Power and heating plants, environmental studies



Similar documents
Automation, electrification (selected references)

Automation, electrification (selected references)

START-UP BURNERS FOR FLUIDIZED BED BOILERS AND GASIFIERS. REFERENCE LIST Page: 1/7

Lappeenranta Climate Capital of FINLAND

Valmet biotechnologies and pyrolysis status update. Joakim Autio Product manager, Pyrolysis systems Valmet

February 9, 2011 Peter Kling, ÅF Consult Ltd Vice President, Bio and WtE Consulting

The new waste burning investment in the Helsinki Metropolitan Area

Uusiutuvien teknologioiden kehittäminen yhteistyössä partnereiden kanssa

Energy story of Turku region, history and future

Rauhalahti Biomass CHP Plant

Good Practice Form

Role of Northern European forestry in the energy production chain, case Fortum. Jari Nylén Purchasing Manager Fortum Power and Heat Oy, HEAT

Stora Enso Fors Ltd Sweden

Key personnel and References 12/2013

Work together with Energy Experts from Finland

Tutkimuksen merkitys menestyvässä liiketoiminnassa- Innovaatiosta tuotteeksi

Södra Näs Vimmerby Energi AB Biomass District Heating Plant, Sweden

M.Sc. Matti Kivelä Power Plant Manager R&D Lahti Energia Oy P.O. Box 93 FIN Lahti Finland Tel matti.kivela@lahtienergia.

Aurinkolämpömarkkinat Skandinaviassa ATY Aurinkoseminaari Jari Varjotie, CEO

THE EU ETS IN THE FINNISH CONTEXT Does the ETS support local bioenergy implementation?

INTEC Engineering GmbH Heating Solutions for the Marine Industry

SEATTLE STEAM COMPANY FREQUENTLY ASKED QUESTIONS

Our dream a city free from fossil fuels

Bioenergy. A sustainable energy source.

CHP and DHC in Helsinki

The heat plant Future biorefinery. Panndagarna 2015 Västerås, April

GOOD PRACTICE: Kuhmon Lampö (Kuhmo s Heating)

Introduction to our Business in Valmet. Marita Niemelä VP, Strategy Pulp & Energy 20 August 2014

Waste to Energy. waste being used to keep cities warm.

- Personal engineering with total economy

Switch from gas to biomass in district heating Case Jelgava, Latvia. Kristian Rehnström, 25 February 2015

Weiss A/S Presentation. by Bo Johansen

Fortum Otso -bioliquid

Bioenergy Småland. Business development through biomass in the region of Småland

Loviisa 3 unique possibility for large scale CHP generation and CO 2 reductions. Nici Bergroth, Fortum Oyj FORS-seminar

NEW NUCLEAR POWER PLANT UNIT IN FINLAND ACCEPTED BY THE FINNISH PARLIAMENT

Allocation of Fuel Energy and Emissions to Heat and Power in CHP

Integrating renewable energy sources and thermal storage

English version. Manual for Determination of Combined Heat and Power (CHP)

Welcome to Norrenergi

Assignment 8: Comparison of gasification, pyrolysis and combustion

District Heating & Cooling in Helsinki

Country Report, SWEDEN

BIOMASS LOOKING FOR EFFICIENT UTILIZATION THE REHEAT CONCEPT. Jaroslav Lahoda Olaf Arndt Walter Hanstein. Siemens Power Generation (PG)

Advanced Steam Parameters in a Large Scale CFB Application Operating on REF and Biofuels background and experiences

KUHMO: the perfect example of local bioenergy production

Energy Efficiency and Renewable Energy Sources in Sweden

UPM Grow with Biofore. Vesiyhdistyksen Jätevesijaoston seminaari Esa Laurinsilta

Developments and trends shaping the future for Waste-to- Energy technology suppliers

FROM WASTE TO CLEAN ENERGY. Efficient energy recovery with low environmental impact at the waste to energy plant in Gothenburg

