Contents. 1. Pre- Commissioning 2. Preservation of pipeline 3. Commissioning Activities

Similar documents
The Pipelines Regulations, 2000

Standard Hydraulic Piping Flushing Procedure

Pressure Testing (Hydrostatic / Pneumatic) Safety Guidelines

PBX Series Quick Fit Connector Bimetallic Steam Traps

Department of Environmental Health & Safety. Lock Out/Tag Out Program. Date Effective: November 2010

Millersville University - Office Of Environmental Health & Safety Scope & Application

Fire Sprinkler System Maintenance and Testing Page 1 MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS

Chapter 19 Purging Air from Piping and Vessels in Hydrocarbon Service

SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN

PROCEDURES PREVENTION OF ACCIDENTAL IGNITION

A Job Safety Execution Plan is required. mixtures of the above called, natural gas liquids (NGL's) refined products and their components

NCCER Progress Blvd., Alachua, FL Tel: (888) Task Number Item Date(s) Recorded By

81000 Series Aluminum Gate Valve Installation and Repair Manual

ANNEX 17 DRAFT AMENDMENTS TO SOLAS REGULATIONS II-2/4 AND II-2/16. Part B Prevention of fire and explosion

IMPORTANT SAFETY NOTICE

WORKING IN CONFINED SPACES GUIDELINES

METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS

This will also provide you with the knowledge to insure long life for your Investment

Industrial Process Pump Safety Manual IMPORTANT SAFETY NOTICE

SELF-INSPECTION PROGRAM FOR FIRE PROTECTION EQUIPMENT

PRECAUTIONS ON TANKER AND TERMINAL DURING CARGO HANDLING

LOCKOUT GUIDELINE. To ensure that a piece of equipment cannot be turned on, pressurized or switched on accidently while an employee is working on it.

Element D Services Plumbing

SECTION TESTING, ADJUSTING, AND BALANCING

University of Tennessee Safety Guidelines

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook

COMPRESSED GASES. 1.2 The contents of each cylinder and container must be clearly identified (by tag or stamp) on the cylinder.

Volkswagen Golf > VW Rabbit GTI 2006->

SAFETY - LIFE SAVING RULES MECHANICAL ISOLATION CAT A-1 SOP #3

Course Title: Safety Issues in Electronics Engineering Technology Number of Credits: 3 B.A. B.S. B.A.S A.A. A.S. Degree Type

Volkswagen Jetta, Golf, GTI 1999, Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17)

LNG Fuel Tank System LNG Tank overview

The Ship/Shore Safety Check-List

Safety and Health Resource Manual. Sample Permit-Required Confined Space Written Program

Elgin Fire Department

Mechanical Installation

This leaflet provides information on

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL. EudraLex The Rules Governing Medicinal Products in the European Union.

FIRE EXTINGUSIHER INSPECTION, MAINTENANCE, AND TESTING PROCEDURES

Take care with oxygen Fire and explosion hazards in the use of oxygen

INSTRUCTION MANUAL. Boil-Out TABLE OF CONTENTS SAFETY WARNINGS 2-3 RESPONSIBILITY 3 INTRODUCTION 3 PRE-BOIL OUT PROCEDURES 3-5 BOIL OUT PROCESS 5-9

OPERATING and MAINTENANCE MANUAL SERIES 2700A CONTROL VALVE CONTENTS. INTRODUCTION...1 Scope...1 Description...1 Valve Identification...

BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap

NW Natural & Pipeline Safety

EUROPEAN INDUSTRIAL GASES ASSOCIATION

TRANSNET PIPELINES. TPL 25 Tarlton Commissioning Plan

Risk Engineering Guideline

Understanding Anesthetic Delivery Systems Dean Knoll, CVT, VTS (Anes.) Anesthesia Technician Supervisor University of Wisconsin Madison, WI May 2003

Underground Storage Tanks

Flushing and Cleaning the A/C System

TANKER - SHORE SAFETY CHECK-LIST

FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST

Inspections Standard Operating Procedure 5 Aboveground Storage Tanks

Volkswagen New Beetle 2.0 Liter 4-cyl General, Engine (Engine Code AEG) 17 Engine-Lubrication system (Page GR-17)

