SUBSTATION SAMPLE PHOTOS HANDBOOK

Similar documents
GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS

Buildings Construction Procurement Strategy

ITS specification Jointing chambers and pull pits (ITS-02-02)

SECTION GROUND WATER STORAGE TANKS

Mechanical arms, belts and sheets

Table of Contents. IV. Interior Doors. 1. Product Training 2. Bilco Quote/Order Checklist

Lift and Escalator Installations

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

Product Catalogue (updated Feb. 2010)

Reduced depth High Density Cabinet HDC with 19 swing frame 36, 40 and 45 U

Summary of Preliminary Assessment on Structural, Fire and Electrical Safety

-1- SPECIFICATIONS CONE SETTER PLATFORM ATTACHMENT INDEX

Cable Trays Technical Instructions & Specifications

SWIMMING POOL, SPA, & HOT TUB GUIDELINES

DIAMOND Retractable Rodding Robot Model SPRAYROD-R

How to secure your property after a disaster

Welcome: What is U Drain? Drain Materials. Flow

Type 1, 3, & 3R Enclosures

CABLE TRENCH INSTALLATION GUIDE

CODE OF PRACTICE 101 FOR DISTRIBUTION SUBSTATION DESIGN. Version 11.0

Guide to working on Public Sewers

Installation Instructions

Specification Number: MV Substation Buildings

Emergency Voice Communication Systems EVCS Network 8 Data Sheet

PivotLoc Ladder Systems

If stepping is required, step at 180mm as seen in this picture.

SECTION PIPE HANGERS AND SUPPORTS

MUNICODE SERVICES LTD.

Networking Cabinets > Part No Capacity Available Colors Height(mm) Width(mm) Depth(mm)

AMERICAN GOTHIC PLAYHOUSE

Machine Foundation Design

Braselton Bros. Store Redevelopment 5134 HWY 53 BRASELTON, GA LEVEL 0 - DEMO & NEW PLAN. Room. Room. Room. Room. Room. Room. Room. Room.

STANDARD SPECIFICATIONS SECTION METAL FABRICATIONS

Rack Cabinets. Rack Configuration. 19 inch

Installation Guide. Bath and Wall Surrounds SERIES B

BUILDINGA 1/10 SCALE FLATBED TRAILER

LOADING DOCK EQUIPMENT. A. Section Concrete Forms and Accessories: Placement of anchors into concrete.

Slavic Village Building Condition Review

Proposed A&A work at E-Commerce Air-Hub at SATS Airfreight Terminal 1 (AFT1)

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

BOQ for Plumbing, Sanitary Works

EARTHING AND BONDING AT SECONDARY SUBSTATIONS

GATES, CATTLEGUARDS and PASSAGEWAYS. This factsheet looks at various options for allowing passage through fences for livestock, wildlife and people.

PROLINE Go l d Se r i e s. Desk Consoles and Accessories

AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding

(This report is endorsed) Industrivej 20, 9900 Frederikshavn, Danmark

plumbing products guide

COMPANY ESTIMATOR BID DAY PHONE NO.

Go-kart for little race-drivers

CDGRD-10. Grounding. Solutions For Comm/Data Applications

James M. Pleasants Company

NEGRP TEST SUMMARY. Joseph A. Lanzoni, November 2005

Standard Door Specification

Crime Prevention through Environmental Design (CPTED) - Checklist

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.

Installing Window and Door Mouldings

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT

TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS. standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

Rittal s Comprehensive Family Of... NETWORK RACK SOLUTIONS

PUBLIC VERTICAL PLATFORM LIFT PLANNING GUIDE

PC INTERFACE MODULES FOR TOLL-PLAZA CLASSIFICATION SENSORS

WASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST

Uncovered Decks & Porches

Linear Luminaire for Fluorescent Lamps Series EXLUX 6001

Information Technology Solutions. Feeder Pillars

LONDON BOROUGH OF HACKNEY BUILDING SERVICES ENGINEER REPORT GAS HOUSE, SPRINGFIELD PARK, HACKNEY

LIEBERT VNSA Installation Sheet

PUBLIC RESTROOMS, DESIGN INTENT

REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING

PART 1 GENERAL 1.1 SECTION INCLUDES

AMS 120. EFT Guest Card Terminal & Refund unit

CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION

GPD Rubber Press Seals

Reticulation sewers in basements Technical guidelines

SUPER SHED. Indoor shelter for your outdoor tools.

