Pressure Testing Procedures for Pipelines
|
|
|
- Charleen Pope
- 10 years ago
- Views:
Transcription
1 Pressure Testing Procedures for Pipelines Document Number Revision 2 Approved By Ric Morris McMurdo, Palmer, and South Pole November 11, 2004 Active Divisions/Departments FEMC Raytheon Polar Services Company HARD COPY NOT CONTROLLED-CONTROLLED COPY AVAILABLE ONLINE
2 Table of Contents Table of Contents... i Purpose... 1 Responsibility... 1 Plumbing Foreman and Project Engineer, FEMC... 1 Personnel... 1 Discussion... 1 Requirements... 2 Tools and Equipment... 2 Ensuring Safety of Work Site... 2 Conducting the Pressure Test... 3 References... 4 Records... 4 i
3 Purpose This procedure outlines the necessary actions and safety practices for pressure testing all new fuel line piping and other piping air tests at McMurdo, Palmer, and South Pole. Responsibility Plumbing Foreman and Project Engineer, FEMC Personnel Plumbing Work Center Foreman, Pipefitters, FEMC Construction Coordinator, Project Engineer, NSF Station Manager Discussion In order to ensure the integrity of pipeline in and around all, RPSC will perform pressure testing. Due to the freezing risks associated with pressure testing with water and the environmental hazards of hydrotesting with fuel, RPSC uses pneumatic (air) testing. The pressure testing procedures adopted by RPSC follow API and ASME recommended standards and practices. The procedures also outline proper safety practices that must be followed in order to minimize risks. Page 1 of 4 pages
4 Requirements Tools and Equipment All personnel within test area shall be required to wear eye and hearing Personnel Protection Equipment (PPE). Chicago quick couplings and an air compressor (currently using Sul-Air Type compressor, exact equipment type may vary). Ensuring Safety of Work Site Pneumatic testing can be dangerous and should be performed with caution and careful attention to all safety procedures. To ensure the safety of all workers and residents, the following safety precautions must be completed prior to conducting the pressure testing: 1. Notify station personnel of area to be avoided due to risks during pressure testing. 2. Ensure that no high pressure testing occur in the work centers. 3. Ensure personnel conducting the test stand behind a barrier during pressurization. 4. Mark off the area as a dangerous site. This information should be provided if the test occurs in town or near a high traffic area. Pedestrians must be advised to avoid the area. Results After following the above procedures, the necessary steps to ensure safety will be complete. Page 2 of 4 pages
5 Conducting the Pressure Test To conduct a pressure test of pipelines in or around all, complete the following steps: 1. Identify the maximum test pressure to be used, as determined by the Project Engineer. 2. Identify the steel pipe to be tested. When possible, the recommended maximum test length is 400 feet. 3. Examine all connections prior to the test to ensure proper tightness. 4. Determine the pressure rating for all connected fittings and devices to ensure they are rated for the maximum test pressure. 5. Place a 150# blind flange or other suitable cover on all openings that are not closed off by valves. 6. Plug all test, drain, and vent ports that are not required for the test. 7. If the section of pipe being tested is isolated from other sections by in-line valves, ensure the portion not being tested is open to the atmosphere. 8. Apply a preliminary test pressure of 25 psi, or as directed by the Project Engineer. Note This pressure should be held for a minimum of 10 minutes to allow for the location of any major leaks. If leaks are detected during this step, or at any time during the test, relieve the pressure and consult the Project Engineer for instruction. 9. Apply the test pressure in increments of 25 psi, or as directed by the Project Engineer, until the maximum test pressure is reached. Hold pressure for 5 minutes at each 25-psi increment before adding more pressure. Note The maximum test pressure (rule of 150%) of the maximum system operating hydrostatic pressure on the fuel distribution system, this pressure should be verified by the Project Engineer prior to testing. 10. Hold the maximum test pressure for 10 minutes. Page 3 of 4 pages