Civil Engineering Sector Labour-Management Health and Safety Committee

Topics of the Presentation

ELECTRIC HEATER COMPANY Operating and Maintenance Manual For Immersion Heating Elements

Rules for Classification and Construction Additional Rules and Guidelines 3 Machinery Installations

Backup Fuel Oil System Decommissioning & Restoration Plan

READ FIRST. Confined Space Entry Procedure. San José State University Environmental Health and Safety. Confined Space Entry Procedure

Factory owners must ensure the boiler is:

Pressure Testing Procedures for Building Services Piping

Refrigerant Charging Unit ICOGD. 020AH1000 Operating Manual. FR İ-COLD Rev. 00

SAFETY AND HEALTH PROGRAM

ATTACHMENT F ONSHORE PIPELINES DECOMMISSIONING GUIDELINE 1. INTRODUCTION

TABLE OF CONTENTS. SECTION 1 General Information: Pg 2 Description of Operation

SunMor SM-V30 Solar Water Heater Installation Manual

3088 Lockout-Tagout Training Program Course Outline

SPECIFICATION TECHNICAL AIR-CONDITIONING UNITS SINGLE AND SPLIT (DUCTED) (AIR COOLED PACKAGED UNIT)

Ceiling Mount Air Handler Manual

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

Winnipeg Fire Department Fire Prevention Branch

Ergo-Pro Single Line Solar Station Installation and Operating Instructions

OHIO MEDICAL CORPORATION. Medical Gas Panel. Installation and Maintenance Manual

Pressure Testing Procedures for Pipelines

Automotive and Diesel Lab Safety Guidelines

Nitrogen Blanketing for Methanol Storage and Transportation

Flood Checklist ACTION TO BE TAKEN BEFORE THE FLOOD SEASON

TABLE OF CONTENT

Aerial/Scissor Lift Program. Environmental Health & Safety Office

Owner-User Pressure Equipment Integrity Management Requirements

Northern Region. Underground Storage Tank

Safe Operating Procedure

KEPPEL GAS GAS SUPPLY HANDBOOK

SELECTION, APPLICATION & MAINTENANCE

CONFINED SPACE ENTRY REQUIREMENTS

Important Ontario Fire Code Information for Building Owners in the City of Windsor

Heater Replacement Procedure

Oxy-Fuel Gas Welding. Given a functional oxy-fuel gas unit, instruction and demonstration of use, each student will be able to:

STANDARD OPERATING PROCEDURE EMERGENCY EYEWASH AND SHOWER EQUIPMENT

Bradlee Boilers Ltd. Instruction Manual for starting up Bradlee Hire Boiler from Cold

Refrigerant Changeover Guidelines R-22 to R-407C. Leading the Industry with Environmentally Responsible Refrigerant Solutions

REPLACEMENT AIR CONDITIONING UNITS FOR BRITISH EMBASSY RESIDENCE

Lockout / Tagout Program

CARING FOR YOUR WATER HEATER

Installation and Commissioning Manual Solar Stations FlowCon Max Evolution II

UST RULES CHANGES. Heather Peters, Environmental Specialist

In progress. Basically a Confined Space Entry Plan has to answer the following questions:

CONTAMINANT REMOVAL FROM CENTRIFUGAL SYSTEMS

Transcription:

September 2013 1

Contents 1. Pre- Commissioning 2. Preservation of pipeline 3. Commissioning Activities 2

Commissioning Procedures These Procedures covers the following: Pre-commissioning, which covers all activities and approvals necessary to allow purging with gas and pressurizing to normal operating pressure to commence. Pipeline preservation, in case gas-initiation of the pipeline is performed later than six months after the installations are completed the pipeline is preserved. Commissioning of dry pipelines. The criteria for being considered a dry pipeline are as follows: Dew point temperature must be < - 20 C measured at atmospheric pressure. Over-pressure following sealing of the lines must be at least I barg. The acceptable minimum standard during the whole period of preservation is a dew point temperature of - I0 C. Commissioning of wet pipelines. Wet pipelines are considered those that are not met the previous criteria 3

