1 I am looking for a 4" fiberglass conduit product. Do you make such a product? Carlon does not make a fiberglass conduit. We do sell 4" fiberglass Multi-Gard with three or four pre-installed innerducts, but not on its own. Two companies come to mind: United Fiberglass (USA) and FRE Composites Inc. (Canada). I am working for the U. S. Government for the "Office of Overseas Buildings Operations (OBO). We have procured big quantity of "Carlon plus 40 rigid non metallic conduits" for the project work, being executed in Abu Dhabi. Please advice us of your recommendation on storage of "Carlon plus 40 rigid non metallic conduits". Can "Carlon plus 40 rigid non metallic conduits" be stored in an open to sky area in direct sunlight, the temperature in this region goes up to 50C to 55C with 100% humidity. Carlon Schedule 40 PVC Conduit is designed for outdoor applications in all weather conditions. Therefore can be stored outside without any additional protection. We recommend when stacking the crates that the wood "slates" used to bundle the conduit are placed on top of each other and not directly onto the conduit. What is the difference between sch 40 and sch 80? What applications would you use one compared to using the other one? Schedule 80 Conduit will have a thicker wall. OD's will remain the same. Section 347-3(c) of the 1999 NEC (352.12(C) of the 2002 NEC) states that Rigid Nonmetallic Conduit is not permitted where subject to physical damage unless identified for such use. Schedule 80 conduit is listed and identified for the areas of physical damage. If you are concerned with impacts or crushing after the raceway has been installed than schedule 80 conduit should be used.
2 I'm trying to deal with a Government spec that speaks in terms of thick wall and thin wall PVC. Can you tell me what these terms mean as they relate to your products? We refer to Schedule 40 conduit as heavy wall EPC (electrical plastic conduit) and our Schedule 80 conduit as Extra Heavy Wall EPC. There is no official definition of thin wall vs. thick wall as it is relative. I'm sure there is more information in the government spec, such as a reference to a NEMA spec or perhaps a UL standard. Is nonmetallic rigid schedule 80 conduit approved for use in a class 1 division 1 area? 501.4(A)(1)(a) Exception, either Schedule 40 or 80 PVC conduit can be used if the conduit is encased in concrete a minimum of 2" thick (all the way a round)and buried a minimum of 24". Threaded rigid conduit has to be used on both ends for the last 24" of underground to emergence or point of connection to the aboveground raceway. This is the only acceptable way to use RNC in Class 1 Div 1 (with the exception of gas stations, fuel storage and other fuel dispensing). Article 347 of the 1999 NEC Handbook states that PVC conduit must be "marked" for 90 degree C conductors. Your literature states that Plus 40 and 80 is "rated for use with 90 C conductors". Is your Plus 40 and 80 actually UL listed for 90 degree C conductors? What is UL E35297, and does it relate to the use of 90 degree C conductors? This same question applies to type DB raceway. Is it UL listed for 90 C cable?
3 Yes, our conduit and duct is rated for 90 deg C conductors. The DB duct is not UL listed, however. The Plus 40 and Plus 80 is actually UL listed for 90 C conductors. E35297 is our UL file number. Carlon Plus 40 and Plus 80 is the product you want to use in accordance with Article 347 of the 99 NEC. The question keeps coming up about running schedule-40 RNC underground and changing over to Schedule-80 above ground, for physical protection. The ID of schedule 80 will produce a ledge inside the conduit at the transition, which could damage conductors when pulled in the raceway. At this point we are not allowing the co-mingling of the two schedules of conduit. Do you know of any listing or testing that has been done by Carlon or any others to support the comingling of the two schedules of RNC? It is common to use Schedule 40 PVC Conduit with Schedule 80 PVC Conduit and is "Co-mingled" often. It is true that an edge does exist and needs to be addressed. There will not be a problem if you are pulling from schedule 80 to schedule 40 since the cable would be going from a smaller ID to a larger. In this case it would be a step down. It is recommended that the ID at the spigot end of the Schedule 80 conduit, where the transition occurs, be "reamed" by a knife or reaming tool to give the conductors a smooth transition for the one conduit to another. As a member of Panels 3 and 8 of the National Electrical Code, I can assure you that the panel recognizes using the two conduits together. Is there a new rule about using Schedule 80 aboveground? Section (a) of the 1999 NEC states that service cables, where exposed to physical damage, is required to protected by any of the following: (1) Rigid Metal Conduit
