Individual tiles or slates that are damaged during or after installation should be replaced as soon as possible using a sound matching unit fixed in accordance with the nailing and/or clipping specification. In some cases, this may not be possible without stripping back a large area of tiling/slating. Superficial coatings or repairs to damaged units using adhesives or other mechanical devices should not be used as their long term performance may be limited. If extensive repairs to the roof are required, sectional or complete re-tiling/slating should be considered, as this may be the most practical and economic solution. Roofs and walls clad with tiles and slates should be treated as fragile, and adequate precautions should be taken including the use of crawling boards and roof ladders (suitably packed to prevent damage to the roof covering) or access platforms when accessing the roof for the purposes of maintenance or repair. Failure to use adequate access equipment can damage the tiles and fixings and may be in contravention of Health and Safety Regulations. For an unfixed tile, remove the damaged unit by first easing it up slightly, using a trowel and timber wedges, so that the tile can be slid out with the nibs clearing the top of the batten. The replacement tile can be inserted using the same procedure. For a tile that is nailed, the neighbouring tiles should be lifted to expose the nail(s), which should be extracted carefully using a slate ripper or hacksaw blade and disposed of safely. The replacement tile can be inserted using the same procedure and re-fixed to the adjacent fixed tiles by using an epoxy resin adhesive applied to the interlock/overlock and head lap area. Care must be taken not to bridge anti-capillary bars or interlocking water channels so that water can drain freely. For a tile that is clipped, the clip can be prised off the interlock and the nail extracted, with the damaged tile removed as described above. The new clip and nail can then be fitted as normal (avoiding the previous nail hole), allowing the clip to rest in the clip recess of the adjacent tile. Hold up the clip, and slide the replacement tile into position, allowing the clip to be released onto the sidelock of the tile. For a tile that is both nailed and clipped, it is necessary to establish the position of the tile nail holes of the in the course directly below the replacement tile. Mark out the corresponding hole positions on the top surface near the tail of the tile. Fit the replacement using the above procedure. Drill a 4mm dia. hole through the top of the replacement tile, directly above the nail hole of the tile below. Secure both courses using a stainless steel screw with cap and washer (40mm -120mm long dependent on tile depth) to provide a minimum 15mm penetration into the batten. The above procedure can also be used to secure the tail of the course above the replacement tile. If there are a number of damaged tiles that are clipped, it may be necessary to strip back the roof to the nearest verge or valley/hip in order to re-clip the replacement tiles. Note : It is important that both washer and cap form a waterproof seal around the hole. If necessary, a mastic sealant should be applied around the screw where it passes through the lower tile nail holes.
16 4 Interlocking tiles and slates 67 Ashmore interlocking tiles Ashmore single lap interlocking roof tiles have a mock bond joint to give the appearance of two traditional double-lap plain tiles when laid on the roof. Tiles are laid single lap with a broken bond, utilising left hand and right hand 3 /4 tiles for use in alternate courses at verges and abutments. Tileand-a-half tiles are also available to assist with setting out to hips and valleys to avoid small cut sections of tile. Tiles requiring fixing are either once or twice nailed using 45mm x 3.35mm aluminium or stainless steel nails with a self fixing stainless steel wire tile clip which is additionally used for exposed locations or roofs with pitches of 55 and above. Setting out 1 Position eaves course batten first and measure distance from top of outer edge of fascia. This should be equal to length of tile, less nib and tile overhang to centre line of gutter width, i.e. 267mm less 50mm (overhang) less 28mm (nib width and indent) = 189mm from outer edge of fascia or tilting fillet. Top course batten should be fixed so that ridge tile provides a minimum 75mm cover over top course tiles. 2 Measure distance between the top of eaves batten and top of ridge course batten. Divide distance by 190mm (maximum gauge of Ashmore tile). Round this figure up to give number of courses up roof slope as a whole number. Divide measured distance by number of courses to give required batten gauge. Note: Batten gauges between fixed points should be calculated individually. 3 Where two roof slopes of varying pitch intersect, set batten gauge to the lower or longer rafter pitch. 4 The practice of adjusting gauge over last few courses at eaves or ridge is technically acceptable, provided maximum gauge is not exceeded. Tiles should only be cut at top, and drilled, nailed/clipped as required. 5 Horizontal alignment can be checked by striking a chalk/ochre line at 90 to vertical line. 6 Check perpendicular alignment by setting out roof along eaves starting with correct overhang at the right hand verge. Overhang at left hand verge can be achieved using full and 3 /4 tiles by opening or closing side lock shunt (max. verge overhang 50mm). 7 Cut tiles at verge should never be less than 3 /4 the width of a standard tile, unless cut from a tile and a half tile.
17 4 Interlocking tiles and slates 68 Ashmore interlocking tiles Fixing Before commencing to tile the roof, check to ensure the correct fixing specification is being used. Ashmore tiles should be mechanically fixed in the following manner: Step A - Tiles requiring once nailing should be nailed through right hand nail hole using a 45mm x 3.35mm aluminium or stainless steel nail. For roof pitches over 45, all tiles should be at least twice nailed. Step B - Tiles requiring clipping should be nailed through the left-hand nail hole using a 45mm x 3.35mm aluminium or stainless steel nail and clipped using Ashmore stainless steel wire clip, which is located over side lock of tile with tail push fitted under back edge of the nailed course of tiles beneath. For exposed sites and for roof pitches over 55, each tile should be twice nailed and clipped. Fig 25 Clipping eaves course Eaves 1 The eaves course of tiles may be fixed by either nailing or clipping, or both. 2 Purpose made eaves clips are nailed to fascia board and located over side lock of the eaves course tile. (Fig.25) 3 Eaves course must be laid at same pitch as remainder of roof. 4 Care should be taken to adjust height of fascia or tilting fillet to accommodate any eaves vent strips (see tables on page 167).
18 4 Interlocking tiles and slates 69 Ashmore interlocking tiles Bedded verges Verges should be formed using standard tiles with left hand or right hand 3/4 width verge tiles in alternate courses. Standard tiles on left hand verges will require the sidelock to be removed (Fig 26). Form verges by mortar bedding tiles onto an undercloak of fibre reinforced cement strip (1200mm x 150mm). Lay undercloak rough side up and closely butted together with a slight tilt outwards to provide a drip edge with a maximum 50mm overhang from brickwork gable or bargeboard. Provide 65mm width of mortar to bed all verge tiles and fix each verge tile by twice nailing and clipping. Use purpose made verge clips on both left hand and right hand verges and twice nailed to battens with upstand level with edge of the undercloak. Strike all mortar bedding off flush and neatly point in one operation. Ridges Roof apexes may be covered using Marley Eternit Segmental ridge tiles or any other ridge tile design suitable for the pitch of the roof (see Marley Eternit Product Catalogue). Edge bed all mortar bedded ridge tiles onto top course of tiles with solid bedding at butt joints. Support mortar at butt joints with pieces of cut tile. Ensure that a minimum 75mm cover is provided by ridge tile over top course of tiles with any exposed mortar neatly pointed (Fig 27). Provide two Security Ridge tiles at each end ridge (or for a distance of 900mm from gable ends, separating walls whichever is the greater), which should be mechanically fixed to a ridge board or supplementary batten. Note: For details of Marley Eternit Dry Ridge systems refer to pages For Ashmore Dry verge system, see page 135. Standard tile 3/4 width RH verge tile Standard tile verge clip Fig 26 Typical bedded verge (right hand) Fig 27 Typical bedded ridge
19 4 Interlocking tiles and slates 70 Ashmore interlocking tiles Hips Hips should be formed using Tile-and-a-half tiles, each tile being nailed or nailed and clipped. 1 Cut tiles to rake of hip and cover with Third Round Hip tiles or alternative suitable hip tiles, edge bedded, with solid bedding at butt joints, onto adjacent tiles. Support mortar at butt joints with pieces of cut tile. 2 Ensure that a minimum 75mm cover is provided by hip tile over adjacent courses of tiles with any exposed mortar neatly pointed. 3 Fix a hip iron at base of hip rafter and shape first hip tile at front to align with tiling at the eaves (Fig 28). 4 Provide two security hip tiles for use for a distance of 900mm from face of rigid masonry supports, abutments or separating walls. 5 Mitre junction of hip and ridge, using a concealed lead saddle in exposed locations. Note: For details of Marley Eternit Dry Hip systems refer to pages Valleys Valleys should be formed using Tile-and-a-half tiles, each tile being nailed and clipped. 1 Cut tiles to rake of valley trough, leaving a clear channel of minimum 125mm wide. 2 Form valley with either a metal lining (Code 4 lead sheet) of not less than 500mm wide (see LSA recommendations) or with the Marley Eternit GRP Valley Trough, or Dry Valley Trough (low profile). 3 Bed raking cut tiles at edges of valley using mortar, ensuring that there is adequate space kept clear behind mortar to avoid water capillarity (Fig 29). Note: For details of Marley Eternit GRP Valley Trough refer to page 162. Fig 28 - Typical bedded hip using third round ridge units as hip capping Tile and a half tiles shown shaded Fig 29 - Typical bedded valley. Tile and a half tiles shown shaded.
