Bore-Gard Trenchless Raceway

Similar documents
Carlon Bore-Gard and Boreable Multi-Gard Raceway

Conduit Fittings & Accessories Directional Drilling Conduit Utility Duct Telephone Duct Residential Boxes

Scepter PVC Molded Junction Boxes

pvc well casing & drop pipe

SECTION UNDERGROUND ELECTRIC SERVICE

Rigid Conduit, Fittings, and Accessories Frequently Asked Questions

HIGHLAND VALLEY SUPPLY, INC STANDARD TERMS AND CONDITONS OF SALE

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS

SECTION SIGNAL WIRE AND CABLE

Native InDesign 2890 SaniTite Brochure 1/8" CMYK April 17, 07

Carlon Multi-Gard Multi-Cell Raceway

COMMERCIAL CONDUIT RULES AND REGULATION

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

The Most Advanced Name in Drainage Systems. Sanitary Sewer Pipe

FRP AQUATIC DUCTWORK COMPONENTS LEADERS IN FIBERGLASS REINFORCED PLASTIC DUCT PRODUCTS

Scepter PVC Molded Junction Boxes

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

INDEX. Sec. No. Items Page Nos.

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe

DIVISION 4300 STORM DRAINAGE

TECHNICAL NOTE Lining of Casings with SaniTite HP Pipe

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe

Duct PVC Duct Steel Duct Pre-Lubricated HDPE Bend PVC Duct Plug End Cap Duct Sealing Kit Sub Duct Anchor Plug PVC Cement PVC Cleaner Duct mandrel

SECTION POLYVINYL CHLORIDE (PVC) PIPE

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

Carlon Expansion Fittings for PVC Rigid Nonmetallic Conduit

WATER & SEWER CORROSIVE RESISTANT PRODUCTS

SECTION 22 LIGHTNING PROTECTION SYSTEM

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

The MC Cable Revolution is Gaining Ground REMKE

Building essentials for a better tomorrow

Conduit Tubing Electrical Metallic Tubing (EMT) Intermediate Metal Conduit (IMC) Hot-Dip Galvanized Steel Rigid Metal Conduit (RMC)

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

Town House Center Highway North Huntingdon, PA 15642

Flowtite Jacking Pipe

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT

TubeTrace, ThermoTube

2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

3200 West 22nd Street Erie, PA ph fax

SECTION DUCTILE IRON PIPE AND FITTINGS

Ecoflex Wall Penetration Systems: An efficient, sustainable solution for penetrating concrete or block walls

Specification Standards Communications Underground Ducts, Raceways and Structures

TEXAS A&M CENTRAL ACADEMIC BUILDIING & PATRIOT S CASA SUBMITTAL Pre-Insulated Piping

Wastewater Capital Projects Management Standard Construction Specification

Royal Seal Gasketed Sewer Pipe

GAS DISTRIBUTION PRODUCTS STEEL SERVICE TEES

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

Carlon Multi-Gard Multi-Cell Raceway. PVC Fiberglass Galvanized Steel Electrical Metallic Tubing

800 Communications Circuits

Oil and Gas Pipeline Design, Maintenance and Repair

MAST ARMS & POLES. Ornamental Pole Top & Bases

Carlon Carflex Liquidtight Flexible Tubing

HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL

CORNING CABLE SYSTEMS GENERIC SPECIFICATION FOR TIGHT BUFFER OPTICAL FIBER CABLES FOR INTER- AND INTRABUILDING APPLICATIONS.

SECTION STORM DRAINAGE SYSTEM

Raceway and Boxes for Electrical Systems Page 1 of 7

ENGINEERED SOLUTIONS. A2 Liner Pipe for Trenchless Technology

Cable Installation Accessories. Cable Hoisting and Attachment. Snap-In Hangers. SnapStak Hangers

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES SITE UTILITIES

BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION

FAIRFIELD INDUSTRIES INC.

TS 813 GROUNDING AND BONDING TTD TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD CONTROLLER CABINET GROUNDING

Unarmored Variable Frequency Drive (VFD) Cable Termination Guide

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION NONREINFORCED CONCRETE SEWER PIPE

Appendix A: Acceptable pipe and fitting materials

SECTION ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL

LK Wallbox UNI Push. Assembly. Only intended for LK PE-X Universal Pipe X.