4 (2) Intermediate Metal Conduit (3) Rigid Nonmetallic Conduit Suitable for the Location (4) Electrical Metallic Tubing (5) Other approved means The only Rigid Nonmetallic Conduit suitable for the location (Area of Physical Damage) is Schedule 80 Rigid Nonmetallic Conduit. In the 2002 NEC, they replaced "(3) Rigid Nonmetallic Conduit Suitable for the Location" with "(3) Schedule 80 Rigid Nonmetallic Conduit". The only time schedule 80 PVC conduit would be required is when the service cable is exposed to physical damage. The AHJ needs to determine if the cables are exposed to physical damage since there is not a definition of physical damage in the code. Some AHJ state if the cable is coming out of the ground next to a house into a meter then it has to be in installed in schedule 80 conduit. Other AHJ are not as strict. Schedule 40 conduit can be used underground and transition to the schedule 80 (usually at the elbow). When it comes right down to it the rule in the code has not been changed at all, just the description. We are a local inspection agency. As you know the use of schedule 40-pvc has been greatly limited in the 2002 NEC. There is a story going around that schedule 80 fittings are not available. We will be enforcing the 2002 NEC Code if these fitting are not available that will mean that sales of schedule 40-and 80-pvc just took a turn for the worst. If these fittings are not available why is that true schedule 80-nonmetallic conduit is not a new product? What is the true story? Carlon does not manufacture separate fittings for Schedule 40 and separate fittings for Schedule 80 (except for the elbows which are formed from Sch. 40
5 and Sch. 80 conduit and fall under the UL category of conduit, not fittings) since the fittings have been UL approved to be used with both Schedule 40 and Schedule 80. Schedule 40 PVC has not necessarily been severely limited as Schedule 80 is only required in areas subject to physical damage, which is usually a limited height coming out of the ground along the exterior wall of a building (Articles (4) and (C)), for example, or in a parking garage or up along a pole. Subject to physical damage areas are where a car or lawnmower or something will impact the conduit. The uses not permitted for RNC for areas subject to physical damage unless identified for such use has been around for quite awhile and Schedule 80 has always been permitted for areas subject to physical damage. This is nothing new. PVC conduit and fittings have been listed since the 1960's. Schedule 80 has a thicker wall than Schedule 40. They both have the same OD but different ID's and thus a different wirefill. The fittings are either over or under the conduit anyways, so even if they are impacted, the conduit is still there to provide the impact protection. Remember, most damage occurs by not using expansion fittings, because the force of contraction/expansion can be great enough to pull apart joints. I am not able to find the coefficient of friction for Sch 40 PVC. Did I miss it in the web site? I always recommend 0.1
6 Of course this can change depending on the type of cable you are pulling in. I also recommend you see the attached website. It has a lot of information including a calculator for determining the actual tension per pull. Is your conduit the same as CPVC? No. We don't carry CPVC, which is chlorinated polyvinyl chloride. I am a self-employed electrician located in Western Massachusetts and was working on a repair job to a swimming pool last week. The pool installers were replacing the underground PVC flexible tubing because of leakage. In the process of digging a new hole for the new tubing one of the underground wires was damaged. I happened to ask the pool repairman what the cause of the leakage was, and he stated "termites" had eaten through the PVC. This kind of made me curious, as I have installed many underground electrical systems using PVC nonmetallic rigid conduit and have never seen or heard of this problem before. Has there been any tests done to determine if termites will do damage to PVC conduit? Insects and termites do not damage PVC conduit. They've been known to damage some types of Plastics, but not PVC. There was a study in Gulfport, Mississippi in 1955 where sample of PVC were exposed to termite attack. After more than fours years of exposures to the termites, there was no sign of termite attack on PVC Samples.
7 Can one of you tell me what the radius is on the following items - UA5AR, UA5AN? The same radius applies as for the standard 90 and 45 degree elbows. See page 145 of the 2001 Price Guide. For the 6" elbow, the radius is 30". For the 4" elbow, the radius is 16". Do you have a rigid non-metallic conduit rated for use with power cables rated 105 degrees C (MV-105)? Please recognize that most wire and cable manufacturers no longer mark Type MV conductors or cables for 90 degrees C since the conductors meet the 105 degree C requirements and are marked for the higher temperature rating. The code currently prohibits the installation of the 105 Type MV conductors and cables since they are rated higher than the RNC temperature rating. The temperature rating of the conduit will not be exceeded since the users do not operative MV conductors or cables above 90 degrees C. The rated temperature is based upon the rating of the insulation and jacketing material used in the construction of the cable, not the operational temperature. There will be proposals for the 2005 NEC to allow 105 Type MC Conductors in RNC. Currently many inspectors will accept MV Conductors or cables in RNC based on Do you have any data or recommendations for your Sched. 40 and 80 products in areas that may be exposed to fumes or splashing (not immersion) of the following chemicals? Acetonitrile, Dimethylformamide, Methanol, Pyridine, Tetrahydrofuran, Toluene
