REQUIREMENTS FOR BUS DUCT ENTRANCE TERMINATION UNIT FOR USE WITH PAD-MOUNTED TRANSFORMERS



Similar documents
ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS

Guidelines for Earthquake Bracing of Residential Water Heaters

RAY-MAX Integrated Solar Power Strip

ELECTRIC METERING COMMERCIAL & INDUSTRIAL

Guidelines for Earthquake Bracing Residential Water Heaters

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

Packaged Terminal Air Conditioner Wall Sleeve Installation

Section 10 Electric Switchboards: 0 Through 600 Volts

BERTHOLD ELECTRIC GENERATOR CONNECTION CABINET


25-kV Apparatus Bushings B Series (bolt-in) for Elbow to Air-Insulated Service 200 Amp, 600 Amp and 1250 Amp

Sports and High Mast Lighting Poles Phone: (866) Fax: (817)

SECTION COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

Type 1, 3, & 3R Enclosures

MGB Chrome Bumper Conversion

Cedar Cottage Doghouse Plans

Cooktop Low-Profile Ventilation Hoods

UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS

-1- SPECIFICATIONS CONE SETTER PLATFORM ATTACHMENT INDEX

SOHOline and SOHO Slimline The SOHOline and SOHO Slimline offer a modular, sturdy and compact design

Conduit Fittings & Accessories Directional Drilling Conduit Utility Duct Telephone Duct Residential Boxes

AMPSEAL* Automotive Plug Connector and Header Assembly

INSTALLATION OF A BAY WINDOW

Installation Instructions

It's large enough to handle most welding job shop projects, yet small enough to make it a worth while home-workshop tool

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13

Installation Instructions For Slider Casement Air Conditioners

WINDOW CHANNEL, WEATHERSTRIP & WHISKER STRIP REPLACEMENT FOR 2-DOOR SEDANS

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

HOUSTON COMMUNITY COLLEGE HCC ALIEF CAMPUS MAIN BUILDING, FIRST, SECOND & FOURTH FLOORS RENOVATION ISSUE DATE:

Power Cube Open Source Ecology Page 1. Power Cube. Version 4

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

LIFE SCIENCE. Hoop House Construction for New Mexico: 12-ft. x 40-ft. Hoop House BRINGING TO YOUR HOME ECONOMICS COLLEGE OF AGRICULTURE AND

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

I BEAM TRACK INSTALLATION

AZEK Rail Install Guide

Multiple Meter Installation Amperes Per Position -Single Phase, Self-contained

INSTRUCTIONS THOROUGHLY BEFORE BEGINNING***************

James M. Pleasants Company

Submit shop drawings for equipment provided under this section Shop drawings shall indicate:

Andersen Electric Window Opener for Andersen Awning and Roof Windows

C O N V E Y O R C O M P O N E N T S C H A I N S B E L T S B E A R I N G S

INSTALL INSTRUCTIONS KK-C-HVAC-1 HVAC UNIT CHEVROLET/GMC VANS FOR

AM/FM ANTENNA RELOCATION KIT

Window Installation Instructions

CROWN BOILER COMPANY BWF SERIES BOILER CATEGORY I VENT KIT INSTALLATION AND OPERATING INSTRUCTIONS

Boiler Plan II Table of Contents

GEH6290. Mechanism Circuit Breaker. Handle Operating Mechanism Cat. No. Type NEMA 1, 3R, 12, 13 NEMA 4/4X Cat. No. Cat. No. Series Instruction

How to secure your property after a disaster

LIEBERT VNSA Installation Sheet

Please check with your local inspection authority for any additional requirements before installation.

