MIDLAND COLLEGE SYLLABUS HART 1445 GAS AND ELECTRIC HEATING 3-3

Similar documents
MIDLAND COLLEGE SYLLABUS DEMR 1323 AUTOMOTIVE HEATING AND AIR CONDITIONING 2-4

HOW MUCH FUEL DOES A GAS STOVE CONSUME AND HOW MUCH DOES IT COST TO OPERATE?

Fossil fuel heating equipment

Certified HVAC - Refrigeration Training Program

Industrial Emergency Response Teams and Safety

Heating, Ventilation, Air Conditioning and Refrigeration (HVACR)

MIDLAND COLLEGE SYLLABUS DFTG 1317 ARCHITECTURAL DRAFTING - RESIDENTIAL 2-4

G670 Intermittent Pilot Ignition Controls

Test Code: 8297 / Version 1

Name: Air Conditioning, Heating and Refrigeration ( )

Boiler and Burner Cleaning and Servicing Specifications

The Basics of Natural Gas

Midland College Syllabus. ITNW 2413 Networking Hardware

FLORIDA STATE COLLEGE AT JACKSONVILLE NON-COLLEGE CREDIT COURSE OUTLINE

JEFFERSON COLLEGE COURSE SYLLABUS HRA216 RESIDENTIAL AIR CONDITIONING SYSTEMS. 5 Credit Hours. Prepared by Roy H. Stueve March 28, 2010

Syllabus: Heating, Ventilation, & Air Conditioning

USER S, MAINTENANCE and SERVICE INFORMATION MANUAL

Evaluate, Clean, and Tune Guidance


THC 85 INDUSTRIAL / COMMERCIAL SPACE HEATER

SIMPLE ELECTRONIC IGNITION WIRE DIAGRAM THERMOSTAT (3) PV PILOT BURNER/IGNITOR - SENSOR Q345A (9) SPARK (4) GND (BURNER) CHASSIS GND

Protect your home s major mechanical systems with Main Street Mechanical s Home Service Agreement.

Air Conditioning Sign-Off Sheet

G26 Corp L11 Revised LENNOXOEMPARTS.COM. Service Literature G26 SERIES UNITS

RESIDENTIAL HEATING OIL SERVICE CONTRACT ANNUAL COST $276.00

prestige Condensing Water Boiler SERVICE TECHNICIAN S TROUBLE SHOOTING GUIDE TSG-PRESTIGE Date revised: 12/6/10


Perkins Statewide Articulation Agreement. Documentation item: Secondary Competency Task List Coversheet

Your safety and the safety of others are very important.

Gas Unit Heaters Duct Furnaces Horizontal - 60 HZ Form No. LF (10/2011) LF24 Standard

The formula for finding CFM is: CFM = BTUH OUTPUT_ Temp Rise (ACF)* *Altitude correction factor below 1000ft = 1.08

Annual Service Agreement

Commercial Gas Water Heaters

The city of Milwaukee s Sample Preventative maintenance manual for Electronically monitored boilers

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

The growing popularity of Gas Fireplaces has created a demand for an ever increasing array of styles and sizes to fit every decor and budget.

INSTALLATION INSTRUCTIONS MC95HAE-1 MASTER CONTROLLER

SL280UHV SERIES GAS FURNACE WARNING

TB-A A. O. SMITH - FVIR INTELLI-VENT TROUBLESHOOTING CHART # LED STATUS PROBLEM SOLUTION

TANKLESS WATER HEATER INSTALLATION DIAGRAMS

DIABLO VALLEY COLLEGE CATALOG

Commercial Gas Furnace Upflow


Customized Assessment Blueprint

O. Gas boiler. Gaz 6000 W WBN H-E-N/L-S2400. Operating instructions for the end customer (2014/07) en

GAS SAFETY PRECAUTIONS

Guide Specification SECTION COMMISSIONING OF HVAC PART 1 - GENERAL 1.1 SUMMARY

High School Graduation years 2013, 2014, Unit/Standard Number

PART 11: START-UP PROCEDURES FOR THE INSTALLER

Policies and Procedures Industrial Maintenance Technician Customized Training Programs and Challenges to IMT Training Requirements

36G22, 36G23, 36G24 & 36G52 36J22, 36J23, 36J24 & 36J52 DSI and HSI Single Stage Combination Gas Valve

XV80 UPFLOW/HORIZONTAL 2-STAGE, VARIABLE SPEED GAS-FIRED FURNACE

PRODUCT DESIGN. 5. Furnace awaits call from thermostat.

