Pre-Inspection Checklist for Hot Water Heating or Hot Water Supply Boilers



Similar documents
STATE OF NEW JERSEY DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT LABOR STANDARDS & SAFETY ENFORCEMENT DIVISION OF PUBLIC SAFETY

FLASH TANK ECONOMIZER PRODUCT GUIDE

CHAPTER 10 BOILERS, WATER HEATERS AND PRESSURE VESSELS

LAKE COUNTY ANIMAL SERVICES EXPANSION SECTION 15459

GUIDELINES FOR LOGBOOKS COMPLIANCE TO BOILER REGULATIONS N.J.A.C. 12:90

Chicago Stationary Engineer Licensure Examination Information

2010 Residential Water Heater Replacement Check List

Boiler & Pressure Vessel Inspection discrepancies and failures

Second Class Chief Statutes and Rules

BOILER CLASS 5, 5A/5B LICENSE EXAMINATION STUDY GUIDE

?52. Questions. and their. Answers, Relating To Hot Water Safety

Electric Water Heater

Indirect-Fired Storage Water Heater Models WH-30 through WH-80 INSTALLATION AND OPERATING INSTRUCTIONS

NFPA31FuelOilPiping 1 Revised

Modulex. Gas Fired Boiler Systems PIPING GUIDE GF-115-P. Modular, Condensing, Hot Water Boilers Models: 303, 454, 606, 757, 909, Instruction No.

Boiler Preparation, Start-Up and Shutdown

Hot Water Boilers and Controls Why Condensing Boilers are Different. Presented Oct. 14, 2008 Long Island Chapter, ASHRAE

INSTALLATION, OPERATING AND SERVICE INSTRUCTIONS

Energy Efficient Operations and Maintenance Strategies for Boilers

Commercial Gas Water Heaters

Chapter 7 Plumbing Connections

HS-901(A) BASIC STEAM HEATING SYSTEMS

Series GM. Peerless Boilers. Residential/Commercial Gas Boilers

ASME Packaged Indirect Fired Water Heater

G234X-55 Conventional Gas Boiler

Quik Lining Systems Heater Owners Guide

OTF Oil Fired Pool Heater

Sec page 1 (5-98)

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-217(I) Series 150S and 157S (Snap Switch, All Models except 157S-RB-P)

SIOUX HYBRID WATER HEATER

PLBG/GAS SAFETY Information Bulletin

INDIRECT WATER HEATER. Installation and Operating Instruction Manual

Preventing Overheated Boiler Incidents

The city of Milwaukee s Sample Preventative maintenance manual for Electronically monitored boilers

Heating Water by Direct Steam Injection

In-Line Air Separators

HOT WATER SYSTEMS CONTENTS

NC General Statutes - Chapter 95 Article 7A 1

INSTALLATION & SERVICE MANUAL

Factory owners must ensure the boiler is:

INTEC Engineering GmbH Heating Solutions for the Marine Industry

Installation & Operation Manual Models: STU

(a) Purpose. The purpose is to safeguard potable water supplies by preventing backflow into public water systems.

Boiler and Burner Cleaning and Servicing Specifications

Overview of Heat Recovery Boiler Systems and Operating Costs Factors Effecting Blowdown Blowdown Heat Recovery The Energy Tank

Morrison Bros. Co. General Product Specifications

FAQ and Device/Usage Chart. What Is a Cross-Connection? What Is Backflow Prevention? What Is Backflow?

Technical Data Manual Model Nos. and pricing: see Price List

ELECTRIC/DIESEL FIRE PUMP CHECK LIST

EVALUATING SCHOOL BOILERS: BEST REPLACEMENT OPTIONS

Routine and Emergency Boiler Operation

Main Boiler Safety Page Fax

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

C. Burner management system to follow requirements of Industrial Risk Insurers (IRI).

Arapahoe County Residential Water Heater Installation and Inspection Guide

T&P and ASME Safety Relief Valves

CHAPTER 5 WATER HEATERS

DESIGNER S GUIDE EFFICIENCY+ BOILER

RESIDENTIAL HEATING OIL SERVICE CONTRACT ANNUAL COST $276.00

TABLE OF CONTENTS THE WATERTUBE BOILER REGULATORY CODES ECONOMIZERS BLOWDOWN SEPARATOR...1-8

What is Thermal Expansion?

POWER ENGINEERS REGULATION

Fundamentals of Hydronic Design

ELECTRODE BOILERS VAPOR POWER INTERNATIONAL

OREGON FIRE CODE Interpretations and Technical Advisories

MINI BTH INSTALLATION & OPERATING MANUAL

What to Expect From the Examination. How to Study the Plumbing Codes

from the turbine manufacturer.

MODEL FLX PACKAGED BOILER

SPECIFICATION DIVISION 22 SECTION DESCRIPTION DIVISION 22 PLUMBING SECTION THERMOMETERS, PRESSURE GAUGES, AND ACCESSORIES

OPERATING AND MAINTENANCE MANUAL FOR COMMERCIAL ELECTRIC WATER HEATER ELECTRIC HEATER COMPANY BASE MODEL SE

1. A belt pulley is 3 ft. in diameter and rotates at 250 rpm. The belt which is 5 ins. wide makes an angle of contact of 190 over the pulley.

