AIRPORT COLLABORATIVE DECISION MAKING

Similar documents
A -- irport C -- ollaborative D -- ecision M -- aking. Erik Sinz, DFS Business Unit Tower

A-CDM from an airport perspective Oslo Airport

User Forum EUROCONTROL s Brussels HQ. 18 January 2011 CDM@CDG

Brussels Airport, a roadmap to A-CDM implementation

SUMMARY. This information paper summarises the status of Airport CDM Trial s and Implementation. RECOMMENDATION

Aircraft De-icing at Leipzig/Halle Airport - Standard Deicing Setup - Titel des Dokuments.

Integrated surface management Herve Drevillon (DSNA) Airport safety support tools for pilots, vehicle drivers and controllers Nicolas Leon (DSNA)

Airport Detailed Operational Description (DOD) Step 1 Yearly Update 2013

A day in the life of an aircraft operator

Glossar Matrix FRA / A-CDM Abbreviations

( T A C T ) C A ) I A

Produktprogramm. Operational concepts Strategy & business development Safety management Human factors System design & development

Training program for S2 (TWR) rating

LOCAL OPERATING PROCEDURES (LOP) LANDVETTER TWR (ESGG)

SWIM Connect SWIM Partnerships: Collaboration with the FAA s Decision Support Service (DSS) Programs 3:00 PM. Federal Aviation Administration

ICAO Safety Management Systems (SMS) Course Handout N 5 Cuzco International Airport operation

ATIS/VOLMET Flex ATIS/VOLMET/DATALINK and Clearance

PF3 ATC at its best Version History

/Flughafen München GmbH Annual Press Conference

Global Data Center. Worldwide Aircraft Communications and Flight Support Services

REVIEW OF AIP SUPPLEMENT. (Presented by Singapore) Attached is a copy of the AIP SUPP for review by the Meeting.

Swedavia s Airport Charges 2016

SITA AIRCOM Service (VHF & Satellite)

WHICH AIR TRAFFIC CONTROLLER TO CONTACT

Key Performance Indicators for Performance-Based Airport Management from the perspective of airport operations

ENR 0.6 TABLE OF CONTENTS TO PART 2 - ENR

Airport Guide to Greenland

Do you know exactly how the communication with an aerodrome controller in a foreign country should look like? No? If not, this list might help you.


Prevention of loss of communication. Air China

Overview of NM and CDM

THE GLOBAL AIRLINE INDUSTRY

How To Manage A Plane With A-Cdm

CIVIL AVIATION REQUIREMENTS SECTION 2 - AIRWORTHINESS SERIES 'I' PART VI

AVIATION TRAINING ACADEMY

Press release from Siemens, Barco, Inform, ATRiCS, DLR and Stuttgart Airport

Annual Work Programme December Page 1 of 66

Exemption No A Regulatory Docket No. FAA

IFR Operators Briefing Pack. May 2013

the safety maker in aviation

SANTOS DUMONT ENGLISH ASSESSMENT IDENTIFICATION

FBO & Handling Charges. Düsseldorf

RTCA SC-214 / EUROCAE WG-78 Advanced Data Communication Baseline 2 Standards. Baseline 2 Tutorial. Melbourne (FL), March 2013

CHAPTER 7. AIRSPACE 7.1 AFFECTED ENVIRONMENT

8-1 Chapter 8 Radio Operations: Aviation Spoken Here

Development and Evaluation of Novel Algorithms for Enhanced Aircraft Routing on Ground ACHILLEAS F. KATSAROS

A Strategic Vision of Air Traffic Management in New Zealand to 2025

AVIT COMMERCIAL AVIATION AVIT - COMMERCIAL AVIATION. Career & Technical Programs - AVIT

How To Operate A Helicopter

SESAR Air Traffic Management Modernization. Honeywell Aerospace Advanced Technology June 2014

ATFCM USERS MANUAL. Network Operations

AIR TRAFFIC FLOW MANAGEMENT (ATFM)

Tallinn Airport Ltd. Conditions of infrastructure use for ground handling service providers. Valid since Lennart Meri Tallinn Airport

2014 NIFA CRM Contestant Briefing Guide San Diego, California

FLIGHT AND DUTY TIME LIMITATIONS FOR FLIGHT CREW OPERATIONS OTHER THAN COMMERCIAL AIR TRANSPORTATION BY AEROPLANES

Pilot Briefing for Helsinki-Vantaa Real Flight Event

Collaborative Departure Queue Management

NAMIBIAN RADIO LICENSE VALIDATION

K+P. Munich Airport International Terminal 2. Architekten und Stadtplaner GmbH Koch Voigt Zschornack

[EN 026] Developing key performance indicators for airports

2.6 Personnel and Goods Check Procedures upon Accessing Security Restricted Areas

IFR Communication Procedure

ATFM Line of Action 7 Consistency between Airport Slots, FPL and ATFM Slots

ADS-B is intended to transform air traffic control by providing more accurate and reliable tracking of airplanes in flight and on the ground.