RadianceRail Installation Guide

SECTION 22 LIGHTNING PROTECTION SYSTEM

POWER LOCK KIT GENERAL INSTALLATION -J04427 REV Kit Number. Models. Additional Parts Required. Kit Contents

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks

Issued E.C.S. Section WTR00 INFORMATION SECTION Page 1 of 1

AM/FM ANTENNA KIT (TOUR-PAK MOUNT)

IRRIGATION PUMPING Table of Contents - Section 900

Cable Support System Guide for Andersen Bow, Bay, and Box Projecting Window Units

Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors

Electrical Service Guidelines

Installation Guide. Bath and Wall Surrounds SERIES B

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

PART 1 GENERAL 1.1 SECTION INCLUDES

Roof Top Air Conditioner INSTALLATION AND OPERATING INSTRUCTIONS

TS 813 GROUNDING AND BONDING TTD TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD CONTROLLER CABINET GROUNDING

SPECIFICATIONS FOR BOON EDAM TOMSED MODEL TUT-65TMB

All-Season Sunroom Sliding Glass Door Installation Instructions

INSTRUCTIONS: LocknCharge Laptop Carts

March 14, Installation of Bay, Bow and Garden Windows

DirectCommand Installation DirectCommand 3-Channel Spreader Kit

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES

F-Series Camera Mounting Accessories

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

MAST ARMS & POLES. Ornamental Pole Top & Bases

INSTALLATION INSTRUCTIONS

Policy on Water Heater Installations Policy No. UPC Effective: September 1, 1995 Revised: February 10, 1996

One Year Warranty. Stock U.S. # of Volts Weight CONN. Height Dia. Watts # GAL. Elements INS. Inches NATURAL GAS* Six Year Warranty

INSTALLATION INSTRUCTIONS HUSTLER 4-BTV, 5-BTV TRAP VERTICAL WARNING INSTALLATION OF THIS PRODUCT NEAR POWER LINES IS DANGEROUS

CABINET OPTIONS AND DESIGNATORS

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

HORIZONTAL INSTALLATION

Hyperlinks are Inactive

Installation Guide 2010 BMW S1000RR Full Exhaust System

STANDARD SPECIFICATIONS SECTION METAL FABRICATIONS

DANGER DANGER. General Information. Safety Is Your Responsibility. Ordering Parts. Contact Information

Clad Direct Glaze Window Installation Instructions

INSTALLATION INSTRUCTIONS

BUILD A TABLETOP LOOM

Linkeo 19" freestanding cabinets

PPS-PPQ-BT-PIAS RESIN INSULATORS FOR OIL INSULATED ELECTRICAL MACHINES

Modular Locomotive System Instruction Manual for HBK8 George Body Kit

REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES

ATLANTA MODEL SPECIFICATIONS

DIVISION 8, METAL SOUND CONTROL DOOR ASSEMBLIES PART 1 GENERAL 1.1 RELATED DOCUMENTS

Front axle components, overview

METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS

Vinyl Greenhouse Window Page 2 of 6 New Contruction Installation Instructions

Premier & Deluxe 3-Season Room Sliding Glass Door

Transcription:

Prepared by: ABB1 REQUIREMENTS FOR BUS DUT ENTRANE TERMINATION UNIT FOR USE WITH PAD-MOUNTED TRANSFORMERS 063929 Asset Type: Electric Distribution Function: Design and onstruction Issued By: Lisseth Villareal (LDV2) Date: 07-01-14 Rev. #10: This document replaces PG&E Document 063929, Rev. #09. For a description of the changes, see Page 10. This document is also included in the following manual: Electric and Gas Service Requirements Manual () Purpose and Scope This document provides the tools, ordering instructions, and the necessary manufacturing specifications and details for the fabrication and assembly of bus duct entrance terminations. The function of the entrance box is to: Provide a means for connecting the customer s bus duct to a pad-mounted transformer. Permit a future, larger transformer to be installed without disturbing the existing bus duct installation. Reduce the shutdown time for transformer replacement. The entrance box is furnished with two removable sections to permit access to the bus duct extension connections. PG&E will supply and install the entrance box. General Information 1. The Entrance Termination Unit is used to provide transition from a customer-provided service entrance bus duct to the low-voltage service compartment of a PG&E, pad-mounted transformer, for services of 3,000 to 4,000 amps. 2. onstruction A. The unit s construction design shown in this document shall comply with the Western Underground ommittee s Guide 2.13, latest revision, for tamper-resistant, pad-mounted, equipment enclosures. B. Each top and side cover shall latch and securely self-lock at a minimum of three points, when the unit is assembled. All sharp external corners, edges, and joints shall be smoothed to prevent injury or damage to clothing.. The edges, seams, and joints shall be made and formed to provide a close-fitting mating surface. Exposed welding on the outside surface of the unit(s) shall be a continuous bead, machined and ground flush. D. All metal work shall be cleaned free of dirt, oils, and rust, and immediately painted, both inside and outside, with one coat of suitable, rust-inhibiting primer, approximately 1.5 mils thick when dry. E. The interior and exterior of the housing shall be finished with one or more coats of Green Munsel, No. 5.5gy, 2.76/2.1 (PG&E No. 610 Green) paint. The total dry film thickness shall not be less than 2 mils (the total paint thickness, including primer, not less than 3.5 mils when dry). F. Approximately a half pint of touch-up paint (preferably in an aerosol spray can) shall be included and shipped with each unit (attached inside the unit to the cable support block). 3. Methods of Serving Large ommercial ustomers A. Main Service Rating 201 Through 2,500 Amps: The approved method is by underground cable in customer-installed conduit (refer to Document 063928 for details). B. Main Service Rating 3,000 Through 4,000 Amps: The approved method is a PG&E-owned and installed bus duct entrance box attaching to customer-owned and installed bus duct that is a minimum of 30 long. 4. Note: Bus ducts shall only be connected to pad-mounted transformers with a minimum 30-inch deep cabinet and a secondary terminal height of 46 inches from the bottom of the cabinet (Style IIE-LB and IIF, 300 kva and larger). Rev. #10: 07-01-14 063929 Page 1 of 10

Requirements for Entrance Termination Unit 5. It is recommended to install pad-mounted transformer, bus duct entrance termination box, and customer bus duct entrance box on the same monolithic pad to avoid soil settlement issues. See Document 043818 or Document 045292 for transformer pad dimensions. 6. Service onnection The customer shall provide a minimum of 30 inches of bus duct, including flanged ends, elbows, and straight sections from the bus duct entrance terminating end at the side of the pad-mounted transformer (top entry is not permitted). The customer shall also supply tie straps for collecting like phases, all necessary bus extensions, and bracing for bus extensions, as required. The bus duct shall enter the transformer entrance box in a horizontal configuration. PG&E will make the connections from the bus extensions to the transformer secondary terminals, using insulated, flexible, copper conductor provided by PG&E. 7. To provide a water tight transition between the components, the bus duct (flanged ends provided by the customer) must match the dimensions of the transition box assembly and flange plate (Detail A on Page 8). 8. Transformer over Plate A cover used to close off the bus duct entrance hole left in a transformer when it is removed or replaced. This plate bolts into the same bolt holes used for the bus duct entrance termination box and can be installed locally so that the transformer can be reused without sending it to Emeryville to have the opening covered (ode 180203). References Location Document onnectors for Insulated ables Underground Distribution Systems... UG-1: onnectors/... 015251 oncrete Pads for Radial-Style, Three-Phase Pad-Mounted Transformers... UG-1: Transformers... 043818 Installation of Loop-Style, Three-Phase, Pad-Mounted Transformers... UG-1: Transformers... 045291 oncrete Pad for Three-Phase, Loop-Style, Pad-Mounted Transformers... UG-1: Transformers/... 045292 Terminating Underground Electric Services 0 600 Volts in ustomer-owned Facilities... UG-1: Services/... 058817 Methods and Requirements for Installing ommercial Undergroung Electric Services 0-600 Volts to ustomer-owned Facilities... UG 1: Sevices/... 063928 Installation Notes 1. Method of installation (see Figure 1 on Page 4) - The location of the edge of the pad must first be established by consultation between PG&E and the building architect or contractor. The bus duct termination end flange and flange plate shall be located such as to permit its connection to the bus duct entrance termination box at a point 23 inches to 24 inches from the edge of the pad. The vertical centerline of the bus duct entrance termination box shall be located 23 inches from the front edge of the transformer pad (see Figure 1, Section A-A and Figure 2, Section B-B on Page 4). Additionally, there must be a minimum of 54 inches straight length between the edge of the pad and any obstruction (joint, bend, support, apparatus, wall or building, etc) in the bus duct to accommodate the 48 long bus duct entrance termination box provided by PG&E. These dimensions will accommodate all style IIB, II, IIE, IIF, IIG, and IIH transformers used in bus applications. 2. Bus duct flange plate (see Detail A on Page 8) - A removable bus duct end flange plate shall be provided by the customer at the transformer end of the bus duct. This plate shall not be drilled. PG&E will locate and drill 1/2-inch diameter holes in the flange plate to match the square holes in the adjustable end flange of the entrance box. 3. Transformer cabinet bus duct cutout - The horizontal centerline of the bus duct termination box in the side of the transformer shall be approximately 24 inches above the top of the pad. The cutout dimensions and drilling for bolt holes must match the dimensions and drilling of the entrance box, as determined in the field. A template is provided in the kit to help in positioning the flanged end and locating the mounting holes. 4. Bus duct connections in transformer (see Figure 3 on Page 5) A. For two and three bars per phase, the customer shall provide tie straps bolted across like phases where they enter the transformer entrance box. 063929 Page 2 of 10 Rev. #10: 07-01-14

