SCHEDULE FOR PRICE BID (1) BASIS = TURNKEY

Similar documents
UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION

Schedule of Quantities

DESCRIPTION UNIT QTY RATE TOTAL (KSHS) Supply and install the following: -

TECHNICAL SPECIFICATION FOR ELECTRICAL WIRING / PANELS / SWITCH GEAR

TS 813 GROUNDING AND BONDING TTD TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD CONTROLLER CABINET GROUNDING

BOQ FOR ELECTRICAL WORK OF HLST IN GROUND FLOOR AT S.B.I. LHO BHOPAL.

TECHNICAL SPECIFICATION FOR HIGH TENSION LINE HARDWARE AND ACCESSORIES FOR ACSR PANTHER & WOLF CONDUCTOR

BOQ for Plumbing, Sanitary Works

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT

Parts Manual. TWIN 2 & 3 Parts & Accessories F210846R01. Your efficiency is our Challenge!

Requirements for the Attachment of Communication Cable Facilities on PPL Poles

TECHNICAL SPECIFICATION FOR HIGH MAST LIGHTING SYSTEM, 20 MTRS HEIGHT

Schedule-4(A3) Page 1 of 5. Specification No.: JPL/KWTL/A3 (Package-A3) To: Bidder's Name & Address

OEM Manual MODEL 2350 ELECTRONIC DUAL CYLINDER SCALE

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

STATE BANK OF INDIA.

SPECIFICATIONS FOR TENDER NO: PSNR/SCP/VKS/E 1635 ANNEXURE I TECHNICAL SPECIFICATIONS FOR LIGHTING HIGH MAST

Please check with your local inspection authority for any additional requirements before installation.

E S T I M A T E TENDER FOR ELECTRICAL & DATA CABLING WORK FOR BANK OF INDIA, KALAWAD ROAD BRANCH(GROUND FLOOR)-RAJKOT CITY

UGVCL/SP/591/11KV HT AB CABLE

ANTENNA PARTS CATALOG

PRIMARY SERVICE LINE: The Company's conductors which connect the supply line with a transformer located on private property.

Mechanical arms, belts and sheets

SUBHEAD-I: POINT WIRING & SUBMAIN WIRING. Ru-Tech Services Inc. Page-1 Electrical BOQ.xls

Installation Instructions

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables

Cable Installation Accessories. Cable Hoisting and Attachment. Snap-In Hangers. SnapStak Hangers

CABLE INSTALLATION SYSTEMS

Hyperlinks are Inactive

A product made in Australia. Insulated Conductor Rail ACTIV-8 PLUS

NORTH ORANGE COUNTY COMMUNITY COLLEGE DISTRICT SECTION GROUNDING AND BONDING FOR COMMUNICATION SYSTEMS

STANDARD OPEN PATIO COVER

CODE OF PRACTICE FOR EARTHING AND BONDING SYSTEM FOR SIGNALLING EQUIPMENTS SPECIFICATION NO. RDSO/SPN/197/2008 SIGNAL DIRECTORATE

TECHNICAL SPECIFICATIONS

ScottishPower Distribution Cables & Equipment. Metal Theft

ACTIV-8 PLUS Insulated Conductor Bar

SECTION 22 LIGHTNING PROTECTION SYSTEM

Section M POWER LIFTS

EM REMOVE NO. 2 MANIFOLD STAY (a) Remove the bolt, nut and stay.

BILL OF QUANTITY FOR THE WORK OF "REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP"

TECHNICAL SPECIFICATIONS & TERMS AND CONDITIONS FOR SOLAR WATER HEATER (FPC/ETC)

Preamble To Schedule A

FIJI COMMERCE COMMISSION

Installation Instructions For Slider Casement Air Conditioners

OUTDOOR DISCONNECTORS A division of ACTOM (Pty) Ltd

NATIONAL COIR RESEARCH AND MANAGEMENT INSTITUTE (NCRMI) KUDAPPANAKUNNU.P.O, THIRUVANANTHAPURAM NOTICE INVITING LIMITED QUOTATION

