APV Baro or LPV SBAS?

Similar documents
EPN, seminar AFIS, september 2013 Instrument approach procedures, PBN, GNSS

CAR/SAM STRATEGY FOR THE EVOLUTION OF AIR NAVIGATION SYSTEMS

Título ponencia: Helicopter IFP. Point-in-Space (PinS)

ILS Replacement. ACI World Safety Seminar November 2008 Kempinski Hotel Beijing Lufthansa Centre

Título ponencia: RNP APCH Implementation

GSA: EGNOS Flight Event, 6-7 May, Toulouse

OPERATIONS CIRCULAR. OC NO 2 OF 2014 Date: 1 st May Continuous Descent Final Approach (CDFA) 1. PURPOSE

IMPLEMENTATION OF PERFORMANCE BASED NAVIGATION (PBN)

ICAO-ENAC PBN PROCEDURE DESIGN COURSE

Area Navigation (RNAV)/Wide Area Augmentation System (WAAS) Instrument Approach Procedures (IAP s) and the New Charting Format.

PBN Aeronautical Charts and Procedure Design

Block 0: Capabilities within our Grasp

a Brief Background DEFINITION

GNSS-EGNOS approaches to European airports

Título ponencia: GBAS Concept

GENERAL INFORMATION ON GNSS AUGMENTATION SYSTEMS

ADVISORY CIRCULAR AC

Area Navigation (RNAV) and Required Navigation Performance (RNP)

ASIA/PACIFIC REGIONAL PERFORMANCE-BASED NAVIGATION IMPLEMENTATION PLAN

A forum to discuss Global Navigation Satellite Systems (GNSS) to benefit people around the world

Doc 9849 AN/457. Approved by the Secretary General and published under his authority. First Edition International Civil Aviation Organization

Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out

NORWAY AIP AIRAC SUP 14/15 EFF 20 AUG TEL:...(+47)

Direct Approach Consulting Inc.

12 AERO Second-Quarter 2003 April CAPT. RAY CRAIG 737 CHIEF PILOT FLIGHT OPERATIONS BOEING COMMERCIAL AIRPLANES

International Civil Aviation Organization South American Regional Office

A. Amendments to AMC/GM to Part-FCL

SYSTEM GLOBAL NAVIGATION SATELLITE SYSTEM LANDING TECHNOLOGY/PRODUCT DEVELOPMENT

C-130 Fleet CNS/ATM Solutions

INTEGRITY AND CONTINUITY ANALYSIS OCTOBER TO DECEMBER 2013 QUARTERLY REPORT FROM GPS. Integrity and Continuity Analysis 08/01/14 08/01/14 08/01/14

LONDON SOUTHEND AIRPORT AIRSPACE CHANGE PROPOSAL. Executive Summary and About the Consultation Documents and Document Contents

SBAS 2015 SPACE BASED AUGMENTATION SYSTEM WORKSHOP

Avionics requirements for civil aircraft Edition 30/10/2013

Performance-based Navigation and Data Quality

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

GAGAN-FOP/PMR-05. Indian SBAS System - GAGAN

FedEx HUD/EFVS Update Aviation New Technology Workshop June 7th, 2012, Beijing, China

Determination of ILS Critical and Sensitive Areas: A Comparison of Flight Measurement versus Simulation Techniques

Inside... Tell Us Your WAAS Story. VOLUME 43 Spring

Quality Assurance Manual for Flight Procedure Design

TP 308 IMPACT STUDY TORONTO BILLY BISHOP/TORONTO CITY AIRPORT. for

Why it may be time to consider Certified Avionics for UAS (Unmanned Aerial Vehicles/Systems) White paper

CNS/ATM SYSTEMS IN INDIA

Meeting of the Cooperation Arrangement for the Prevention of Spread of Communicable Diseases Through Air Travel

EUROCONTROL Guidelines for Cold Temperature Corrections by ATS

INTERNATIONAL CIVIL AVIATION ORGANIZATION GUIDE FOR GROUND BASED AUGMENTATION SYSTEM IMPLEMENTATION

MSAS current status. Japan Civil Aviation Bureau S TSAT A ATELLITE-BASED S UGMENTATION. MTSAT Satellite-based Augmentation System