6 The NSF Station Manager or other appropriate NSF representative must observe this step. 11. After the required 10 minutes, reduce the pressure to 100 psi or predetermined pressure. 12. Hold this pressure for 24 hours. 13. Obtain confirmation of a successful test by the NSF representative after the 24 hour time period. 14. Remove the pressure, with caution to avoid escaping air stream, debris, and high decibel noise level. 15. Complete the appropriate following forms Pressure/Leak Testing Sheet (a) and/or the Pressure and Temperature Log (EN-MPS- 706b) and place them in the appropriate engineering files as specified by the Project Engineer. Results After completing these steps, pressure testing is completed. Once the test is successfully completed, then the line is ready for service. References ASME b31.1, American National Standard for Pressure Piping; API Recommended Practice 1110 Pressure Testing of Liquid Petroleum Pipelines Pressure/Leak Testing Sheet (a) Pressure and Temperature Log (b) Records See the Pressure/Leak Testing Sheet and the Pressure and Temperature Log, under the FEMC-MPS tab of the FEMC Records Management Table (EN-D- 226a). (All forms are located on Common drive I:/Perm/Procedures/Master List/FEMC forms) Page 4 of 4 pages
Pressure Testing Procedures for Building Services Piping
Pressure Testing Procedures for Building Services Piping Document Number Revision 0 Approved By Ric Morris McMurdo, Palmer, and South Pole February 25, 2005 Active Divisions/Departments FEMC Raytheon Polar
Project Scheduling and Control Procedures
Project Scheduling and Control Procedures Document Number Revision 0 Approved By Ric Morris (Acting Director) DHQ, Stations August 30, 2001 Active Divisions/Departments FEMC Raytheon Polar Services Company
Water System Disinfection
Water System Disinfection Document Number Revision 1 Approved By Ric Morris All 6/2/04 Active Divisions/Departments FEMC Raytheon Polar Services Company HARD COPY NOT CONTROLLED-CONTROLLED COPY AVAILABLE
Facilities Maintenance Work Order Procedures
Facilities Maintenance Work Order Procedures Document Number Revision 2 Approved by Ric Morris 09/14/05 Active Divisions/Departments FEMC Raytheon Polar Services Company Facilities, Engineering, Maintenance,
Pressure Testing (Hydrostatic / Pneumatic) Safety Guidelines
The INGAA Foundation, Inc. 1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines for the safety of all personnel and the general public during pressure (e.g., hydrostatic, pneumatic)
Standard Hydraulic Piping Flushing Procedure
Page 1 of 6 1.0 Scope This procedure covers the minimum technical requirements for cleaning and flushing of Hydraulic and Piping, and related accessories. 2.0 Introduction In hydraulic fluid power systems,
PBX Series Quick Fit Connector Bimetallic Steam Traps
6262100/6 IM-P626-01 ST Issue 6 PBX Series Quick Fit Connector Bimetallic Steam Traps Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning
Engineering Documents in Expedition
Engineering Documents in Expedition Document Number Revision 0 Approved By Wayne L. Cornell, PE January 10, 2006 Active Divisions/Departments Raytheon Polar Services Company Facilities, Engineering, Maintenance,
Standard Pneumatic Test Procedure Requirements for Piping Systems
the pressure equipment safety authority Standard Pneumatic Test Procedure Requirements for Piping Systems AB-522 Edition 2, Rev. 0 Issued 2012-06-28 Table of Contents FOREWORD... 3 1.0 INTRODUCTION...
