Document TABLE OF CONTENTS. Doc. No. Document Title Doc. Date INTRODUCTORY INFORMATION

Similar documents
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

CSTM 102 Spring Construction Documents to Contract Documents

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1

All other provisions of the contract documents, plans and specifications shall remain unchanged.

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

The Change in Status is used to start, suspend or resume time charges on a project or to indicate that the project is completed.

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

Career Path Project Engineer to Project Manager 1

PROJECT MANUAL INCLUDING SPECIFICATIONS FOR OXNARD SCHOOL DISTRICT EDUCATIONAL SERVICE CENTER DATA ROOM ALTERATION. Oxnard, CA

DIVISION 1 - GENERAL REQUIREMENTS SECTION SPECIAL PROVISIONS

CSC-DIVISION 1-MASTER SECTIONS Description

Document Comparison. AIA Documents A and A131CMc 2003

SUBCONTRACTOR QUALIFICATION FORM

CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS FOR

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST BID PROPOSAL

Airport Safety and Construction Management Under The FAA

How To Install An Overhead Sewer

HOMER TOWNSHIP HIGHWAY DEPARTMENT ADDENDUM #1. June 13, 2014 VARIOUS (2014 ROAD PROGRAM) SECTION NO.: GM

AGREEMENT FOR PROFESSIONAL DESIGN SERVICES

Development Services Department City of San Antonio. Permits & Licenses. Development Services Manager. Deputy Historic Preservation Officer

TLHAMATSI AFRICA PROJECTS CONSTRUCTION MANAGEMENT PRESENTATION. PRESENTED BY: BAKANG MOENG

ARTICLE 11. INSURANCE AND BONDS

A mandatory pre bid walk through will be held on May 14, 2015 at 1:30 p.m. See Invitation to Bid for pre qualifications required to bid.

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

GENERAL PERMIT WMGM043

ADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH

ADMINISTRATIVE PROCEDURES

LOCAL AGENCY CONTRACT ADMINISTRATION CHECKLIST

HEANEY General Contracting, Inc.

SUCF PROJECT COST REPORTING GUIDE

City of Beaumont, Texas Grading Permit Information

CONSTRUCTION PERMIT REQUIREMENTS

TruexCullins Architecture Fairfield Center School Bid Documents Kitchen and Bathroom Renovation March 1, 2015

ADVERTISEMENT FOR BIDS

CONSTRUCTION MANAGEMENT SERVICES for the new REPLACEMENT NORTH DORCHESTER HIGH SCHOOL Dorchester County Public Schools December 9, 2015

Georgia State University. Urban Life Building Roof Replacement

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

7 CFR Parts 3400, 3401, 3402, 3403, 3405, 3406, 3407, 3415, 3430, and 3431

Dear Contractor: If you have any questions about the Program or your Application, please feel free to call our office at

BID BOND 9/7/12 BS - 1. KNOW ALL MEN BY THESE PRESENTS, that I/We. as Principal, hereinafter called Contractor, and

Shook Subcontractor Prequalification Form

GENERAL SPECIFICATIONS REHABILITATION RESIDENTIAL CONTRACTORS HANDBOOK

SECTION ASBESTOS ABATEMENT

REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSTRUCTION MANAGEMENT SERVICES

2014/2015 PAVING PROJECT MILLING AND PATCHING BID DOCUMENTS JASPER COUNTY, GEORGIA

Notes. Score. 1 Basic Services 1.1. A few instances; could have been more proactive

MOBILE HOME LAW. Revised November 2001

C. Section TESTING LABORATORY SERVICE.

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL Phone: (561) Fax: (561)

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K Commerce Road Renovations Project DATED: February 9, 2015

DESCRIPTION OF WORK:

CONSTRUCTION DOCUMENTS TECHNOLOGY PROGRAM CDT STUDY GUIDE

CONTENTS OF BID. Each bid must include all of the following: A completed and signed Bid Form (the form is attached).