International Civil Aviation Organization The Fourth Meeting of the APANPIRG ATM Sub-Group (ATM /SG/4) Bangkok, Thailand, July 2016

Ref.: AN 13/2.5-09/45 19 June 2009

and Implementing Rules for Air Operations of Community Operators F. Cross Reference Tables

SESAR Air Traffic Management Modernization. Honeywell Aerospace Advanced Technology June 2014

EUROCONTROL. Paving the way towards UAS ATM integration. Mike Lissone

Performance Based Navigation (PBN)

The European EGNOS System:

European ADS-B Regulation

Paper presented at ISASI 2014 Seminar, October 2014, Adelaide, Australia. Safety Management; Reversing the False Glide Slope Myth

Zuverlässige Navigation für die Luftfahrt. Boubeker Belabbas Institute of Communications and Navigation

HUNGARY. HungaroControl Pte. Ltd. Co. Hungarian Air Navigation Services Aeronautical Information Service H-1675 Budapest, POB 80

OPERATING MINIMA FOR AEROPLANES AND HELICOPTER OPERATIONS PURPOSE REFERENCE 4.0 DEFINITION

ASTRAEA the findings so far

COMMITTEE ON AVIATION ENVIRONMENTAL PROTECTION (CAEP)

PLANNIN WORKING PAPER. International. Theme 1: WORK. (Presented by SUMMARY. in this paper. feasibility of. system in the future.

THE SESAR CONCEPT AND SWIM. David Bowen Head of ATM Operations & Systems SESAR Joint Undertaking

Flight Operations Briefing Notes

Air Accident Investigation Unit Ireland. PRELIMINARY ACCIDENT REPORT SA-227-BC Metro III, EC-ITP, Cork Airport, Ireland 10 February 2011

Australian Enhanced Flight Tracking Evaluation Performance Report. August 2015

NOTICE TO AERODROME CERTIFICATE HOLDERS (NOTAC) No. 02/2013

The SESAR programme: Making air travel safer, cheaper and more efficient

Quality Assurance Manual for Flight Procedure Design

With all of the new hype the

LOG OF REVISIONS Revision Page FAA Date of Number Number(s) Description Approved Approval A All Initial Release K.

FAA Familiarization Briefing

Manual of All-Weather Operations

Transition IR-OPS. 3.3 Examen des changements principaux Part CAT & SPA. Direction générale de l Aviation civile. Direction navigabilité et opérations

O Copyright Civil Aviation Department 2010

Automatic Dependent Surveillance Broadcast (ADS-B)

EUROPEAN CIVIL RPAS OPERATORS FORUM

DFS Deutsche Flugsicherung GmbH

Communication, Navigation, Surveillance (CNS) engineers and executives of Airports Authority of India

airsight Company Profile

Space Applications and Technologies Expo Rome, Italy February 4 6, 2010

Performance management Identification of metrics

Michael Harrison Aviation Management Associates Alternative PNT Public Meeting Stanford University August Federal Aviation Administration

DRAFT WHITE PAPER ON CIVIL AVIATION CRAFTING NEW POLICY FOR SA AVIATION

Terms of Reference for a rulemaking task. In-flight recording for light aircraft

Enhancing Airspace Efficiency and Capacity in the Asia Pacific Region

AeroMACS Briefing / Update

Opening the airspace to UAS - ASTRAEA s next phase

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

PRESENTATION. Patrick Ky Executive Director EUROPEAN COMMISSION

EUROCONTROL AT THE WORLD ATM CONGRESS

SESAR BENEFITS: TOMORROW STARTS NOW

RPAS-EASA update EUROCAE, WG-73, 12 February, Eric Sivel, Innovation and Research Programme Manager

ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA- INDIAN OCEAN REGION. 23 April 2004

White Paper Mode S and the European Mandates

Tuesday, March 18, :00 p.m. 5:30 p.m. MODERATED BY: Carey Miller Universal Avionics Systems Corp.

