2040 Southeast Florida Regional Freight Plan Project Update



Similar documents
Miami-Dade County s Freight System:

2040 Southeast Florida Regional Freight Plan

2014 Miami-Dade County Freight Plan Update. Table of Contents

Executive Summary. Literature/Community Review. Traffic Flows and Projections. Final Report Truck Route System for Miami-Dade County CORRADINO

South Florida East Coast Corridor (SFECC) Projects. February 7, 2012

Improving Access in Florida International University Biscayne Bay Campus Executive Summary

FLORIDA S STRATEGIC INTERMODAL SYSTEM THE

Capital Improvement Project Status Report October 2015 (Actuals through August 2015) Percent Design Complete. Design Finish. Construction Finish

FTP/SIS/FMTP Regional Workshop - Miami

AIR QUALITY TECHNICAL MEMORANDUM

FLC 4th Annual Summer Research Symposium: Planes, Trains, Ports & Highways What Keeps Florida Moving?

The total estimated PFC revenue for the application is $266,900,000. The estimated charge effective date for this application is December 1, 2016.

Cuyahoga County Airport - A Guide to Funding Capital Improvements

Southern California International Gateway Project Description

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS

DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST

FTP/SIS/FMTP Regional Workshop - Tampa

Examples of Eligible Projects. Project Category Description Examples

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

Connecticut s Bold Vision for a Transportation Future

MASTER PLAN PREPARATION

Florida. Logistics & Distribution Industry. Source: Florida Department of Economic Opportunity, Bureau of Labor Market Statistics

Current and Forecast Demand

Florida Transportation Commission: A Meeting of the Modes

Technical Memorandum PERFORMANCE MEASURES. Prepared by:

SR-18 Corridor Improvements in Wood County

The Preservation of Local Truck Routes: A Primary Connection between Commerce and the Regional Freight Network

A SOLUTION FOR THE NEW YORK HARBOR TODAY. A LEADER FOR THE SHIPPING WORLD TOMORROW.

MPO Priority Projects MPO# FM PROJECT DESCRIPTION PHASE ADOPTED TENTATIVE

Ne w J e r s e y Tr a f f i c Co n g e s t i o n :

Infrastructure & Growth Leadership Pillar Strategy Statements from Existing Plans Developing Florida s Strategic 5-Year Direction, 29 November 2011

Appendix 1 Washington State Department of Transportation (WSDOT)

MIAMI-SOUTH FLORIDA National Weather Service Forecast Office

A. TAX AT A GLANCE B. TAX LEVY SOURCES TYPES AND LIMITS OF LEVIES:

Who is implementing managed lanes with pricing strategies? Operational Under Construction/ Development

Exhibit 4 Page 1 of 14 BOARD OF COUNTY COMMISSIONERS, BROWARD COUNTY, FLORIDA

Transportation Management Plan Template

ANNEX 1 (ESF-1) TRANSPORTATION SERVICES. Department of Transportation

10 Aviation Element Introduction Purpose of Chapter

Existing Facilities. Current and Forecast Demand

Construction Management Association of America San Diego Chapter

Partnering for 21 st Century Prosperity

Connecticut s Bold Vision for a Transportation Future

MAP 21 themes. Strengthens America s highway and public transportation systems. Supports the Department s aggressive safety agenda

MASTER PLAN DRAFT RECOMMENDED PLAN

Aventura 3601 NE 207th Street Aventura, FL 33180

Informational Workshop Public Meeting Kanawha Falls Bridge Project

PRIORITIZATION PROCESSES

LONG-TERM INFRASTRUCTURE DEVELOPMENT PLAN

COMMERCIAL AND GENERAL AVIATION

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.

Goals & Objectives. Chapter 9. Transportation

Fact Sheet RITA. Atlantic Coast U.S. Seaports. By Matthew Chambers. Select Atlantic Coast U.S. Seaports. Figure 1: Atlantic Coast U.S.

Downtown Tampa Transportation Vision

State Budget Conference Chairs House Appropriations Committee / Senate Budget Committee BUMP ISSUES

WESTCO Rail Development Plan

EXHIBIT A Accessible Truck Routes Map

Section ALTERNATIVES. 3. Alternatives

INDOT Long Range Plan

Florida s Future Corridors Initial Study Areas

Miami/Ft. Lauderdale

COMMERCIAL AND GENERAL AVIATION

MIAMI INTERNATIONAL AIRPORT MIAMI-DADE AVIATION DEPARTMENT

DRAFT Freight Performance Measures

MIAMI-SOUTH FLORIDA National Weather Service Forecast Office

Transportation. McKinley County Map of Roads. Trucking. Federal Express RAC Transport United Parcel Service Yellow Freight Line

Operations at Coulter Airfield

MIAMI-DADE COUNTY FREIGHT & LOGISTICS OVERVIEW. Florida Department of Transportation

Dallas-Fort Worth Area Major Transportation Projects

U.S. Logistics & Multimodal Transport Presentation

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.