Installation (continued) Requirements for Entrance Termination Unit UG-1: Services B. PG&E will provide the flexible copper conductor and spade connectors necessary to make the connection between the secondary spades of the transformer and the customer s bus duct.. The customer shall furnish the tie bars (Section F-F on Page 8) and spacers (Detail D on Page 8) with the bus duct. The bus duct must be in a horizontal configuration when entering the entrance box. D. PG&E will provide the necessary spade supports (see Document 045291) for the protection of the transformer (supports are not part of a kit). 5. Feeder bus duct and entrance box supports - Feeder bus duct supports (where necessary) are required to be installed by the customer. The entrance box shall not be used as a bus duct support. PG&E will provide and install a support (supports are not part of a kit) for the bus duct entrance termination box, as shown in Figure 1 and Figure 2 on Page 4, and Detail F on Page 9. Rev. #10: 07-01-14 063929 Page 3 of 10

Requirements for Entrance Termination Unit Installation (continued) HV ompartment Door LV ompartment Door Transformer Provided by PG&E Box L Pad A See Page 6 and 7 for Termination Dimensions A Termination End Flange and Flange Plate 48 23-24 54 Min. See Detail F on Page 9 PG&E Supplied Entrance Termination Box Provided by PG&E Unobstructed Straight Length of Feeder See Note 1 on Page 2 Feeder ustomer Supplied Transformer Entrance Termination L Obstruction Box Box L L 24 22-3/8 ustomer Supplied 23 Section A-A Bus Duct Figure 1 Typical Assembly for Largest Pad-Mounted Transformer Transformer Provided by PG&E HV ompartment Door LV ompartment Door Pad Termination End Flange and Flange Plate Box L B B See Page 6 and 7 for Termination Dimensions 48 23 24 54 Min. See Detail F on Page 9 Entrance Termination Box Provided by PG&E PG&E Supplied ustomer Supplied Figure 2 Typical Bus Assembly for Smallest Pad-Mounted Transformer Note: Dimensions in all Figures are not to scale. Unobstructed Straight Length of Feeder See Note 1 on Page 2 Feeder Transformer ustomer Supplied Obstruction L Entrance Termination Box L Box Bus L Duct 24 22-3/8 23 Section B-B 063929 Page 4 of 10 Rev. #10: 07-01-14