Air Conditioner Duct Construction & Repair

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD

4 Installation Requirements

Ontario Electrical Safety Code - Info Sheet

SECTION DUCTILE IRON PIPE AND FITTINGS

Mueller. Pipe Repair Products. Saddles Tapping Sleeves Pipe Repair Clamps A complete selection for all types of pipe... all from a single source.

Puddle Flange. FRANK Puddle Flange

Stainless Steel Single and Dual Circulation Kits


The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 21

AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding

How To Launch A Rocket From A Formica

IMPORTANT DOCUMENTATION DO NOT DISCARD!

REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING

During severe flood events, such as those

LOW-VOLTAGE TRANSFORMER QUICK START GUIDE PLANNING GUIDE INSTALLATION GUIDE

SRA-125/SRAX-125 Double-Rail Lift-Out Rail System Installation & Service Manual with Parts List

Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling

PVC Pipe PVC SCHEDULE 40. Nominal Pipe Size (in.) 1/8. Average I.D. O.D.

TABLE OF CONTENTS. PUD SERVICE TERRITORY & CONTACTS... Page 1. NEW SERVICE QUESTIONNAIRE... Page 2. GENERAL... Page 3

Specifications for Residential Property Owners Connection to New Public Sewer

Purpose of the ANSI/TIA/EIA-569-A Standard

Multiple Meter Installation Amperes Per Position -Single Phase, Self-contained

Gas Risers and Transition Fittings

Steel Fire Sprinkler Pipe

Section SEWER PIPE INSTALLATION AND TESTING

GUE, GUB Junction Boxes

TECHNICAL SPECIFICATION

Transcription:

Bore-Gard Trenchless Raceway

Prime Conduit Bore-Gard Insertion depth indicator tells at a glance if pipe ends are inserted to the correct depth. Precision engineered design has matching grooves and nylon locking strap to provide a secure connection. Positive stop automatically aligns strap grooves. Triple-lobed gasket designed to provide ease of assembly and a watertight seal. ENGINEERED RACEWAY SYSTEM The unique design incorporates a proprietary water-tight seal and locking ring that enables fast, cement-free assembly, strong enough for 1000 foot bores. Heavy walls and deep insertion make the joint immune to the effects of normal bending. The belled end will not snag when pulled into a bore. LABOR - TIME - MONEY SAVER Bore-Gard is a PVC trenchless raceway system utilizing horizontal directional drilling for electrical and datacom applications. Bore-Gard eliminates the costly problems of HDPE pipe on a reel, minimizes environmental disruptions in tight and confined spaces, and is easy to install. ELECTRICAL, UTILITY AND TELECOMMUNICATION MARKETS Bore-Gard is perfect for under roads, highways, airport runways, railways and waterways, metropolitan/urban areas, or any other buried conduit application.

The Preferred Trenchless Solution ADVANTAGES OVER HDPE HDPE ovalizes which reduces the internal capacity of the ducts. Bore-Gard is packaged in bundles, not wound on reels, so it does not collapse into an oval shape. The Bore-Gard bundles are also easier to transport and results in less material waste. Because Bore-Gard does not use reels like HDPE, reel handling equipment is not needed, there aren t any costly reels to return, and there isn t the safety risk of uncoiling reels. USES STANDARD SCHEDULE 40 FITTINGS Purchasing special Bore-Gard fittings is NOT required. In fact, they don t even exist! Bore-Gard uses standard, off the shelf, Schedule 40 fittings, making transitions faster, easier, and less expensive. FAST, EASY WATER-TIGHT CONNECTIONS Prime Conduit s locking strap provides a fast, easy and secure connection. No cement or tools required. It also eliminates costly fusion welding. The locking strap is shipped installed with product. The factory installed gasket keeps out ground water and drilling fluid and has been tested to 80 psi. AGENCY APPROVALS AND MARKET ACCEPTANCE Bore-Gard has been tested to UL651 standard and received ETL approval. It can be used for use with electrical conductors per The National Electrical Code articles 300 and 352. Bore-Gard is also proudly Made in the USA.