20 4 Interlocking tiles and slates 71 Symphony clay interlocking tiles Introduction Marley Eternit Symphony single lap clay interlocking roof tiles have the appearance of a traditional single pantile when laid on the roof. Tiles are laid single lap with a straight bond, utilising special Left Hand Verge Finishing tiles at bedded left-hand verges and at abutments. Dentil slips are available for bedded ridges and hips. Tiles requiring fixing are either once or twice clipped using a one piece clip fitted over the tile side-interlock, or in addition, a one piece clip fitted over the head-lock of the tile, both nailed to the batten. All tiles on roof pitches above 45 should be clipped using a head clip, and a side interlock clip. All eaves and verge tiles should be fixed using purpose made eaves and verge clips. Ridge and hip tiles are available for use with Symphony tiles in addition to the following Dry Fix and Ventilation products: Universal 10mm and 25mm Eaves Ventilation systems Marley Eternit In-line vent Marley Eternit GRP Dry Valley (deep profile) Fig 30 - Typical eaves detail with over fascia vent strip, underlay support tray, comb filler and eaves clip General Before commencement of sitework, the following installation guidance for the laying and fixing of Marley Eternit Symphony tiles should be considered. Designers and installers should consult BS 5534 Code of practice for slating and tiling, taking into account local conditions and current good practice, which should be undertaken in accordance with BS and the manufacturers recommendations.
21 4 Interlocking tiles and slates 72 Symphony clay interlocking tiles 75mm Fig 31 - Eaves to ridge setting out Setting out Vertical coverage 1 The tile battens should be set out at a maximum spacing of 389mm to ensure a minimum headlap of 96mm. Symphony tiles have a built in head lock adjustment which allows the gauge to be reduced within the range 389mm 361mm. When setting out the batten gauge for the Symphony tile, lay a sample set of seven to ten tiles on a flat surface with headlaps and interlocks engaged. Lay the tiles first with a tight headlock and calculate the average margin. Relay the files with an open headlock and recalculate the margin again. The gauge used to set out the roof battens should equal a figure between these two averages. (Figs 33 and 34, page 73). Where two roof slopes of varying pitch intersect, the batten gauge should be set to the lower 75mm or longer rafter pitch. 2 Position the eaves course batten to allow the bottom edge of the eaves course tiles to overhang the fascia, tilting fillet and under eaves protector tray by 70mm i.e just over the centre of the gutter. 3 Measure the distance between the top of the eaves batten and the top of the ridge course batten which should be fixed so that the ridge tile provides a minimum 75mm cover over top course tile.
22 4 Interlocking tiles and slates 73 Symphony clay interlocking tiles 4 Divide the distance by 389mm, the maximum gauge of the Symphony tile. Round this figure up to give the number of courses up the roof slope as a whole number. Divide the measured distance of by the number of courses to give the required batten gauge. NOTE : Batten gauges between fixed points should be calculated individually. 5 The practice of adjusting the gauge over the last few courses at eaves or ridge is technically acceptable provided the maximum gauge is not exceeded, although the resulting distortion of the diagonal lines may not be aesthetically acceptable. 6 Tiles L1 should only be cut at the top edge, for use at the Top course (mortar bedded ridges only), drilled and nailed using a 45mm x 3.35mm aluminium nail. L1 L1 L1 L2 L2 L2 L2 Fig 32 - Using tile shunt to adjust linear coverage
23 4 Interlocking tiles and slates 74 Symphony clay interlocking tiles Linear coverage The average linear coverage (cover width) of the Symphony tile is 230mm. There is a 3mm 4mm adjustment (shunt) built into the side interlocks to aid setting out across the roof. 1 Lay a course of tiles along the eaves length, setting the tiles at the average linear coverage, and make adjustment in the shunt to allow for a 38mm 50mm overhang at the verges. 2 Ensure that a Symphony LH Verge Finishing Tile is used to complete the linear tile array and that the verge overhang is equal on both left and right hand verges. Using a gauging rod 1 An alternative method is to use a gauging rod (a short length of batten) and mark the position of three tiles with their sidelocks fully closed, then mark the position of the three tiles open. Set the average coverage by making a third mark midway between the two previous two marks on the rod. Use this third position to set out the linear coverage on both eaves and top course battens. 2 Strike a chalk or ochre line from the eaves to ridge at each mark so that the tiles can be laid to a straight perpendicular alignment. Alignment and cutting of tiles Horizontal alignment can be checked by striking a chalk/ochre line at 900mm to the vertical line. Perpendicular alignment should be checked by setting out the roof along the eaves starting with the correct overhang at the right hand verge. The left-hand verge can be achieved using special LH Verge finishing tiles (max. verge overhang 50mm). 1 Cut tiles at the verge should be avoided wherever possible, but if this is unavoidable, should never be less than half the width of the standard tile. 2 Bedded verge tiles should be mechanically fixed using an aluminium verge clip nailed to the batten using two 25mm x 3.35mm aluminium nails. Note: Check verge tiles are available to special order where maximum durability is required e.g. coastal locations. b1 b2 b1 b1 b2 + b2 20 b2 b2 Fig 33 - Using tile shunt to adjust linear coverage inwards Fig 34 - Using tile shunt to adjust linear coverage outwards b2 + b2 20
24 4 Interlocking tiles and slates 75 Symphony clay interlocking tiles General fixing Before commencing to tile the roof, check to ensure the correct fixing specification is being used. Load out all sides of the roof uniformly, randomly mixing tiles from different pallets. 1 Symphony tiles should be laid straight bonded, commencing at the right hand side of the roof and working from right to left. 2 The following is the minimum specification for fixing Symphony tiles : A Tiles requiring once clipping (side) should be fixed using a Symphony one piece Tile clip, located over the side lock of the tile (Fig 35). B Tiles requiring twice clipping (side and head) should be fixed using a Symphony one piece tile clip, located over the side lock of the tile, and in addition, a Symphony one piece head clip, located over the head lock of the tile (Fig 36). 3 All verge tiles should be clipped using a Symphony verge clip nailed to the battens with two 25mm x 3.35mm aluminium nails. 4 All eaves course tiles should be clipped using a Symphony eaves clip nailed to the fascia or tilting fillet with two 25mm x 3.35mm aluminium nails. 5 For roof pitches each tile must be twice clipped using both the Symphony one piece tile clip and Symphony Head clip. Contact the Technical Advisory Service for fixing specifications. Fig 35 - Symphony tile clip Fig 36 - Symphony head clip
25 4 Interlocking tiles and slates 76 Symphony clay interlocking tiles Eaves The eaves course tiles should be laid at the same pitch as the remainder of the roof with the fascia board or tilting fillet fixed at the correct height, taking account of any over fascia ventilation strip. Protector tray 1 An eaves protector tray (1.5 x 0.22m) should be fitted over the fascia, tilting fillet or eaves vent strip and nailed to each rafter. The roof underlay should lap the protector tray by a minimum 150mm (Fig 37). 2 The eaves course of tiles should be fixed by clipping. Purpose made eaves clips are nailed to the fascia board and located over the side lock of the eaves course tile (Fig 38). Fig 37 - Section through typical eaves showing protector tray 3 A comb filler strip should be fitted above the fascia/tilting fillet/eaves vent strip to prevent the ingress of birds or vermin. See page 166 for fascia heights with Universal eaves vent systems, and page 204 for fascia heights without ventilation. Fig 38 - Eaves clip and comb filler
26 4 Interlocking tiles and slates 77 Symphony clay interlocking tiles Bedded verges Verges should be formed using standard tiles for right hand verges with special Left-hand Verge Finishing tiles for left-hand verges. 1 Verges should be formed by mortar bedding the tiles onto an undercloak of fibre reinforced cement strip (1200mm x 150mm). 2 Lay the strips of undercloak rough side up and closely butted together, with a slight tilt outwards to provide a drip edge with a maximum 50mm overhang from the brickwork gable or bargeboard (Fig 39). 3 Provide 65mm width of mortar to bed all verge tiles and fix each verge tile by clipping each tile with purpose made verge clips on both lefthand and right-hand verges, twice nailed to the battens with the upstand level with the edge of the undercloak (Fig 40). 4 Strike all mortar bedding off flush and neatly point in one operation. 5 When used with a bedded ridge, the gable end Symphony ridge tile should be finished with a Block Ridge tile. Verge clip Min 65mm wide mortar bedding 38-50mm overhang 150mm wide undercloak LH finishing tile Batten Rafter Symphony tile Fig 39 - Section through typical brickwork verge showing verge clips Fig 40 - Symphony verge clips
