NERC: 2.1 TOP Planned Outage Coordination 2.2 IRO a Reliability Coordination - Current Day Operations



Similar documents
Responsibility for Outage Coordination is designated by 4 key artifacts: 1. FERC Order 2000 FERC Order 2000 (Docket No. RM ; Order No.

New Brunswick Electricity Business Rules

Risks and Controls for VAR and EOP Richard Shiflett Ruchi Ankleshwaria

Generation and Transmission Interconnection Process

Job Descriptions. Job Title Reports To Job Description TRANSMISSION SERVICES Manager, Transmission Services. VP Compliance & Standards

GIP Net Zero Interconnection Service.

SOP-RTMKTS Test and Approve Operations Software Applications. Contents

Analysis One Code Desc. Transaction Amount. Fiscal Period

ReliabilityFirst CIP Evidence List CIP-002 through CIP-009 are applicable to RC, BA, IA, TSP, TO, TOP, GO, GOP, LSE, NERC, & RE

Master/Local Control Center Procedure No. 13 (M/LCC 13) Communications Between the ISO and Local Control Centers

FRCC Coordination Procedure. Title: FRCC Reliability Coordinator Contingency Analysis Monitoring Criteria

CURTAILABLE RATE PROGRAM FOR INDIVIDUAL CUSTOMER LOADS

PG&E Web Tool for Reporting Information Related to. NERC Reliability Requirement Compliance

MEMORANDUM OF UNDERSTANDING THE INDEPENDENT ELECTRICITY SYSTEM OPERATOR THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION

ICO GROUP LIMITED 揚 科 集 團 有 限 公 司

THE CONNECTICUT LIGHT AND POWER COMPANY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 18

LOGIX Fax to Service

THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 20

Project Management Fact Sheet:

Firm Flow Entitlement on M2M Flowgates Readers' Guide. Last Updated: February 01, 2016 Version: 4.0

APPENDIX I: STANDARD FORM BUSINESS ASSOCIATE CONTRACT AND DATA USE AGREEMENT (2012 Version)

ATTACHMENT G. Network Operating Agreement

Ashley Institute of Training Schedule of VET Tuition Fees 2015

Case 2:08-cv ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8

European Freight Forwarding Index

Rules on Southern Companies Energy Auction Participation

IICLE ONLINE SUBSCRIPTIONS TERMS AND CONDITIONS

BUSINESS ASSOCIATE AGREEMENT

Table of Contents. Real-Time Reliability Must Run Unit Commitment and Dispatch (Formerly G-203) Operating Procedure

DOCUMENT CONTROL PROCEDURE

PJM Compliance Bulletin

PJM LMP Market Overview

ISO 9001:2008 Clause PR001 Document Control Procedure

Methodology for Merit Order Dispatch. Version 1.0

References Appendices I. INTRODUCTION... 6 A. Background... 6 B. Standards... 6

EP SP RAILCORP NETWORK MANAGEMENT PLAN CHAPTER 2 - CUSTOMER INSTALLATION SAFETY. Authorised by: Neal Hook Chief Engineer Electrical

PLANTTOGETHER REFERRAL PARTNER AGREEMENT. Updated: January 1, 2015

Rail Network Configuration Management

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015

Article 5.--CODE OF PROFESSIONAL CONDUCT

Terms of Use & Privacy Policy

U.S. COMMODITY FUTURES TRADING COMMISSION

INVESTMENT ADVISORY AGREEMENT

AGREEMENT AND TERMS OF USE FOR INTERNET ADVERTISING SERVICES

Agreement for Net Metering and Interconnection Services (Level 1, 2 and 3 Interconnection)

DISPATCH AGREEMENT RECITALS

ALCOA POWER GENERATING INC. Long Sault Division. Open Access Transmission Tariff

Outage Scheduling Manual

The Compliance Model: A Framework for All Things Compliance. Director Corporate Compliance & Risk Management jutter@midwestiso.org.