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

DOCUMENT ADDENDA ADDENDUM NUMBER ONE (1) A. Project Name: BHFC New Single Family Dwelling Unit Dahlia Circle

Contractor s Guide. April 2016

NOTICE TO BIDDERS FASHION INSTITUTE OF TECHNOLOGY

HIGHWAY AND BRIDGE SUBCONTRACTORS MANUAL

NOTICE TO BIDDERS FIT STUDENT HOUSING CORPORATION BIDDING SPECIFICATIONS FOR ALUMNI RESIDENCE HALL CLOSET RENOVATION INVITATION FOR BID # C1310

Fire Damage Repairs, 2510 Burton Street

SPECIFICATIONS. City of Beverly Hills Roxbury Park Restroom Facility 471 S. ROXBURY DRIVE BEVERLY HILLS, CALIFORNIA

SECTION SELECTIVE DEMOLITION

SECTION SITE PREPARATION

REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES (PS-0748-A) Appendix 1 Project Information. PS-0748-A Page 1 5/4/2016 Appendix 1

1. PROJECT DESCRIPTIONS.

PROJECT MANAGEMENT BASICS

REQUEST FOR PROPOSAL: STRUCTURED CABLING, LAN SWITCHES, LONG DISTANCE SERVICE, ELECTRONIC FAXING, AND HOSTED VOIP SPECIFICATIONS

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons)

Chesapeake Redevelopment & Housing Authority. Addendum to the Emergency Work Write-Up For Dr. Vivian Anderson 1812 Gannet Ct Chesapeake, VA 23320

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

CCFC 22 nd Annual Conference

Texas Commission on Environmental Quality Page 1 Chapter Water Districts

Request for Qualifications

CONTRACTOR PREQUALIFICATION REQUIREMENTS GENERAL CONTRACTORS, MECHANICAL/PLUMBING SUBCONTRACTORS & ELECTRICAL SUBCONTRACTORS FOR THE

Morgan Hill Unified SCHOOL DISTRICT PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS. October 19, 2015

OAKLAND UNIFIED SCHOOL DISTRICT FOR LOCAL FIRST TIER SUBCONTRACTORS PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS

CONSTRUCTION LAW. Mechanical Roofing Contractor. Electrical Class A Air Conditioning. Contractor Class B Air Conditioning

DIVISION I GENERAL REQUIREMENTS SECTION 01005

GENERAL AND SPECIFIC OBJECTIVES

TRAVIS UNIFIED SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES CONSTRUCTION MANAGER MULTI-PRIME

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES. Part I: Proposal Information

Position: HEAVY EQUIPMENT OPERATOR Classification: 3 Highway Personnel Member B & C

RFP VOICE OVER IP PHONE SYSTEM BID: # BOE

Town of Islip Housing Authority Bid Specifications Cesspool Cleaning & Servicing

Construction Technologies Career Field Pathways and Course Structure

ALABAMA STATE DEPARTMENT OF EDUCATION

Concrete Waste Management

ANY INVALID WILL NOT

Contractor Safety Management

Work Type Definition and Submittal Requirements Work Type: Construction Contract Administration & Management

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)

New Home Construction Packet

PREQUALIFICATION QUESTIONNAIRE

Development Variance Permit Application Package

Transcription:

Document 00010 NOTE: Bold capitalized Specification Sections are included in the City of Houston Department of Public Works and Engineering Standard Construction Specifications for Wastewater Collection Systems, Water Lines, Storm Drainage, Street Paving, and Traffic located here: http://edocs.publicworks.houstontx.gov/; and are incorporated in Project Manuals by reference as if copied verbatim. Documents listed "for filing" are to be provided by Bidder and are not included in this Project Manual unless indicated for example only. The Document numbers and titles hold places for actual documents to be submitted by Contractor during Bid, post-bid, or construction phase of the Project. Specification Sections marked with an asterisk (*) are amended by a supplemental specification, printed on blue paper and placed in front of the Specification it amends. Documents in the 200, 300 and 400 series of Division 00, except for Document 00410B Bid Form, Part B, are not part of the Contract. Doc. No. Document Title Doc. Date INTRODUCTORY INFORMATION 00010 Table of Contents... 00015 List of Drawings... BIDDING REQUIREMENTS INSTRUCTIONS TO BIDDERS 00200 Instructions to Bidders....03-01-2014 00210 Supplementary Instructions to Bidders....09-20-2012 00220 Request for Bid Information... 06-11-2004 BID FORMS AND SUPPLEMENTS 00410 Bid Form, Parts A & B....07-01-2013 00430 Bidder s Bond (For filing; Example Form)... 06-16-2006 00452 Contractor Submission List - Fair Campaign Ordinance... 04-30-2004 00453 Bidder's Statement of Residency... 02-01-2004 00454 Affidavit of Non-interest... 02-01-2004 00455 Affidavit of Ownership or Control... 09-04-2007 00457 Conflict of Interest Questionnaire... 02-28-2006 00459 Contractor s Statement Regarding Previous Contracts Subject to EEO... 02-01-2004 00460 Pay or Play Acknowledgement Form (POP-1A)... 07-03-2012 00010-1