www.klmtechgroup.com TABLE OF CONTENT
Page : 1 of 19 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 2 REFERENCES
OPERATIONS & MAINTENANCE (O&M) FOR PROPANE STORAGE FACILITIES
OPERATIONS & MAINTENANCE (O&M) FOR PROPANE STORAGE FACILITIES Reference: National Fire Protection Association (NFPA) Pamphlet No. 58 Liquefied Petroleum Gas Code, 2001, Chapter 11 Type of Facility: Petroleum
Installing a Probe. Typical Installation
for hazardous locations. Prior to any installation in a Classified Hazardous Location, verify installation methods by the Control Drawing referenced on the product s name tag 2. The Feed Through Assembly
PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT
PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT GENERAL INFORMATION 1.1 This section applies to piping systems for chilled water, hot water, condenser water, steam, condensate return, fuel oil, refrigerant
Lockout - Tagout. Control of Hazardous Energy OSHA Standard 1910.147
Lockout - Tagout Control of Hazardous Energy OSHA Standard 1910.147 You will learn Purpose of Lockout-Tagout Requirements for LOTO Types of Hazardous Energy Procedures for LOTO Types of Energy Electrical
Northern Region. Underground Storage Tank
California CUPA Northern Region Presents Underground Storage Tank Designated Operators Workshop Workshop Agenda Definitions Tank Construction Corrosion Protection Spill Prevention Overfill Prevention Piping
IMPORTANT SAFETY NOTICE
IMPORTANT SAFETY NOTICE To: Our Valued Customers User safety is a major focus in the design of our products. Following the precautions outlined in this manual will minimize your risk of injury. ITT Goulds
P O B o x 3 11 5 4 S t. L o u i s, M O 6 3 1 3 1-0 1 5 4 P h o n e : ( 3 1 4 ) 9 6 6-8 9 1 9 ~ E m a i l : w m h u I t t @ a o l.
P O B o x 3 11 5 4 S t. L o u i s, M O 6 3 1 3 1-0 1 5 4 P h o n e : ( 3 1 4 ) 9 6 6-8 9 1 9 ~ E m a i l : w m h u I t t @ a o l. c o m Determining Code Compliance and Pipe System Leak ing by William M.
Confined Space Training. Developed and Presented by: Scott Cole, CSP (440) 520-9499 [email protected]
Confined Space Training Developed and Presented by: Scott Cole, CSP (440) 520-9499 [email protected] Objectives To understand and recognize a confined space, To understand the difference in a permit required
Industrial Process Pump Safety Manual IMPORTANT SAFETY NOTICE
Industrial Process Pump Safety Manual IMPORTANT SAFETY NOTICE To: Our Valued Customers User safety is a major focus in the design of our products. Following the precautions outlined in this manual will
Technical Note 802 Leak Testing of Polyethylene Pipe For Municipal and Industrial Applications Part 1 Pre-Test Considerations
Technical Note 802 Leak Testing of Polyethylene Pipe For Municipal and Industrial Applications Part 1 Pre-Test Considerations Leak testing may be used to find leaks in a newly constructed or newly modified
SAFETY - LIFE SAVING RULES MECHANICAL ISOLATION CAT A-1 SOP #3
SUNCOR ENERGY PRODUCTS DISTRIBUTION TERMINAL OPERATING MANUAL STANDARD OPERATING PROCEDURE SAFETY - LIFE SAVING RULES Verify isolations of hazardous energy before any work begins. Date Issued: February
BOP PRESSURE TESTING PROCEDURE
0 Discuss Operator BOP requirements WITH RIG MANAGER. Insure that all Romfor's BOP equipment is tested consistent with Romfor's policy. This may require Nabors to incur the cost for the testing subcontractor
Maryland Containment System Testing Protocol. The individual performing the inspection and testing as outlined in this protocol must be either:
MARYLAND DEPARTMENT OF THE ENVIRONMENT Oil Control Program, Suite 620, 1800 Washington Blvd., Baltimore MD 21230-1719 4 410-537-3442 410-537-3092 (fax) 1-800-633-6101 http://www.mde.state.md.us Maryland
PROCEDURES PREVENTION OF ACCIDENTAL IGNITION
Page No: 1 of 7 6.0 PURPOSE (192.751) All possible precautions shall be exercised to prevent the accidental escape and ignition of gas. Whenever possible, potential sources of ignition should be eliminated
Morrison Bros. Co. General Product Specifications
Morrison Bros. Co. General Product Specifications Tank Mounted Spillbox The spill containment device is manufactured to contain spills and drips that may occur at the fill point on aboveground storage
FEMC Document Control
FEMC Document Control Document Number Revision 7 Approved by Wayne L. Cornell, PE Posting Date- April 10, 2006 Active Divisions/Departments FEMC Raytheon Polar Services Company Owning Division or organizational
Department of Environmental Health & Safety. Lock Out/Tag Out Program. Date Effective: November 2010