GENERATING FACILITY INTERCONNECTION AGREEMENT (3 RD PARTY INADVERTENT-EXPORTING) FORM

TRANSMISSION OPERATIONS (August 5, 2010)

COVERMYMEDS BUSINESS ASSOCIATE AGREEMENT

Electric Generation Supplier Contract Summary

Memo. AESO Board. Should you have any questions or additional information requirements please let me know. Yours truly, Todd Fior

Alberta Reliability Standard Cyber Security Security Management Controls CIP-003-AB-5

AGREEMENT FOR PRELIMINARY ENGINEERING DESIGN MISO PROJECT J233

OE-417 ELECTRIC EMERGENCY INCIDENT AND DISTURBANCE REPORT...

SERVICE LEVEL AGREEMENT (SLA)

MORTGAGE BROKER AGREEMENT

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-29

Core Fittings C-Core and CD-Core Fittings

Renewable Energy Interconnection Requirements for the US. IEEE PES Meeting Denver, CO July 26-30, 2015 J. Charles Smith, Executive Director, UVIG

PJM Seams Update: Day-Ahead M2M Revisions to MISO- PJM Joint Operating Agreement

FORM OF SURETY BOND. NOW, THEREFORE, Surety hereby agrees and covenants as follows:

TERMS AND CONDITIONS

RESIDENTIAL AND SMALL COMMERCIAL UNIFORM DISCLOSURE STATEMENT FOR ILLINOIS

HART TELEPHONE COMPANY SERVICE TERMS AND CONDITIONS OF SERVICE

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

Alberta Reliability Standard Cyber Security Configuration Change Management and Vulnerability Assessments CIP-010-AB-1

SEK ING Sprinter Sverige ING Bank NV (NL) 20 Units Outperformance Bonus Certificates linked to OMX due

Referral Agency and Packaging Agency Agreement

PROCEDURE. Part 3.1: Metering Service Provider (MSP) Registration, Revocation, and Deregistration PUBLIC. Market Manual 3: Metering. Issue 14.

Last revised: September 1, 2014 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS

LENDERS INSURANCE POLICY ENDORSEMENT

124 FERC 61,317 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. Communication Protocols for Public Utilities ORDER NO.

Transcription:

1 Purpose a Notification of Automatic Voltage The purpose of this procedure is to ensure Generator Operators (GOPs) within the MISO Reliability Coordinator Area inform the MISO Reliability Coordinator (RC) of changes in the status of Automatic Voltage Regulator (AVR) equipment. MISO must also know the status of Dynamic Reactive Power Reserves in its Reliability Coordinator Area. GOPs, Transmission Operators (TOPs), Balancing Authorities (BAs), Local Balancing Authorities (LBAs), and the RC must coordinate outages of AVR equipment to ensure reliability of the Interconnection. This procedure assumes that the GOP plans and coordinates AVR outages with the TOP per the North American Electric Reliability Corporation (NERC) Standards. This procedure also assumes that the TOP informs the affected BAs and LBAs of any AVR outages per the NERC Standards. AVR outages are any actions that impair the automatic function of the AVR including complete failure, manual operation, or equipment testing. 2 References NERC: 2.1 TOP-003-1 Planned Outage Coordination 2.2 IRO-005-3.1a Reliability Coordination - Current Day Operations MISO: 2.3 MISO Open Access Transmission, Energy and Operating Reserve Markets Tariff 2.4 RTO-SPEC-006 MISO Reliability Data Specification 3 Procedure Description 3.1 Responsibilities: GOP/Designee 3.1.1 The GOP will coordinate planned and forced outages of AVR equipment on commercially operational generating units with affected TOPs, BAs, LBAs, and the MISO RC. b 3.1.2 As soon as the GOP is aware of the need for a planned AVR outage, it will notify the TOP and the MISO RC to allow time to study impacts of the outage. 3.1.3 The GOP will notify the TOP and the MISO RC of a forced AVR outage as soon as possible, but within 30 minutes, and provide details on the cause and estimated return time. ADM-01 Page 1 of 6

