RIVER RESTORATION EXPERIENCE IN ROMANIA



Similar documents
Lower Prut Floodplain - Ecological restoration of the Lower Prut Floodplain Natural Park LIFE05 NAT/RO/000155

Three Risks, One Solution

International Cooperation in Water Management and Pollution Control in the Danube River Basin. Joachim Bendow ICPDR Executive Secretary

Green Infrastructure Case Study Template

River restoration and Natural Water Retention Measures. but questions and obstacles remain regarding their implementation

New approaches of river restoration: matching the EU blueprint to safeguard Europe s waters

monitoring in Romania

Experience in Wetlands restoration and conservation concerning natural water retention measures. Ministry of Environment and Water, Bulgaria

The Danube Accident Emergency Warning System in operation

Delivering multiple benefits through effective river restoration UK & EU

Case study: Trans-National Monitoring Network: A transboundary long-term monitoring in the Danube River basin (#390)

Equilibrium Europe. drs. J.H.J. Lutgens RA, WRO

By: Joanne Vinke-de Kruijf With: Dennis van Peppen, Bouke Ottow, Ad Sannen and Job Udo

Annual Stakeholder Seminar of the Pillar II. - Protecting the Environment - of the EU Strategy for the Danube Region.

French Global Environment Facility. Körös / Crisuri Basin

WATER MANAGEMENT IN BULGARIA. Atanaska Tuntova Director of East Aegean River Basin Directorate, Bulgaria

River floodplains in Germany in times of climate change

FULL NAME INFORMATION WHICH COUNTRIES/REGIONS/AREAS ARE COVERED SHORT DESCRIPTION OF MEMBERS LOWER DANUBE EUROREGION

Transboundary River Basin Management of the Körös/Crisuri River Project, Hungary - Romania

Lessons learned from floodplain restoration on the Lower Danube

Priority Area Coordinator

3. The submittal shall include a proposed scope of work to confirm the provided project description;

Rapid Assessment of proposed Hydropower Plants on Drin River near Ashta (south of Shkodra)

FLOOD MANAGEMENT IN ROMANIA PRESENT AND FUTURE

DREAM Danube River REsearchAnd Management

Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy

Project acronym: KnoCH. Project type: Leonardo da Vinci, Transfer of Innovation. Project duration: 24 months (

Romanian Action Plan for Recognition

Floodplain restoration to improve green infrastructures and address multiple management objectives in an urban context: the case study of the Lobau

Case Study of Transboundary Dispute Resolution: The Environmental program for the Danube River Authors: Aaron T. Wolf and Joshua T.

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

Black Sea Basin Programme Our Projects

Working paper for the Danube River Basin. Assessment of the restoration potential along the Danube and main tributaries

Interim Progress Report Annex 2: Summary Report on Mid-term Evaluations and Stocktaking Meeting

RESTORATION OF URBAN WATERWAYS AS A GREEN INFRA

THE DRIN RIVER BASIN

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.

Public Law and Non-Structural Alternatives to Levee Repairs

Associated Programme on Flood Management: IFM HelpDesk, activities and outcomes

Wadden Sea World Heritage

Welcome to Odessa region

Flood Risk Management

Flood Risk Management

goods exchange, diplomatic and cultural contacts for years

St. Vrain Watershed Master Plan Thursday, January 23 10:00 a.m. 12:15 p.m.

Capitalizing on Flooding as Passive. Hearts and Minds of the Musselshell

WATER RESOURCES ENGINEERING DESIGN LANDSCAPE ECOLOGY AND RIVER RESTORATION.

Sims Bayou Federal Flood Damage Reduction Project

General scheme Human Resources & Settlement Structure

Country overview and assessment

Ayeyarwady Integrated River Basin Management Project

CONTENTS. 1. Introduction: Rationale of the Project within the context of this Forum. 2. Integrated Planning of Waterborne Transport in Cambodia

"How can the Danube Region help to have a more competitive Europe?

Arkansas River Corridor Vision & Master Plan

IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County

ENTERING THE EU BORDERS & VISAS THE SCHENGEN AREA OF FREE MOVEMENT. EU Schengen States. Non-Schengen EU States. Non-EU Schengen States.

King County, Washington Policies and Practice for the Use of Eminent Domain For Flood Risk Reduction

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1

An Irish Strategy for River Restoration: How it works on the ground. Karen Delanty

EUROPE-INBO 2015 Roundtable TR2

Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk

Presented by Dani Wise Johnson Vanasse Hangen Brustlin, Inc.

Public Involvement in Water Management Best Practices Database

Geography of Europe Handouts

Muddy River Restoration Project Maintenance and Management Oversight Committee 68 Harvard Street Brookline, Massachusetts

Kristina Veidemane, Baltic Environmental Forum Panevezys,

Develop hazard mitigation policies and programs designed to reduce the impact of natural and human-caused hazards on people and property.

Flood Risk Management Plans

US Army Corps of Engineers Los Angeles District. Rio Salado Oeste Salt River-Phoenix, Arizona FEASIBILITY REPORT SUMMARY

Urban Stream Restoration Defining the Full Benefits of a Project. Warren C. High MACTEC Engineering and Consulting

Protecting Floodplain. While Reducing Flood Losses

Sediment and Dredged Material Management - Relevance and Objectives 18 September 2003

Background Information: The Mamquam River Floodplain Restoration Project

UNESCO and the Water Convention

Investment in Natural Resources - How to Do it Right

Official Journal of the European Communities. (Acts whose publication is obligatory)

Restoration Planning and Development of a Restoration Bank

Water Security Agency. Plan for saskatchewan.ca

2 nd Black Sea Stakeholders Conference Sofia, 24th March 2015 Background paper

Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects

Leveraging Ohio s Clean Water SRF Program to Fund Stream and Wetland Restoration and Protection Projects

ANGORA FIRE RESTORATION PROJECT

Mensa Romania GM Spring 2016

Watersheds, Streams, & Highways: Resiliency in Disaster Recovery Through Partnerships and Innovation

The European Organisation For Insolvency Professionals

Using Ramsar tools for site monitoring and management. Kati Wenzel, Ramsar Secretariat

Prefeasibility Study for the High Speed Line HU-RO Border Bucharest - Constanta Description and Objectives

River Basin Management in Croatia

Urban Waters and River Restoration. Pinja Kasvio, Finnish Environment Institute, SYKE RESTORE North Region Closing Seminar 14.8.