ARTS AND CRAFTS (open) 5412 (doors) H : 84" Tote Tray Storage. Damp Storage. Tote Tray Storage. Notebook Board Storage, Doors

Cold Room & Refrigeration System (Casserole Assembly) No of units: 1

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

SECTION CABLE TRAYS. A. Continuous, rigid, welded steel or stainless steel wire mesh cable management system.

Seismic Retrofitting for School Buildings in Japan Nonstructual Seismic Retrofitting

Integral Kit Instructions

CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS

HARDWARE LOCATIONS FOR HOLLOW METAL DOORS AND FRAMES

SECTION FREIGHT & PARKING GARAGE ELEVATORS PART I - GENERAL

Does Wall Township require an inspection by the building department on resale of a home?

Linkeo 19" freestanding cabinets

39HQ Airovision Air Handling Units

GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS PHILLIP STREET, SYDNEY

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

GUARDIAN REFUGE & EMERGENCY VOICE COMMUNICATION SYSTEMS

OVERALL CONVEYOR WIDTH STEEL ALUMINUM MODEL # PER FT. 10 FT. 5 FT. PER FT. 10 FT. 5 FT. PER FT. 10 FT. 5 FT. PER FT. 10 FT. 5 FT.

SECTION CHAIN LINK FENCES AND GATES

BERTHOLD ELECTRIC GENERATOR CONNECTION CABINET

SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete

All Weather Hall. Efficient, multipurpose & quick to build

Table of Contents. I. Roof Scuttles

Transcription:

SUBSTATION SAMPLE PHOTOS HANDBOOK Version: May 2015

Table of Content 1.0 Switchgear Room Removable Stainless Steel Hand Railings..3 Switchgear Louvred Door 5 HT Openings & Floor Frame...12 Opening for Marshaling Box, Pilot Box & Battery Charger.15 Equipment Dimension...16 LT Openings...17 DB Box 19 Trap Door...20 Lightings.24 Isolator 25 2.0 Cable Basement Cable Basement Door 26 Red Luminous Paint..27 Cable Ramp And Entry Pipes...29 3.0 Transformer Room Transformer Room Door...31 Transformer Plinth 32 4.0 Substation w/o cable basement.34 5.0 Temporary Substation...35 6.0 Earthing for s/s Lighting...40

7.0 Fencing 41 8.0 Draw Pit..42 9.0 Substation Main Gate 44 Butterfly Lock.44 10.0 Others 10.1 Signage 46 10.2 MCT 47 10.3 Cable Lugs..48 10.4 Hot Gland...51 11.0 Arrangement of single core cable..52 12.0 Backfill of sand at trench (for substation w/o cable basement) 53 13.0 Things to include in Handover Letter..54

Removable Stainless Steel Hand Railings Reference: Appendix 11, Railings Switchgear Room 100mm

Reference: Appendix 11, Railings SP POWERGRID LTD

Switchgear Louvred Door Reference: Appendix 12, Switchgear Louvred Door 50mm

Hasp & Staple Reference: Appendix 12 55mm 150mm 65mm 40mm 20mm 18mm 55mm 15mm

Reference: Appendix 12, Switchgear & Cable Chamber Exit Door 30mm Shoot bolt housing

Reference: Appendix 12, Switchgear Louvred Door 1m

Reference: Appendix 12, Switchgear & Cable Chamber Exit Door All doors must latched at the internal floor level Use Spacer if required

Reference: Appendix 12, Switchgear & Transformer Louvred Door All doors to be fitted with good quality door hook and must be able to open fully.