Department of Environmental Health & Safety Lock Out/Tag Out Program Issued by: Jeff Campbell Date Effective: November 2010 Date Revised: April 2014 General Policy Ohio University Lockout/Tagout Policy
www.klmtechgroup.com TABLE OF CONTENT
Page : 1 of 10 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia PIPING FLEXIBILITY ANALYSIS TABLE
Air Conditioner Water Heater - A Product of HotSpot Energy LLC
Air Conditioner Water Heater - A Product of HotSpot Energy LLC PLEASE READ THIS BEFORE YOU INSTALL THE UNIT 1. This air conditioner must be installed and/or repaired by a qualified technician. If you perform
The following definitions apply with regard to requirements specified in this document:
GUIDELINES FOR INSTALLATION OF TEMPORARY AND PERMANENT ABOVEGROUND DIESEL FUEL TANKS FOR EMERGENCY AND STANDBY POWER SYSTEMS LOCATED OUTSIDE OF BUILDINGS For Use by Unidocs Member Agencies or where approved
PC1131 Electric Air Compressor
Senco Products Inc. 8485 Broadwell Road Cincinnati, Ohio 45244 PC1131 Electric Air Compressor Operating Instructions 2006 by Senco Products, Inc. Warnings for the safe use of this tool are included in
Installation and Operating Instructions Installation Instructions for SS EPE-316L Series
INSTR3010 0406 Installation and Operating Instructions Installation Instructions for SS EPE-316L Series Congratulations on your purchase of this Aqua-Pure high flow, single housing filtration system. This
CONFINED SPACE ENTRY NON-MARINE FACILITES
CONFINED SPACE SAFETY CONFINED SPACE ENTRY NON-MARINE FACILITES EM-385 Chapter 34 CONFINED SPACE ENTRY NON- MARINE FACILITIES UFGS 013526 OSHA 29 CFR 1910.146 A space that: What is a Confined Space? Is
Steam System Best Practices Condensate System Piping
Steam System Best Practices Condensate System Piping Summary The best method for improving steam system energy efficiency, reducing chemical costs, and reducing make-up water costs is to return the maximum
Select the Right Relief Valve - Part 1 Saeid Rahimi
Select the Right Relief Valve - Part 1 Saeid Rahimi 8-Apr-01 Introduction Selecting a proper type of relief valve is an essential part of an overpressure protection system design. The selection process
LNG Fuel Tank System LNG Tank overview
Index 1. LNG Tank Overview 2. 3. Gas Flow Diagram 4. Tank Operation 5. 6. Maintenance Boil off line Slave tank Master tank manual gas line vacuum control manual liquid line Check nonreturn filling line
BLADDER SURGE CONTROL SYSTEM
PART I GENERAL 1.01 Description BLADDER SURGE CONTROL SYSTEM This specification describes the requirements for a Bladder Surge Control System. The purpose of the system is to minimize transient pressures
BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap
1263050/6 IM-P126-07 ST Issue 6 BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation
Investigation report. Leakage testing of coal seam gas wells in the Tara rural residential estates vicinity
Department of Employment, Economic Development and Innovation Investigation report Leakage testing of coal seam gas wells in the Tara rural residential estates vicinity The State of Queensland, Department
Float and Thermostatic Traps Series H, C and X
Hoffman Specialty Installation & Maintenance Instructions HS-(E) and Thermostatic Traps Series H, C and X Series C & NPT Series C NPT Series X NPT Series C NPT Series H Ratings Maximum Max. Operating NPT
This page left intentionally blank
1 This page left intentionally blank 2 STATE OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF UNDERGROUND STORAGE TANKS TECHNICAL CHAPTER 4.2 SPILL AND OVERFILL PREVENTION EFFECTIVE
FLANGED END BALL VALVE
Specification: FLANGED END BALL VALVE - Chem Oil s two-piece ball valve has been designed to handle extreme service applications with unsurpassed reliability. Valve body machined from solid wrought material
BERMAD Fire Protection
400E-2M/700E-2M IOM Bermad Electrically Controlled Deluge Valve with EasyLock Manual Reset Model: 400E-2M/700E-2M INSTALLATION OPERATION MAINTENANCE Application Engineering BERMAD 400E-2M/700E-2M Bermad
PC1130 Electric Air Compressor
Senco Products Inc. 8485 Broadwell Road Cincinnati, Ohio 45244 PC1130 Electric Air Compressor Operating Instructions 2006 by Senco Products, Inc. Warnings for the safe use of this tool are included in
NCCER 13614 Progress Blvd., Alachua, FL 32615 Tel: (888) 622-3720 E-mail: [email protected]. Task Number Item Date(s) Recorded By
NCCER 13614 Progress Blvd., Alachua, FL 32615 Tel: (888) 622-3720 E-mail: [email protected] PIPELINE MAINTENANCE On-the-Job Training Level One MODULE 66101-02 INTRODUCTION TO THE PIPELINE INDUSTRY This is
ASME/ANSI B16.1-1998 - Cast Iron Pipe Flanges and Flanged Fittings ASME/ANSI B16.3-1998 - Malleable Iron Threaded Fittings ASME/ANSI B16.