Truck Diversion Forecasts. DRAFT Executive Summary

The Dynamics of the US Container Market and Shifting Trade Patterns Implications for East Coast and Gulf Coast Ports March 15, 2012

Transcription:

2040 Southeast Florida Regional Freight Plan Project Update Presented by Michael Williamson, Cambridge Systematics, Inc. Stewart Robertson, Kimley Horn and Associates, Inc. February 26, 2014

Agenda Introductions Scope of Work Update on Key State & Regional Initiatives Draft Regional Needs Next Steps Q&A 2

Scope of Work Task 1 Review Existing Plans and Policies Task 2 Coordination, Communication and Outreach Task 3 Data Collection and Commodity Flow Analysis Task 4 Economic Impact of Freight Activity Task 5 Needs Assessment and Proposed Solutions Task 6 Evaluation, Prioritization and Implementation Task 7 2040 Southeast Florida Regional Freight Plan

Key Regional Initiatives Examples of Major Freight Projects SR 826/836 Interchange Eller Drive Port Miami Tunnel Martin Luther King Blvd Port Miami Dredging NW 25 th St Viaduct Phase II ICTF at Port Everglades and Port Miami Port of Palm Beach Slip Redevelopments Post Panamax Cranes South Port Turning Notch FLL Runway Extension 4

Key Regional Initiatives MAP-21 and the National Freight Network Route County Start End Primary Freight Network I-395 Miami FL48A I-95 No I-595 Broward I-75 I-95 Yes I-75 I-95 Miami/ Broward Miami/ Broward/ Palm Beach S821 U41 GA/FL Line GA/FL Line From S821 to I-595 From 0.40 miles west of U27 to 27.30 miles west of U27 From S90 (South) to 0.62 Miles North of S90 From 0.36 miles south of S836 to.31 miles north of S836 From 0.33 miles North of S112 to 0.74 Miles North of S826 From 2.59 Miles South of S820 to 0.63 Miles North of S810 S798 to 0.68 Miles North of S706 S821 Miami U27 I-75 Yes S826 Miami S976 S91 Yes S836 Miami S826 I-95 From S826 to S953 From 0.35 Miles West of I-95 to I-95 S91 Miami S826 I-95 No

Key Regional Initiatives Proposed SIS Designation Changes SIS Airport Hub (General Reliever): Kendall-Tamiami Airport (designated in May 2013) Emerging SIS Waterway: Miami River Emerging SIS Seaport: Port of Ft. Pierce ILCs to be eligible for designation as freight hubs 6

Key Regional Initiatives Intermodal Logistics Center (ILC) Development FDOT ILC Grant Program $5 Million a year to support ILC development Existing and Proposed ILCs FECI s South Florida Logistics Center (underway) Key Master Planned ILCs in Palm Beach, St. Lucie, Glades, and Hendry Counties 7

Key Regional Initiatives TIGER Grants 2013 TIGER Grants gave $474 million to 52 projects in 37 states Florida DOT s South Florida Freight & Passenger Rail Enhancement received $13.75 M Improve linkage between CSX and FEC Allow FEC to handle more traffic from Port Miami and Port Everglades Improve regional passenger rail connectivity 8

Key Regional Initiatives Florida Perishables Trade Coalition January 2012 FPTC formed to increase trade in perishable products through Florida s airports and seaports October 1, 2013 Pilot program to bring grapes and blueberries from Peru and Uruguay begins Cold-treated products can now arrive through Florida ports rather than entering through ports in the northeast and trucked south November 29, 2013 Port Everglades receives its first container of grapes from Peru December 2, 2013 PortMiami receives first grape shipment 9

Key Regional Initiatives Transshipment Committee Prior to 9/11, transshipment was more than 22% of cargo trade at Port Miami Now this cargo goes to Panama, Freeport, and Kingston Creation of a Transshipment Committee with CBP 10 Assignment of Customer Service Manager at CBP Outreach role to work with FCBF on an In-Bond class Terminals to provide CBP with advanced list of goods to help expedite review