TECHNICAL ADVISORY BULLETIN

BOILER ROOM GUIDE. Reference Guide

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

Commercial Gas Water Heaters

PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations.

INSTALLATION, OPERATING, AND SERVICE INSTRUCTIONS

DIRECT STEAM INJECTION HOT WATER SYSTEMS FOR JACKETED HEATING

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

NMSU FIRE DEPARTMENT Commercial Kitchen Fire Suppression Worksheet

Section 20 TABLE OF CONTENTS Pressurized Equipment and Systems. 20.A General B Compressed Air and Gas Systems

STEAM AND CONDENSATE PIPING AND PUMPS DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Purpose:

Element D Services Plumbing

BLADDER SURGE CONTROL SYSTEM

I N S T A L L A T I O N I N S T R U C T I O N S F O R T H E H i l k o i l Energy S aving Hot Water Kit

Gas Fired Water Heater Installation

Plumbing Code Sections For Commercial Food Facilities

D Youville College July 31, 2008 New Academic Building Cannon Design Project No

INSTALLATION, OPERATING, AND SERVICE INSTRUCTIONS

Design, Construction, Installation and Use of Boilers and Pressure Vessels

A cure for water damage in real estate

Mini Tank water heater Electric undersink Water heaters GL GL 4 - GL 6+

Mega-Stor INSTALLATION AND OPERATING INSTRUCTIONS ENGINEERING MANUAL MAINTENANCE PARTS

INSTALLATION AND SERVICE MANUAL EPJ SERIES INDIRECT WATER HEATERS

Indiana Boiler and Pressure Vessel Safety Section Frequently Asked Questions

Float and Thermostatic Traps Series H, C and X

Originators of the Flexible Water Tube design

Plumbing Code Statutes and Regulations February 2011 Labor Standards and Safety Division Mechanical Inspection

Instruction Manual. A DIVISION OF A. O. SMITH CORPORATION RENTON, WASHINGTON

Transcription:

Department of Labor and Workforce Development Labor Standards and Safety Enforcement Division of Public Safety and Occupational Safety & Health Bureau of Boiler and Pressure Vessel Compliance (BB&PVC) 1 John Fitch Way, 3 rd Floor P.O. Box 392 Trenton, NJ 08625-0392 Voice: (609) 292-2921 Fax: (609) 984-1577 Email: BPVRCompliance@dol.state.nj.us Pre-Inspection Checklist for Hot Water Heating or Hot Water Supply Boilers Notice: This checklist reflects the most common violations BB&PVC field inspectors encounter when performing an inspection on low pressure hot water heating and supply boiler installations. It is suggested that boiler industry personnel have access to a current set of applicable codebooks, regulations, and jurisdiction laws, such as: the American Society of Mechanical Engineers (ASME) Section IV and Section VI for Heating Boilers; the National Board Inspection Code (NBIC); the New Jersey Statutes Annotated, N.J.S.A. 34:7-1, N.J.S.A. 34:7-14; and the New Jersey Administrative Code, N.J.A.C. 12:90. Administration and General Requirements REFERENCE N.J.A.C. 12:90-4.2 NBIC A minimum clear space of eighteen inches (18 ) shall be provided on all sides of the boiler. As a minimum, all other sides shall comply with the boiler manufacturer s installation instructions for clearances to combustible materials. N.J.S.A. 34:7-20 N.J.S.A. 34:7-23 The owner or user of any boiler required to be inspected upon installation/reinstallation shall not operate the boiler until a certificate-inspection has been made. N.J.S.A. 34:7-23 N.J.A.C. 12:90-4.3 All low pressure steam boilers shall be constructed, stamped, and installed in conformance with Section IV of the ASME code. ASME CSD-1 CG-500 Completion of the Installer s Verification of Function Testing and Operation of Controls and Safety Devices for Boilers Rated Up to 12,499,999 Btu/hr is required. Form BPVC-INST.101 Rev 3.2010. Pre-Inspection Checklist for Hot Water Heating or Hot Water Supply Boilers Page 1 of 5