ASME/ANSI B16.1-1998 - Cast Iron Pipe Flanges and Flanged Fittings ASME/ANSI B16.3-1998 - Malleable Iron Threaded Fittings ASME/ANSI B16.4-1998 - Cast Iron Threaded Fittings ASME/ANSI B16.5-1996 - Pipe
Occupational Health Program Safety Training Series. Lockout/Tagout Safety Awareness Training
Occupational Health Program Safety Training Series Lockout/Tagout Safety Awareness Training 1 Lock out/tag out Lock out: the placement of a lockout device (lock) on an energy isolating device in accordance
OPERATING and MAINTENANCE MANUAL SERIES 2700A CONTROL VALVE CONTENTS. INTRODUCTION...1 Scope...1 Description...1 Valve Identification...
OPERATING and MAINTENANCE MANUAL SERIES 2700A CONTROL VALVE CONTENTS INTRODUCTION...1 Scope...1 Description...1 Valve Identification...2 1.0 VALVE INSTALLATION...2 2.0 VALVE MAINTENANCE...3 Actuator Disassembly...3
Highlights of Colorado s New Oil and Gas Hydrocarbon Emission Reduction Rules - Adopted February 2014
Highlights of Colorado s New Oil and Gas Hydrocarbon - Adopted February 2014 Presentation to the Colorado Counties, Inc. June 3, 2014 Mike Silverstein Colorado Department of Public Health and Environment
240-3118 AIR CUT OFF KIT INSTALLATION INSTRUCTIONS
OPERATION MANUAL GLOBAL ELECTRONIC MIX SOLUTIONS PLURAL COMPONT MIXING SYSTEM 240-3118 AIR CUT OFF KIT INSTALLATION INSTRUCTIONS 77-3087-R1.0 (8/2015) 1 / 5 In this part sheet, the words WARNING, CAUTION
Spill Containment Device and Containment Sump Testing Protocols. Introduction
Department of Natural Resources and Environmental Control Tank Management Branch 391 Lukens Drive New Castle, DE 19720 (302) 395-2500 (Phone) (302) 395-2555 (Fax) http://www.dnrec.state.de.us/dnrec2000/divisions/awm/ust
LEAKAGE ACCEPTANCE RATES COMPARISON METAL & SOFT SEATED VALVES API 598/API 6D/MSS SP-61/FCI 70-2
ADELAIDE BRISBANE PERTH LEAKAGE ACCEPTANCE RATES COMPARISON METAL & SOFT SEATED VALVES API 598/API 6D/MSS SP61/FCI TESTING & LEAKAGE RATES OVERVIEW From an engineering point of view, almost all valves
AMX300 DirectConnect Mixing Valve Kits
AMX300 DirectConnect Mixing Valve Kits INSTALLATION INSTRUCTIONS Tools needed (not supplied) 1. Wrench 2. Pliers Safety Definitions These safety terms identify information you must read. CAUTION Indicates
I-768 FireLock NXT Dry Valve
HANG THESE INSTRUCTIONS ON THE INSTALLED VALVE FOR EASY FUTURE REFERENCE WARNING WARNING Failure to follow instructions and warnings can cause product failure, resulting in serious personal injury and
CTV-1500 Cooling Tower Vacuum Operating & Maintenance Manual
CTV-1500 Cooling Tower Vacuum Operating & Maintenance Manual Goodway Technologies Corporation 420 West Avenue Stamford, CT 06902-6384 (203)359-4708 Sales: 1-800-333-7467 Customer Service: 1-800-370-2855
CARING FOR YOUR WATER HEATER
http://waterheatertimer.org/troubleshoot-rheem-tankless-water-heater.html Water Heater Inspections CARING FOR YOUR WATER HEATER Venting System (Direct Vent Only) The venting system should be inspected
BERMAD Fire Protection
Model: 400E-2M BERMAD Electrically Controlled Deluge Valve with Easy Lock Manual Reset Installation Operation Maintenance Safety First BERMAD believes that the safety of personnel working with and around
Air Eliminators and Combination Air Eliminators Strainers
Description Air Eliminators and Combination Air Eliminator Strainers are designed to provide separation, elimination and prevention of air in piping systems for a variety of installations and conditions.