Heating, Ventilation, and Air Conditioning (HVAC) Troubleshooting and Repair (DEMR 1423)

MINNESOTA WEST COMMUNITY & TECHNICAL COLLEGE COURSE OUTLINE

PACKAGED FIRE TUBE BOILER

Heating and Air Conditioning

TECHNICAL MANUAL GDS8 & GHS8

Construction Technology: HVAC I, July 2012, Page 1 of 5

NORTHEAST COMMUNITY COLLEGE COURSE SYLLABUS HVAC 2110 COMMERCIAL REFRIGERATION

M7RL Series TECHNICAL SPECIFICATIONS. FEATURES and BENEFITS. High Efficiency / Direct Vent Condensing Downflow Gas Furnace

KENNEBEC VALLEY COMMUNITY COLLEGE

International Training Institute for the Sheet Metal and Air Conditioning Industry

Operator: Save these instructions for future use!

LAKE COUNTY ANIMAL SERVICES EXPANSION SECTION 15459

Mechanical-Electrical Technology

Gas Oven Repair Guide

SMITH PLUMBING & HEATING 2012 Home Care SERVICE PLAN AGREEMENT. A. Silver Plan

Flame Conductivity VS Flame Rectification Systems

Energy Saving Fact Sheet Boilers

Electric & Gas Water Heaters

High efficiency, cast-iron gas boiler

Fuel Gas Fitter. Legislation. Licensure Requirements. Regulatory Agency. Licensed, Certified, and Registered Occupations in New Hampshire 2015

Mechanical-Electrical Technology MECHANICAL-ELECTRICAL TECHNOLOGY Sacramento City College Catalog

Gas-Fired, Residential Storage Type Water Heaters

Troubleshoot resources for homeowner

ecomax Instructions for use Wall hung room sealed fan assisted condensing boilers For the user

Factory owners must ensure the boiler is:

Owner Retain this manual in a safe place to provide your serviceman information if it becomes necessary.

Heating, Ventilation and Air Conditioning

Propane Conversion Kit PROPANE CONVERSION KIT INSTALLATION MANUAL

Construction Technology: HVAC II, July 2012, Page 1 of 5

UA-NJ Air Conditioning & Refrigeration Division Training Curriculum

OASIS SERVICE & TROUBLESHOOTING MANUAL (WITH DM10 OR DM12)

XV 95. Upflow/ Horizontal Left, Downflow/ Horizontal Right Variable Speed Two Stage Condensing Gas-Fired Furnace PUB. NO.

80UHG. Service Literature

Rogelio Longoria. Bachelors in Applied Arts & Science, Currently under way; taking basics at TSTC Harlingen

Refrigeration and Air Conditioning Mechanic (Commercial) Level 5 (Gasfitter B)

Proposed Amendment: Revisions to Chapter 8 Sections Proponent: RESNET Technical Committee

STATE UNIVERSITY OF NEW YORK COLLEGE OF TECHNOLOGY CANTON, NEW YORK COURSE OUTLINE. ACHP 104 Refrigeration & Air Conditioning Service II

Service Bulletin SA-008. DATE: June 18, 2008 TO: All Service and Parts Managers SUBJECT: Flood Damaged Appliances

BUILDING PERFORMANCE INSTITUTE TECHNICAL STANDARDS

Condensing Boiler Efficiency

Certification Information. Qualifications. Test Specifications. Gas Furnaces Industry References

Automotive Technology Comprehensive Automotive Training (CAT)

HVA 120 RESIDENTIAL HVAC INSTALLATION

CROWN BOILER COMPANY BWF SERIES BOILER CATEGORY I VENT KIT INSTALLATION AND OPERATING INSTRUCTIONS

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project.

Consortiwm Awdurdodau Lleol Cymru Consortium Local Authorities Wales

Luna 3 Comfort Troubleshooting Guide June 2008

Transcription:

MIDLAND COLLEGE SYLLABUS HART 1445 GAS AND ELECTRIC HEATING 3-3 Course Description: A study of procedures and principles used in servicing heating systems, including gas fired and electric furnaces. The student will be introduced to proper testing and troubleshooting techniques. The class will cover proper wiring, gas controls, thermostats, spark ignition, and venting procedures. Prerequisites: HART 1401 or consent of instructor. Text, References, and Supplies: 1. REFRIGERATION AND AIR CONDITIONING Whitman and Johnson. Current Edition. 2. REFRIGERATION AND AIR CONDITIONING TECHNOLOGY LAB MANUAL, Whitman and Johnson. Current Edition. 3. Industry Literature Course Goals/Objectives: This course will focus on the skills needed to perform maintenance and service for heating equipment. The student will learn the principles and components of heating equipment, including gas heat and electric heat. This course will stress application of skills in many lab exercises. The following list of course goals will be addressed in the course. These goals are directly related to the performance objectives. (* designates a CRUCIAL Goal) 1. Display work habits. 2. Use safe work habits. 3. Explain combustion. 4. Define complete combustion. 5. Define incomplete combustion. 6. Explain combustion testing. 7. Describe heating fuels. 8. List furnace components 9. Calculate gas furnace BTU output. 10. Explain outside combustion air requirements.