27 4 Interlocking tiles and slates 78 Symphony clay interlocking tiles Ridges Bedded ridges The roof apex should be covered using Symphony socketed ridge tiles, edge bedded onto the top course of tiles with dentil slips bedded into the pans. 1 Ensure that a minimum 75mm cover is provided by the ridge tile over the top course of tiles with any exposed mortar neatly pointed (Fig 41). Security ridges 1 The two ridge tiles at each gable end, or over any supporting walls or junctions, should be mechanically fixed using a wire (and washer) passed through a pre-drilled hole in the ridge unit. This wire may be secured to the top course tiling batten or secured to a ridge board. 2 Drill a 6mm diameter hole in the ridge tile, approximately 75mm from the end, using a sharp masonry drill bit. 3 Fit the security ridge wire around the top course tile batten, ensuring that the end loop closes over the wire above the rectangular loop (Fig 42). 4 Pull the wire tight so that the loop closes tightly around the batten, and feed the end up through the hole in the ridge tile (Fig 43). 5 Feed the rubber washer and stainless steel clip onto the wire, and using pliers pull the wire tight through the self-locking slot in the top of the clip (Fig 44). 6 Bend over the wire and cut any excess with a wire cutter. Note: Security ridge may also be fixed using a stainless steel screw and washer of suitable length secured to a ridge board or supplementary ridge batten (contact the Technical Advisory Service for further information). 75mm Fig 41 - Section through bedded ridge Fig 42 - Securing ridge wire to tiling batten Fig 43 - Passing ridge wire through ridge unit Fig 44 - Securing and trimming of wire
28 4 Interlocking tiles and slates 79 Symphony clay interlocking tiles Bedded hips 1 Cut tiles to the rake of the hip and cover with Symphony Ridge/Hip tiles, edge bedded, with dentil slips bedded in the pans of the adjacent raking cut tiles. 2 Ensure that a minimum 75mm cover is provided by the hip tile over the adjacent courses of tiles with any exposed mortar neatly pointed. 3 Fix a hip iron at the base of the hip rafter and shape the first hip tile at the front to align with the tiling at the eaves. Mitre the junction of the hip and ridge, using a concealed lead saddle in exposed locations (Fig 45). 4 The two hip tiles at each hip end, or over any supporting walls or junctions should be mechanically fixed using a wire (and washer) (see page 78). Valleys 1 Cut tiles to the rake of the valley trough, leaving a clear channel of minimum 125mm wide. 2 Form the valley with either a metal lining (Code 4 or 5 lead sheet) of not less than 500mm wide (see LSA recommendations) or with a Marley Universal Dry Valley (deep profile see pages ). 3 For mortar bedded valleys, bed raking cut tiles at the edges of the valley using mortar, ensuring that tile interlocks are kept free and there is adequate space kept clear behind the mortar to avoid water capillarity (Fig 46). 4 Ensure the mortar is laid onto a fibre cement undercloak strip above the lead valley gutter lining. Fig 45 - Bedded hip Symphony tile Tiling batten Welt Underlay 19mm timber valley board Code 4/5 lead sheet Min 125mm Fig 46 - Section through bedded, metal lined valley Mortar Rafter Fibre cement undercloak
29 4 Interlocking tiles and slates 80 Domino clay interlocking tiles Introduction Marley Eternit Domino clay interlocking roof tiles have the appearance of a small format flat tile when laid on the roof. Tiles are laid single lap with a broken bond, utilising special half tiles and left hand verge tiles at bedded verges and abutments. Tiles requiring fixing are either once or twice clipped using a one piece clip fitted over the tile side-interlock, or in addition, a one piece clip fitted over the head-lock of the tile, both nailed to the batten. All tiles on roof pitches above 45 should be clipped using a head clip, and a side interlock clip. All eaves and verge tiles should be fixed using purpose made eaves and verge clips. Ridge and hip tiles are available for use with Domino tiles in addition to the following Dry Fix and Ventilation products: Universal 10mm and 25mm Eaves Ventilation systems Marley Eternit In-line vent tile Marley Eternit GRP Dry Valley (low profile) Fig 47 Typical eaves detail with over fascia vent strip, felt support tray and eaves clip General Before commencement of sitework, the following installation guidance for the laying and fixing of Marley Eternit Domino tiles should be considered. Designers and installers should consult BS 5534 Code of practice for slating and tiling, taking into account local conditions and current good practice, which should be undertaken in accordance with BS and the manufacturers recommendations.
30 4 Interlocking tiles and slates 81 Domino clay interlocking tiles Fig 48 Eaves to ridge setting out Setting out Vertical coverage The tile battens should be set out at a maximum spacing of 354mm to ensure a minimum headlap of 83mm. Domino tiles have a built in head lock adjustment which allows the gauge to be reduced within the range 354mm 343mm. When setting out the batten gauge for the Domino tile, lay a sample set of seven to ten tiles on a flat surface with headlaps and interlocks engaged. Lay the tiles first with a tight headlock and calculated the average margin. Re-lay the tiles with an open headlock and re-calculate the margin again. The gauge used to set out the roof battens shouldl1 equal a figure between these two averages (Figs. 48 and 49). 1 Position the eaves course batten to allow the bottom edge of the eaves course tiles to overhang the fascia or tilting fillet by approximately 60 mm i.e just over the centre of the gutter. 2 Measure the distance between the top of the eaves batten and the top of the ridge course batten which should be fixed so that the ridge tile provides a minimum 75mm cover over the top L1course tiles. 75mm 3 Divide this distance by 354mm, the maximum gauge of the Domino tile. Round this figure up to give the number of courses up the roof slope as a whole number. Divide the measured distance by the number of courses to give the L1 required batten gauge. Note : Batten gauges between fixed points should be calculated individually. L1 L2 L2 L2 Fig 49 Using tile shunt to adjust linear coverage L2
31 4 Interlocking tiles and slates 82 Domino clay interlocking tiles Linear coverage The average linear coverage (cover width) of the Domino tile is 224mm. There is a 3mm adjustment (shunt) built into the side interlocks to aid setting b1 out across the roof. 1 Lay a course of tiles along the eaves length, setting the tiles at the average linear coverage, and make adjustment in the shunt to allow for b2 a 38mm 50mm overhang at the verges. 2 Ensure that a Domino LH Verge Finishing Tile is used to complete the linear tile array and that the verge overhang is equal on both left and right hand verges. b2 + b2 Using a gauging rod 20 b1 1 An alternative method is to use a gauging rod (a short length of batten) and mark the position of three tiles with their sidelocks fully closed, then mark the position of the three tiles open. b2 2 Set the average coverage by making a third mark midway between the two previous two marks on the rod. Use this third position to set out the linear coverage on both eaves and top course battens. b2 + b2 3 Strike a chalk or ochre line from the eaves to 20 ridge at each mark so that the tiles can be laid to a straight perpendicular alignment. b1 b2 b1 Fig 50 Using tile shunt to adjust linear coverage inwards b2 + b2 b2 20 b2 + b2 20 Fig 51 Using tile shunt to adjust linear coverage outwards
32 4 Interlocking tiles and slates 83 Domino clay interlocking tiles Half tile Alignment and cutting of tiles The practice of adjusting the gauge over the last few courses at eaves or ridge is technically acceptable provided the maximum gauge is not exceeded, although the resulting distortion of the diagonal lines may not be aesthetically acceptable. 1 Tiles should only be cut at the top edge, for use at the Top course (mortar bedded ridges only), drilled and nailed using a 45mm x 3.35mm aluminium nail. 2 Horizontal alignment can be checked by striking a chalk/ochre line at 900mm to the vertical line. 3 Perpendicular alignment should be checked by setting out the roof along the eaves starting with the correct overhang at the right hand verge (Fig 52). The left-hand verge can be achieved using special Domino LH Verge finishing tiles (max. verge overhang 50mm) (Fig 53). 4 Cut tiles at the verge should be avoided wherever possible, but if this is unavoidable, should never be less than half the width of the standard tile. 5 Bedded verge tiles should be mechanically fixed using an aluminium verge clip nailed to the batten using two 25mm x 3.35mm aluminium nails. Half tile Standard tile Standard tile Half tile Standard tile Fig 52 Right hand verge achieving broken bond using half tile and standard tiles (clips omitted for clarity) Left hand verge finishing tile Half tile Standard Standard Half tile Standard Left hand verge finishing tile Left hand verge finishing tiles Half tile Standard tile Left hand verge finishing tiles Fig 53 Left hand verge achieving broken bond using left hand verge finishing tiles and half tiles (clips omitted for clarity)
33 4 Interlocking tiles and slates 84 Domino clay interlocking tiles General fixing Before commencing to tile the roof, check to ensure the correct fixing specification is being used. Load out all sides of the roof uniformly, randomly mixing tiles from different pallets. 1 Domino tiles should be laid broken bonded, commencing at the right hand side of the roof and working from right to left, utilising purpose made Half tiles located adjacent to standard tiles and Left hand Finishing tiles in alternate courses. 2 The following is the minimum specification for fixing Domino tiles : A Tiles requiring once clipping (side) should be fixed using a Domino one piece Tile clip, located over the side lock of the tile (Fig 54). B Tiles requiring twice clipping (side and head) should be fixed using a Domino one piece Tile clip, located over the side lock of the tile, and in addition, a Domino one piece Head clip, located over the head lock of the tile (Fig 55). 3 All verge tiles should be clipped using a Domino verge clip nailed to the battens with two 25mm x 3.35mm aluminium nails. 4 All eaves course tiles should be clipped using a Domino eaves clip nailed to the fascia or tilting fillet with two 25mm x 3.35mm aluminium nails. 5 For roof pitches each tile must be twice clipped using both the Domino one piece Tile clip and Head clip. Fig 54 Domino tile clip Fig 55 Domino head clip