DEVELOPMENT AND STATUS OF THE USE OF AGRICULTURAL RESIDUES FOR ENERGY IN DENMARK HISTORY AND POLICY DRIVERS

Technologies for small scale Biomass CHP-Plants an actual survey

OPTI_ENERGY PROSPECTS OF INTRODUCTION OF INNOVATIVE TECHNOLOGIES IN POLAND

PERFORMANCE EVALUATION OF NGCC AND COAL-FIRED STEAM POWER PLANTS WITH INTEGRATED CCS AND ORC SYSTEMS

Drying of Woody Biomass. Process Engineering / GEA Barr-Rosin

Fortum bygger Sveriges största biokraftvärmeverk i Stockholms stad. Daniel Nilsson Värme & Kraftkonferensen, Stockholm 12 november 2014

This fact sheet provides an overview of options for managing solid

COMPARISON OF ELECTRICITY GENERATION COSTS

LANDFILL GAS TO ENERGY- COMBINED ENGINE AND ORC-PROCESS

Biofuel Handling Technologies

CCS in the Oil refining Industry System Solutions and Assessment of Capture Potential

La caldaia a letto fluido circolante per la riduzione delle emissioni di CO2

Linkoping is in Sweden, where winters are cold

CONFERENCE DISTRICT HEATING AND COOLING. a main key to CO 2 reduction

Hybrid system. Energy-efficient and environmentally friendly

Riga Smart City Concept. Timurs Safiuļins Riga Energy Agency

AffaldVarme Aarhus. AffaldVarme Aarhus. Teknik og Miljø Aarhus Kommune

Cost Analysis of District Heating Compared to its Competing Technologies

RENEWABLE ENERGY IN FINLAND

AB Fortum Värme samägt med Stockholms stad

Summary technical description of the SUNSTORE 4 plant in Marstal

CHP as a part of energy transition - Opportunities for investors

From today s systems to the future renewable energy systems. Iva Ridjan US-DK summer school AAU Copenhagen 17 August 2015

Energy from digester gas. Optimised biogas utilisation

System analysis of overall efficiencies of different routes for bioenergy. Content

CFD Simulation of Biofuel and Coal Co-Combustion in a Pulverized Coal Fired Furnace

BIOMASS RESEARCH at ECN. Bram van der Drift

VESI JA ENERGIA VIENTITUOTTEENA. Fortum Miko Olkkonen Senior Executing Manager, Hydro Projects Fortum Power & Heat Oy

Country specific notes on municipal waste data

of 11,000 households Steam temperature, boiler 400 C Steam pressure, boiler Incineration temperature 1,100 C

Outline. Intro Methodology Background energy system Foreground system Conclusion. DTU Management Engineering, Technical University of Denmark

Annual Electricity and Heat Questionnaire

Steam and hot water boiler systems for industrial and municipal power generation Dr.-Ing. Wolfgang Sobbe VKK Standardkessel Köthen GmbH

District heating and district cooling with large centrifugal chiller - heat pumps

How To Improve The Energy Situation In Europe

Waste a source of energy. Regional Solid Waste Management Plan Review: Engaging solutions for tomorrow. Incineration. Incineration

SHELL HAUSWÄRME-STUDIE. Nachhaltige Wärmeerzeugung für Wohngebäude Fakten, Trends und Perspektiven

BUILDING THE BUSINESS CASE FOR LARGE-SCALE UTILIZATION OF FOREST RESIDUES AS FEEDSTOCKS FOR PRODUCTION OF ENERGY COMMODITIES:

It s time for H.E.R.O. Energy Saving Strategy for. Tunnel & Shuttle Kilns

Renewable Energy from Biomass. Opportunities in London and Area? Eric Rosen

Efficiency Metrics for CHP Systems: Total System and Effective Electric Efficiencies

THE REGIONAL BALANCE OF WOOD FUEL DEMAND AND SUPPLY IN FINLAND

GASIFICATION FROM THE VIEWPOINT OF THE FINNISH FOREST INDUSTRY

Use of Substitute Fuels in Large Combustion Plants (LCPs)

Finanzierung von Erneuerbaren Energie und Energieeffizienz Projekten in Asien. INTEC Engineering GmbH Berlin,

Transcription:

1(7) Power and heating plants, environmental studies 2011 Jalasjärven Lämpö 5 MW biofuels heat only boiler Application for environmental permit and financing 2011 Vatajakosken Sähkö Biofuels CHP power plant and steam boiler plant Feasibility FC Energia, Äetsä 30 MW Steam boiler plant Evaluation of tenders, expert services Keitele Energy Biofuels combustion CHP power plant (5 MW e / 15 MW th ) Feasibility Ecolution Turku Energia TEKES project Aerobic biowaste treatment technology 40 MW biofuels heat only boiler and combined district cooling and heating by heat pumps Process development Feasibility 2009 Hyvinkään Lämpövoima /Ekokem Ab Combined district cooling and heating Feasibility 2008 Nivalan Kaukolämpö Biofuels and peat combustion CHP power plant (5 MW e / 15 MW th ) Feasibility, application project management 2008 2009 Raisio district heating plant Biofuels CHP power plant cost estimates and feasibility 2007 Keuruu Lämpövoima Biofuels and peat combustion CHP power plant (5 MW e / 15 MW th ). 2-4 MW flue gas condensing and heat recovery plant Feasibility, application implementation engineering, project management

2(7) 2007 2008 Ecolution Composting Development of composting system 2007 Vaasan Sähkö 2009 2007 2007 2007 Kemijärven Lämpö Turku Energia Parkanon Voima Technical Research Centre of Finland Fortum Power and Heat Nynäshamn, Sweden Fortum Heat and Vahterus Vapo Voima, Forssa power plant Confidential 12/30 MW biofuels and peat power plant Peat and biofuels combustion CHP power plant (5 MW e / 15 MW th ) Combined district cooling and heating by heat pumps (10-15 MW cool / 15-20 MW heat ) with accumulator, waste water as heat source 3 MW e / 8 MW th CCA-treated wood power plant, Flue gas cleaning 5 20 MW e condensing biofuels power plant A 5 MW flue gas condensing and heat recovery plant for 28 MW th recycled fuels burning boiler A 1,5 MW flue gas condensing and heat recovery plant for 12 MW th natural gas burning boiler Biofuels burning power plant (66 MW th ). Study of Flue-gas condensing and heat recovery plant and heat accumulator 3,5 MW e / 13 MW t CHP-plant and 12 MW district heating plant cost estimates and feasibility Feasibility, application implementation engineering, project management Concept design, implementation design cost estimates and feasibility cost estimates, procurement tenders, project services Process and detail design of plate and heat exchanger, investment cost estimates cost estimates, energy balance calculations and feasibility Investment cost estimates, energy balance calculations and feasibility Alajärven Lämpö and Myllyvoima 1,7 MW e / 8,5 MW t power plant Peat and biofuels Concept design, investment cost estimates, feasibility

3(7) Pölkky Heating plant 2008 2008 Lapuan Energia (Kiviristin Lämpö ) Confidential Junnikkala, Kalajoki Saarijärven Kaukolämpö Peat and biofuels combustion power plant (4 MW e / 14MW th ) 20 50 MW e CHP- and condensing power plant. Peat, wood, municipal solid waste District heating plant + 4,9 MW cutter chip burning boiler plant Peat and biofuel combustion 3 MW district heating plant + 0,5 MW flue gas Feasibility, application implementation engineering, project management cost estimates, feasibility cost estimates, feasibility, application for environmental permit cost estimates, feasibility, procurement planning TEKES-project CO 2 for greenhouses Purification of flue gases from biofuels for use as CO 2 -source in greenhouses Taivalkosken Voima Kuusiston Saha Heating plant 2,5 MW flue gas condensing and district heating plant for 2 x 7,1 MW biofuels burning boilers Isojoen Lämpö District heating plant

4(7) Taivalkosken Voima District heating plant Haapajärven Lämpö District heating plant Liedon Lämpö District heating plant Kannuksen Kaukolämpö District heating plant JK Juusto Kaira Heating and steam producing plant Foster Wheeler Energia Pirken Kiviristin Lämpö Confidential Demolite Several customers Jyväskylä CHP project (440 MW th ) unit Peat and biofuel combustion 7 MW heat only boiler and power plant (2 MW e / 8.5MW th ) Peat and biofuel combustion power plant (3 MW e / 13MW th ) or 12-15 MW heat only boiler Treatment of flue gas condensate water 8 MW CCA-wood burning district heating plant Studies of emission regulations, calculation of CO 2 -emission permits, mass and energy balances of boilers according to DIN 1942. document preparation, emission control planning, document preparation, emission control planning, document preparation, emission control planning, Procurement planning, evaluation of tenders, expert services cost estimates, CO 2 trade and energy balance feasibility, procurement planning cost estimates, CO 2 trade and energy balance calculations and feasibility Survey of environmental requirements and available purification methods including effluent free systems Expert services