11. Explain primary air combustion requirements. 12. List three thermostat types. 13. Explain multi-stage thermostats. 14. Explain cooling anticipator operation. 15. Explain heating anticipator operation. 16. Use amp meter. 17. Use volt meter. 18. Measure anticipator current. 19. Set heat anticipator. 20. Calculate gas furnace CFM. 21. Explain gas piping requirements. *22. Explain standard furnace venting requirements. 23. Test gas furnace efficiency. 24. Measure temperature rise. 25. Clean burner chamber. 26. Clean furnace burners. 27. Explain electric heat only thermostat. 28. Explain two-stage manual changeover thermostat. 30. Explain burner orifice sizing. 31. Explain combustion air requirements. 32. Explain gas furnace safety controls. 33. Trace gas heat schematic diagram. 34. Identify gas furnace components. * 35. Identify LP gas pressure requirements. * 36. Identify natural gas pressure requirements. 37. Measure supply gas pressure. * 38. Measure manifold gas pressure. 39. Adjust gas pressure. 40. Adjust burner flame. 41. Analyze types of flames. 42. Test pilot safety. 43. Test fan control. 44. Test limit safety. * 45. Inspect heat exchanger. 46. Test flue draft. 47. Troubleshoot gas furnace. 48. Perform gas heat pre-season maintenance. 49. Read gas heat schematics. 50. Install gas valve. 51. Install fan control. 52. Explain 80+ furnace venting requirements. 53. Explain secondary heat exchanger function. 54. Explain pulse furnace operation. *55. Explain pulse furnace venting requirements. 56. Identify electric heat components. 57. Calculate electric furnace BTU output.

58. Calculate electric furnace CFM. 59. Draw electric heat schematic. 60. Explain fusible link function. 61. Trace electric heat schematic diagram. 62. Write electric furnace operational sequence. 63. Test electric heat strip. 64. Test electric heat sequencer. Student Contributions and Class Policies: Each student will spend at least 4 hours per week preparing for class. As a student in this class you are expected to display respect, professional behavior and a cooperative attitude at all times. Punctual attendance is critical in this class. This course will focus on the basic skills needed to perform in the field as a beginning service technician. The student will learn how to use meters and test instruments, how to apply these test instruments to troubleshoot simple electrical problems. Evaluation of Students: Lab 30% Quizzes & Homework 25% Attitude & Attendance 20% Final Examination 25% Total 100% Course Schedule: The class meets for 6 lecture hours and 6 lab hours per week for 8 weeks.

SCANS Information: this course. The following SCANS skills will be taught and/or reinforced in SYSTEMS: Suggests modifications to existing systems and develops new or alternative systems to improve performance. Knows how technological systems work and operates effectively with them. Safety Glass Policy: TECHNOLOGY: Instructor Information: Chooses procedures, tools or equipment including computers and related technologies. Prevents, identifies, or solves problems with equipment. It is required that all persons in the Air Conditioning Program wear eye protection while in the lab. Students are required to furnish their own protection. Visitors will be supplied with a pair of glasses to be used during their visit. If you have any questions about this policy, please ask your instructor to clarify them for you. Jaroy Roberts, Instructor Room 187 TC (432) 685-4687 Office (432) 349-5913 cell E-Mail: jroberts@midland.edu Office Hours: Posted Curt Pervier, Applied Technology Dean Lisa Tanner, Applied Technology Secretary Room 143A TC (432) 685-4676 Fax: (432)685-6472 Students are encouraged to contact the instructor at any time; however, making an appointment will guarantee the instructor s availability at a specific time. Students with Disabilities Midland College provides services for students with disabilities through Student Services. In order to receive accommodations, students must place documentation on file with the Counselor/Disability Specialist. Students with disabilities should notify Midland College prior to the beginning of each semester. Student Services will provide each student with a letter outlining

any reasonable accommodations. The student must present the letter to the instructor at the beginning of the semester. *Students MUST actively participate by completing an academic assignment required by the instructor by the official census date. Students who so not actively participate in an academically-related activity will be reported as never attended and dropped from course.