REAR SHOCK ABSORBER WITH COIL SPRING

About our Chairman cum- Managing Director

LIEBERT VNSA Installation Sheet

Tender schedule. Rate in

ELECTRICAL WORKS FOR CPCB ZONAL OFFICE AND LABORATORY AT BANGALORE. Consultants: SRIMATHA ENTERPRISES

I BEAM TRACK INSTALLATION

Ceiling Mounted Folding Attic Ladders Installation Instructions

electrics P OW E R E N T RY B A S I C S P OW E R & C O M M U N I C AT I O N S B A S I C S P OW E R D I S T R I B U T I O N B A S I C S

**ATTENTION** WE DO NOT PROMOTE OR ENCOURAGE YOU TO DO YOUR OWN ELECTRICAL WIRING!!! IT IS BY FAR THE MOST DANGEROUS THING YOU CAN ATTEMPT

Universal Vehicle Power Supply 9007AX01. Installation Instructions

Installation information. METTLER TOLEDO MultiRange DW150 / DW150T wall scale

DEHN + SÖHNE. DEHNconductor System No Problems with Proximities

Premium Nixalite All Stainless Steel Bird Barrier Spikes Includes specifications for: Premium Nixalite Models S, H and W and Mounting Hardware.

TYPICAL WIRING OF METER SOCKET FOR SINGLE PHASE, THREE WIRE OVERHEAD SERVICE

APDRP SCHEME, WESCO. Technical Specification for 33KV lines ( New & Up-rating ) PART 1: SCOPE AND CONDITIONS

3M Mobile SkyWalk Series Horizontal Lifeline Product Return Form

How To Fit A Portman Door Leaf

Terminal Boxes Series 8146

Project : CONSTRUCTION OF BUILDING(including electrical and plumbing works) FOR NATIONAL CENTRE FOR SUSTAINABLE COASTAL MANAGEMENT,CHENNAI

OVR-3SP Recloser with PCD Control Style Guide 1VAL SG March 30, 2009 Revision B

XL PREMIUM OIL COOLER KIT

Chapter 10 - Scaffolding Systems

1. SAFETY RULES. 8. Avoid placing objects in the path of the blades.

BUILDING INSTRUCTIONS

Residential Deck Safety, Construction, and Repair

1. SAFETY RULES WARNING TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK OR PERSONAL INJURY, MOUNT FAN TO OUTLET BOX MARKED "ACCEPTABLE FOR FAN SUPPORT".

Underground Commercial Electric Service

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

Pelco manufactures a variety of sign brackets in rigid and free-swinging mounts for both flat and internally illuminated signs.

OVR Three-Phase Recloser and PCD Control Style Guide 1VAL SG October 13, 2009 Revision F

TECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.)

STANDARD SPECIFICATIONS SECTION METAL FABRICATIONS

AutoLink Three-Phase Sectionalizer Specifications. Scope. General. Applicable Standards. Operating principle

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

BILL OF QUANTITY FOR THE HVAC WORKS OF The Institute of space technology, near Toll Plaza (G.T. Road,) Islamabad

Awning Instructions. Full Cassette 1.5m to 6m

Financial Bid Format(All Inclusive)

ELECTRIC METERING COMMERCIAL & INDUSTRIAL

TC Grounding and Bonding for Telecommunications Systems

Multiple Meter Installation Amperes Per Position -Single Phase, Self-contained

400 Series - Mini USB Buccaneer

IRRIGATION PUMPING Table of Contents - Section 900

SQUARE TRUSS: 2' long square truss SUPPORT BARS:

BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE

CABINET OPTIONS AND DESIGNATORS

Cables, Cable Laying & Accessories Manual

INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION

DELHI METRO RAIL CORPORATION LIMITED. (A Joint Venture of Govt. of India & GNCTD) MASS RAPID TRANSPORT SYSTEM PHASE III. Contract: - CE -16 VOLUME-6

Linear Luminaire with LED Series EXLUX 6402/2

POLE MOUNT SYSTEM-3 INSTALLATION

Decorative Metal Wiring Accessories in Assorted Plate Finishes

TECHNICAL SPECIFICATION FOR 200, 315 & 630 KVA, 11/0.433 KV DRY-TYPE (VPI) DISTRIBUTION TRANSFORMERS (INDOOR AND OUTDOOR)