CHAPTER 7. AIRSPACE 7.1 AFFECTED ENVIRONMENT

SESAR. Luftfahrttechnologie - Auftaktveranstaltung zum 7. EU-Forschungsrahmenprogramm Wien, 4 Dezember 2006

CAD 360 AIR OPERATOR'S CERTIFICATES

Airspace classification change

Transcription:

APV Baro or LPV SBAS? APV Barometric Implemented on large aircraft types. No independent height check at FAF. APV SBAS Currently Implemented on many Business Jets Height check at FAF is independent of the GNSS Geometric height. UK CAA DAP encouraging inclusion of LNAV, LNAV/VNAV and LPV minima lines on all charts. Implementation of additional minima line is a small incremental cost if undertaken with initial designs compared with later addition. Southampton RNAV (GNSS) procedures Runway 20. LNAV/VNAV OCH 462 LPV 250 Runway 02 LNAV/VNAV OCH 475 LPV 375 LNAV/VNAV procedures can be flown by SBAS aircraft to LNAV/VNAV minima if coded in the database. SBAS and Barometric Approaches are complimentary

ICAO Assembly Resolution A37-11 (Extract) Resolves that: States and planning and implementation regional groups (PIRGs) complete a PBN implementation plan by 2009 as a matter of urgency to achieve: 1) implementation of RNAV and RNP operations (where required) for en route and terminal areas according to established timelines and intermediate milestones; and 2) implementation of approach procedures with vertical guidance (APV) (Baro-VNAV and/or augmented GNSS) for all instrument runway ends, either as the primary approach or as a back-up for precision approaches by 2016. The intent of the Resolution is supported by UK CAA, but is not considered to be a mandate. A 37-11 is the basis of the ICAO ASBU 0-65 (Optimization of Approach Procedures including vertical guidance ) All options in the proposed European PBN Implementing Rule will require carriage of APV and APV procedures at all instrument runways by 2020.

TEN-T Project: LPV Operation at Alderney Aurigny BN 2 Trislander Aircraft One aircraft fitted with Garmin 430/W avionics integrated to autopilot. EASA certified aircraft for LPV Dec. 2011 Aurigny achieved LPV Operational Approval from CAA Dec. 2011 The first certified operation in Europe Aurigny now upgrading 5th aircraft with Garmin GTN 750 and Aspen 1000 EFD. BRNAV, PRNAV, LNAV, LPV. Terrain Avoidance Warning Squitters ADS position. Slide 4

Benefits at Alderney Approach Type NDB NPA (No DME) GNSS LNAV GNSS LPV Height (Feet) Visibility (Metres) Characteristics 390 1400 Lateral Guidance Only High workload (Pilot has to assess drift) Unstable Approach Inaccurate: Costal Refraction Night effect Precipitation Static 350 1200 Lateral Guidance Only 300* 900 Lateral and Vertical Guidance Stabilised Approach * Current ICAO design criteria limits minimum height to 300 on nonprecision runway. Plans to reduce to 250 feet in near future Increased revenues from training traffic Slide 5

Alderney NDB Approach Slide 6

Alderney LPV Approach Slide 7

UK IAP Requirements Instrument approach Procedures require: An Instrument Runway Provision of Air Traffic Control service CAA proposing to consult on Risk Based Instrument Approach Procedures at visual runways and airfields served by AFIS. Mitigations such as increased OCH to offset lighting deficiencies CAA Web Page on RNAV (GNSS) Approach Operations http://www.caa.co.uk/default.aspx?catid=1340&pagetype=90&pageid=13 338 CAA RNAV (GNSS) Approach Operations Application Process and Regulatory Information http://www.caa.co.uk/default.aspx?catid=1340&pageid=12992

UK Regulatory Documentation All CAA Regulatory documents map to SES Regulations. From April 2010, the UK CAA enabled the design of Instrument Flight Procedures by approved organisations. http://www.caa.co.uk/default.aspx?catid=7&pagetype=90&pa geid=2368 CAP785 Approval Requirements for Instrument Flight Procedures for Use in UK Airspace http://www.caa.co.uk/docs/33/cap785.pdf Sets out the Regulatory requirements for an organisation or individual to become an approved instrument procedure designer. The process and criteria for the approval of instrument flight procedures. Appendix A of this note provides a flowchart taken from Appendix A of CAP 785 detailing the IFP Design and Approval process.