Key Regional Initiatives Customs and Border Protection Reimbursable Services Authority Creation of 5 Public-Private Partnerships Dallas/Fort Worth International Airport The City of El Paso, Texas South Texas Assets Consortium Houston Airport System Miami-Dade County Services can include all Customs and Immigration-related inspectional activities and covers all costs December 2013 Finalization of partnership agreements 11

Key Regional Initiatives Alternative Site Framework FTZ No. 281: Miami-Dade County Serves a broader area New expedited process Reduce number of unused FTZ sites 23 Magnet and Usage-Driven sites created to date, amounting to about 1.8 million sq. ft. 12

Preliminary Stakeholder Input Seaports Port Miami 2035 Master Plan Update recently completed which details priority projects Key projects include: Channel Deepening, Post-Panamax Cranes, onport ICTF, Port Tunnel Effective use of P3 s is seen as critical to investment strategies Improvements on key landside corridors and connectors will be critical for market access Transshipment and perishable markets are a priority, requiring changes or modifications to regulations 13

Preliminary Stakeholder Input Seaports Port Everglades CIP and MP detail priority projects; MP update currently underway Key projects include: STN Widening, Post-Panamax Cranes, on-port ICTF, Eller Drive Overpass, and Deep Dredge and Widening Current Master Plan Update will refine the projects and schedules Effective use of P3 s is seen as critical to investment strategies Traffic flows on-port have severe peaks now; future growth will worsen the flows Improvements on key landside corridors and connectors will be critical for market access Technology should be used effectively to facilitate traffic flows and enforcement activities 14

Preliminary Stakeholder Input Seaports Port of Palm Beach (draft pending interview) CIP and MP detail priority projects Key projects include: Slip Rehabilitation/Redevelopment, Intermodal Passenger and Cargo Terminal, Reefer Line Expansion, MLK Widening, FEC Connection Improvements Improvements on key landside corridors and connectors will be critical for market access 15

16 Preliminary Stakeholder Input Airports Miami International Airport Capacity exists to serve additional growth based on $500 million in air cargo projects over last 10 years Targeting new international markets to augment Latin America Traffic Middle East is emerging Truck parking, staging, fueling facility is needed Fort Lauderdale-Hollywood International Airport Air cargo volume has been on decline since 2008 Targeting European markets (passenger belly-cargo) Recent growth in Latin American markets No cargo capacity issues anticipated No major access issues reported

Preliminary Stakeholder Input Airports 17 Palm Beach International Airport Air cargo volume increase in 2010 due to FedEx arrival, flat since Not actively marketing or anticipating increased cargo activity/carriers Room to expand existing cargo ramp if demand warrants No cargo capacity issues anticipated General Aviation Airports All cargo activity at GA airports are non-scheduled charter flights using single and twin-engine prop aircraft E.g. Fort Lauderdale Executive has regular activity from 5 charter carriers based at Airport Primarily used to move foodstuffs for island restaurants and resorts

Preliminary Stakeholder Input Rail 18 FEC Railway Constructing leads to Port Miami and Port Everglades Developing on-port ICTFs at Port Miami and Port Everglades Working with Port Of Palm Beach to improve rail connection FDOT D6 conducting connector study for Hialeah Ramp Adding second track to Hialeah Ramp access point Hialeah Ramp entrance/exit gate complex to be rebuilt/expanded/automated Expanding siding/staging area in North Miami to build trains from Port Miami Fort Lauderdale Ramp to be redeveloped; possible staging for ethanol TIGER Grant award will shift cargo traffic in South Florida All Aboard will add double track capacity

Preliminary Stakeholder Input Rail CSX Transportation CSX provides carload and box car service to South Florida Focused on investments in Winter Haven Ramp and subsequent industrial/distribution facilities South Florida investments/needs currently limited to local spurs TIGER Grant award will shift cargo traffic in South Florida, providing an opportunity for CSX to connect to its Winter Haven facility Balancing passenger and cargo operations in South Florida will be critical Service to America s Gateway ILC may impact South Florida Service offerings will be market driven; municipal solid waste may be a market to service in South Florida as land fills close 19

Preliminary Stakeholder Input Roadways 20 On-going truck driver survey providing input directly from the industry Biggest roadway problems: Congestion Distance to make lane changes Mid-block sight clearance Turning radii at intersections Biggest non-roadway problems: Availability of truck parking Gate queues

Preliminary Stakeholder Input Roadways Bottlenecks identified thus far: 21 Port Congestion SR 826 SR 836 Golden Glades NB to I-95 Construction on local Miami- Dade roadways creates heavy congestion Hours of construction create heavy road delays in some commercial areas NW 25 th St South River Dr and Okeechobee Rd Intersection lights not in sequence Flooding (especially in Doral) creates heavy traffic in inclement weather; horrible drainage sewer system in all of Doral