ILLUSTRATED PARTS LIST

Transcription:

Dear Sir, We here by furnish the detailed price of Supply, Errection & Inspection of the equipements & materials covered for "BGJY" Work in Kendrapara Block for the year 2010-2011 in Kendrapara District. Sl SCHEDULE FOR PRICE BID (1) BASIS = TURNKEY 1 Erection, Drawal & Commissioning of 11KV 2Phase 2Wire HT Lines with 34sqmm (7/2.5) AAA Conductor equivalent to Weasel conductor (span = 70 mtr.), complete work as per REC standard specification comprising of i) Erection, Drawal & Commissioning of AAAC 34 sq. mm (7/2.5) conductor including installation of insulators along with installation of hardware fittings & conductor accessories, jumpering arrangement at cut points & stringing of guard wire wherever required, supply & installation of PG clamp & connector, pin binding, complete of work in all respect as per IE Rule/ REC Span 3 ii) Erection, Drawal & Commissioning of 8mtr. Long / 200 kg. PSC Single Pole is to be excavated to size of 600 x 600mm upto a plantation depth 1/6 of height of the support, padding of pole of 1:4:8 PCC of thickness 150x600x600mm using black hard granite metal, fixing of V cross arm, pole top bracket, back clamp for V cross arm, extension arrangement with 100x50x6mm channel upto 2mt. wherever required, DP Channel & Clamp and DP Cross bracing & Clamp for DP Structure with strain insulators & accessories as required, coil earthing, anti climbing device with fasteners, danger plate, nuts, bolts & washers, preformed insulator bindings, cables/conductors and required hardware, complete in all respect as per IE Rule/ REC Specification & standard, inscribing in each pole BGJY and the year of electrification in white paint in the background of deep green paint with provision of 9mtr long PSC pole at cut-points. Erection, Drawal & Commissioning of HT Stay set with concreting ratio. 3 Set 1 Page 1

SCHEDULE FOR PRICE BID (2) BASIS = TURNKEY 2 Erection, Drawal & Commissioning of 11KV 3phase 3wire HT Lines with 34sqmm (7/2.5) AAA Conductor equivalent to Weasel conductor (span = 70 mtr.), complete work, comprising of i) Erection, Drawal & Commissioning of AAAC 34 sq. mm (7/2.5) conductor including installation of insulators along with installation of hardware fittings & conductor accessories, jumpering arrangement at cut points & stringing of guard wire wherever required, supply & installation of PG clamp & connector, pin binding, completion of work in all respect as per IE Rule/ REC Span 31 ii) Erection, Drawal & Commissioning of 8mtr. 200 kg PSC Single Pole is to be excavated to size of 600 x 600mm upto a plantation depth 1/6 of height of the support, padding of pole of 1:4:8 PCC of thickness 150x600x600mm using black hard granite metal, fixing of V cross arm, pole top bracket, back clamp for V cross arm, extension arrangement with 100x50x6mm channel upto 2mt. wherever required, DP Channel & Clamp and DP Cross bracing & Clamp for DP Structure with strain insulators & accessories as required, coil earthing, anti climbing device with fasteners, danger plate, nuts, bolts & washers, preformed insulator bindings, cables/conductors and required hardware, complete in all respect as per IE Rule/ REC Specification & standard, inscribing in each pole BGJY and the year of electrification in white paint in the background of deep green paint with provision of 9mtr long PSC pole at cut-points. Erection, Drawal & Commissioning of HT Stay set with concreting ratio. 31 Set 13 Page 2