8 Acetonitrile - Not sure, usually anything with Acetone is bad and PVC should not be used. Dimethylformamide - Not Recommended, severe effect Methanol - Excellent, no effect Pyridine - Not Recommended, severe effect Tetrahydrofuran - Not Recommended, severe effect Toluene - Not Recommended, severe effect This is a great site for determining chemical resistance: Does Carlon have any CSA certified Schedule 80 products? CSA does not recognize heavy wall product over schedule 40. knowledge, none of our heavy wall products are CSA approved. To my I have browsed your site and looked in the printed information that I have and can find nothing outlining storage requirements for your products. Is such a publication available? If not please indicate the same. We are being told to properly store several thousand feet of the 4" and 5 PVC ridged conduit. The material is stored outside, in the bundles delivered by the carrier for up to 10 months. Our stance is that it does not have to be covered nor raised up on blocks. The conduit is sunlight resistant and in fact storing it on blocks of wood may damage the conduit or at least instill curvatures, which are undesirable. Please refer to the NEMA document at the above website for some guidelines on storage. You don't want to store the product on raised block because sagging will
9 occur. Covering the product with a tarp doesn't hurt, but you don't have to. The worst thing that could occur is that some discoloration (aesthetic appearance), but that won't affect he integrity of the conduit. We are in the process of providing an installation in a salt-water environment. We are utilizing PVC raceways, fiberglass equipment enclosures and stainless steel hardware. We were provided PVC coated Myers hubs with the fiberglass (motor starter) enclosures by the manufacturer. It would be a perfect situation to use threaded PVC to connect to the Myers hubs and then use a male adapter on the underside of our fiberglass wireway (line gutter). Is it acceptable to (the NEC) thread schedule 40 PVC with a regular GRC hand threader? Threading PVC conduit would void the UL listing. Threading is commonly done if listing and inspection is not an issue. Majority of the people who thread the conduit use Schedule 80 PVC to give themselves a thicker wall. Can I use 2.5 sch. 80 PVC for a service mast? It will be 18 to 24 in above a roof with out any support. If this is a good installation, how should I connect the Eyebolt to the mast? Section of the 2002 National Electrical Code requires raceways used as a service mast must be identified for the purpose or have the adequate strength. Schedule 80 PVC conduit is not identified for this purpose. If the raceway were supported than it would be acceptable. Does Carlon publish information on the constant pressure under which their Schedule 40 & 80 PVC conduits will maintain their rigidity? If you are referring to internal pressures found for Water Pressure Pipe. Carlon does not manufacture such a product.
10 If it is an external crush than we would refer to the UL Product Standard, UL651 Section 11, Resistance to Crush. These load requirements vary from 750 Pounds Foot to 1000 lbf for different sizes of Schedule 40 product and is 2000 lbf for all sizes of Schedule 80 product. Basically you load the conduit with this weight and the product cannot deform more than 70%. This test procedure is similar to ASTM D2412.
Conduit Fittings & Accessories Directional Drilling Conduit Utility Duct Telephone Duct Residential Boxes
CANTEX INC. 301 Commerce Ste 2700 Fort Worth, Texas 76102 817-215-7000 Fax: 817-215-7001 Conduit Fittings & Accessories Directional Drilling Conduit Utility Duct Telephone Duct Residential Boxes YOUR FULL
Carlon Expansion Fittings for PVC Rigid Nonmetallic Conduit
Carlon Expansion Fittings for PVC Rigid Nonmetallic Conduit All construction materials expand and contract with fluctuations in temperature. These temperature changes affect polyvinyl chloride (PVC) more
Carlon Bore-Gard and Boreable Multi-Gard Raceway
Carlon Bore-Gard and Boreable Multi-Gard Raceway Bore-Gard Schedule 40 Bore-Gard Schedule 80 Boreable Multi-Gard Type 40 www.carlonsales.com 231 Bore-Gard Trenchless Raceway Carlon Bore-Gard Trenchless
CTI TECHNICAL BULLETIN Number 6: A publication of the Cable Tray Institute
CTI TECHNICAL BULLETIN Number 6: A publication of the Cable Tray Institute Circuit Integrity of Cable Tray Wiring Systems During Natural Disasters The January 17,1994 Los Angles, California earthquake
Installation Instructions Hustler 6-BTV Trap Vertical
Installation Instructions Hustler 6-BTV Trap Vertical ASSEMBLY 1. Check the package contents against the parts list on page 2. 2. WARNING. Installation of this product near power lines is dangerous. For
26 0533 Raceway and Boxes for Electrical Systems Page 1 of 7
Last Update: November, 2015 A. Conduits: Consultant s Handbook Page 1 of 7 1. All conductors for each and every electrical system shall be installed in a raceway except communications and A/V systems which
All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.
DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,
Ontario Electrical Safety Code - Info Sheet
Ontario Electrical Safety Code - Info Sheet The following are the Code requirements and explanatory material for buried electrical wiring that are applicable to most residential applications. 12-012 Underground
SECTION 22 LIGHTNING PROTECTION SYSTEM
SECTION 22 LIGHTNING PROTECTION SYSTEM 22.01 SCOPE: A. These Specifications shall form a part of the Contract Documents and shall govern construction work for all buildings to be built or modified for
CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements
16600 Underground Electrical Duct Bank This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications
Carlon Carflex Liquidtight Flexible Tubing
Carlon Carflex Liquidtight Flexible Tubing Carflex Carflex X-Flex Fittings Cord Grips Pre-Wired Whips www.carlon.com 3 Carflex Liquidtight Flexible Conduit Carflex Liquidtight Flexible Nonmetallic Conduit
ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:
ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS: Chapter 12 of the Burlington Code of ordinances allows owner occupants of single family homes to do their own wiring if they choose. If you choose to
Grounding & Bonding Why it is done And How to Install Properly
Grounding & Bonding Why it is done And How to Install Properly The technical information provided herein is to assist qualifi ed persons in planning and installing electric service to farms and residences.
COMMERCIAL CONDUIT RULES AND REGULATION
Electric Engineering Division COMMERCIAL CONDUIT RULES AND REGULATION S:\COO_ACM_US_Electric_Telecommunications\COO_ET_Engineering\Conduit Policies\Residential 1805 NE 30th Ave., Bldg. 400 Ocala, FL 34470-4875
4 Installation Requirements
4 Installation Requirements 9 4.1 Code Reference The authority having jurisdiction should be referenced to determine what law, ordinance or code shall apply in the use of flexible duct. Ducts conforming
CTI TECHNICAL BULLETIN Number 9: A publication of the Cable Tray Institute
CTI TECHNICAL BULLETIN Number 9: A publication of the Cable Tray Institute Cable Tray Wiring Systems Have Many Cost Advantages Cost is usually a major consideration in the selection of a wiring system.
BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS
BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS PLEASE READ COMPLETE INSTRUCTIONS BEFORE YOU BEGIN LEAVE INSTALLATION INSTRUCTIONS AND USER'S GUIDE WITH OWNER ALL ELECTRIC WIRING AND PLUMBING MUST BE DONE
Electrical Service Guidelines
Electrical Service Guidelines Middle Tennessee Electric Membership Corporation Revised: May 23, 2013 MTEMC's Electrical Guidelines TABLE OF CONTENTS Right-of-Way Clearance Guide 3 MTEMC Requirements 4
LEAD FREE FIREX. Interlock Armored Cables TECK90 and MC Industrial Cables. w w w. n e x a n s e n e r g y. c o m
FIREX Interlock Armored Cables TECK90 and MC Industrial Cables LEAD FREE O V E R 1 8 0 Y E A R S O F E X P E R I E N C E 866-663-9267 w w w. n e x a n s e n e r g y. c o m Interlock Armored Cables Introduction....2
Odyssey of the Mind Technology Fair. Simple Electronics
Simple Electronics 1. Terms volts, amps, ohms, watts, positive, negative, AC, DC 2. Matching voltages a. Series vs. parallel 3. Battery capacity 4. Simple electronic circuit light bulb 5. Chose the right
Compliant Healthcare Technologies, LLC. NFPA 99, 2012 Changes" November 13, 2013!
Compliant Healthcare Technologies, LLC NFPA 99, 2012 Changes November 13, 2013! The standard is now a CODE!! The NFPA 99 has now been upgraded from a Standard to a Code. This will put it in the same light
2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property
2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property A brief summary of the most used code references for residential wiring State of Idaho Division of Building Safety Electrical
READ THIS MANUAL BEFORE PROCEEDING WITH THE INSTALLATION. FAILURE TO FOLLOW THE INSTALLATION INSTRUCTIONS MAY VOID YOUR WARRANTY!
READ THIS MANUAL BEFORE PROCEEDING WITH THE INSTALLATION. FAILURE TO FOLLOW THE INSTALLATION INSTRUCTIONS MAY VOID YOUR WARRANTY! The main power to any existing system must be disconnected prior to the
INSTALLATION INSTRUCTIONS HUSTLER 4-BTV, 5-BTV TRAP VERTICAL WARNING INSTALLATION OF THIS PRODUCT NEAR POWER LINES IS DANGEROUS
INSTALLATION INSTRUCTIONS HUSTLER 4-BTV, 5-BTV TRAP VERTICAL WARNING INSTALLATION OF THIS PRODUCT NEAR POWER LINES IS DANGEROUS FOR YOUR SAFETY, FOLLOW THE INSTALLATION DIRECTIONS GENERAL DESCRIPTION:
foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.