Instruments, Fittings, and Controls Each hot water heating or hot water supply boiler shall have a pressure or altitude gage connected to it or its flow connection. The scale on the dial of the pressure or altitude gage shall be graduated approximately to not less than 1½ nor more than 3½ times the pressure at which the safety relief valve is set. Piping or tubing for pressure or altitude gage connections shall be of nonferrous metal when smaller than NPS 1 inch. Section IV HG-612 Each hot water heating or hot water supply boiler shall have a thermometer so located and connected that it shall be easily readable. The thermometer shall be so located that it shall at all times indicate the temperature of the water in the boiler at or near the outlet. Each automatically hot water heating or hot water supply boiler shall be protected from over-temperature by two temperatureoperated controls. Each individual automatically hot water heating or hot water supply boiler shall have a high temperature limit control that will cut off the fuel supply to prevent the water temperature from exceeding its marked maximum water temperature at the boiler outlet. This control shall be constructed to prevent the temperature setting above the maximum. Each individual automatically hot water heating or hot water supply boiler or each system of commonly connected boilers without intervening valves shall have a control that will cut off the fuel supply when the system water temperature reaches a preset operating temperature, which shall be less than the maximum water temperature. Section IV HG-614 Each automatically fired hot water boiler with heat input greater than 400,000 Btu/hr shall have an automatic low-water fuel cutoff that has been designed for hot water service, and it shall be so located as to automatically cut off the fuel supply when the surface of the water falls to the lowest safe permissible water level established by the boiler manufacturer. Pre-Inspection Checklist for Hot Water Heating or Hot Water Supply Boilers Page 2 of 5

Instruments, Fittings, and Controls (continued) Section IV HG-614 A coil-type boiler or a watertube boiler with a heat input greater than 400,000 Btu/hr requiring forced circulation to prevent overheating of the coils or tubes shall have a flow-sensing device installed in lieu of a low-water fuel cutoff to automatically cut off the fuel supply when the circulating flow is interrupted. Installation Requirements Safety valves and safety relief valves shall be located in the top or side of the boiler. Coil or header type boilers shall have the safety valve or safety relief valve located on the steam or hot water outlet end. Safety valves and safety relief valves shall be installed with their spindles vertical. The opening or connection between the boiler and any safety valve and safety relief valve shall have at least the area of the valve inlet..4 Safety valves and safety relief valves shall not be connected to an internal pipe in the boiler..5 No shutoff of any description shall be placed between the safety or safety relief valve and the boiler, or on discharge pipes between such valves and the atmosphere..6 A discharge pipe shall be used. Its internal cross-sectional area shall be not less than the full area of the valve outlet..6 The discharge from safety or safety relief valves shall be so arranged that there will be no danger of scalding attendants..6 The safety valve discharge shall be as short and straight as possible and so arranged as to avoid undue stress on the valve..7 Hot water heating or supply boilers limited to a water temperature of 210 F may have one or more officially rated temperature and pressure safety relief valves installed. If additional valves are used they shall be temperature and pressure safety relief valves. Pre-Inspection Checklist for Hot Water Heating or Hot Water Supply Boilers Page 3 of 5

Installation Requirements (continued).7 When the temperature and pressure safety relief valve is mounted directly on the boiler with no more than 4 in. maximum interconnecting piping, the valve may be installed in the horizontal position with the outlet pointing down. Section IV HG-703.1 Provisions shall be made for the expansion and contraction of hot water mains connected to boilers by providing substantial anchorage at suitable points and by providing swing joints when boilers are installed in batteries. Makeup water may be introduced into a hot water boiler through the piping system or through an independent connection. The water flow from the independent connection shall not discharge directly against parts of the boiler exposed to direct radiant heat from the fire. The makeup water pipe shall be provided with a check valve near the boiler and a stop valve or cock between the check valve and the boiler or between the check valve and the piping system. In lieu of a check valve in the makeup water line, a back flow preventive device may be used if it meets the requirements established by the Boiler Regulation Advisory on Backflow Preventers issued by the BB&PVC..2 On closed heating systems an expansion tank shall be installed that will be consistent with the volume and capacity of the system..2 Expansion tanks for systems designed to operate above 30 psi shall be constructed in accordance with ASME Section VIII, Division 1. Provisions shall be made for draining the tank without emptying the system, except for pre-pressurized tanks. For single hot water heating boilers stop valves shall be located at an accessible point in the supply and return pipe connections as near the boiler nozzle as is convenient. Pre-Inspection Checklist for Hot Water Heating or Hot Water Supply Boilers Page 4 of 5

Installation Requirements (continued) When the boiler is located above the system and can be drained without draining the system, stop valves may be eliminated. Section IV HG-710.3 A stop valve shall be used in each supply and return pipe connection of two or more boilers connected to a common system. Section IV HG-710.4 The minimum pressure rating of all valves or cocks shall be at least equal to the pressure stamped on the boiler, and the temperature rating of such valves or cocks including all internal components, shall be not less than 250 F. Section IV HG-715 Each hot water boiler shall have one or more drain connections, fitted with valves or cocks connecting to the lowest water containing spaces. Section IV HG-715 The minimum size of the drain piping, valves, and cocks shall be ¾ inch. The discharge piping shall be full size to the point of discharge. Section IV HC-325 All cast iron hot water boilers shall be provided with washout openings to permit the removal of any sediment. Washout plugs shall not be smaller than NPS 1½ inch for boilers having gross internal volume more than 5 cu ft. Washout plugs shall not be smaller than 1 inch for boilers having gross internal volume not more than 5 cu ft. NOTE: Make certain that all items listed above are in compliance prior to requesting an inspection on a new or reinstalled boiler. Please contact the BB&PVC if you have any questions regarding this document. Pre-Inspection Checklist for Hot Water Heating or Hot Water Supply Boilers Page 5 of 5