Recommended Fuel Piping Specification For UPP Piping, UL-971
Recommended Fuel Piping Specification For UPP Piping, UL-971 1.0 General The primary delivery piping system shall be for suction or pressure applications and have semi-rigid coaxial type double wall construction,
Failure to comply with the following cautions and warnings could cause equipment damage and personal injury.
1.0 IMPORTANT RECEIVING INSTRUCTIONS Visually inspect all components for shipping damage. Shipping Damage is not covered by warranty. If shipping damage is found, notify carrier at once. The carrier is
FIBERGLASS UNDERGROUND STORAGE TANKS Special Installation Instructions for New York City Gasoline and Diesel Motor Fuels
INTRODUCTION The purpose of this manual is to provide speci c, detailed supplemental instruction regarding the installation of special Fiberglass Double-Wall Underground Storage Tanks (including compartment
Flushing and Cleaning the A/C System
Flushing and Cleaning the A/C System Once an AC system has been contaminated or has suffered a failure, the most important part of the AC service to restore the cooling performance to the system = FLUSHING
Safety and Health Resource Manual. Sample Permit-Required Confined Space Written Program
Sample Permit-Required Confined Space Written Program Purpose The purpose of this document is to communicate Employer s compliance with MIOSHA s requirements for a permit-required confined space entry
2010 Residential Water Heater Replacement Check List
2010 Residential Water Heater Replacement Check List The intent of this check list is to provide installers a general reference for the enforcement of code requirements in the Greater San Diego Area. This
JB ENGINEERING AND CODE CONSULTING, P.C. 1661 Cardinal Drive Munster, IN 46321 Phone: 219-922-6171 Fax: 219-922-6172 E-Mail: JBEngineer@aol.
JB ENGINEERING AND CODE CONSULTING, P.C. 1661 Cardinal Drive Munster, IN 46321 Phone: 219-922-6171 Fax: 219-922-6172 E-Mail: [email protected] JULIUS A. BALLANCO, P.E. President July 9, 2010 - Engineering
SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes)
SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) Maintenance Office Administrative Office Billing Office 530-426-7802 530-426-7800 916-332-4872
Many Products...One Source
PRESSURE GAUGES Dedicated Sales Rep for Your Area 97%Fill Rate Shipping within 24 Hours State of the Art Warehouse System Technical Support Quality Control Program 25 Whaley Avenue Milverton, Ontario N0K
ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR 1910.147 THE CONTROL OF HAZARDOUS ENERGY (LOCKOUT / TAGOUT) SECTION: 2400
OSHA REGULATION: 29 CFR 90.7 THE CONTROL OF HAZARDOUS ENERGY (LOCKOUT / TAGOUT) DATE: 0/5/2008 DATE: /2/202 A. POLICY. This procedure follows requirements set forth in 29 CFR 90.7. 2. It is the policy
TEMPORARY EMPLOYEES SAFETY PROCEDURES
TEMPORARY EMPLOYEES SAFETY PROCEDURES Temporary Agencies will ensure that any temporary employee sent to work at Modern will have received and understand the General Safety Rules. GENERAL SAFETY RULES
SANITARY SEWER SPECIFICATIONS
SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,
A Job Safety Execution Plan is required. mixtures of the above called, natural gas liquids (NGL's) refined products and their components
TITLE Pipelines and Terminals Manual/Volume 3 - SECTION 02: SUBJECT 20: PURPOSE AND SCOPE During the normal lifetime of a pipeline it becomes necessary to add or remove piping, modify existing piping or