Requirements for Entrance Termination Unit Entrance Termination Box Assembly Entrance Termination Box Top Section Transformer End Flange Locking Provision Upper Section UG-1: Services arriage Bolt W/Nut and Washer able Spacer Block otter Pins able Spacer Block Bracket Air Vent Entrance Termination Box Bottom Section Locking Provision Lower Section Figure 3 Entrance Termination Box (ode 019645) 2 Min. Entrance Terminating End Flange 23-3/4 25-3/4 25-3/4 Table 1 List of Material for Entrance Termination Box Kit Quantity Description 1 Stainless Steel Entrance Termination Box 1 Spade Support Kit (Document 045291) 4 opper Bus Bar Extensions (see Detail E on Page 9) 24 1 x 3/8 arriage Bolts With Nuts and Washers 2 3/8 x 3-1/2 Bolt, With Nut and 3/16 Diameter Hole for Safety Lock 2 Safety Locks, Utilco atalog Number PEL-1, ode 170115 10-Foot Length Weather Stripping 1 Template Table 2 Recommended Tools for Assembly and Installation of Entrance Termination Box Description ode Sawzall, Heavy Duty, Milwaukee #6511-W/ase 210075 Blades, Sawzall, Milwaukee #48-00-1171 Package of 10 207674 Drill, Skil #6550, 1/2 Variable Speed Reversible 210026 Drill Bit Set, 1/16 to 1/2, W/ase 203026 Punch, enter, 3/8 201305 Rev. #10: 07-01-14 063929 Page 5 of 10

Requirements for Entrance Termination Unit Termination Assembly Fully Extended See Detail E on Page 9 X0 X1 X2 X3 Termination Box ustomer Feeder No. 1 No. 2 30 Min. No. 3 No. 4 No. 5 No. 6 No. 7 30 Min. 48 Secondary ompartment Plan View Figure 4 Typical Outdoor Bus Termination Fully Extended See Document 045291 Bus Bar Support Brackets 1,000 kcmil, 600-V opper onductor Extra Flexible, 127 D Stranding ode 294490 Phase X3 Phase X2 Phase X1 Phase X0 able Spacer Termination End Flange and Flange Plate 30 Min. Pad 23-24 See Note 1 on Page 2 Section - Fully Extended 22-3/8 063929 Page 6 of 10 Rev. #10: 07-01-14

Requirements for Entrance Termination Unit Termination Assembly Fully ompressed UG-1: Services See Detail E on Page 9 X0 X1 X2 X3 Termination Box ustomer Feeder No. 1 No. 2 30 Min. No. 3 No. 4 No. 5 No. 6 No. 7 30 Min. 48 Secondary ompartment Plan View Figure 5 Typical Outdoor Bus Termination Fully ompressed See Document 045291 Bus Bar Support Brackets 1,000 kcmil, 600-V opper onductor Extra Flexible, 127 D Stranding ode 294490 Phase X3 Phase X2 Phase X1 Phase X0 48 able Spacer Termination End Flange and Range Plate 30 Min. Pad 22-3/8 23 24 See Note 1 on Page 2 Section D-D Fully ompressed Rev. #10: 07-01-14 063929 Page 7 of 10