22 Draft Regional Freight Needs Seaports Port Miami Direct Cargo Improvements Project Category Seaboard Parking Relocation (due to rail) Seaboard Related & Misc. Trailer Relocation (Seaboard) Seaboard Related & Misc. Trailer Relocation (Cargo Terminal 3) Seaboard Related & Misc. Cargo Terminal 3 Reconfiguration Electrical Seaboard Related & Misc. Port Crane Management Facility Infrastructure Port Wide SFCT Drainage Infrastructure Port Wide Wharves V & VI Curved Gantry Crane Rail Infrastructure Port Wide Purchase 4 Additional Gantry Container Cranes Cranes Rail Upgrades and Super Post-Panamax Cranes Crane 12 Relocation Cranes Rail Upgrades and Super Post-Panamax Cranes Cranes 7-10 Wire Replacement Cranes Rail Upgrades and Super Post-Panamax Cranes Crane Electrification 4, 5, 6, 7, 11, 12 Cranes Rail Upgrades and Super Post-Panamax Cranes Relocation of Cranes 4, 5, 6, 7 Cranes Rail Upgrades and Super Post-Panamax Cranes Crane Network Connectivity Cranes Rail Upgrades and Super Post-Panamax Cranes Crane Lighting Study Cranes Rail Upgrades and Super Post-Panamax Cranes Relocation of Fumigation Yard Miscellaneous Projects RPM Rails for Cargo Yards Miscellaneous Projects Runway/Rails for Future RTG in Cargo Yards Miscellaneous Projects Reefer Expansion Project Miscellaneous Projects Development of MDC ILC Facility Miscellaneous Projects

23 Draft Regional Freight Needs Seaports Port Miami Miscellaneous Port Improvements Project Category Fence Relocation Chute Road Seaboard Related & Misc. Pavement Repairs (Various Locations) Seaboard Related & Misc. Shed E Canopy Seaboard Related & Misc. Shed G Chiller Building Demolition Seaboard Related & Misc. Shed C Demolition Infrastructure Port Wide Moring Bollards Phase 2 Infrastructure Port Wide Bldg. Structural and Electrical Recertification - 1509 and SHED B Infrastructure Port Wide Demo Shed E Infrastructure Port Wide Federal Inspection Facility Infrastructure Port Wide MSRC Facility Infrastructure Port Wide Physical Security Information Management (PSIM) Infrastructure Port Wide GIS Programming Infrastructure Port Wide Sanitary Sewer Upgrades Waterside Bays 148-195 Seawall Upgrades Waterside North Bulkhead Repairs Waterside Bays 0-65 Seawall Rehabilitation Waterside Wharf 1 Infill Waterside Comprehensive Way Finding Signage Project Miscellaneous Projects Miscellaneous IT Projects Miscellaneous Projects

24 Draft Regional Freight Needs Seaports Port Everglades Direct Cargo Improvements Project Category Tracor Basin Fill Docks Berth 16, 17, 18 New Bulkheads Docks Berth 14, 15 New Bulkheads Docks Berth 19, 20 New Bulkheads Docks Slip 1 New Bulkheads and Reconfiguration - (Berths 9 & 10) Docks/Dredging Harbor Slip 1 New Bulkheads and Reconfiguration - (Berths 7 & 8) Docks/Dredging Harbor Slip 3 New Bulkheads and Widening Docks/Dredging Harbor Demolish RORO Berths and Lengthen Berth 33 Docks/Dredging Harbor Upland Enhancement Dredging Channel Westlake Mitigation Dredging Channel ACOE Deepening and Widening-Design Dredging Channel ACOE Deepening and Widening-Construction Dredging Channel Turning Notch Extension Dredging Harbor Neo-Bulk Storage Yard Intermodal Transfer Improvement Phase IX-A Container Yard Intermodal Transfer Improvement Phase IX-B Container Yard Intermodal Transfer Improvement Crushed Rock Facility Intermodal Transfer Improvement FTZ + CBP Relocation Intermodal Transfer Improvement Super Post Panamax Cranes (2) Intermodal Transfer Improvement Super Post Panamax Crane (3) Intermodal Transfer Improvement Container Yard Densification Improvements Intermodal Transfer Improvement Aggregate Storage Yard Intermodal Transfer Improvement McIntosh Road Gate Lane Addition Internal Roadway