3.1.4 The GOP shall enter the AVR outage information in the MISO CROW outage request system and notify the MISO RC via phone communications. 3.1.5 The GOP will keep the TOP and the MISO RC informed of changes to outages and when the outages have ended. 3.1.6 The GOP will reschedule AVR outages when the TOP, BA, LBA, or MISO RC cannot support the outage, when possible. 3.2 Responsibilities: Transmission Operator (TOP) 3.2.1 The TOP will notify the MISO RC of any adverse impacts of the AVR outage. 3.2.2 If the TOP, BA, LBA, or the MISO RC cannot support a planned AVR outage, the TOP will contact the GOP and the GOP will reschedule as appropriate. 3.3 Responsibilities: Balancing Authority and Local Balancing Authority (BA/LBA) 3.3.1 The BA or LBA will inform the TOP if it cannot support the AVR outage. 3.4 Responsibilities: MISO (MISO RC and BA) c 3.4.1 The RC or Regional Operations Engineer (ROE) shall track AVR status changes in the MISO CROW outage request system. 3.4.2 The RC or ROE will conduct any current day analysis, as applicable. 3.4.3 The ROE will review the AVR outages in the MISO CROW outage request system to ensure the information is up to date and contact the GOP for updates if necessary. The GOP will only be contacted if the AVR outage information is in conflict with dates (for example, the date of the outage has expired, but MISO has not been contacted). 3.4.4 The ROE will notify the EMS Engineer of any AVR status changes. 3.4.5 The EMS Engineer will update the status of AVRs in the MISO Energy Management System (EMS), as applicable. d 3.4.6 The ROE will review the daily AVR status report from the MISO CROW outage request system and share any applicable information with the Shift Manager (SM), the RC, the Regional Generation Dispatcher (RGD), and the MISO BA Operator. 3.4.7 The ROE will provide the daily AVR status report to MISO Transmission Security Planning (TSP) Engineers for inclusion in forward analysis. 3.4.8 The RC will notify the TOP of any concerns regarding adverse impacts of an AVR outage. ADM-01 Page 2 of 6

3.4.9 If a forced AVR outage has adverse impacts which cannot be mitigated with the available reactive resources, the MISO RC will utilize market generation to provide additional reactive support. ADM-01 Page 3 of 6

4 Disclaimer Notification of Automatic Voltage This document is prepared for informational purposes only to support the application of the provisions of the MISO Tariff and the services provided thereunder. MISO may revise or terminate this document at any time at its discretion without notice. However, every effort will be made by MISO to update this document and inform its users of changes as soon as practicable. Nevertheless, it is the user s responsibility to ensure you are using the most recent version of this document in conjunction with the MISO Tariff and other applicable procedures, including, but not limited to, the applicable NERC Reliability Standards as they may be revised from time to time. In the event of a conflict between this document and the MISO Tariff, the MISO Tariff will control, and nothing in this document shall be interpreted to contradict, amend or supersede the MISO Tariff. MISO is not responsible for any reliance on this document by others, or for any errors or omissions or misleading information contained herein. ADM-01 Page 4 of 6

5 Revision History Issue No Reason for Issue Revised By Issue Date Effective Date RTO-OP-051-r6 RTO-OP-051-r5 RTO-OP-051-r4 RTO-OP-051-r3 RTO-OP-051-r2 RTO-OP-051-R1 Added reference to RTO- SPEC-006, and changed language in Section 3.1.4 Annual Review. Updated 3.1.1 to better define the requirements for reporting of AVR status changes. Changed Midwest ISO to MISO. Compliance Review completed. Procedure owner approval on file. Annual Review/ Change to include use of CROW outage request system/compliance Review/Owner Approval on File Revised scope of notification responsibilities, removed language on conflicting procedures, and clarified notification times based on member comments Andy Witmeier FEB 05, 2016 FEB 05, 2016 Andy Witmeier JAN 30, 2015 JAN 30, 2015 Andy Witmeier DEC 31, 2013 DEC 31, 2013 Joe Reddoch JAN 04, 2013 JAN 04, 2013 Joe Reddoch FEB 24, 2012 FEB 24, 2012 Joe Reddoch OCT 06, 2010 OCT 06, 2010 Joe Reddoch MAY 12, 2009 MAY 12, 2009 RTO-OP-051-R0 Creation of Procedure Joe Reddoch FEB 06, 2009 FEB 06, 2009 ADM-01 Page 5 of 6

Compliance References a MISO Open Access Transmission, Energy and Operating Reserve Markets Tariff - Attachment X, Appendix 6, Section 9.6.2.1 b IRO-005-3.1a:R1.1 c TOP-003-1:R2 d IRO-005-3.1a:R1.1 ADM-01 Page 6 of 6