1.1 PRE-COMMISSIONING ACTIVITIES On substantial completion of construction activities, Contractor mobilizes its commissioning team to initiate pre-commissioning activities in a phased manner. The objective of pre-commissioning is to ensure that the pipeline as well all the facilities have been completed according to the Project Specifications and that commissioning and operation will take place safely and effectively. Also during the pre-commissioning should be verified that all the relevant data with the commissioning of the pipeline has been received and that the commissioning procedure is presented and discussed with all personnel involved. Another important aspect which has to be verified during this procedure is that all the necessary drawings, technical information, and O & M manuals have been received and that the operating plan has been existing. Pre-commissioning may therefore be defined as all the checks that are to be completed prior to commissioning being permitted to commence. 4

The pre-commissioning phase includes three main types of field activities: a) Systematic conformity checks, carried out on each item of equipment or component, such as pressure gauges, cables, etc., to verify visually the condition of the equipment, the quality of the installation, the compliance with project drawings and specifications, manufacturer's instructions, safety rules, codes, standards and good engineering practices. These checks will confirm the following: All pipe assemblies and weldings have been completed. All pipeline pressure and leak tests have been completed and relevant certified test documents have been received (weld radiographs, hydrostatic test documents etc) Electrical and control installations have been completed and are functioning. 5

Cathodic protection systems have been completed and are functioning. Security fences have been installed around all above ground high pressure pipeline facilities. Emergency vehicle access is provided to all pipe line facilities (land valve stations, MIR-stations, Scraper Stations. Right-of-way restoration has been completed according to specifications and landowner agreements and all environmental concerns have been addressed. b) Equipment static/de-energized tests, to ensure the quality of a number of critical components. This "cold" testing concerns all disciplines, e.g. calibration of instruments, machinery alignments, setting of safety valves, pressure testing of piping, cable continuities, etc. c) Dewatering and drying of the pipeline and the vessels has been completed in accordance with specifications and approved procedures. 6

As soon as practical, the Pre-commissioning team shall acquire a complete set of drawings and data as listed below: 1. As built drawings and technical information regarding: Pipeline sections between line valve stations : pipe logs showing the location, size, wall thickness, and pipe grade Line Valve stations: schematic showing venting and valving arrangements, as well as technical data regarding material, fittings, valves, etc. M/R Stations: schematics showing venting arrangements, customer interconnections for gas service and by-pass technical data regarding material, fittings, valves, etc. Scraper Stations: schematics showing piping arrangement as well as technical data regarding material, fittings, valves, etc. Cathodic protection facilities: including type and description of rectifiers, number and type of sacrificial anodes, measuring posts, insulating couplings, type of pipeline external and internal coating 7

2. Route Maps which indicate among the others the pipeline routing, the depth of pipeline, the access routes to valve stations, M/R Stations, Scraper Stations, cathodic protection rectifiers and measuring posts have been received. 3. 3. Vendor-supplied equipment design specifications, installation drawings, operation and maintenance manuals. 4. 3. All QC documentation relating to the construction testing i.e. hydro test packs, cable checklists etc. as well as emergency procedures and operating plans. Pre-commissioning work described herein will require all necessary tools, test instruments, water, air and electric power etc to be made available to the Pre-commissioning team. Also spare parts and repair materials as well as that all the necessary tools and work equipment as pipe locators, gas detection equipment etc should be available. Each craftsman such as pipe fitter, millwright, mechanic, instrument technician, or electrician, who is assisting the Pre-commissioning team, shall have his normal tools available. 8

All necessary tags, warning tapes, barricade tapes and safety supplies shall be made available at the site. The following signs are posted at strategic locations before proceeding with the appropriate Pre-commissioning activities: Tags: No smoking Danger, high voltage Do not enter beyond this point 9

Finally, the following safety supplies are made available to all staff involved in the pre-commissioning activities. Ear Protection Safety Glasses Hard Hats First Aid Kit Face Shield Chemical Gloves Safety Goggles Padlocks with Multi-Lock Clips Safety Boots Boiler suits/overalls 10