A new dimension in infotainment

A presentation of the NM19.5 to Externals via video-conference took place on the 16 th of September 2015.

Remote Tower Solutions. BY SEARIDGE TECHNOLOGIES AND NAVCANatm. The cost-effective alternative for airport monitoring and control

Airport logistics - A case study of the turnaround

ATFM STATUS REPORT: SOUTH AFRICA

Pilot Briefing Stockholm/Arlanda

Pilot Briefing Manual. Εγχειρίδιο Ενημέρωσης Πιλότων

CHARGES REGULATIONS APPLYING TO COPENHAGEN AIRPORT IN FORCE DURING THE PERIOD 1 APRIL 2015 TO 31 MARCH 2019

Oostwold Airshow 2015

VATSIM CODE OF CONDUCT

Safety Bulletin Newsletter

Take-off from Taxiway. Amsterdam Airport Schiphol. Take-off from Taxiway. The Dutch Safety Board

Organización de Aviación Civil Internacional. Международная организация гражданской авиации. Ref.: AN 13/1.1-12/19 10 April 2012

Contents. Munich Airport International 3. Introduction 4. Areas of Expertise. ORAT Operational Readiness and Airport Transfer 6.

Policy Regarding Datalink Communications Recording Requirements. AGENCY: Federal Aviation Administration (FAA), Department of Transportation (DOT).

Performance-based Navigation and Data Quality

years in the community

ACARS INTRODUCTION. ACARS Coverage

The Community College of Baltimore County AVIATION STUDIES DEPARTMENT INFORMATION PACKET

Mesa Resolves Multiple Comms Issues with AvFinity s AIRS Solution

.OR.AT.ATTORNEY.AUCTION.BARGAINS.BAYERN.BERLIN.BLACKFRIDAY.BOUTIQUE.BRUSSELS.BUILDERS

Minimum Safety Requirements for Helicopter Landing Areas used on Regular basis.

Price list for access to airport systems and spaces and the use of centralized infrastructure at Warsaw Chopin Airport

Aircraft incident at Helsinki-Vantaa airport on

Catania Airport Commercial Aviation Policy 2016 on incremental international traffic. 31st January 2016

> SESAR. Open Skies and 4D trajectories Project Flight-Management Dr. Gunter Küchler Member of the Executive Board, Lufthansa Systems AG

Malmi - Helsinki City International Airport. Malmi operators development plan


AERONAUTICAL TELECOMMUNICATION NETWORK PANEL WORKING GROUP 3 - FIFTEENTH MEETING. Agenda item: 4.2 Review Trials and Implementation Activities

CIVIL AVIATION REQUIREMENTS SECTION 4 AERODROMES & AIR TRAFFIC SERVICES SERIES X PART IV 17 th OCTOBER 2007 EFFECTIVE : FORTHWITH

Tours Reporting System (Divisional) English version

11 Distress and Urgency

June 22, 2011 Exemption No Regulatory Docket No. FAA

ACARE Mobility Challenge

With all of the new hype the

Breakdown of separation near Melbourne Airport, Victoria 5 December 2010

Transcription:

AIRPORT COLLABORATIVE DECISION MAKING AIRPORT CDM AT MUNICH AIRPORT Flight Crew Briefing English

Version: 6.0 Author: Airport CDM Team Munich Date: 22.04.2014 Number of pages: 8 TABLE OF CONTENTS 1. General... 3 1.1. Definition... 3 2. Target Off-Block Time (TOBT)... 4 2.1. Automatic TOBT... 4 2.2. Person responsible for TOBT... 4 2.3. TOBT input and adjustment... 4 2.4. TOBT deletion... 5 2.5. TOBT reporting channels... 5 3. Target Start Up Approval Time (TSAT)... 5 3.1. TOBT and TSAT handling in extreme situations... 5 4. Start-Up and Push-Back... 6 4.1. Datalink Clearance - DCL... 6 4.2. Swapping flights within the sequence... 7 4.3. De-icing... 7 4.3.1. De-icing on position... 7 4.3.2. Remote de-icing... 7 4.3.3. Fanblade de-icing... 7 4.4. Coordination with NMOC... 7 4.5. Remote Holding... 7 5. Aeronautical Information Publication (AIP)... 7 6. Persons responsible for the process/contact persons... 8 Airport CDM Munich Flight Crew Briefing Seite 2