Procedure Design Procedures designed in accordance with ICAO PANS OPS. Alderney IAP s by NATS Southampton IAPs by CAA. OCH for LPV procedures to the Non Precision Runway at Alderney have been limited to a minimum of 300 as detailed in PANS- OPS.

UK Regulatory Documentation CAP 232 Aerodrome Survey Information http://www.caa.co.uk/docs/33/cap232.pdf Details CAA requirements for aeronautical surveys is in accordance with ICAO DOC 9674-AN/946 (WGS-84 Manual). Surveying companies employed in work for aerodromes with IFPs are required to be registered with the CAA. Validation of IFPs Policy Statement http://www.caa.co.uk/docs/2111/20090624validationofifpforwebsitev2po licystatementv2.pdf Requires Procedure Validation rather than flight inspection. Does not Require use of calibration aircraft. Procedures coded by Garmin...Cost! Means of recording track was useful (USB stick, GPS data logger) Flown by Aurigny Training captain with CAA Regulator as observer.

UK Safety Case Requirements CAA s safety management requirements detailed in CAP 670. http://www.caa.co.uk/docs/33/cap670.pdf CAP 670 Part B, APP 01 requires that a Safety Management System (SMS) is implemented at all ATS units as defined in Regulation (EU) No 549/2004. CAP 670 APP01 States: The overall safety objective is to ensure that all safety issues within the provision of an ATM service have been addressed in a satisfactory manner, and to a satisfactory conclusion. With Specific reference to GNSS procedures, CAP 670 NAV 07 details the ATS Requirements for RNAV(GNSS) Instrument Approach Procedures requires: Commission Regulation (EC) No. 2096/2005 of 20 December 2005 laying down common requirements for the provision of air navigation services requires safety assessment of changes to services including initial provision of a service. CAP670 sets out the requirements for Air Traffic Service Providers wishing to provide Instrument Approach Procedures supported by Global Navigation Satellite Systems (GNSS) signals. These encompass lateral navigation (LNAV) guidance aspects of Non Precision Approach (NPA) or Approaches with Vertical Guidance (APV). These Instrument Approach Procedures are termed RNAV(GNSS). Safety Objective Changes to services provided by ATS Providers including instrument approaches supported by GNSS shall be assessed by the ATS Provider as being adequately safe. LPV Safety templates prepared by SESAR 5.6.3

Key Lessons Learnt Undertake early conversations with your Regulator. Establish Regulators preferred procedure design options. Agree Safety Case Expectation and Content Do not assume that everyone has the same knowledge of SBAS or LPV. SBAS is new, everything will be scrutinised. Do not underestimate airspace issues. Watch out for Gotchas! Know where the Runway Threshold is in relation to Runway markings.. Sector width of short runway is measured at ILS Point B, not at Threshold,.. This is clear in Annex 10 for ILS on Code 1 & 2 (Short) runways But not many Code 1 or 2 Runways have ILS Ensure everyone understand that the implementation is not a trial Slide 14 Maintain communication between parties

Alderney Success: A Catalyst for LPV. The Alderney project implemented: Airport approach procedures Aircraft avionics upgrade Airline Operational Approvals. First European use of EGNOS in revenue Passenger Service Other Aircraft and Airport Operators have seen the benefits of LPV. Particularly Economic and Safety benefits at island/low traffic volume locations where ILS is impossible or costs are not justified. 40+ runway ends now in design in UK. Significant LPV implementation in progress to remote communities in Scotland. Scheduled passenger services. Air Ambulance operations. Will deliver high societal benefits. Slide 15

SBAS Operators Loganair HIAL Implementing LPV at all airfields DHC-6 (Twin-Otter) and Islander aircraft equipped. Hebridean Based Cumbernauld, Services to Coll, Colonsay, Islay Tiree, Oban First BN 2 aircraft upgrade 17 September 2012. Gama Aviation Implementing LPV on 2 Beech 200 aircraft Used for Scottish Air Ambulance Skybus Based Lands End, services to Isles of Scilly, Exeter & Southampton DHC-6 (Twin-Otter) aircraft upgrade winter 2012 Specsavers First Corporate operator Upgrading 2 Beech 350 s. UK, Ireland, Spain, Scandinavia & Netherlands Professional Air Training Bournemouth, Beech 76 equipped Southwest Aviation Exeter, 2 Beech 76 training aircraft equipped City Jet 8 Fokker 50 aircraft from May 2013 Slide 16