POST-BID PROCEDURES 00495 Post-Bid Procedures... 07-01-2013 CONTRACTING REQUIREMENTS AGREEMENT 00501 Resolution of Contractor... 02-01-2010 00520 Agreement... 12-17-2013 BONDS AND CERTIFICATES 00601 Drug Policy Compliance Agreement... 02-01-2004 00602 Contractor's Drug Free Workplace Policy (For filing) 00603 Checklist for Drug Policy Submittal... 02-09-2012 00604 History of OSHA Actions and List of On-the-job Injuries... 02-01-2004 00605 List of Safety Impact Positions... 02-01-2004 00606 Contractor's Certification of No Safety Impact Positions... 02-01-2004 00607 Certification Regarding Debarment, Suspension, and Other Responsibility Matters... 02-01-2004 00610 Performance Bond... 05-17-2005 00611 Statutory Payment Bond... 05-17-2005 00612 One-year Maintenance Bond... 05-17-2005 00620 Affidavit of Insurance (with attached Certificates of Insurance)... 02-01-2004 00622 Name and Qualifications of Proposed Superintendent (For filing) 00630 Certification of Agreement to Comply with Pay or Play Program... 07-03-2012 00631 City of Houston Pay or Play Program List of Participating Subcontractors... 07-03-2012 GENERAL CONDITIONS 00700 General Conditions... 01-01-2015 SUPPLEMENTARY CONDITIONS 00800 Supplementary Conditions... 12-17-2013 00805 Equal Employment Opportunity Program Requirements... 05-01-2012 00820 Wage Scale for Engineering Construction... 02-01-2015 00840 Pay or Play Program Requirements... 07-03-2012 SPECIFICATIONS 00010-2

DIVISION 1 - GENERAL REQUIREMENTS 01110 Summary of Work... 01145 Use of Premises... 08-01-2003 01255 Change Order Procedures... 08-01-2003 01270 Measurement and Payment... 08-01-2003 01292 Schedule of Values... 08-01-2003 01312 Coordination and Meetings... 08-01-2003 01321 Construction Photographs... 08-01-2003 01325 Construction Schedule... 09-28-2007 01330 Submittal Procedures... 08-01-2003 01340 Shop Drawings, Product Data, and Samples... 08-01-2003 01410 TPDES Requirements (with Attachments)... 08-01-2003 01422 Reference Standards... 08-01-2003 01450 Contractor's Quality Control... 08-01-2003 01452 Inspection Services... 08-01-2003 01454 Testing Laboratory Services... 08-01-2003 01502 Mobilization... 08-01-2003 01504 Temporary Facilities and Controls... 08-01-2003 01555 Traffic Control and Regulation... 08-01-2003 01562 Tree and Plant Protection... 08-01-2003 01570 Storm Water Pollution Control... 08-01-2003 01575 Stabilized Construction Exit... 08-01-2003 01576 Waste Material Disposal... 08-01-2003 01578 Control of Ground Water... 08-01-2003 01580 Project Identification Signs... 08-01-2003 01610 Basic Product Requirements... 08-01-2003 01630 Product Substitution Procedures... 08-01-2003 01725 Field Surveying... 08-01-2003 01731 Cutting and Patching... 08-01-2003 01740 Site Restoration... 08-01-2003 01755 Starting Systems... 08-01-2003 01770 Closeout Procedures... 09-28-2007 01782 Operations and Maintenance Data... 09-28-2007 01785 Project Record Documents... 09-28-2007 DIVISION 2 - SITE WORK 02221 Selective Demolition... 02-21-2012 02316 EXCAVATION AND BACKFILL FOR STRUCTURES... 01-01-2011 02410 Landscape Drainage... 06-13-2014 00010-3

02520 Fall Surface... 06-13-2014 DIVISION 3 - CONCRETE DIVISION 4 - MORTAR DIVISION 5 METALS DIVISION 6 - WOOD AND PLASTICS DIVISION 7 - THERMAL AND MOISTURE PROTECTION DIVISION 8 - DOORS AND WINDOWS DIVISION 9 FINISHES DIVISION 10 - SPECIALTIES DIVISION 11 - EQUIPMENT DIVISION 12 - FURNISHINGS 00010-4 07-01-2013

DIVISION 13 - SPECIAL CONSTRUCTION DIVISION 14 - CONVEYING SYSTEMS DIVISION 15 - MECHANICAL DIVISION 16 - ELECTRICAL END OF DOCUMENT 00010-5 07-01-2013