SCHEDULE FOR PRICE BID (3) BASIS = TURNKEY 3 Construction of 16 KVA, 11/0.23KV, 1-Phase Distribution Substation complete comprising of i) Erection, Drawal & Commissioning of 16 KVA, 11/0.23KV, 1-Phase Distribution Transformer with all accessories such as 11 KV 2-pole AB switch, HG Fuse Unit, LA & LT Distribution box with MCCBs complete as per specification with 9mtr. Long / 300 kg. PSC Single Pole structure along with pole padding and concreting, transformer mounting bracket, Channel and angle for supporting HG Fuse unit, Channel for supporting AB Switch, anti climbing device with fasteners and belting support for transformer, danger plate, nuts, bolts & washers, preformed insulator binding and required hardware, 3 nos. of earthing arrangement with electrodes, proper size of cable for connection of transformer to LTDB & supply of all other sundry items complete in all respect with painting of all iron materials with red-oxide and aluminum paints as per IE Rule/ REC Specification & standard, inscribing in each pole and transformer BGJY and the year of electrification in white paint in the background of deep green paint. The neutral of the transformer should be earthed with 25x3mm G.I. flat.. 1 ii) Erection, Drawal & Commissioning of HT Stay set with concreting ratio Set 2 Page 3

SCHEDULE FOR PRICE BID (4) BASIS = TURNKEY 4 Construction of 25 KVA, 11/0.4KV (3 star rated), 3-Phase Distribution Sub-station complete comprising of i) Erection, Drawal & Commissioning of 25 KVA, 11/0.433KV, 3-Phase Distribution Transformer with all accessories such as 11 KV 3-pole AB switch, HG Fuse Unit, LA & LT Distribution box with MCCB complete as per specification with 9mtr. Long / 300 kg PSC Double Pole structure along with pole padding and concreting, transformer mounting bracket, Channel and angle for supporting HG Fuse unit, Channel for supporting AB Switch, anti climbing device with fasteners and belting support for transformer, danger plate, nuts, bolts & washers, preformed insulator binding and required hardware, 5 nos. of earthing arrangement with electrodes, proper size of 3½ core PVC cable for connection of transformer to LTDB & supply of all other sundry items with painting of all iron materials with red-oxide and aluminum paints as per IE Rule/ REC Specification & standard, inscribing in each pole and transformer BGJY and the year of electrification in white paint in the background of deep green paint.the neutral of the transformer should be earthed with 25x3mm G.I. flat.. 5 ii) Construction of Boundary Wall with 1st Class KB Bricks around the DP Structure with sand filling, metal spreading & one. iron gate complete in all respect as per IE rules & REC specification & standard. Erection, Drawal & Commissioning of HT Stay set with concreting ratio. 5 Set 10 Page 4

SCHEDULE FOR PRICE BID (5) BASIS = TURNKEY 5 Construction of 63 KVA, 11/0.4KV (3 star rated), 3-Phase Distribution Sub-station complete comprising of i) Erection, Drawal & Commissioning of 63 KVA, 11/0.433KV, 3-Phase Distribution Transformer with all accessories such as 11 KV 3-pole AB switch, HG Fuse Unit, LA & LT Distribution box with MCCBs complete as per specification with 9mtr. Long / 300 kg PSC Double Pole structure along with pole padding and concreting, transformer mounting bracket, Channel and angle for supporting HG Fuse unit, Channel for supporting AB Switch, anti climbing device with fasteners and belting support for transformer, danger plate, nuts, bolts & washers, preformed insulator binding and required hardware, 5 nos. of earthing arrangement with electrodes, proper size of 3½ core PVC cable for connection of transformer to LTDB & supply of all other sundry items with painting of all iron materials with red-oxide and aluminum paints as per IE Rule/ REC Specification & standard, inscribing in each pole and transformer BGJY and the year of electrification in white paint in the background of deep green paint. The neutral of the transformer should be earthed with 25x3mm G.I. flat.. 1 ii) Construction of Boundary Wall with 1st Class KB Bricks around the DP Structure with sand filling, metal spreading & one. iron gate complete in all respect as per IE rules & REC specification & standard. Erection, Drawal & Commissioning of HT Stay set with concreting ratio. 1 Set 2 Page 5