34 4 Interlocking tiles and slates 85 Domino clay interlocking tiles Eaves In order to ensure that the eaves course of tiles is laid at the same pitch as the remainder of the roof, the fascia board or tilting fillet should be fixed at the correct height taking account of any over fascia ventilation strip (Fig 56). 1 The eaves course of tiles should be fixed by clipping. Purpose made eaves clips are nailed to the fascia board and located over the side lock of the eaves course tile (Fig 57). See page 166 for fascia heights with Universal eaves vent systems, and page 204 for fascia heights without ventilation. Fig 56 Section through eaves Fig 57 Clipping at eaves
35 4 Interlocking tiles and slates 86 Domino clay interlocking tiles Bedded verges Verges should be formed using standard tiles for right hand verges with special Left hand Verge Finishing tiles for left hand verges. Half tiles are laid adjacent to standard tiles and left hand finishing tiles in alternate courses to create a broken bond (Fig 58). Verges should be formed by mortar bedding the tiles onto an undercloak of fibre reinforced cement strip (1200mm x 150mm). 1 Lay the strips of undercloak rough side up and closely butted together, with a slight tilt outwards to provide a drip edge with a maximum 50mm overhang from the brickwork gable or bargeboard. 2 Provide 65mm width of mortar to bed all verge tiles and fix each verge tile by clipping each tile with purpose made verge clips on both left hand and right hand verges, twice nailed to the battens with the upstand level with the edge of the undercloak. Strike all mortar bedding off flush and neatly point in one operation (Fig 59). 3 When used with a bedded ridge, the gable end Domino Block End ridge tile should be used. Verge clip Min 65mm wide mortar bedding 38-50mm overhang 150mm wide undercloak LH finishing tile Domino half tile Batten Rafter Domino tile Fig 58 Section through typical brickwork verge Fig 59 Verge clip
36 4 Interlocking tiles and slates 87 Domino clay interlocking tiles Bedded ridges The apex of the roof should be covered using Domino socketed ridge tiles, edge bedded onto the top course of tiles. Ensure that a minimum 75mm cover is provided by the ridge tile over the top course of tiles with any exposed mortar neatly pointed (Fig 60. Security ridges 1 The two ridge tiles at each gable end, or over any supporting walls or junctions, should be mechanically fixed using a wire (and washer) passed through a pre-drilled hole in the ridge unit. This wire may be secured to the top course tiling batten or secured to a ridge board. 2 A Block End Ridge tile should be used at the gable end. 3 Drill a 6mm diameter hole in the ridge tile, approximately 75mm from the end, using a sharp masonry drill bit. 4 Fit the security ridge wire around the top course tile batten, ensuring that the end loop closes over the wire above the rectangular loop (Fig 61). 5 Pull the wire tight so that the loop closes tightly around the batten, and feed the end up through the hole in the ridge tile (Fig 62). 6 Feed the rubber washer and stainless steel clip onto the wire, and using pliers pull the wire tight through the self-locking slot in the top of the clip (Fig 63). 7 Bend over the wire and cut any excess with a wire cutter. Note: Security ridge may also be fixed using a stainless steel screw and washer of suitable length secured to a ridge board or supplementary ridge batten (contact the Technical Advisory Service for further information). 75mm Fig 60 Typical bedded ridge Fig 61 Securing ridge wire to tiling batten Fig 62 Passing ridge wire through ridge unit Fig 63 Securing and trimming of wire
37 4 Interlocking tiles and slates 88 Domino clay interlocking tiles Bedded hips 1 Cut tiles to the rake of the hip and cover with Domino Ridge/Hip tiles, edge bedded onto raking cut tiles. 2 Ensure that a minimum 75mm cover is provided by the hip tile over the adjacent courses of tiles with any exposed mortar neatly pointed. 3 Fix a hip iron at the base of the hip rafter and shape the first hip tile at the front to align with the tiling at the eaves. Mitre the junction of the hip and ridge, using a concealed lead saddle in exposed locations (Fig 64). 4 The two hip tiles at each hip end or over any supporting walls or junctions should be mechanically fixed using a wire (and washer) (see page 87). Fig 64 Typical bedded hip Domino tile Valleys 1 Cut tiles to the rake of the valley trough, leaving a clear channel of minimum 125mm wide. Form the valley with either a metal lining (Code 4 or 5 lead sheet) of not less than 500mm wide (see LSA recommendations) or with a Marley Universal Dry Valley (deep profile see pages ). 2 For mortar bedded valleys, bed raking cut tiles at the edges of the valley using mortar, ensuring that tile interlocks are kept free and there is adequate space kept clear behind the mortar to avoid water capillarity (Fig 65). 3 Ensure the mortar is laid onto a fibre cement undercloak strip above the lead valley gutter lining. Tiling batten Underlay 19mm timber valley board Code 4/5 lead sheet Fig 65 Typical bedded valley Min 125mm Welt Rafter Fibre cement undercloak
38 4 Interlocking tiles and slates 89 Melbourn Interlocking slates Before commencing the installation of the slates, ensure the following is carried out: Undercloak Battens 1 The batten gauge is 250mm maximum, and recommended softwood batten size is 50 x 25mm graded in accordance with BS Verge 2 Position eaves batten so that eaves course overhangs fascia by a maximum of 50mm (Fig 67). Eaves Fig 67 - Batten configuration at eaves Fascia board 3 Fix subsequent battens at a maximum gauge of 250mm (minimum 235mm) up to ridge, where top batten spacing may be less than 250mm to suit ridge detail (see Interlocking tiles setting out) Edge of slate aligns approximately with side of upstand on slate below Edge of slate aligns approximately with side of upstand on slate below Fixing 1 Melbourn slates are designed to be fixed with one nail per slate, at bottom left hand corner, at roof pitches of 25-65º, but nail penetrates through head of slate below (twice nailed over 65º). 2 Correct alignment of slates is essential (see Figs 68-69). Note: Two nails per slate are needed at eaves, verges, ridges, hips, valleys and on roof pitches of between 15 and 24. (When using a 25mm eaves ventilator or at steeper pitches, a special Melbourn stainless steel nail and clip are required.) (See Fig. 71) Centreline mark on each slate Centreline mark on each slate Perpendiculars 2nd nail fixing Verge 2nd nail fixing Fig 68 - Standard eaves Nail to be driven home and flat through slot aligning with arrow on lower slate Nail to be driven home and flat through slot aligning with arrow on Eaves lower slate 50mm Head nail Head nail Eaves course Eaves co Position of eaves clip Position of eaves clip Front face of fascia bo Front face of fascia board Fig 69 - Eaves with 25mm Eaves ventilator strip
39 4 Interlocking tiles and slates 90 Melbourn interlocking slates Nailing positions These fixing recommendations apply to wind suction loadings up to 2kN/m 2 ; for greater loadings contact the Technical Advisory Service. B C 1 Each slate is generally nailed once at position A (See Fig.70), but additional nail fixings are required around perimeter of roof and at pitches shallower than 25º and greater than 65º. 2 B Special clip fixings are also required for some details. C 3 For body of roof, single slates are generally nailed at point A only, but for roof pitches below 25 or above 65 a second fixing A is required at position C. Single slate 4 For single slates, slate-and-a-half slates and double slates, additional fixings at positions B B, D and E may be required, (see table, below). Fig 70 - Single slate B A Single slate CB D A A A Single Slate-and-a-half slate Double slate Fig 71 - Slate and a half slate D E C B B D E C A A DC E B C D Sl Slate-and-a-half Use of different nailing positions A at roof perimeters Double slate Eaves Ridge Verge/valley/hip/ abutment Right-hand Left-hand Single slate A,C A,C A, B C Slate-and-a-half A, D, B D, C Double slate A, B & E C, D or E (or D) A Double slate Fig 72 - Double slate
40 4 Interlocking tiles and slates 91 Melbourn interlocking slates Eternit continuous rafter roll 50mm clear airpath Eaves 1 The eaves batten should be set out so that the eaves slates overhang the fascia by 50mm. The height of the fascia, or eaves ventilator, if used, should be in accordance with the table on page 90 so that the eaves course does not kick up or down (Fig 73). 2 The eaves slates should be nailed at position 'C' and, if they bear directly onto a timber fascia, or onto the 10mm eaves vent used with a timber fascia, at point 'A' as well (Fig 71). 3 If a 25mm eaves ventilator is used, an eaves clip should be nailed through the ventilator into the timber fascia to restrain the tail of each slate at the perpendicular joint (Fig 74). 4 If a composite fascia is being used which cannot take a nail fixing, the clip should be fixed into the tilting fillet; in this instance roof ventilation should be provided by soffit vents. 5 The eaves clip should be bent on site to suit the roof pitch. 6 At a left hand bedded verge, an eaves clip should be used to restrain the bottom left hand corner of the last eaves slate (as shown in Fig. 76, on page 92). 10mm eaves ventilator Universal eaves felt support tray Fig 73 - Eaves detail with 10mm eaves ventilator Eaves clip fixed through 25mm eaves ventilator into fascia Universal eaves felt support tray Fig 74 - Eaves detail with 25mm eaves ventilator
41 4 Interlocking tiles and slates 92 Melbourn interlocking slates Bedded verge The slates should be laid as described in Figs with the addition of a Melbourn stainless steel verge clip which should be used at the bottom corner of each verge slate. 1 Fix undercloak over underlay to give 38mm to 50mm projection at the verge. (The battens should be cut 100mm back from the edge of the undercloak.) (Fig. 75) 2 Fix verge clips to battens using the 2 No. 25mm 2.8mm nails supplied, so that the verge slates align with the edge of the undercloak. 3 Insert verge slates into clip and nail at positions shown on page Point verge in 3:1 aggregate (sand)/cement mortar with a weathered joint. To ensure greater adhesion, the underside of the verge slates should be coated with a bonding agent and the mortar should contain a non-shrink additive. 5 At a left hand verge, an eaves clip, with the hook opened out to 12mm, should be used to restrain the bottom left hand corner of the last eaves slate. (Fig.76) S/S Verge clip fixed to batten Mortar Fig 75 - Bedded verge section showing verge clip Melbourn slate-and-a-half Underlay Rafter Fig 76 - Left hand bedded verge showing verge clip and additional eaves clip Melbour