5(7) Wärtsilä Biopower 0,6 MW flue gas condensing and district heating plant for 4 MW biofuel burning boiler Concept design, expert services Fortum Lämpö, Vammala 4,0 MW flue gas condensing and district heating plant for 15 MW biofuel burning boiler Viitasaaren Lämpö 3,5 MW flue gas condensing and district heating plant for 16 MW biofuel burning boiler Kauhavan Kaukolämpö 6,5 MW biofuel + 16,2 MW heavy fuel oil burning district heating plants Feasibility, CO 2 and emission trade calculations Viitasaaren Lämpö 16 MW biofuel + 18 MW heavy fuel oil burning district heating plants Feasibility, CO 2 and emission trade calculations Myllyahon Saha 10,5 MW biofuel + 22,2 MW heavy fuel oil burning district heating plants Feasibility, CO 2 and emission trade calculations Porin Lämpövoima Aittaluoto 37/75 MW CHP biofuel power plant (206 MW th ). Study of Flue-gas condensing and heat recovery and heat accumulator cost estimates, energy balance calculations and feasibility Turku Energia Combined district cooling and heating by heat pumps (25 MW cool / 37 MW heat ) with accumulator Feasibility and preliminary lay-out Kemin Energia Biofuel boiler (26 MW + 8 MW) unit, DH-accumulator Procurement planning, evaluation of tenders, contract, expert services 2004 - Ähtärin Lämpökeskus 4 MW biofuel burning district heating boiler plant 2004 Noviant CMC (Metsa Specialty Chemicals ) CMC Mill, Äänekoski Finland Total energy consumption survey 2004 Confidential The value of district heating plant Evaluation of the company and feasibility

6(7) 2004 Suomussalmen kunta 2004 Jyväskylän Energiantuotanto 2004 Demolite 13 MW biofuel + 25,7 MW heavy fuel oil burning district heating plants Emission trade documents, emission control, phase 1 Rauhalahti biofuel power plant (295 MW fuel ) unit (60 MW th ) Incineration of chromated copper arsenate (CCA) treated waste wood Document preparation, Procurement planning, evaluation of tenders, expert services Evaluation of gate fee, process expert services 2003 2004 Tartu Energia AS Tartu, Estonia Biofuel boilers (2 X 18 MW): Flue-gas condensing and heat recovery Simulation and engineering services, evaluation of tenders, project expert services 2003 Turku Energia Waste to energy boiler (7 MW th ) Feasibility 2003 Vapo Energia Biofuel district heating market and power plants in Sweden Evaluation 2003 Kiviristin Lämpö and Vapo Biofuel combustion power plant (3 MW e / 13MW th ) Simulation, feasibility 2003 Kauhavan Kaukolämpö Biofuel district heating plant (5 MW e / 6 MW th ) Process expert services 2003 Ähtärin Lämpökeskus Biofuel boiler plant (4 MW th ) unit (2 MW th ) Feasibility, procurement and engineering services 2003 Virtain kaupunki Heating of sidewalk and bicycle track by DH return water Feasibility 2003 Lapuan Nahka Energy systems Energy consumption 2002 Kvaerner Pulping Simulation and process design/engineering services

7(7) 2002 Noviant CMC (Metsa Specialty Chemicals ) CMC Mill, Äänekoski Finland Energy systems Feasibility : Energy consumption 2000 Powertechnics / Empower Power plant, Sines, Portugal Utility systems, outsourcing Technical evaluation, Due Diligence -report 2000 Sallan Aluelämpö Simulation 1999 Kvaerner Pulping /Sydkraft Malmö unit (17 MW th ) Simulation