VC Series Zone Valves BALANCED 2-WAY AND 3-WAY HYDRONIC VALVES
VC Series Zone Valves BALANCED 2-WAY AND 3-WAY HYDRONIC VALVES PRODUCT DATA Design VC Series zone valves consist of: 2-way or 3-way valve housing available with various connection ends Spindle and cartridge
Confined Space Entry Policy
University of Illinois at Urbana-Champaign Facilities & Services Division of Safety and Compliance Confined Space Entry Policy Reviewed November 2012 UNIVERSITY OF ILLINOIS AT URBANA-CHAMPAIGN CONFINED
A Safe Workplace A Workplace Safety and Health Manual for Your Community Section: III-C Subject: G-9
Page 1 of 7 The following procedure provides the requirements for. Refer to part 15 Confined Spaces, part 6 Personal Protective Equipment, part 14 Fall Protection, of The Manitoba Workplace Safety and
Section 20 TABLE OF CONTENTS Pressurized Equipment and Systems. 20.A General... 20-1. 20.B Compressed Air and Gas Systems... 20-4
Section 20 TABLE OF CONTENTS Pressurized Equipment and Systems Section: Page 20.A General... 20-1 20.B Compressed Air and Gas Systems... 20-4 20.C Boilers and Systems... 20-7 20.D Compressed Gas Cylinders...
Portable Pipelines for First Responders. Chris Christopoulos, Jr.
Portable Pipelines for First Responders Introduction Recently the Northeastern United States has begun to see an increase in the demands and use of Natural Gas in lieu of other fossil fuels, e.g. propane
DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES
SECTION 15062 STEAM AND CONDENSATE PIPING PART 1 DESIGN DIRECTIVES 1.1 QUALITY ASSURANCE A. Comply with the provisions of the following: 1.2 DESIGN CRITERIA 1. ASME B 31.9 Building Services Piping : for
Quik Lining Systems Heater Owners Guide
Quik Lining Systems Heater Owners Guide Quik Lining Systems, Inc is pleased to present the Quik Heater, an innovative heater used to cure cured in place pipe for sewer laterals. The unit is the most cost
TRAINING AND EQUIPMENT MANUAL HOSE PRACTICES EFFECTIVE: OCTOBER 2007
TRAINING AND EQUIPMENT MANUAL HOSE PRACTICES 301.010 ANNUAL SERVICE TEST FOR FIRE HOSE EFFECTIVE: OCTOBER 2007 The Department will test all fire hose annually. The testing of fire hose determines its serviceability.
TECHNICAL DATA. Dry 122a. November 12, 2013
Dry 122a 1. PRODUCT DESCRIPTION The Viking is a quick-opening device. When installed with the required external Anti-flood Device, the assembly is designed to increase the operating speed of Viking Model
Model: 400E-2M. Bermad Electrically Controlled Deluge Valve with Easy Lock Manual Reset. Installation Operation Maintenance. Application Engineering
Model: 400E-2M Bermad Electrically Controlled Deluge Valve with Easy Lock Manual Reset Installation Operation Maintenance Application Engineering BERMAD 1. Safety First BERMAD believes that the safety
BODY OF KNOWLEDGE API-653 ABOVEGROUND STORAGE TANK INSPECTOR CERTIFICATION EXAMINATION November 2015, March 2016 and July 2016 (Replaces October 2013)
BODY OF KNOWLEDGE API-653 ABOVEGROUND STORAGE TANK INSPECTOR CERTIFICATION EXAMINATION November 2015, March 2016 and July 2016 (Replaces October 2013) API Authorized Aboveground Storage Tank Inspectors
High kw Electric Tankless Water Heater Troubleshooting Guide
Technical Service Bulletin High kw Electric Tankless Water Heater Troubleshooting Guide Models: WH17, WH27, WH36 AE115, AE125, (FD108 and higher) DANGER: ELECTRIC SHOCK ELECTRICITY IS EXTREMELY DANGEROUS.