1. General Airport CDM München This document describes the airport collaborative decision making (CDM) process at Munich Airport. It is to be understood and used as information material for flight crews. Together with the publications about Airport CDM (AIP Germany, AIP AD2.EDDM and the airport user regulations FBO), this document is to ensure that Airport CDM at Munich Airport is handled in a optimum way in the interest of all partners. A detailed description of the process is also available as a "brief description". This document will enter into effect on 19.05.2014 and supersedes any and all previous versions. 1.1. Definition Airport CDM facilitates the optimal handling of turn-round processes in operations at Munich airport. It covers the period of time between the estimated off-block time (EOBT) minus 3h and take-off and is a coherent process from flight planning (ATC flight plan) to landing and the subsequent turn-round process on the ground before the next take-off. Airport CDM at Munich Airport is based on the European standard for Airport CDM, the common specification for Airport CDM ( Community Specification ) and the initiative "Deutsche Harmonisierung von Airport CDM" (German harmonisation of Airport CDM). Airport CDM Munich Flight Crew Briefing Seite 3

2. Target Off-Block Time (TOBT) Airport CDM München The TOBT is the reference time used for all ground handling processes except for aircraft push-back and de-icing. This time is used for coordination, as it is the best available time for that purpose. 2.1. Automatic TOBT TOBT is the prediction of aircraft ready. The TOBT for the linked outbound flight will be generated automatically 12 minutes prior landing, if the TOBT has not been entered manually before. The earliest time for a manual TOBT input is 90 min. before EOBT. If the TOBT for a flight has not been generated automatically, it must be entered by the person responsible for the TOBT as described below. The TOBT for flights which are not subject to a direct turn-round and which do not park on their outgoing position will be generated automatically at "off-block from the direct preceding position" or based on the EOBT. 2.2. Person responsible for TOBT Airlines have to ensure: the nomination of one person responsible for the TOBT the communication with the relevant airline OCC (ATC flight plan/person responsible for the EOBT) and the coordination of internal working procedures The person responsible for the TOBT, the handling agent, the airline (for flights without handling agents) or the pilot-in-command/flight crew (for general aviation flights without handling agent) is responsible for TOBT correctness and adherence. A wrong TOBT leads to disadvantages for further sequencing and/or CTOT allocation of regulated flights. Therefore, the TOBT has to be adjusted as early as possible. 2.3. TOBT input and adjustment The following facts have to be taken into account for the input and/or adjustment of the TOBT: a TOBT can be adjusted as often as necessary until TSAT has been issued after TSAT has been issued, a TOBT can only be corrected three times the forth TOBT change can result in disadvantages for sequencing the entered TOBT has to be at least 5 minutes later than actual time new and old TOBT must differ by at least 3 minutes the entered TOBT is not allowed to be earlier than 10 minutes before EOBT Airport CDM Munich Flight Crew Briefing Seite 4

As the TOBT is also the basis for further airport processes, adjustments of the TOBT (also if the process is completed more than three minutes earlier) are to be entered by the person responsible for the TOBT. 2.4. TOBT deletion The TOBT has to be deleted, if the TOBT cannot be met and the new TOBT is still unknown (e.g. technical problems with the aircraft). A flight without TOBT will not be sequenced and is therefore not allowed to depart. If the TOBT is deleted, the TSAT is automatically deleted as well. If a new TOBT is known and the process shall continue, the person responsible for the TOBT has to enter a new TOBT. 2.5. TOBT reporting channels The TOBT is reported and/or adjusted by one of the following ways: - Sequence Manager - internal system of the aircraft operator/ handling agent - Common Situational Awareness (CSA) Tool - via telephone at the FMG traffic operations centre (+49-(0)89-975-21135) 3. Target Start Up Approval Time (TSAT) The TSAT is the target time for start-up approval according to the A-CDM procedure. The pre-departure sequence is based on the flights with a calculated TSAT. The TSAT is published 40 minutes prior to the valid TOBT. The TSAT is transmitted via the same communication channels as the TOBT. As a rule, TSAT and any changes to the TSAT are transmitted to the person responsible for the TOBT, who then forwards them to the flight crew/pilots. When the Datalink procedure (DCL) is used for clearances, TSAT will additionally be transmitted directly into the cockpit. 3.1. TOBT and TSAT handling in extreme situations If TOBT and TSAT deviate from each other by more than 90 minutes, the ground handling process has to be completed before TOBT. This does not apply to passenger boarding. Passenger boarding has to be completed TSAT -60 minutes at the latest. Airport CDM Munich Flight Crew Briefing Seite 5