Skylight Installation Instructions This document provides instruction and guidelines for installation of both curb mount (CM) and self flashing (SF) unit skylights on flat, pitched (> or equal to 3/12
Conduit Tubing Electrical Metallic Tubing (EMT) Intermediate Metal Conduit (IMC) Hot-Dip Galvanized Steel Rigid Metal Conduit (RMC)
Conduit Tubing Electrical Metallic Tubing (EMT) Intermediate Metal Conduit (IMC) Hot-Dip Galvanized Steel Rigid Metal Conduit (RMC) Download Buy American Brochure Includes 2011 National Electrical Code
List of Frequently Utilized Storage Tank Standards and Practices
List of Frequently Utilized Storage Tank Standards and Practices Below is a list of frequently used storage tank standards and practices from organizations that are referenced in 25 PA Code, Chapter 245.
Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:
Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial
Chapter 7 Plumbing Connections
Chapter 7 Plumbing Connections 7-1 General All plumbing equipment and installations must be designed, constructed, and installed in accordance with this code and where not specific, to the applicable provisions
NEW SERVICE INSTALLATION STEPS. Common Slow Downs. Other Necessary Steps
NEW SERVICE INSTALLATION STEPS Here is the step-by-step process required to fulfill your service installation request. Please take a few minutes to review the steps, become familiar with key milestones
Cable Installation Notes
Cable Installation Notes June 2006 Table of Contents Cable Pulling... 2 Bending Radius... 2 Pulling Tension... 3 Friction... 3 Installation with Rollers... 4 Installation without Rollers... 4 Pulling Tension
**ATTENTION** WE DO NOT PROMOTE OR ENCOURAGE YOU TO DO YOUR OWN ELECTRICAL WIRING!!! IT IS BY FAR THE MOST DANGEROUS THING YOU CAN ATTEMPT
**ATTENTION** WE DO NOT PROMOTE OR ENCOURAGE YOU TO DO YOUR OWN ELECTRICAL WIRING!!! IT IS BY FAR THE MOST DANGEROUS THING YOU CAN ATTEMPT. YOU COULD PUT YOUR FAMILY AND WORLDLY POSSESSIONS IN DANGER!!!
PVC Pipe Restriction Law and Legislation 1) NYS PVC Pipe Restriction Law (Repealed)
PVC Pipe Restriction Law and Legislation 1) NYS PVC Pipe Restriction Law (Repealed) * 246. Uses of standard piping materials. 1. Building sewers under public ways. Building sewers under public ways shall
FRP AQUATIC DUCTWORK COMPONENTS LEADERS IN FIBERGLASS REINFORCED PLASTIC DUCT PRODUCTS
Perry Fiberglass Products, Inc. FRP AQUATIC DUCTWORK COMPONENTS LEADERS IN FIBERGLASS REINFORCED PLASTIC DUCT PRODUCTS PERRY FIBERGLASS Perry Fiberglass Products, Inc. is a leading manufacturer of high
PEX TUBING FAQ WHAT IS PEX?
PEX TUBING FAQ WHAT IS PEX? Pex is cross-linked polyethylene. Through one of several processes, links between polyethylene macromolecules are formed to create bridges between PE molecules (thus the term
SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT
SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT The purpose of these specifications is to insure that there are minimum
American National Standard For Electrical Rigid Steel Conduit (ERSC)
Revision of ANSI C80.1-1994 American National Standard For Electrical Rigid Steel Conduit (ERSC) Secretariat: Approved August 18, 2005 American National Standards Institute, Inc. NOTICE AND DISCLAIMER
Frequently Asked Questions Generators
Frequently Asked Questions Generators Fuel Related How much fuel do the generators use during normal operation? At exercise? The generator fuel consumption is given in each of the product knowledge books
STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM
STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM Installed in Pre-engineered Steel Buildings Provides Lowest Cost Construction Method for CORROSIVE AND WET Environments PREFERRED SOLUTIONS, INC.
Chapter 9. Bonding and Grounding
Chapter 9 Bonding and Grounding Objectives Describe why the cable should be bonded Describe bonding and grounding procedures Define Bonding and Grounding Explain Safety Benefits and intent of bonding and
METER REQUIREMENTS GENERAL REQUIREMENTS SECTION D
12 - ELECTRIC SERVICE HANDBOOK SECTION D METER REQUIREMENTS This chapter gives you information on Central Lincoln s metering requirements. It's divided into three sections: General requirements This section
STABILOY BRAND FEEDER SOLUTIONS ASSISTED LIVING FACILITIES
STABILOY BRAND FEEDER SOLUTIONS ASSISTED LIVING FACILITIES Introduction General Cable understands that assisted living facilities require complex building designs that must address a wide range of systems
Utility Distribution Systems
Utility Distribution Systems 6/2012 A0011037 1 WARRANTY This equipment is warranted to be free from defects in materials and workmanship, under normal use and service, for a period of 12 months from date
Multiple Meter Installation - 200 Amperes Per Position -Single Phase, Self-contained
Overhead Meters TABLE OF CONTENTS D D Consumer Service Pole for Mobile Home Park Temporary Service -wire Single Phase D. Overhead Meter Installation - Single Phase D. Connection Diagram - Single Phase
STABILOY BRAND FeeDeR SOLuTIONS
STABILOY BRAND Feeder Solutions DATA CENTER Introduction General Cable understands that data centers depend heavily on a steady, reliable and scalable source of power. That is why our STABILOY Brand aluminum
Merrimac Municipal Light Department. Residential Developments Policy
Merrimac Municipal Light Department Residential Developments Policy General: This document provides specific instructions for the provision of underground electrical facilities associated with the construction
STABILOY BRAND FeeDeR SOLuTIONS
STABILOY BRAND Feeder Solutions DATA CENTER Introduction General Cable understands that data centers depend heavily on a steady, reliable and scalable source of power. That is why our STABILOY Brand aluminum
Scepter PVC Molded Junction Boxes
Scepter PVC Molded Junction Boxes ELECTRICAL SYSTEMS PVC MOLDED JUNCTION BOXES 4" to 12" We build tough products for tough environments Standing Still is Not an Option. We re proud to introduce the NEW
The Contractor shall furnish and install all shielded power cable suitable for use on this project.