The Easiest Installation PRODUCT INSTALLATION 1. Position Bore-Gard with the print line facing up. 2. Remove plastic locking strap and set it aside. 3. Remove end caps. On first stick only, trim spigot end of Bore-Gard at the groove before attaching the pulling eye/gripping attachment. 4. Insert pulling eye into spigot end of Bore-Gard. 5. Tighten pulling eye so that it expands against the interior of the conduit. Use of sleeve over O.D. of conduit is recommended. 6. The installer should use appropriate instrumentation to ensure that maximum pull rating is not exceeded. *Note: lbf (pounds-force) is NOT equivalent to psi (lbf/in 2 ). It is the responsibility of the customer to make that conversion (if needed) based on installation/equipment conditions. 7. Take next piece of Bore-Gard and insert spigot end into belled end of the first piece until the insertion line is no longer visible. 8. Slide the plastic locking strap into slot on the side of the bell. Push the strap in completely. It is not necessary to remove or cover the handle on the strap. 9. Repeat with remaining sections as space allows. 10. Bore-Gard is now ready for installation. PERFORMANCE SPECIFICATIONS Bore-Gard is tested to a rigorous Pull test at 80 psi and a Bend & Pull test at a 65' radius and 80 psi.

Bore-Gard Trenchless Raceway Specifications P A C K A G I N G Part Number Wall Trade Package Quantity (ft./bundle) Bundles per Truckload 10' 20' Type Size 10' 20' 10' 20' Feet per Truckload Approx. Wt. per 100 ft. (lbs) BG340SP-010 BG340SP-020 Sch 40 3" 350 700 56 28 19,600 164 BG440SP-010 BG440SP-020 Sch 40 4" 260 520 56 28 14,560 234 BG540SP-010 BG540SP-020 Sch 40 5" 230 460 40 20 9,200 317 BG640SP-010 BG640SP-020 Sch 40 6" 200 400 40 20 8,000 418 BG840SP-010 BG840SP-020 Sch 40 8" 140 280 32 16 4,480 647 - BG280SP-020 Sch 80 2" - 2800-15 42,000 101 BG380SP-010 BG380SP-020 Sch 80 3" 350 700 56 28 19,600 210 BG480SP-010 BG480SP-020 Sch 80 4" 260 520 56 28 14,560 308 10 ft lay length = 9' 6"; 20 ft. lay length = 19' 6" T E C H N I C A L D A T A Part Number Wall Type Trade Size 1 Avg. OD (in.) 1 Min.Wall Thickness (in.) 2 Pull Test (lbf) 3 Bend & Pull (lbf) 4 Min. Crush (lbs) Listings BG340SP Sch 40 3" 3.500 0.216 7,500 7,000 1,000 ETL, CSA BG440SP Sch 40 4" 4.500 0.237 9,200 8,700 900 ETL, CSA BG540SP Sch 40 5" 5.563 0.258 11,800 11,300 900 ETL, CSA BG640SP Sch 40 6" 6.625 0.280 14,500 14,000 850 ETL, CSA BG840SP Sch 40 8" 8.625 0.322 18,500 *18,000 850 N/A BG280SP Sch 80 2" 2.375 0.218 3,150 3,000 2,000 ETL BG380SP Sch 80 3" 3.500 0.300 9,800 9,300 2,000 ETL BG480SP Sch 80 4" 4.500 0.337 12,500 12,000 2,000 ETL 1 Average OD & Minimum Wall Thickness per UL651 & NEMA TC-2. 2 Pull Test UL651 6.12.2.1 - @ 80 psi 3 Bend & Pull UL651 6.12.2.2-65' Bend Radius @ 80 psi * 8" Bend & Pull tested at 60 psi/72' Bend Radius The Bend & Pull and Pull test results are recorded in lbf (pounds-force). This is NOT equivalent to psi (lbf/in 2 ). It is the responsibility of the customer to make that conversion (if needed) based on installation/equipment conditions. 4 Schedule 40 - Meets UL651 6.9, NEMA TC-2, & CSA C22.2 No.211.2 6.3 ; Schedule 80 Meets UL651 6.9 US Patent 6,789,629 A C C E S S O R I E S Size Locking Strap Gaskets Pulling Eyes 2" GSUP2 HBOR2 BG2PE 3" GSUP3 HBOR3 BG3PE 4" GSUP HBOR BG4PE 5" GSUP5 HBOR5 BG5PE 6" GSUP6 HBOR6 BG6PE 8" GSUP8 HBOR8 BG8PE