SCHEDULE FOR PRICE BID (6) BASIS = TURNKEY 6 Construction of 100 KVA, 11/0.4KV (3 star rated), 3-Phase Distribution Sub-station complete comprising of i) Erection, Drawal & Commissioning of 100 KVA, 11/0.433KV, 3-Phase Distribution Transformer with all accessories such as 11 KV 3-pole AB switch, HG Fuse Unit, LA & LT Distribution box with MCCBs complete as per specification with 9mtr. Long / 300 kg PSC Double Pole structure along with pole padding and concreting, transformer mounting bracket, Channel and angle for supporting HG Fuse unit, Channel for supporting AB Switch, anti climbing device with fasteners and belting support for transformer, danger plate, nuts, bolts & washers, preformed insulator binding and required hardware, 5 nos. of earthing arrangement with electrodes, proper size of 3½ core PVC cable for connection of transformer to LTDB & supply of all other sundry items with painting of all iron materials with red-oxide and aluminum paints as per IE Rule/ REC Specification & standard, inscribing in each pole and transformer BGJY and the year of electrification in white paint in the background of deep green paint. The neutral of the transformer should be earthed with 25x3mm G.I. flat.. 1 ii) Construction of Boundary Wall with 1st Class KB Bricks around the DP Structure with sand filling, metal spreading & one. iron gate complete in all respect as per IE rules & REC specification & standard. Erection, Drawal & Commissioning of HT Stay set with concreting ratio. 1 Set 2 Page 6

SCHEDULE FOR PRICE BID (7) BASIS = TURNKEY 7 Erection, Drawal & Commissioning of 3-Phase 4 Wire XLPE insulated ABC LT OH Lines (Span = 50mtr), complete work, as per specification comprising of i) Erection, Drawal & Commissioning of XLPE Insulated, 3-Phase 4 Wire ABC (3X35+1X25)sq.mm as per specification. ii) Erection, Drawal & Commissioning of 8 mtr. Long / 200KG PSC Pole to be excavation to size 600x600mm upto a plantation depth 1/6 of height of the support, padding of pole of 1:4:8 PCC of thickness 150x600x600mm using Black hard granite metal, Coil earthing arrangement, eye hook, suspension / dead end clamp/ strain fitting etc. complete as required for supporting LT XLPE insulated AB conductor, anti climbing device with fastners, danger plate, nuts, bolts & washers and required hardware, complete in all respect as per I.E. Rule/ REC specification & standard, inscribing in each pole BGJY and the year of electrification in white paint in the background of deep green paint. Span 40. 40 Erection, Drawal & Commissioning of LT Stay set with (concreting ratio Set 16 Page 7

SCHEDULE FOR PRICE BID (8) BASIS = TURNKEY 8 Erection, Drawal & Commissioning of 1-Phase 2 Wire XLPE insulated ABC LT OH Lines (Span = 50mtr), complete work, as per specification comprising of i) Erection, Drawal & Commissioning of XLPE Insulated, 1-Phase 2 Wire ABC (1X35+1X25)sq.mm as per specification. ii) Erection, Drawal & Commissioning of 8 mtr. Long / 200KG PSC Pole to be excavation to size 600x600mm upto a plantation depth 1/6 of height of the support, padding of pole of 1:4:8 PCC of thickness 150x600x600mm using Black hard granite metal, Coil earthing arrangement, eye hook, suspension / dead end clamp/ strain fitting etc. complete as required for supporting LT XLPE insulated AB conductor, anti climbing device with fastners, danger plate, nuts, bolts & washers and required hardware, complete in all respect as per I.E. Rule/ REC specification & standard, inscribing in each pole BGJY and the year of electrification in white paint in the background of deep green paint. Span 92. 92 Erection, Drawal & Commissioning of LT Stay set with (concreting ratio Set 32 Page 8

SCHEDULE FOR PRICE BID (9) BASIS = TURNKEY 9 Installation of Service Connections complete work for BPL consumer as specified below Erection, Drawal & Commissioning of 2-Core 2.5 sq mm PVC TC wire of 30mtr long for service connection Erection, Drawal & Commissioning of Static Energy Meters with TP box Supply & fixing of Piercing type Connector for ABC Cable Universal Distribution Connector for ABC.. 101 Supply & fixing of 1no. 18W & 1no. 11W CFL Lamp including GI Pipe & bends with clamps, 10 SWG GI Wire & reel insulator, 16 Amp. DP Main Switch with earthing terminal, Coil Earthing, Wooden Distribution Board with 2 s. of flush type 5 Amp. Page 9