For the purpose of pre-commissioning, the facilities will be subdivided suitably into a few systems. The pre-commissioning checks of each piece of equipment are to be as complete and as comprehensive as possible to ensure that the equipment are installed as specified and will operate as designed. Proper pre-commissioning will ensure that the facilities can be made operable with the least number of problems. To achieve this, (1) The Pre-commissioning Team shall become familiar with all data and information. (2) The Pre-commissioning Team shall start all pre-commissioning checks as early as possible during the construction activities to ensure that the final installation of all equipment is as designed and specified. 11

All personnel involved in the pre-commissioning and commissioning activities have to be educated with regard to the following: Access routes to line valve stations, MfR stations, and scraper stations. Vehicle and equipment use and capabilities. The overall commissioning plan and the co-ordination and procedures to be utilized. The job responsibilities of each individual and his part in the overall plan. Determination of gas volumes required for purging and loading. Sequence of valve sections to be purged and loaded Details of purging and loading procedures. Details.of emergency and operating plans and responses to any problems or difficulties that may be encountered. The effects and precautions necessary when working with high pressure natural gas. Use and capabilities of telecommunication and mobile telecommunications systems. Also it has to be verified that involved personnel have been trained and qualified for operating the pipeline. 12

The following guidelines summarize all activities to be completed during the pre-commissioning phase of the project. 1. Testing and adequate flushing of all piping systems. 2. Removal of all blinds or spool pieces used during hydrostatic testing. 3. Proper positioning of spectacle blinds. 4. Witness or calibrate, and test all instruments in accordance with the Pre-commissioning procedures, and record all calibrations and test data on the checklists provided for each instrument and instrument loop. 5. Verify that lubricants, oils, coolants, etc., required for all equipment are on the job site and in good condition (i.e. not contaminated). 6. Ensure that fire extinguishers are in place. 7. Check all electrical closures. 8. Ensure that all escape routes are clear of obstacles. 13

9. Ensure that all eyewash stations are operational. 10. Wear personal safety equipment. 11. Clear area from unauthorized personnel. 12. Be aware of the wind direction. 13. Be aware of the designated meeting area location. 14. Ensure that fire detection equipment is operational. 14

General Preservation of a pipeline is carried out to maintain the pre commissioning condition, which the installations are in until commissioning comes into force. 2.1 Preservation with dry air If the initial gas filling of the pipelines is carried out later than six months after the installationworks are completed preservation of the pipelines takes place according to the dry air method. The main criteria for a dry pipeline are as follows: Dewpoint temperature must be -20 C measured at atmospheric pressure. Overpressure after sealing of the pipelines must be at least one barg. The acceptable minimum norm during the entire preserva tion-period is a measured dewpoint temperature of -10 C (measured at atmospheric pressure and at an overpressure of one barg). 15

The dewpoint temperature and the pressure is measured and registered within the preservation period with stated intervals since the pipeline-contractor as well as a neutral third party is involved. 2.2 Preservation with nitrogen (N2) If it is decided to preserve the pipeline by the use of nitrogen the criteria are as follows: Purge with nitrogen until achieving 100% N2 The overpressure after sealing must be at least 2 barg. Measurements of the pressure at stated intervals during the preservation period is required. 16

3.1 Commissioning of dry pipelines 3.1.1 General Commissioning includes the following activities: The supervision and execution of the Commissioning activities are to be carried out by DESFA s personnel who are suitably trained and qualified for this task. Commissioning check list is to be strictly adhered to during execution of the commissioning. Commissioning is to take place in coordination with Gas Control Center. No valves are to be opened without prior approval from Gas Control Center. 17

Purging of a section of pipeline is to be considered as complete when 100 % gas is measured 3 times at the exhaust point with two independent gas measuring instruments. When commissioning a new section of pipeline, or possibly a modified section of pipeline (e.g. in case of repair or construction activity) notification is to be carried out by means of form 2.2.b. Purging, loading, and placing into service may be carried out only after presentation of the notification of placing into service. The person responsible for observation of the commissioning policy is DESFA s District Manager, or alternately, a deputy named by him. The criteria for being considered a dry pipeline are as described here above, and if those criteria are not fulfilled then the pipeline is considered as wet. Sections of the pipeline which have been constructed, as well as sections of the pipeline on which repairs have been carried out, contain air or a mixture of gas and air. These pipelines or sections of pipelines must be placed into service in a safe, economical and environmentally responsible manner. 18