42 4 Interlocking tiles and slates 93 Melbourn interlocking slates Hips Hips can be close mitred or capped with bedded hip ridge tiles. Where raking cuts are required, either slate-and-a-half slates or double slates should be used (dependent on roof pitch) Close mitred hips For close mitred hips the minimum rafter pitch is 22.5 and the maximum is 60, assuming a plan angle of 90 and equal pitches on either side of the hip. A mitred hip pack is available, containing 10 each of soakers, hip clips and nails. (See page 155). Capped hips 1 Bedded Hip Tiles Hip tiles are available to suit a range of hip angles, although mechanical fixings may be required in addition to the mortar bedding. The slates should be fixed as described for a close mitred hip, excluding soaker packs. 2 Before bedding the hip tile, it is recommended that a coat of bonding agent be applied at the appropriate position on the slates and to the inside of the hip tile. The mortar should contain an additive to prevent shrinkage (Fig 77). Note: For pitches below 20 refer to the Technical Advisory Service. 3 Use security hip tiles for a distance of 900mm from the face of rigid masonry supports, abutments or separating walls. 50 x 25 battens Rafter Underlay Fig 77 - Section through bedded hip (eaves not shown)
43 4 Interlocking tiles and slates 94 Melbourn interlocking slates Open lead valley Open lead valleys should be formed from minimum Code 4 lead laid on 19mm thick external grade WBP plywood boards, minimum width 225mm, dressed over valley fillets and welted (Fig 78). Min. 125mm The width of the valley should be designed in accordance with the recommendations of the Lead Sheet Association, Tel: S/S Valley clip fixed to batten 1 The valley clips should be twice nailed to the battens, so that they clamp two layers of slate at the lap, allowing the slates to overhang the valley by 50mm. 50mm 2 The raking cut slates should be cut from double slates and inserted into the valley clips and head nailed in the positions shown in Figs.70-72, page 90. Valley fillet Code 4 lead Valley board 3 Raking cuts should be made by using a disc cutter, following Health and Safety guidelines. Fig 78 - Section through open lead valley (eaves not shown) 4 Ensure that nibs which foul on valley fillets are removed prior to nailing. 5 To the right of the valley, an eaves clip should be used to restrain the bottom left hand corner of the last eaves slate.
44 4 Interlocking tiles and slates 95 Melbourn interlocking slates Duo and mono-pitch ridges The apex of the roof should be covered using ridge tiles of complementary colour, or contrasting, and texture to that of main roof slates. Always check that the ridge tile design suits the pitch and type of roof tile being used. (See Marley Eternit Roofing Product Range catalogue). 75mm 1 Edge-bed ridge tiles onto the top course slates with solid bedding at butt joints (Figs 79 and 80). 2 Support mortar at these butt joints using pieces of tile. 3 A minimum of 75mm cover should be provided over top course slates. Note: Top course slates may require cutting and drilling for nailing dependent on setting out. 4 Exposed mortar should be neatly pointed. Ridges at gable ends 1 Allow for mechanically fixing of two ridge tiles at gable ends, abutments, above separating walls, or for a minimum distance of 900mm (whichever is the greater). 2 For trussed rafter roofs, fix a length of batten approximately 2m long at the apex of wall and adjacent trusses. 3 Drive a nail into batten and attach a Security Ridge tile to it using the galvanised wire or security strap provided with the tile. 4 Fill fair ends of ridges with mortar inset with pieces of Plain tile and neatly point. 5 Point ridge in 3:1 aggregate (sand) cement mortar or 4:1 aggregate (sand) with a weathered joint. To ensure greater adhesion, the top surface of the top course slates should be coated with a bonding agent and the mortar should contain a non-shrink additive. Fig 79 - Modern ridge bedded onto Melbourn slates 75mm Fig 80 - Modern mono ridge bedded onto Melbourn slates
45 4 Interlocking tiles and slates 96 Melbourn interlocking slates Abutment Abutments should be weathered with either a secret gutter and/or a stepped lead cover flashing, constructed in accordance with the recommendations of the Lead Sheet Association. Preparation 1 The last rafter should be spaced 75mm clear of the wall and the gap closed with a valley board on timber supports. 2 The slating battens should finish 100mm from the wall, be nailed to the rafter and be closed with a 25mm 25mm timber trimmer. 3 The underlay should be trapped between the ends of the battens and the trimmer, and be cut off level with the top of the battens. 4 At the eaves, the fascia board should be notched where possible to accept the gutter depth. If the sole of the gutter has to be raised, the side of the gutter should be splayed out to avoid the risk of an overflow and the lead should be welted on the timber trimmer. Fixing 1 Code 4 lead should be dressed into the gutter, and turned up the wall at least 65mm above the top of the slates. 2 Verge clips should be twice nailed to the battens so that the slates overhang the gutter to within 15mm of the wall (secret gutter only). 3 Slates at the abutment should alternate standard 15mm max slates and slate-and-a-half slates, cut down in width where necessary. The slates should be inserted into the clips and nailed in the positions detailed on page The stepped lead cover flashing should overlap the gutter upstand by at least 75mm, and be fixed as recommended by the Lead Sheet Association. Severe exposure In conditions of severe exposure, on pitches of less than 25, or where there is a risk of blockage, the stepped cover flashing should be dressed over the slates by 150mm - 200mm. In this instance, the width of the gutter can be reduced to 50mm. (See Figs. 81 and 82 below.) Welt 150mm-200mm 50mm 65mm 75mm Fig 81 - Secret gutter detail Gutter depth 25mm min Fig 82 - Secret gutter Gutter detail depth with stepped 25mm min cover flashing 15mm max
46 4 Interlocking tiles and slates 97 Repair and replacement of Melbourn interlocking slates Introduction Individual tiles or slates that are damaged during or after installation should be replaced as soon as possible using a sound matching unit fixed in accordance with the nailing and/or clipping specification. In some cases, this may not be possible without stripping back a large area of tiling/slating. Superficial coatings or repairs to damaged units using adhesives or other mechanical devices should not be used as their long term performance may be limited. If extensive repairs to the roof are required, sectional or complete re-tiling/slating should be considered, as this may be the most practical and economic solution. Roofs and walls clad with tiles and slates should be treated as fragile, and adequate precautions should be taken including the use of crawling boards, roof ladders (suitably packed to prevent damage to the slates) or access platforms when accessing the roof for the purposes of maintenance or repair. Failure to use adequate access equipment can damage the tiles and fixings and may be in contravention of Health and Safety Regulations. Marley Eternit Melbourn reconstituted slates are interlocking slates which are always fixed with one (occasionally two) stainless steel ring-shanked nails, into softwood battens. Because each stainless steel fixing is concealed and protected from the elements by an overlapping adjacent slate, replacement of a damaged slate must be carried out with care, and in accordance with the following procedure: 1 At bottom left hand corner of damaged slate, immediately adjacent to neighbouring slate, insert a hacksaw blade and cut through shank of fixing nail (Fig 17). 2 This releases lower edge of damaged slate and allows it to be broken gently into smaller pieces, and removed, all except for head or upper portion of the slate (Fig 18). Fig 83 - Cutting fixing nail with hacksaw blade Fig 84 - Removal of lower part of slate
47 4 Interlocking tiles and slates 98 Repair and replacement of Melbourn interlocking slates 3 With a larger opening, it is now possible to cut head off nail that retains slate directly above damaged slate. 4 The remaining portion of damaged slate can now be pushed upwards over batten and removed. 5 If resistance is felt, cut second nail fixing in remaining head portion in a similar manner (Fig 85). 6 Pliers or a saw may be used to remove any lengths of nail left in battens, so that replacement slate may be fitted without obstruction. Fig 19 Removal of further fixings 7 On new slate, batten nibs at positions A and B should be carefully removed (Fig 86). 8 In addition, top upstand X should be slightly reduced in height to allow easy insertion of new slate (Fig 86). 9 Slip modified slate into position by carefully lifting surrounding slates. Hook onto batten with remaining nib and align with adjacent slates. 10 Fix replacement slate through slate immediately to left of new slate. To position fixing, measure 260mm up from tails of slates on course below, and mark a light parallel line on adjacent slate. Then mark a vertical line on same slate 25mm in from right hand edge of slate. At intersection of two lines on adjacent slate, carefully drill a 3mm-diameter hole through the two thicknesses of slate (Fig 87). 11 Screw through drilled hole and both layers of slate into batten below using No. 9 countersunk stainless steel screw with washer. 12 Use same procedure to secure tail of slate above replacement slate. X A B Fig 20 Removal of nibs lift 3mm hole 25 lift 260 Fig 21 Position new slate
Ridge. Hip. Abutment. Eaves. Roof slope. Vertical slating. Clay plain tiles. Valley. Ridge Roll. Verge. Bedded verge.