Section 16122 PRIMARY POWER CABLES PART 1 GENERAL: WORK INCLUDED The Contractor shall furnish and install all shielded power cable suitable for use on this project. RELATED WORK Section 16020: Tests SUBMITTALS
TYPICAL WIRING OF METER SOCKET FOR SINGLE PHASE, THREE WIRE OVERHEAD SERVICE
TYPICAL WIRING OF METER SOCKET FOR SINGLE PHASE, THREE WIRE OVERHEAD SERVICE A. GENERAL NOTES: Service entrance line and load conductors, conduit straps, weatherhead, lock nuts, bushings, connectors, and
ASX7-4-IOM-7 J30-08579
INSTALLATION INSTRUCTIONS 4" COMBUSTION AIR INLET KIT TUBULAR GAS FIRED DIRECT SPARK PROPELLER UNIT HEATERS UNIT CONVERSION & CATEGORY III VENTING FOR SEPARATED COMBUSTION For 30,000 to 75,000 BTU/HR SUPPLEMENT
Gas Line Sizing. Z Maximum gas demand shall be determined by adding all of the equipment Btu ratings from appliances connected on the system.
Gas Line Sizing When sizing Gas piping systems certain factors must be considered. They are: Z It shall provide sufficient gas to meet the maximum demand of the gas equipment. Piping must be sized to supply
Please check with your local inspection authority for any additional requirements before installation.
Specifications for Residential Overhead Electric Service Installation This brochure addresses most typical residential overhead service installations. Variances for the following specifications must be
Electrical Code Regulation
Electrical Code Regulation St. Clair County has adopted the 2005 National Electrical Code in its entirety for the unincorporated areas of the county and all communities that have contracted with the county
Electrical Grounding. Appendix C
Appendix C Electrical Grounding Low-Voltage Equipment Grounding The most frequently cited Office of Safety and Health Administration (OSHA) electrical violation is improper occupational grounding of equipment
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings
THE STABILOY BRAND ADVANTAGE UNLOCKING THE SECRETS OF ALUMINUM A LOOK AT THE ADVANTAGES OF ALUMINUM ALLOY OVER COPPER
THE STABILOY BRAND ADVANTAGE UNLOCKING THE SECRETS OF ALUMINUM A LOOK AT THE ADVANTAGES OF ALUMINUM ALLOY OVER COPPER Ever Wonder Why There s No Copper in the Air? Since the early 1900s, aluminum and aluminum
98371000 REV. REL 1302 WEST BEARDSLEY AVENUE P.O. BOX 1127 ELKHART IN 46515 (574) 295-8330 FAX (574) 293-9914 2011 ELKHART BRASS MFG. CO., INC.
81471067 Electric Monitor Motor Control Panel For use with Model 8394059 SPIT-FIRE Monitor Installation, Operation, and Maintenance Instructions FOR ATEX APPLICATIONS 1302 WEST BEARDSLEY AVENUE P.O. BOX
Recommended Fuel Piping Specification For UPP Piping, UL-971
Recommended Fuel Piping Specification For UPP Piping, UL-971 1.0 General The primary delivery piping system shall be for suction or pressure applications and have semi-rigid coaxial type double wall construction,
ELECTRIC SERVICE HANDBOOK
ELECTRIC SERVICE HANDBOOK Revised July 2006 Table of Contents Electric Construction Title: Electric Service Handbook Page No. TOC Rev. July-06 Section 1: Introduction...1-010 Section 2: DP&L Offices...2-010
GUE, GUB Junction Boxes
E GUE, GUB Junction Boxes Cl. I, Div. & 2, Groups B, C, D Cl. II, Div., Groups E, F, G Cl. II, Div. 2, Groups F, G Cl. III NEMA 4*, BCD, 9EFG Ex d IIC T6, IP66 Ex d IIC, IP66, ATEX certified Explosionproof
SnoTrace KSR Surface Snow and Ice Melting INSTALLATION PROCEDURES
SnoTrace Surface Snow and Ice Melting INSTALLATION PROCEDURES SnoTrace INSTALLATION PROCEDURES Refer to the SnoTrace Cable Testing Report for required recording of test data and circuit information. Upon
Scepter PVC Molded Junction Boxes
Scepter PVC Molded Junction Boxes TM ELECTRICAL SYSTEMS PVC MOLDED JUNCTION BOXES 4" to 12" Fully Certified: NEMA, UL & CSA We build tough products for tough environments Standing Still is Not an Option.