Chehalis River Basin Flood Damage Reduction Capital Budget Approved by Legislature in June 2013

MS4 Municipal Stormwater Compliance: Pollutant Removal through Floodplain Restoration / Reconnection Villanova Urban Stormwater Partnership

Floodplain Connectivity in Restoration Design

UTILITIZATION OF ECOHYDROLOGIC MODELS IN FLOODPLAIN FISH PASSAGE AND HABITAT RESTORATION EVALUATION

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT

HORTOBAGY SODIC LAKES - Restoration of sodic lake sub-type of the Pannonic salt steppe and marsh habitat in the Hortobágy LIFE07 NAT/H/000324

Ecological and Economical Restoration of Danube Floodplain. Iulian NICHERSU. Danube Delta National Institute Tulcea, ROMANIA

DESWAT project (Destructive Water Abatement and Control of Water Disasters)

Aneeqa Syed [Hatfield Consultants] Vancouver GIS Users Group Meeting December 8, 2010

Transcription:

RIVER RESTORATION EXPERIENCE IN ROMANIA Elisabeta Cserwid NATIONAL INSTITUTE OF HYDROLOGY AND WATER MANAGEMENT 1

BACKGROUND Romania is founding member of ECRR, which was set up in 1999 National Administration Apele Romane (ANAR) is member in Board Council of the ECRR Since September 2001, the Romanian Centre of River Restoration (RCRR ) was established through the Order of Ministry of Waters and Environment ( Art.7 in Water Law) 2

ACTIVITIES 1999 first national Workshop regarding The Ecological River Restoration, was organized by The National Administration Romanian Waters and National Institute of Environmental Research in Bucharest; 1999 Board Meeting of ECRR was held in Bucharest; 2000 The Training Course on River Restoration organized by the National Administration Romanian Waters together with the Romanian Centre for River Restoration (RCRR) in cooperation with experts from RIZA The Netherlands and WWF- Germany took place in Bucharest 3

ACTIVITIES 2003 -Interministerial Committee Work Meeting on Green Corridor of Lower Danube under the presidency of State Secretary in Ministry of Waters and Environmental Protection and President of Romanian Centre for River Restoration was held in Bucharest 2010 - National River Restoration Centres/ Networks - Seminar organized by ECRR and ANAR in Bucharest 4

LEGAL FRAMEWORK The framework of river restoration topic in Romania is represented by: Water Law 107/1996 with modifications and completions; Ministerial Order 1215/2008. 5

PROJECTS IMPLEMENTED 1998 Restoration of Babina and Cernovca islands within Green Corridor Project ( INCDD Tulcea); 2002 Restoration of Comana Wetland Pr. LIFE 02/Nat/ RO/008571 Arges River Basin ( project coordinated by Giurgiu County Council); 2003-2006 The Ciobarciu Wetland Project Prut River Basin (cooperation between Prut River Basin Administration & RIZA); 2005 Lower Prut Floodplain Pr. LIFE 05/Nat/RO/000155 Prut River Basin( project coordinated by Regional Environmental Protection Agency Galati, Romania); 2005 Conservation, restoration and sustainable management in Small Island of Braila Pr. LIFE 06/Nat/ Ro/000176 Danube River Basin 6

BABINA & CERNOVCA ISLANDS 7

Habitat in Danube Delta before restoration after restoration 8

CIOBARCIU PROJECT Before After 9

PROJECTS PROPOSED Rehabilitation of Crisul Repede River downstream Oradea till Hungarian border ( Crisuri River Basin); Ecological restoration of Bega Channel on the Timisoara-Serbian border sector (Banat River Basin); Restoration of the wetland area at the confluence of Calmatui River with Danube (on going); Ecological restoration of Mamina Valley (Arges River Basincounty Giurgiu) Ecological restoration of Caldarusani Lake (Arges River Basin) Green Coridor Project (cooperation WWF, WB- GEF, UE); Flood plains restoration along the Danube River (Nedeia & Rast area) in the framework of the implementation of the Partners for Water MoU RO/NL- study on going 10

ROMANIAN SECTOR - PROPOSED ACTIONS ALONG LOWER DANUBE FOR GREEN CORRIDOR 1 YUGOSLAVIA 2 2 3 1 2 1 3 4 5 BULGARIA 3 4 6 5 6 19 18 17 7 12 1 8 9 011 0 25 50 75 100 Kilometers 4 10 MOLDAVIA 16 15 14 UKRAINE 8 9 13 5 BLACK SEA Ecological reconstruction areas proposed to be studied roads existing protected areas proposed protected areas areas proposed for reconstruction 11

Future Proposals Training in RR practices Improvement of the legal framework Enhancement of exchange experience in the RR field at EU level, inclusive within CEENBO Accessing of European funds through European and international RR projects Developing of guidelines/ manuals/ methodologies regarding the ecological restoration (conceptual planning and technologies) 12

Thank you for your attention! 13