Verge Vertical tiling Ridge Mono-ridge Clay interlocking Hip Close mitred hip Roof slope Abutment Interlocking tiles Eaves Valley Bedded verge Ridge Roll Rigid sarking Tile vent terminal Fibre cement slates
!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035
Decra Plus Drawing no DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 Description Shown In Decra Brochure Most Commonly Used Detail t~êã=oççñ=b~îéë=aéí~áä=b~îéë=lîéêü~åö=táíü=fåëìä~íéç=c~ëåá~=~åç=pçññáí
Asphalt Shingle Application Requirements
Alberta Allied Roofing Association Asphalt Shingle Application Requirements Section 1 Roof Decks 1.1 General Asphalt Shingles are not permitted to be installed directly over rigid insulation. When Asphalt
Fibre cement slates Fixing guide. Call 01283 722588 [email protected] www.marleyeternit.co.uk
CI/SfB March 2015 (4-) Rf9 Call 01283 722588 Email [email protected] Or visit www.marleyeternit.co.uk Marley Eternit Lichfield Road Branston Burton upon Trent DE14 3HD Fibre cement slates Fixing
Ubiflex. Non-lead flashing system
Ubiflex Non-lead flashing system Ubiflex non-lead flashing Ubiflex is a non-lead waterproof flashing material which can be used in most applications where lead is traditionally used to provide a weatherproof
CI/SfB (Ff3) January 2011. Roofing design guide. Showing you the way. Redefining traditional products
CI/SfB (Ff3) January 2011 Roofing design guide Showing you the way Redefining traditional products Contents 2-3 General information Eaves detailing 4 Traditional eave 4 Hardrow slates eave Verge detailing
Cupa Natural Slate Roofing design and fixing guide
Cupa Natural Slate Roofing design and fixing guide Cupa Natural Slate synonymous with quality Currently the Spanish slate industry is the undisputed market leader in natural slate production, with 90%
FUNCTIONAL REQUIREMENTS
FUNCTIONAL REQUIREMENTS FUNCTIONAL REQUIREMENTS 7.9 ROOF COVERINGS TRADITIONAL SLATE AND TILES Workmanship i. All workmanship must be within the tolerances defined in Chapter 1 of this Manual. ii. All
How To Build A Gambrel Roof And A Gable End Roof
Dutch Gable or Gambrel Roof and The Scotch Valley The folowing pages are an extract from Carp 12 text TAFE NSW Construction and Transport Division 71 HIP and VALLEY ROOFING GAMBREL / DUTCH GABLE The effect
Under Tile and Slate Undersheeting System
CI Sf (4-) Nn2 Under Tile and Slate Undersheeting System One system providing a weatherproof barrier, ventilation and insulation A RITISH OARD OF AGREMENT CERTIFICATE NO. 94 / 3055 2 Under Roofing System
Technology at its best. Benefits
Protecting what s under your roof from the elements is simplicity itself with Ruberoid Roofing Shingles. Roofing Shingles make ideal roofing; they are attractive, easy to install and are perfect for use
CONTENTS. General conditions 2. Material requirements 3. Terms 4. Estimating shingle requirements 4. Roof preparation 6. Shingle application 9 - 1 -
CONTENTS General conditions Material requirements 3 Terms 4 Estimating shingle requirements 4 Roof preparation 6 Shingle application 9 Shingle Shingle application application guide guide - - b a 3a 3b
Clay Roof Tile Council. Vertical Tiling
Clay Roof Tile Council Vertical Tiling Prepared by : The Technical Committee of the Clay Roof Tile Council, 2004 ii CLAY ROOF TILE COUNCIL - VERTICAL TILING Acknowledgements This document has been prepared
REDLAND DRY BONDING GUTTER. Installation Instructions for Redland Dry Bonding Gutter
REDLAND DRY BONDING GUTTER Installation Instructions for Redland Dry Bonding Gutter 1 Introduction 1.1 TECHNICAL DATA Dimensions: 3 m long x 210 mm wide Material: Glass-fibre/polyester composite. Pitch
SHINGLE APPLICATION GUIDE
SHINGLE APPLICATION GUIDE CONTENTS 01. General conditions 01. Material requirements 02. Terms 07. Estimating shingle requirements 08. Roof preparation 10.Shingle application E version 2006 GENERAL CONDITIONS
CI/SfB (4-) Rf9 January 2016. Dry fix and ventilation systems including UNIVERSAL accessories. Roofing product catalogue 45
CI/SfB (4-) Rf9 January 2016 Dry fix and ventilation systems including UNIVERSAL accessories Roofing product catalogue 45 Today s roofs need to be weatherproof and look good, as well as providing adequate
Guidelines for Earthquake Bracing of Residential Water Heaters
Guidelines for Earthquake Bracing of Residential Water Heaters Department of General Services Division of the State Architect 1102 Q Street, Suite 5100 Sacramento, CA 95814 Phone: (916) 324-7099 Fax: (916)
BUILD A CARPORT. 2 - Planning the carport. 3 - Designing the carport
BUILD A CARPORT You only need basic DIY and woodworking skills to build a carport. The most important part of the job is setting the supporting posts truly vertical - a job for which another pair of hands
Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1
Top plate Stud Soffit lining 45mm min nog Fix scotia bead Building underlay/james Hardie rigid air barrier Soffit Detail Building underlay/james Hardie rigid air barrier Bottom plate 25mm wide cant strip.
NRG 75 CRF NRG GREENBOARD WALL SYSTEM
NRG GREENBOARD WALL SYSTEM NRG Energy Efficient Building Systems is pleased to announce a revolution in lightweight cladding systems. NRG Building Systems is the first and only company to achieve CodeMark
The formation of roof waterproofing details calls for
3.5 BUILT-UP ROOFING DETAIL DESIGN INTRODUCTION The formation of roof details calls for a combination of the skills of the designer and the roofer. There are many different approaches to detail design
Shingle Installation Guide
Shingle Installation Guide Getting Started Dedicated to improving the environment, NewTech manufactures roofing tiles that are composed of up to 90% recycled post-industrial plastic. The manufacture of
CARPENTRY - HOUSING. This is the sloping length of a right-angled triangle.
CARPENTRY - HOUSING PART 2: GABLE ROOFS The gable roof is classified as being double-pitched and one of the simplest roof forms, due to the fact that all rafters in the roof are exactly the same length
PANELIZED HOME INSTALLATION GUIDELINE
PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.
KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE
FITTING YOUR KITCHEN GUIDE How to mark out a kitchen PAGE 1 Before starting on the installation, measure 870mm from the lowest point of the floor and mark a datum line around the room to indicate where
Guidelines for Earthquake Bracing Residential Water Heaters
Guidelines for Earthquake Bracing Residential Water Heaters Department of General Services Division of the State Architect In accordance with the Health and Safety Code Section 19215, the Division of the
Good Craftsmanship Guide. Carpentry and Joinery- Carcassing
Good Craftsmanship Guide Carpentry and Joinery- Carcassing Introduction This Good Craftsmanship Guide highlights key problems with the major elements of Carpentry and Joinery - Carcassing, and gives guidance
How to Install UnderDeck The Original.
How to Install UnderDeck The Original. TOOLS: Chalk Line Caulk Gun Garden hose or water bucket Gloves Hammer or Screw Gun Power Mitre Saw with OSB Blade Pencil Pliers Safety Glasses Straight Edge / Carpenter
Including. Rubershield-Pro. Breather Membrane
Including RubershieldPro Breather Membrane 2 Ruberoid produces a wide range of underslating membranes, primarily to be installed below tiles, slates or metal roofing providing a secondary barrier against
Multi-layer Insulation Blanket for Roofs
Multilayer Insulation Blanket for Roofs Thermal Insulation in a 40mm thin, flexible, multilayer membrane Meets requirements of L1A, L1B 2010 In accordance with BR443 NHBC Acceptance Pitched & Flat roof
Chapter 3 Installing Over-the-Post Railing on an L-Shaped Stair
49 Chapter 3 Installing Over-the-Post Railing on an L-Shaped Stair In this chapter: The Over-the-Post Balustrade System Determining the Rail Centerline Using Rail Bolts Making a Pitch Block Laying Out
Screw Patterns Roof & Walls 403-279-2766 TR-36 MD-36 TSM-32. PBR-Panel
Screw Patterns Roof & Walls Overlap Underlap ¾ 9 TR-36 36 5/8 6 MD-36 36 ½ 8 TSM-32 32 1¼ 12 PBR-Panel 36 Bottom Edge Screw Pattern apply to every profile except for MD36 (1 screw beside every rib) High
METAL ROOFING INSTALLATION GUIDE
METAL ROOFING INSTALLATION GUIDE MIGHTY-RIB PBR (R-Panel) Regardless of whether your roofing project is a new installation or a re-roof, and whether your building is residential, commercial or agricultural,
Residential Roofing Guide
Residential Roofing Guide TABLE OF CONTENTS Building Detail and Accessories...... 1 Panel Introduction and Handling...... 2 Cutting and Trimming.... 3 Roof Preparation..... 3 Roof Slope..... 3 Re-roofing...
TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS. standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING
6.CW.1A TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS wood or gas standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING The Fireplace Ltd is able to design and fabricate custom brick open masonry
BUILDING CONTROL GUIDANCE SHEET USE OF BREATHABLE ROOFING FELTS.
Building Control Charnwood Borough Council Southfield Road Loughborough LE11 2TN BUILDING CONTROL GUIDANCE SHEET USE OF BREATHABLE ROOFING FELTS. Last updated 16/11/2010 Page 1 of 6 PURPOSE: This Guidance
PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS
Application Instructions for THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR OTHER ROOFING
UBBINK SOLAR IN-ROOF SYSTEM
UBBINK SOLAR IN-ROOF SYSTEM The integrated solar mounting system Installation guide UBBINK SOLAR IN-ROOF SYSTEM Table of contents Solar In-Roof System introduction System components Installation guide
Flue Installation. High Efficiency Condensing Boilers
Flue Installation High Efficiency Condensing Boilers Table of contents INTRODUCTION 1 Instruction guidance...4 1.1 Product documentation...4 1.2 Explanation of symbols...4 1.3 Important Notes...4 INSTALLATION
majestic install ation guide barcelona three sided enclosure 24mm surface mounted wall channels and underframe to base
majestic install ation guide barcelona three sided enclosure 24mm surface mounted wall channels and underframe to base These Instructions are for a left and right handed unit. The diagrams show a left
INSTALLATION. General. Important Note. Design. Transport
General The roof trusses you are about to install have been manufactured to precise engineering standards. To ensure that the trusses perform as designed, it is essential that they be handled, erected
After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE
86 :: Certificate in Construction Supervision (CIVIL) 12 ROOF 12.1 INTRODUCTION The structure provided to cover the house surface (floor) is known as roof. For different situation and requirement, it is
Installation Instructions
Installation Instructions 1. Position the unit onto bridging packers. These keep the unit away from any water sitting inside the frame. 2. Centralise the unit within the frame and pack the edges with appropriate
Installation Manual for STANDING SEAM ROOFING
Installation Manual for STANDING SEAM ROOFING Absolute Steel Toll Free 877-833-3237 / Phone 480-768-1618 / Fax 480-768-1514 www.metalroofingsource.com Standing Seam features approximately one-inch high
VAIL Metal Shingles. Application Instructions. Custom-Bilt Metals 13940 Magnolia Ave. Chino, CA 91710
VAIL Metal Shingles Application Instructions 13940 Magnolia Ave. Chino, CA 91710 VAIL Metal Shingles Application Instructions When installing or walking on VAIL Metal Shingles: 1. OSHA fall protection
Clad Direct Glaze Window Installation Instructions
Clad Direct Glaze Window Installation Instructions Sill flashing and sealing: 2. An overview of the proper flashing sequence is shown in figure 1. Please read entire installation instructions carefully
SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING
SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING PART ONE GENERAL DESCRIPTION This section includes pre-formed standing seam metal roofing and related flashings, closures, trim and accessories including,
CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS
CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS D E F Y I N G C O N V E N T I O N Congratulations on your new Corner Fridge Your new corner fridge may have different functions
VM ZINC : standing seam Guidelines for specification and installation
VM ZINC : standing seam Guidelines for specification and installation Junglim Architecture - QUARTZ-ZINC Roofing and cladding system in VM ZINC Roofs from a 3 pitch and facades Freedom with shape and appearance
Directions For Applying Malarkey Laminate Shingles
S Laminate Shingle Instructions 1 Directions For Applying Malarkey Laminate Shingles GENERAL INSTRUCTIONS Install Malarkey laminate shingles according to building code and local amendments. To qualify
KAHU RESIDENTIAL ROOFING RRKA DETAIL LIST
KAHU DETAIL LIST 00 / 24 COVER SHEET 01 / 24 ROOF RIDGE 02 / 24 SAWTOOTH RIDGE 03 / 24 SAWTOOTH EAVE 04 / 24 ROOF VALLEY 05 / 24 ROOF - CHANGE PITCH 06 / 24 EAVE WITH METALLINE FASCIA 07 / 24 EAVE WITH
Cedar Cottage Doghouse Plans
Overlapping cedar shingles add an element of charm to this medium size doghouse. The walls, floor, and trim are constructed of solid cedar, making it naturally weather resistant and provides excellent
How-To-build guide timber windows
How-To-build guide timber windows What you can build using this guide This guide shows you how to install a factory-made timber casement window into a house with a weatherboard cladding. Casement windows
DIY CABINET REFACING INSTALLATION GUIDE
DIY CABINET REFACING INSTALLATION GUIDE CABINET REFACING INSTALLATION Are you ready to reface your outdated cabinets? This guide will show you how to install your new Facelifters Cabinet Refacing Products
HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY
HOW-TO HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY Most floor coverings, if laid over uneven wooden floors, will wear unevenly and look unsightly. The answer is to cover the old boards with hardboard
CI SfB. (4-) Nn2. Onduline. Mini Profile. Onduline Garden Roof Range. Onduline Building Products Ltd
CI SfB (4-) Nn2 Onduline Mini Profile Onduline Garden Roof Range Onduline Building Products Ltd Onduline Garden Roof Range Onduline Mini Profile The new Onduline Mini Profile sheets have been designed
ROOF CONSTRUCTION Roof Styles Gable Roof Hip Roof Gambrel Roof
ROOF CONSTRUCTION The overall appearance of a building is greatly affected by the roof lines and the roofing materials. The designer has many standard designs to choose from and should be able to find
Classic Products, Inc. ClickLock Standing Seam Installation Manual
Classic Products, Inc. ClickLock Standing Seam Installation Manual Classic Products, Inc. 8510 Industry Park Drive Piqua, OH 45356 800.543.8938 Table of Contents page Introduction 1. 1 Starter. 2. 1 Panels.
FORM DESIGN. easy to work with, and generally available.