4. Start-Up and Push-Back Airport CDM München Start-up (ASAT) and push-back (AOBT) clearances are issued taking into account the TOBT and TSAT. The following rules shall apply: Start-up (ASAT) and push-back (AOBT) clearances are issued taking into account the TOBT and TSAT. The following rules shall apply: The aircraft has to be ready for start-up and/or on-stand de-icing at TOBT. In principle the timeframe for start-up approval and en-route clearance is TSAT +/- 5 minutes o o The pilot should request start-up approval and en-route clearance TSAT +/- 5 minutes. Clearance Delivery issues the start-up approval and en-route clearance depending on TSAT and the current traffic situation. The push-back/taxi clearance has to be requested not later than 5 minutes after the start-up approval has been issued. In case of delays Clearance Delivery has to be informed. Otherwise the TOBT will be deleted and has to be re-entered. If there are any significant changes to the TSAT, the pilot will be informed accordingly by the airline/handling agent. In the case of general aviation flights, this task will be performed by Clearance Delivery. 4.1. Datalink Clearance - DCL The published procedures and the time parameters published in the AIP AD 2 EDDM 1-20 continue to apply to data link departure clearances (DCL). The TSAT is transmitted via CLD (departure clearance uplink message issue of the start-up approval and en-route clearance by Clearance Delivery). Start Up approved TSAT <hh:mm> The push-back/taxi clearance has to be requested at TSAT +/-5 minutes. Example: DCL with Start up approval and En route clearance QU QXSXMXS.MUCDFYA 110454 CLD AN D-AHFX/MA 767A - /MUCDFYA.DC1/CLD 0454 070311 EDDM PDC 001 HLF111 CLRD TO LPFR OFF 26L VIA AMPEG1S SQUAWK 3553 ADT MDI NEXT FREQ 121.775 AT IS D STARTUP APPROVED TSAT 05:00 DCL only with En route clearance QU QXSXMXS.MUCDFYA 110818 CLD AN D-ACPQ/MA 891A - /MUCDFYA.DC1/CLD 0818 070311 EDDM PDC 001 DLH06M CLRD TO LFBO OFF 08R VIA AMPEG1E SQUAWK 3545 ADT MDI NEXT FREQ 121.725 AT IS J STANDBY ON 121.725 FOR STARTUP TSAT 08:30 Airport CDM Munich Flight Crew Briefing Seite 6

4.2. Swapping flights within the sequence After the TSAT has been calculated, the sequence of flights can be changed via the CSA-Tool within the area of responsibility of the person responsible for the TOBT. As there are special restrictions in connection with swapping flights, the possible flights to be swapped will be indicated in the CSA-Tool. If one of the flights has a TSAT which is less than 15 min. in the future, the swap has to be confirmed and executed by DFS Tower. 4.3. De-icing 4.3.1. De-icing on position In case of apron de-icing the aircraft has to be ready for de-icing at TOBT. It must have been de-iced at TSAT. 4.3.2. Remote de-icing Aircraft de-icing times don t have to be considered for the calculation of the TOBT, because de-icing request, estimated de-icing time and de-icing capacity will be included in the calculation of the TSAT. Therefore de-icing should be requested as early as possible. 4.3.3. Fanblade de-icing Fanblade de-icing is an event that takes place before the beginning of the CDM process and is therefore not taken into account for the calculation. The TOBT must be after the end of fanblade de-icing. 4.4. Coordination with NMOC The general CFMU procedures remain the same. In addition during the turn-round process local Target Take-Off Times (TTOT) will be automatically calculated and transmitted to NMOC. In case of longer delays, which are under the responsibility of the airline, the standard CTOT allocation will apply, but will be fine-tuned by the local TTOT. Generally NMOC will take the local TTOT into consideration for CTOT calculation and try to adjust it accordingly. If an adjustment/extension is not sufficient, DFS (Clearance Delivery) offers to coordinate a new CTOT in consultation with the pilot in command/flight crew. 4.5. Remote Holding Remote holding can be requested by the CSA-Tool, if the TOBT is at least 30 minutes before the CTOT. 5. Aeronautical Information Publication (AIP) The Airport CDM procedure at Munich Airport is published in AIP Germany, Volume II, AD2-EDDM, section AD 2.20 Local Traffic Regulations. Airport CDM Munich Flight Crew Briefing Seite 7

6. Persons responsible for the process/contact persons Flughafen München GmbH Peter Kanzler Tel. +49-(0)89-975-21160 airport-cdm@munich-airport.de Airport CDM Munich Flight Crew Briefing Seite 8