Product Summary Visit www.primeconduit.com for more information Product Schedule 40 PVC Heavy Wall Schedule 80 PVC Extra Heavy Wall Schedule 40 Heavy Wall PVC Utility Telephone Duct Specifications ETL Certified to UL651, NEMA TC-2, Federal Specification WC1094A ½", ¾", 1", 1¼", 1½", 2", 2½", 3", 3½", 4", 5", 6" Concrete encased & direct burial underground applications; exposed or concealed applications aboveground Rated for use with 90 C conductors ETL Certified to UL651, NEMA TC-2, Federal Specification WC1094A ½", ¾", 1", 1¼", 1½", 2", 2½", 3", 4", 5", 6" Listed for aboveground & belowground applications including areas subject to physical damage [352.12 (C)] Rated for use with 90 C conductors Non-UL Listed, Designed for power utility applications 1½", 2", 2½", 3", 4", 5", 6", 8" Concrete encased, direct burial, power utility applications; Rated for use with 90 C conductors or cable NEMA TC-10 & Bellcore CAO8546 (Types B and C) 4 PVC: Type B & Type B Heavy Wall, Type C, Type C Tel-Gard, Type D Concrete encased (Types B & C), Direct Bury (Type C), Exposed Applications (Type D) Type Size 90 Cable TC 6 & 8 ASTM F-512 Concrete Encased * EB-20 2", 3", 4", 5", 6" EB-35 Heavy Wall 2", 3", 4", 5", 6" Direct Burial P&C Duct DB-60 2", 3", 31/2", 4", 5", 6" DB-120 Heavy Wall 1", 11/2", 2", 3", 4", 5", 6" DB-100 4", 5", 6" DB-100 DWP 3", 4", 5" * EB-20 is ETL Certified to UL651 Multi-Gard Intra-Gard Bore-Gard Trenchless Raceway PV Mold Split Duct & Kits Material Application Type Size Approvals Type C, Type 40, PVC UL Listed, ETL Certified to UL651 Type 80 Fiberglass Steel Outdoor - Direct Bury, Concrete Encased Outdoor (UV Resistant) - Bridge Crossings, Areas Subject to Physical Damage (Bullet-Proof) Outdoor - Bridge Crossings, Areas Subject to Physical Damage (Vandalism & Crush) EMT Indoor - Inside Buildings EMT Boreable Outdoor - Horizontal Directional Drilled Heavy or Bullet Resistant Galvanized or PVC Coated Steel Type 40 PVC Outer Duct Schedule 40 & Type C: 1¼", 1½", 2 4-Way, 6-Way, and 4-Way Hybrid Direct bury & concrete encased applications; Bellcore GR-356 Core ETL Certified to UL651, CSA Certified (Schedule 40) 2", 3", 4", 5", 6" & 8" Horizontal directional drilling for electrical and datacom applications Exceeds NESC requirements, Designed in accordance with NEMA TC-19 Standard Duty: 1", 2", 3", 4", 5" Heavy Duty Schedule 40: 1½", 2", 3", 4", 5", 6" Extra Heavy Duty Schedule 80: 2" - 3" Pole riser system designed to protect communications power cable installed on poles Conforms to NEC Article 300.22 and NFPA 90A for installation of communication cables inside buildings UL Listed EMT Outer Shell, Conforms to NFPA 90A for installation of communication cables inside buildings Minimum Crush per CSA C22.2 No.211.2, UL 651 & NEMA TC-2 Schedule 40 Duct & Kits: 2", 2½", 3", 3½", 4", 5", 6"; Schedule 80 Duct: 2", 4"; C Duct & Kits: 4" Repair broken ductwork Fittings & Accessories Couplings, adapters, junction boxes, end bells, reducers, clamps, switch boxes, access fittings Elbows & Sweeps Schedule 40, Schedule 80, DB Sweeps, and Telephone Duct Sweeps 23240 Chagrin Blvd., Suite 405 Cleveland, OH 44122 216-464-3400 www.primeconduit.com PCBGTR PP 06/16 2016 PrimeConduit, Inc.