Wire types and sizes
Wire types and sizes This worksheet and all related files are licensed under the Creative Commons Attribution License, version 1.0. To view a copy of this license, visit http://creativecommons.org/licenses/by/1.0/,
STANDARD SPECIFICATION. for. Plumbing, Heating, Hot Water, Cold Water & Electrical work. Sussex Lodge London W2 & 16 Stanhope Terrace London W2
STANDARD for Plumbing, Heating, Hot Water, Cold Water & Electrical work undertaken by owners within the building known as Sussex Lodge London W2 & 16 Stanhope Terrace London W2 BPME Consulting Engineers
The MC Cable Revolution is Gaining Ground REMKE
The MC Cable Revolution is Gaining Ground June 2014 MC Cable Installation Continues to Improve with Advances in Materials and Fittings As the use of Metal Clad Cable grows, contractors are demanding better
Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS
Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS TABLE OF CONTENTS I. RULES AND REGULATIONS A. TABLE OF CONTENTS... 2 B. TERMS AND DEFINITIONS... 3 C. DEVELOPER S/CONTRACTOR S RESPONSIBILITIES...
RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS:
RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS: Signed completed Electrical Permit application form. Minnesota law requires all electrical work is to be performed by licensed,
Lightning Arresters P30027 18 KVA P30038 10 KVA. Description & Installation
Lightning Arresters P30027 18 KVA P30038 10 KVA Description & Installation Printed in USA 09/11 TO330 Rev. B Table of Contents Page 1.0 SCOPE 2 2.0 PRODUCT OVERVIEW 2 2.1 Intended Uses 2 2.2 Lightning
Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association
Air-Conditioning, Heating, and Refrigeration Institute Sheet Metal and Air-Conditioning Contractors National Association GUIDELINE B-1997 ACKNOWLEDGEMENT These guidelines for Roof Mounted Outdoor Air-
Mobile Home Pre-Inspection Checklist
Mobile Home Pre-Inspection Checklist TWO (2) STEP INSPECTION PROCESS STEP ONE: CALL FOR THE FIRST INSPECTION WHEN THESE ITEMS ARE COMPLETE. 1. Septic tank installed and plumbing complete. (SEE PLUMBING
ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS
Prepared by: ABB1 ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS 052521 Asset Type: Electric Metering Function: Construction Issued by: Quoc Hoang (QxH1) Date: 07-01-16 Rev. #06: This document
EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013
PERMIT AUTHORIZATION EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013 El Lago ordinances require the issuance of building permits as a method of enforcing code minimums, ensuring
Pre-Drywall Inspection Report
SM MEDALLION INSPECTIONS helping people make informed decisions Pre-Drywall Inspection Report 5657 Garden Valley Place Milton, Georgia 30024 Prepared for Betsy and Paul Dougherty January12, 2015 Medallion
800 Communications Circuits
ARTICLE 800 Communications Circuits INTRODUCTION TO ARTICLE 800 COMMUNICATIONS CIRCUITS This article has its roots in telephone technology. Consequently, it addresses telephone and related systems that
Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling
Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling 250_P1 R10/7/2015 Copyright 2015 Liberty Pumps Inc. All rights reserved. Specifications subject to change without notice.
COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES
COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES These guidelines are to be used for ALL commercial cooking hoods, ventilation systems and related fire suppression
The National Armored Cable Manufacturers Association Presents. Installation Standard for Types AC and MC Cables
The National Armored Cable Manufacturers Association Presents Installation Standard for Types AC and MC Cables An ANSI Standard Original document jointly produced by NECA and NACMA as Standard for Installing
TMC CableReady Connectors For Jacketed Metal Clad Cable TMC For Non-Hazardous Locations
TMC CableReady Connectors For Jacketed Metal Clad Cable TMC For Non-Hazardous Locations CableReady connectors are designed for use with the following cables: Type MC jacketed corrugated aluminum, interlocked
REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING
REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING Revised October, 2013 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 REQUIRED DRAWINGS... 3 2.1 Site Plan... 3
More inside :: Tackle even the toughest water treatment piping challenges with
More inside :: Tackle even the toughest water treatment piping challenges with Corzan Industrial Systems Corrosion to pipes, valves and fittings caused by chemicals and microbes can greatly impact the
Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit
R-H-DI1 INSULATION BATT NR-E-IB1 Avoid Using Batt Insulation With Metal Framing Batt insulation should not be used with metal framing systems. Although it is common to see fiberglass batt insulation installed
TS 813 GROUNDING AND BONDING TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET GROUNDING
TORONTO TRANSPORTATION January 2012 TS 813 GROUNDING AND BONDING TABLE OF CONTENTS 1. DRAWINGS TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET
ENGINEERING SPECIFICATION FIBERGRATE MOLDED GRATING. January 24, 2014 06610-1
ENGINEERING SPECIFICATION FIBERGRATE MOLDED GRATING January 24, 2014 06610-1 SECTION 06610 FIBERGLASS REINFORCED PLASTICS (FRP) FABRICATIONS MOLDED GRATING PART 1 - GENERAL 1.1 SCOPE OF WORK A. The CONTRACTOR
Building essentials for a better tomorrow
electrical conduit MEETS ANSI/ul 651 and nema tc-2, tc-6 and TC-8 Building essentials for a better tomorrow electrical conduit PVC Rigid Non-Metallic Conduit for Electrical Systems Schedule 40 and Schedule
Questions and Answers for Heating and A/C Contractors
1. How do we accomplish grounding of furnaces and / or water heaters on two wire circuits? 250.134 Equipment Fastened in Place or Connected by Permanent Wiring Methods (Fixed) Grounding. Unless grounded
SWIMMING POOL HEAT PUMP
SWIMMING POOL HEAT PUMP Installation & User Manual Model HP40B HP50B HP65B Hayward Pool Products Canada, Inc. T: 1-888-238-7665 www.haywardpool.ca CONTENT I. Application 4 II. Features 4 III. Technical
AJ s Technical Tips: Designing a Small Solar PV System Part IV; Selecting Wires for the System
AJ s Technical Tips: Designing a Small Solar PV System Part IV; Selecting Wires for the System A little while back Simon Nyukuri of Kitale wrote to ask me about sizing wires and cables for solar PV systems.
BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE
BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE Toll Free Telephone Numbers Residential Services 800.454.3853 Commercial Services 800.653.5307 Utility Locating Company N.C. 800.632.4949 S.C. 888.721.7877
3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
Explosion proof enclosures
1 of 7 Explosion proof enclosures DE8 C 2 of 7 The Ex d enclosures are rugged and designed for harsh environment like: Oil and gas industry Chemical industry Pharmaceutical industry Agribusiness Without
ENGINEERING SPECIFICATION PULTRUDED DYNARAIL FIBERGLASS LADDER & LADDER CAGES
ENGINEERING SPECIFICATION PULTRUDED DYNARAIL FIBERGLASS LADDER & LADDER CAGES PART 1 - GENERAL 1.1 SCOPE OF WORK SECTION 06610 FIBERGLASS REINFORCED PLASTICS (FRP) FABRICATIONS PULTRUDED SQUARE TUBE LADDER
PRIMARY SERVICE LINE: The Company's conductors which connect the supply line with a transformer located on private property.
INTRODUCTION These rules are issued for use by Customers, builders, electrical contractors, architects, engineers, etc. The rules require the installation of safe and adequate wiring and electrical equipment,
In-Ground Basketball System Owners Manual
In-Ground Basketball System Owners Manual Customer Service Center N53 W4700 South Corporate Circle Sussex, WI 53089 U.S.A. Write Model Number From Box Here: WARNING! 3 Capable Adults REQUIRED TOOLS AND
6/14/02 Chapter 14: Use of Electrical Test Equipment 1/20
USE OF ELECTRICAL TEST EQUIPMENT Test equipment is necessary for determining proper set-up, adjustment, operation, and maintenance of electrical systems and control panels. The following is a general procedure
Electrical Code (NEC) Snake Tray Cable Management Solutions
Cable Pathway Use and Selection and the National Electrical Code (NEC) By Eric J. Sadler, BSME MIT Snake Tray Cable Management Solutions References: All references to the NEC in this presentation are taken
ELECTRICAL SAFETY Information Bulletin
ELECTRICAL SAFETY Information Bulletin January 2016 CEC-10 [rev-9] Page 1 of 8 CANADIAN ELECTRICAL CODE SUBJECT: Section 10 Grounding and Bonding Rule 10-204 Grounding Connections for Alternating-Current
White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5
White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code June 2015 Revision 1.5 Shalhevet Bar-Asher; SolarEdge Technologies, Inc. Bill Brooks, PE; Brooks Engineering LLC
WHITE PAPER Fire & safety performance standards
WHITE PAPER Fire & safety performance standards Terminologies describing Fire Performance Terminologies describing Fire Performance often present a challenge to understand as how they apply to a cable