Forms play a major role in concrete construction. They give the plastic concrete its shape and hold it until it hardens. Forms protect the concrete, assist in curing it, and support any reinforcing rods
Historical Information
Historical Information The use of gutters, or eaves troughs, dates from early colonial times when two boards were nailed together to form a functional V-shaped trough placed below the drip edge of the
INSTALLATION MANUAL For Grand Rib-3 / Multi Purpose / & Classic Rib Roofing Panels
INSTALLATION MANUAL For Grand Rib-3 / Multi Purpose / & Classic Rib Roofing Panels Grand Rib-3 / Multi-Purpose / Classic Rib Grand Rib-3 / Multi-Purpose / & Classic Rib Grand Rib 3 panels are a strong,
Window Installation Instructions
Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for
STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS
ROOFING APPLICATION STANDARD (RAS) No. 133 STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS 1. Scope 1.1 This application standard has been developed to provide consistent information for the
Western Red Cedar Shingles Product Guide
Western Red Cedar Shingles Product Guide Western Red Cedar Shingles & Shakes from John Brash are a truly renewable and sustainable roofing and cladding material; with one of the lowest carbon footprints
HORIZONTAL INSTALLATION
THERMO/SOLAR Žiar s.r.o. MANUAL FOR INSTALLATION PV SUPPORTING FRAMES HORIZONTAL INSTALLATION Technical alternation reserved A1410 1 12/2014 CONTENT ORD.NO. PAGE Mounting information 3 Mounting, flat roof
How to build raised beds page
This leaflet has information to help you if you want to build a raised bed yourself or if you need information to give to a professional contractor. This information should be read in conjunction with
Tested to BS 6375: Part 1: 1989 and achieved a weathertightness classification of 2000 Pa (Special)
THE B6 GLAZING SYSTEM GLAZING SYSTEMS FOR SEPTEMBER 2013 THE B6 HEEL BEAD SEAL SECURITY GLAZING SYSTEM Page 1 DESCRIPTION The B6 Heel Bead Seal Security Glazing System is suitable for installing all types
Discount Direct Metal Roofing Plus Rib Roofing Panels Installation Instructions
Discount Direct Metal Roofing Plus Rib Roofing Panels Installation Instructions All questions and concerns please call 904-696-9700 Discount Direct Metal Roofing Plus Rib metal roofing panels are a strong,
How to build a Pizza Oven in 4 days
How to build a Pizza Oven in 4 days Preparation day (slab) 1. Foundation 1500 deep x 1300 wide x 75mm deep Required 20 bags cement pre mix. If you already have a concrete base, you save this prep day DAY
CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011
CERTIFICATE NAME OF PRODUCT No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 H-CONTROL REFLEX+ reflective insulating vapour control layer for roof and wall applications MANUFACTURER ACTIS
Brick Veneer Construction
Brick Veneer Construction Check list of suggested tools & support items Claw hammer Tape measure 3/4" [19 or 20] Wood chisel Wood or plastic shims Pry bar Utility knife Caulking and caulking gun Power
BRIDGE & SUPPLY COMPANY. Installation Guide. Ultra 2000. Includes:
BRIDGE & SUPPLY COMPANY Installation Guide Ultra 2000 Includes: Ultra 2000 Installation Guide Stock Trim Profiles Ultra 2000 Trim Installation Guide Page 2 Table of Contents Ultra 2000 Profile, Colors
ROOF CONSTRUCTION Roof Styles Gable Roof Hip Roof Gambrel Roof
ROOF CONSTRUCTION The overall appearance of a building is greatly affected by the roof lines and the roofing materials. The designer has many standard designs to choose from and should be able to find
Be Proud of What You Build Available from
CI/SfB (47) Nf9 Uniclass JH61 October 2008 PACKAGING Tegral ThrutonePlus slates are delivered covered with a cardboard hood and polythene shrink-wrap on timber pallets. Slates are strapped in bundles of
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings
Safety Method Statement Roofing
Description of Work and Location ROOF TILING A. Generally All materials shall be of a standard not lower than the requirements of the latest appropriate British Standard. The Contractor is advised that
K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11
K. D. FRAME ASSEMBLY FOR MASONRY WALLS...........................Ins 2 FRAME INSTALLATION DETAILS FOR MASONRY WALLS......................Ins 3 INSTALLING EXISTING MASONRY WALL ANCHORS IN FRAME..................Ins
ROOFING ACCESSORIES GENERAL ... ... ... ... ... ... ... 4590 ... References. England and Wales
............................................................................. CI/SfB (47) Uniclass L529 October 2014 GENERAL....................... References England and Wales Building Regulations 2010
EDW + FS, VS, VSE, GGL, GGU, GHL. EDW Deck Mounted Skylight and Roof Window Flashing Installation Instructions VAS 452259-0509
EDW + FS, VS, VSE, GGL, GGU, GHL EDW Deck Mounted Skylight and Roof Window Flashing Installation Instructions VAS 4559-0509 a FS, VS, VSE For proper installation, remove cladding as shown b GGL, GGU, GHL
0331 Brick and block construction
0331 BRICK AND BLOCK CONSTRUCTION This worksection has been written for Class 1 and 10a buildings that fully conform to the scope of AS 4773.1. If the works include isolated structures, (totally separate
Installing Window and Door Mouldings
Installing Window and Door Mouldings About Window and Door Mouldings The trim around windows and doors greatly influences the look and style of your interior. They also bridge the gaps and cover spaces
When considering Roof drainage design the following should be taken into account:
Roof Drainage Design The primary objective of a gutter or spouting system is to remove water from the roof catchment area and channel that water to the ground drainage. Water ingress can have detrimental
Marley Double Roman. concrete roof tile. The classic double roman tile with the extra-bold roll. Manufactured in Gauteng and KwaZulu-Natal
Double Roman page 1 of 7 Marley Double Roman concrete roof tile Manufactured in Gauteng and KwaZulu-Natal The classic double roman tile with the extra-bold roll Double Roman page 2 of 7 Double Roman See
HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES
HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES 101 Retrofits Required. Pursuant to Section 553.844 553.884, Florida Statutes, strengthening of existing site-built,
Installation Guide. Bath and Wall Surrounds SERIES 7104 1021861-2-B
Installation Guide and Wall Surrounds SERIES 7104 1021861-2-B Thank You For Choosing Sterling We appreciate your commitment to Sterling value. Please take a few minutes to review this manual before you
(4-) Nh2. CI/SIB July 2014. Colorcoat Urban. Installation Guide. Tata Steel Colors
CI/SIB July 2014 (4-) Nh2 Colorcoat Urban Installation Guide Tata Steel Colors Contents 1. 2. 3. 4. 5. 6. 7. 8. 8.1 8.2 8.3 8.4 8.5 Introduction Urban Profile Product Selector Colour Selector Ordering
The WANZ Guide to Window Installation
The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 Ver. 1.1 Page 2 of 74 Contents Overview Page 5 Objective Page 5 Scope Page 5 Opening Preparation Page 7 Step P1 Preliminary Check
Chapter. Restoration of Damaged Structures
5 Chapter Restoration of Damaged Structures Bringing back a damaged structure to its pre-earthquake state and original strength is called restoration. This is the first step of building rehabilitation.
SECTION 07 61 13 STANDING SEAM METAL ROOFING
SECTION 07 61 13 STANDING SEAM METAL ROOFING PART 1 GENERAL 1.01 SCOPE OF WORK A. The Work shall include all labor, materials, equipment and supervision required to complete the work of the above referenced
THE REDLAND GUIDE TO BS 5534
THE REDLAND GUIDE TO BS 5534 HELPING YOUR COMPANY TO GET ONE STEP AHEAD www.redland.co.uk Enforcement is via authorities such as the National House Building Council (NHBC) and Local Authority Building
How to Build a Poker Table
How to Build a Poker Table www.pokertablematerials.com 10-Person Poker Table- 96 x 48 These are step by step instructions for building a poker table. The table will measure 48" x 96" and have a 4" wide
INSTALLATION OF A BAY WINDOW
INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening
Triflex system: Triflex ProDetail. Solution type: Roof detail and repair waterproofing. Application: Overlay of existing substrate
CAD details Triflex ProDetail Triflex system: Triflex ProDetail Solution type: Roof detail and repair waterproofing Application: Overlay of existing substrate CAD details CAD S: CAD details Triflex ProDetail
Your guide to home maintenance. Flat Roofs
Your guide to home maintenance Flat Roofs Your guide to home maintenance is a series of information leaflets that gives you all the information you need to keep your home in tiptop condition. Flat Roofs
Titan Old World Spanish Tile
Installation Guide Titan Old World Spanish Tile Titan Manufacturing Phone: 407-587-5492 Fax: (866) 859-8607 www.titanroofsystems.com Rev 70908 This document includes the recommended and suggested installation
Timber Decks. Technical Note. March 2007
Timber Decks Technical Note. March 2007 This Technical Note contains general information for residential timber decks and floor frame structures for veranda s, patios etc which are exposed to the weather.
Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers..
Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide Table of Contents Section Page Section Page Notes to Designer /Installers.. 1 Fastener Placement and Selection.2-3
Stormproof Your Roof. I ve done enough roof repairs to know that storm water that gets past the shingles
Stormproof Your Roof Self-adhering underlayment provides critical protection in vulnerable locations BY MIKE GUERTIN I ve done enough roof repairs to know that storm water that gets past the shingles and