Voltmaster Trash Pumps Model TSP2, TSP3 and TSP4
Model TSP2, TSP3 and TSP4 Owner s Manual July 2010 Table of Contents 1 Introduction...................................................... 1 1.1 Read before using..............................................
COMPRESSED GASES. 1.2 The contents of each cylinder and container must be clearly identified (by tag or stamp) on the cylinder.
Page 1 of 5 COMPRESSED GASES A compressed gas is defined as any mixture of gases in a container with a pressure exceeding 40 psi. at 70 o F, or 104 psi. at 130 o F; or any flammable liquid with an absolute
Control of Hazardous Energy Equipment-Specific Lockout/Tagout Procedure (ELP) Template Instructions
Control of Hazardous Energy Equipment-Specific Lockout/Tagout Procedure (ELP) Template Instructions Note Only one ELP is required for identical equipment set up in an identical configuration. The template
Emergency Plan. This emergency plan provides a format of data essential in an emergency situation.
Emergency Plan A. Introduction This emergency plan provides a format of data essential in an emergency situation. B. Definition of Emergency Incident An emergency condition exists when we determine that
Sewer Jetter GuideSM. How to Unclog Drains with Your Pressure Washer. Use this Guide To:
Sewer Jetter GuideSM How to Unclog Drains with Your Pressure Washer Use this Guide To: Learn how a sewer jetter works Find out if a sewer jetter can help solve your plumbing problem Choose the right pressure
PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta
PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification Number: 3503-11.2.610 Rev. 2 Rubber Lined Steel Pipe and Fittings Mechanically Coupled Plain End Type System Issued Revised Approved
Portable Pipelines for First Responders
Bulk Transportation of Compressed Natural Gas Chris Christopoulos, Jr., Fire Chief Lebanon Fire Department Lebanon, NH Portable Pipelines.com Slide 1 Portable Pipeline Sometimes called a Virtual Pipeline,
STANDARD OPERATING PROCEDURE EMERGENCY EYEWASH AND SHOWER EQUIPMENT
STANDARD OPERATING PROCEDURE EMERGENCY EYEWASH AND SHOWER EQUIPMENT 1.0 PURPOSE 2.0 SCOPE 2.1 PLUMBED EYEWASH UNIT 2.2 EMEMERGENCY SHOWER 3.0 DEFINITIONS 4.0 RESPONSIBILITIES 4.1 OFFICE OF ENVIRONEMNTAL
Design Requirements for Eyewash and Safety Shower Units APPLICATION: Detailed Installation, Operation and Design. Eyewash Stations.
APPLICATION: Eyewash Stations must be provided in the following areas. Laboratories Plumbed emergency eyewash equipment shall be installed in every lab or room, where an MSDS for the materials used specifies
WORKING IN CONFINED SPACES GUIDELINES
WORKING IN CONFINED SPACES GUIDELINES Contents 1 Introduction... 2 2 Scope... 2 3 Definitions... 2 4 Responsibilities... 3 4.1 Permit Authoriser... 3 4.2 Permit Receiver... 3 4.3 Responsible UOW Officer...
Installation Manual DIAPHRAGM WELL TANK
Installation Manual DIAPHRAGM WELL TANK Safety Instructions Installation Warranty IN-LINE SERIES: 2-5 & 7 GALLON HORIZONTAL SERIES: 7-14 & 20 GALLON VERTICAL SERIES: 14-20-32-36-52-86-96-119 GALLON KEEP
Title: Aircraft Parking
Environmental Standard Operating Procedure Originating Office: Revision: Prepared By: Approved By: MCAS Miramar Environmental Original Environmental Management Department William Moog Management Department
Oil and Gas Pipeline Design, Maintenance and Repair
Oil and Gas Pipeline Design, Maintenance and Repair Dr. Abdel-Alim Hashem Professor of Petroleum Engineering Mining, Petroleum & Metallurgical Eng. Dept. Faculty of Engineering Cairo University [email protected]