HT Openings & Floor Frame Screed the floor 5mm below the floor frame, after the floor frame had been fixed

600mm x 150mm checker plate / metal grating Checker Plate (Back View)

30mm gap Grating width must not more than 300mm

Opening for Marshaling Box, Pilot Box & Battery Charger Reference: Appendix 11, Floor Plan IDS RTU Marshalling Tools & Key Cabinet Battery Charger Pilot Box Box

Equipment Dimension Item DIMENSION (L X B X H)mm BATTERY CHARGER 960 x 390 x 1300 RTU 600 x 300 x 600 MARSHALLING BOX 790 x 300 x 1300 PILOT BOX 800 x 250 x 1300 IDS 390 x 240 x 500 TOOLS & KEY CABINET 800 x 360 x 1110

LT Openings To provide (2x25mm2)+16mm2 cu cable with 1m of flexi hose and hot gland from DB box to right side of the LT opening. LT Board 2200mm x 600mm x 1850mm

Distribution Box Reference: Appendix 15, Electrical Installation Single Line Diagram Must be endorsed by LEW All MCB must be Label

Trap Door Reference: Appendix 11, Aluminum Trap Door & Cat Ladder 860mm x 860mm Alum Trap Door 760mm x 760mm opening 250mm

Reference: Appendix 11, Aluminum Trap Door & Cat Ladder 1500mm 375mm

Reference: Appendix 11, Aluminum Trap Door & Cat Ladder Non slip type 200mm

300mm 200mm

Lightings Reference: Appendix 15, Electrical Installation Wall Lighting 2.4m Ceiling Lighting 3m

Isolator Isolator 1.5m

Cable Basement Cable Basement Door Reference: Appendix 12, Switchgear & Cable Chamber Exit Door 5 x 12mm Steel Bolts Shoot Bolt Housing 30mm

Red Luminous Paint Reference: Appendix 15, Cable Chamber Basement To paint front and back of all beam with 50mm Red Luminous Paint

Cable Ramp & Entry Pipes Reference: Appendix 11, Cable Ramp & Entry Pipes All entry pipes must be smoothed and flush to the wall 200mm Less or equal to 30 degrees 150mm

For Earthing Cable 200mm

Transformer Room Door Reference: Appendix 12, Transformer Room Louvred Door with Hasp & Staple 2x50mm

Transformer Plinth Appendix 11, Layout Plan 75mm x 25mm Deep Grove

Angled-iron to be solidly welded across the trench All cable trenches to be covered by removable hot-dipped galvanized mild steel gratings Angled-iron to be solidly welded across the trench

Substation w/o cable basement SP POWERGRID LTD

Temporary Substation SP POWERGRID LTD

LT Opening (OGB) 200mm

5-WAY OGB 830 X 320 X 1300

Trap Door SP POWERGRID LTD

Earthing for s/s Lighting To DB Box From Earth Pit

Fencing Reference: Appendix 15, Fencing (where required) 600mm wide concrete apron to surround the fence externally

Draw Pit SP POWERGRID LTD

Substation Main Gate Reference: Appendix 13, Gate Details

Butterfly Lock Reference: Appendix 13, Gate Details

Signage SP POWERGRID LTD

MCT SP POWERGRID LTD

Cable Lugs 1000mm2 4 holes cable lugs

500mm2 2 holes cable lugs

500mm2 1 holes cable lugs

Hot Gland SP POWERGRID LTD

Arrangement of 2 2 500mm or 1000mm Cu single core cables 2 2 Arrangement of 500mm or 1000mm Cu single core cables is carried out as shown below so that the current in each phase is evenly distributed between the cables for that phase. Arrangement 1 L3 L2 L1 N L1 L2 L3 Width For S/C 2 500mm - 280mm Width For S/C 2 1000mm - 380mm Arrangement 2 L3 L3 L2 L1 N L1 L2 Width For S/C 2 500mm - 200mm Width For S/C 2 1000mm - 280mm

Things to include in Handing Over letter **All the 7 item below need to be done by the main contractor after the substation work had been completed 1) Seal all cable entry pipes. 2) Backfill all trench with wash dry sand 3) Apply thin layer of cement 4) Touch-up paint work 5) Cover all excess opening with checker plate or grating 6) Any other minor defect work 7) 24/7 security access For handover of substation, kindly liaise with the Project Officer of the respective section using Appendix 5 form extracted from the How to Apply for Electricity Connection handbook.