Requirements for Entrance Termination Unit Termination Assembly Details Termination End Flange Plate (see Detail A) D 3/8-16 x 5/8 Long Nelson Stud omplete With 1 Flat, 1 Spring Washer, and Hexagonal Nut 1 24-3/4 11-3/8 11-3/8 Only ables and onnectors Are Furnished by PG&E D 1 Bus Duct L W = 22 Max. 23-1/4 10 1 The Bottom Bus Is Always to Be Designated the Neutral Bus (see Detail ) Figure 6 Termination Detail With End and Tie Bars 1 Min. 5/8 Insulation on Bus Bar Tie Bars, Two Per Phase Spacer Thickness to Match the Thickness of Manufacturer s Bus Bar 2 3 4 5 Detail B Typical Phase Bus Termination Assembly 2 3 4 1 1 5 Tie Bar (Section F-F) See Page 6 Insulation on Bus Bar Detail Typical Neutral Bus Termination Assembly 3 3 3 3 3 3 1 Min. Drill 14 ea. 20 Min. 22 Max. 9/16 Dia. Detail D Holes Spacer 3 x 20 Long opper (thickness to suit) (customer supplied) 3 Phase Bus, (see Detail B) #12 AWG 1 old-rolled Steel Detail A End Flange Plate (customer supplied) 2 Top Phase 5 2-1/2 Phase 2-1/2 Phase 5 Bottom Neutral 1 Min. 6 5/8 Drill 14 ea. 9/16 Dia. Holes 32 3/4 8 2 20 Min. 22 Max. 3 3 3 3 3 3 L of Bus Bar 22 Max. Obstruction (building, apparatus wall, support, or bend) Termination End Flange Plate L Straight Length of Feeder Section E-E Bus Bar (customer supplied) 1 Min. 8 11 Wall Section F-F Tie Bar onnection 1/4 x 6 x 20 Long opper (two per phase and one per neutral required) (customer supplied) 063929 Page 8 of 10 Rev. #10: 07-01-14

Requirements for Entrance Termination Unit Termination Assembly Details (continued) UG-1: Services 8 1-1/8 1 5/8 L of Transformer s Low-Voltage ompartment 3 3 3 3 3 3 20-1/2 3 Min. Air learance From End of Bus to Door or Metal Detail E opper Bus Bar Extension (see Table 1 on Page 5) 3/4 3/4 L 1-1/2 As Reqd. Height as Reqd. 6 oncrete Footing 12 Dia. x 12 H For Unpaved Areas Angle 2-1/2 x 2-1/2 x 3/16 Galvanized As Reqd. Weld All Around 2 Steel Pipe, Schedule 40, Galv. Existing oncrete Pad Height as Reqd. Steel Flange for 2 Pipe (weld-on type) ode 025391 For Paved Areas Detail F Termination Unit Supports (PG&E supplies one under the bus duct termination box. ustomer supplies remainder as required.) Table 3 opper onductor Requirements 1 Main Switch Rating Number of onductors Per Phase Number of Neutral ables Approximate Footage of onductor 2,500 4 2 140 3,000 5 3 180 3,500 6 3 210 4,000 7 4 250 1 Use only 1,000 kcmil copper cable (ode 294490). Table 4 List of Materials for Bus Termination Assemblies (see Detail B and Detail on Page 8) Item Description ode Document 1 Terminal onnector, ompression-type, able-to-flat, for 1,000 kcmil able 303461 015251 2 Screw, ap (bolt), Hex. Head, 1/2 x 2-1/2, Everdur or Equivalent 193177 3 Nut, Bolt, Hex., 1/2, Everdur or Equivalent 195013 4 Washer, Round, 1/2, Everdur or Equivalent 195252 5 Washer, Lock, 1/2, Everdur or Equivalent 195193 Rev. #10: 07-01-14 063929 Page 9 of 10

Requirements for Entrance Termination Unit Revision Notes Revision 10 has the following changes: 1. Revised General Information Note 3B on Page 1. 2. Added Note 5 under General Information on Page 2. re-numbered Notes 6-8 on Page 2. 3. Added two new references on Page 2. 4. Revised Installation Section Note 1 on Page 2. 5. Revised Figure 1 and added Figure 2 on Page 3. Re numbered Figures 3 6 on Pages 5-8. 6. Revised Item 1 description in Table 1 on Page 4. 063929 Page 10 of 10 Rev. #10: 07-01-14