Avionics Capability. SBAS avionics are available on the majority of modern business aviation aircraft, or avionics upgrades are available for the FMS. (Universal, Rockwell Collins and Honeywell) Business operators under an AOC require Operational Approval to undertake RNAV 1 or GNSS Approach Operations (Private corporate operators do not) Many operators do not know they have the LPV avionics capability FAA have already certified Business Jets with Enhanced Vision Systems for 100 Decision Height operations with WAAS. Embraer E-Jets are LPV SBAS capable Flybe are promoting the implementation of LPV procedures at airports. Flybe do not currently perform LPV operations, but are planning for future capability. Airbus implementing SBAS capability on A400M and A350 XWB aircraft. ATI Beluga aircraft have LPV implemented (TEN-T Project) A380 Trials. Propose SBAS upgrade for A320 (circa 2016) and A380 Eurocopter will certify EC145 for LPV by end 2012 Boeing remain opposed to SBAS.

The Future Validation of GBAS CAT II /III SARPS 2015/16 EGNOS development: 2014 Will support LPV 200 operations, comparable to ILS CATI minima 2020 Expansion of service volume into Africa. Avinor seeking high latitude improvements NEW SBAS systems: SDCM (Russian Federation) Gagan (India) Accommodation of GLONASS and Beidou GPSIII and Galileo post 2020 will allow new avionics to achieve higher accuracies and availabilities. Work in progress by ICAO, RTCA, Eurocae, ESA, FAA, and industry to define system and Avionics capability: Multi Constellation/Dual Frequency avionics (ICAO 12 th Air Navigation Conference) Advanced RAIM (Receiver Autonomous Integrity Monitoring) to allow LPV operations with no (or minimal) augmentation. Expansion of LPV Operations to include LPV 100 (CAT II Operations) Stretch objective of LPV 50 (CAT III A auto-land operations)

ken.ashton@nats.co.uk

EGNOS Overview EGNOS = European Geostationary Navigation Overlay Service The European Component of the ICAO Satellite Based Augmentation System. (SBAS) WAAS in USA, MSAS in Japan, GAGAN in India & SDCM in Russia. Collects GPS data from remote monitors throughout Europe and beyond, processed data is sent to users through Geostationary satellites. Corrects GPS errors and gives integrity warnings within 6 Sec. Provides approach guidance to airports throughout Europe with no ground equipment at the airport. Provides positioning to any point in space e.g. offshore platforms etc. EGNOS is owned by the European Union. Development managed by the European Space Agency. Made available for Safety of Life operations in March 2011. Slide 20

Types of GNSS Approach LNAV Lateral Navigation. A GPS Non-Precision Approach. Lateral positioning +/-556m Large Obstacle Assessment area LNAV/VNAV An LNAV Approach with a Vertical profile Lateral positioning +/-556m Vertical profile derived from Barometric altimeter (Vertical Performance not specified) A Large Aircraft solution LPV Localiser Precision Vertical (SBAS) Supported by Space Based Augmentation (EGNOS in Europe, WAAS in US) Lateral positioning +/-40m Vertical Positioning +/-50 m Capability available throughout SBAS Service Volume with no ground equipment at airports System Minima 250 Not supported by IATA LPV 200 GBAS An upgrade of LPV comparable with ILS CATI Performance Available in Europe from 2014 Ground Based Augmentation Local Equipment based at Airports (LAAS in US) Current CAT I system operational at Bremen. (Other CATI GBAS systems at Malaga and Toulouse) CAT II/III Draft ICAO SARPS awaiting validation SBAS and Barometric Approaches are complimentary

EGNOS Operations Into Alderney Project supported by European TEN-T programme and Eurocontrol. Alderney is a Crown Dependency, not part of the UK. 4.8 km by 2.4 km. 2400 population. Is a tourist destination, with 20 rotations on peak summer days. Improve safety through a Stabilised 3D Approach in place of NDB NPA. Improve regularity through lower aircraft operating minima. Aurigny, a single operator had a business case with clear boundaries. APV procedures will also be implemented at Southampton Q4 2012. Slide 22