The following description and points to be observed ensure a trouble-free process for commissioning of dry pipelines. Prepare the scope and the technique for commissioning and complying with Gas Control requirements Establish the purge direction Determine whether inert gas is required and eventually required volume Calculate the purge time Determine which will be the inlet throttle valve and exhaust valve and carry out a function test of these valves Establish the purge velocity. This velocity is usually between 5 m/sec in the main pipeline if no inert gas is used or 7-10 m/sec if inert gas is used 19

Check all facilities which have a relation to the commissioning according to the safety check list which is herewith Ensure that capable and adequate personnel is assigned Ensure satisfactory performance of vehicles, equipment, and instruments Ensure effective and reliable communications between the inlet point, the exhaust point, and Gas Control Center Advise Gas Control Center of commencement of purging, loading, and placing into service Ensure with the Gas Control Center for the availability of the required quantities of gas In case of use of inert gas, the adequate volume will be determined from the cross sectional area of the pipe. An inert gas plug approx. 300 m in length is recommended as it may be difficult to maintain a purge velocity of 3-7 rn/s. The supervisor in charge of commissioning will determine if inert gas is to be used 20

3.1.2 Commissioning procedure The procedure begins with the injection of gas, or inert gas if it is decided, into the inlet throttle valve which is opened slowly, while measuring the velocity at the outlet throttle valve Then should regulate the purge velocity (usually approx. 10 rn/sec in the main pipeline - 90 m/sec from vent stack) following always the be given by a per son at the vent stack Commence timing of the purge only after regulation of the purge velocity has been achieved Close to the expiration of the purge time, the gas concentration is to be measured by means of two independent gas measuring instruments After verification of measurements of 100 % Vol gas at least 3 times then first the throttling valves of the exit and then the valves of the insert point are to be closed in that order All vented gas quantities are to be reported for the calculation of the vented gas 21

Two pressure gauges and one pressure recorder are installed at the start and end of the pipeline section to be loaded (one additional pressure gauge is to be kept in reserve in case of malfunction). The range of the scales of the gauges and recorders must be at least equal to the maximum possible loading pressure The pipeline is loaded in stages so that the pressure in the pipeline rises to 5-10 bar during the first hour The second hour the throttle inner valve is opened further so that the pressure rises to 10-20 bar Finally the inlet throttle valve is opened further so that final loading pressure is reached after three hours Depending on the quantity of gas supply available for loading the pipeline, lower pressure increments are to be selected in accordance with Gas Control Center 22

After each hour a leak test of susceptible points on the pipeline (e.g. tie-in welds, flange connections, etc.) is to be carried out using a foam producing liquid. If any leaks are found permanent repairs are to be carried out in accordance with specifications before proceeding with the loading operation Leaks from fittings should be tightened in accordance to vendors instructions Loading time for the pipeline or section of pipeline will generally be determined by the gas volumes available and the configuration at the inlet and throttle valve After the pipeline has been loaded (pressure equalization) it will be connected to the pipeline system For further commissioning of pipeline downstream Section the above procedure is repeated 23

3.2 Commissioning of wet pipelines In the case of wet pipeline and before purging with natural gas it is necessary to dry the pipeline. The cause of this is that under certain pressure and temperature conditions, gas hydrates will form when hygroscopic water (i.e. water remaining after de-watering) comes into contact with gas. The range of pressure and temperature, within which natural gas hydrates form, lies above 0o C (water dew point) and 6 bar. A decomposition of gas hydrates occurs by an increase in temperature or reduction in pressure. Based on present experience the following dehydration procedures are generally accepted: Drying with dry air Absorption of residual water by alcohol Drying of residual water by vacuum After the drying of the pipeline the procedure for the commissioning of dry pipeline is followed. 24