Draft Regional Freight Needs Seaports Port Everglades Miscellaneous Port Improvements Project Slip 2 New Bulkheads and Widening Seaport/Convention Center Security Improvement Project Dynergy Site Grid Project Category Docks/Dredging Harbor Internal Roadway Intermodal Transfer Improvement 25

Draft Regional Freight Needs Seaports Port of Palm Beach Project Berth 17 Enhancement Intermodal Cargo Transfer/Passenger Service Facility Tropical Reefer Line Expansion Cargo Expansion - Cargo Laydown/Annex Property Development Cargo Storage on FP&L Right of Way Container Yard/Bulk Improvements FPL Overhead Line Relocation Harbor & Channel Improvements North Wharf Improvements Off Port Intermodal Rail Improvements On Port Intermodal Rail Improvements Slip 2 Redevelopment & Enhancement Slip No. 1 Redevelopment Waterside Cargo Terminal Redevelopment Western Cargo Terminal Redevelopment 26

Draft Regional Freight Needs Airports Access Projects 27 Airport Facility From To Description Increase Turn Radius at Perimeter Dr. access MIA NW 36 th St NW 36 th St Perimeter Dr points for FedEx and UPS facilities. NW 62 nd Ave and NW 59 th Ave MIA NW 25 th St HEFT MIA Widen 25 th St from 4 to 6 lanes. Provide adequate left turn bay lengths, study the possibility of median opening closures within 1,000 feet of the intersection and provide adequate turning radius MIA NW 25 th St NW 87 th Phase 2 construction of Viaduct from SR 826 Ct SR 826 Viaduct to NW 87 th Ct MIA NW 25 th St NW 25 th Add southbound access to SR 826 from NW St SR 826 Viaduct 25 th St Viaduct MIA NW 25 th St Viaduct SR 826 HEFT Extend Viaduct to HEFT FLL SW 42 nd St SW 23 rd Ave W. Perimeter Rd Widen SW 42nd St from 2 to 4 lanes, including bridge over I-95 Consider signal at intersection to facilitate PBI Belvedere Rd Belvedere Rd N. Perimeter Rd westbound trucks entering and exiting bellycargo facility. PBI Australian Rd Australian Rd Perimeter Rd Consider signal at intersection to facilitate northbound trucks accessing FedEx/UPS facility.

Draft Regional Freight Needs Miami-Dade County Airports Description Project Type Airport Additional Air Cargo Apron Cargo Capacity MIA Fuel Tanker Parking Facility Ops Improvement @ West Cargo Base MIA Northeast Apron And Drainage Improvements Cargo Ramp MIA Perimeter Road Widening & Realignment Access MIA Acquisition Of FODequipment Airport Safety MIA Taxiway S Rehabilitation Aircraft Ops Improvement MIA Taxiway T Rehabilitation Aircraft Ops Improvement MIA Miami-Dade Aviation GPS Landing System Aircraft Ops Improvement/Safety MIA Rehab Aprons Airport Ops Opa-Locka Opf Taxiway Repair Airport Ops Opa-Locka 28

Draft Regional Freight Needs Broward and Palm Beach County Airports Description Project Type Airport Runway 9R/27L Extension (8,000 x 150 ) Airport Capacity/Ops FLL ILS for Runway 9R-27L Airport Capacity/Ops FLL Cross-field taxiways from 9R-27L Airport Capacity/Ops FLL Taxiway C, E, F, S Rehab Aircraft Ops FXE Runway 8/26 & 13/31 Pavement Rehab Aircraft Ops Improvement FXE Rehab Airfield Lighting Aircraft Ops/Safety FXE Construct Customs Building And Apron Airport International Ops FXE Construct Eastern Perimeter Road Access FXE Taxiway C Rehab Aircraft Ops Improvement PBI Rehab Itinerant Apron Airport Capacity/Ops LNA

Draft Regional Freight Needs Rail Railroad Project CSX/FEC CSX TO FEC Pompano Connection FEC FEC Miami Freight Forwarding Yard FEC FEC N. Miami to Little River Track Upgrade FEC FEC N. Miami to Ojus Double Track FEC FEC SIS for R/R from Hypoluxo to Villa Rica CSX/FEC IRIS Connection from CSX Mainline to FEC Mainline FEC NE 203 rd St & NE 215 th St Intersection Improvements between US-1 & W Dixie Hwy CSX/FEC Northwood Connection from CSX Mainline to FEC Mainline CSX CSXT Positive Train Control CSX SFRC R/R Bridge over S Fork New River Replace Existing Bridge BR#869924 SFRC South Central FL Express Cane Block New US 27 Rail Link 30

Draft Regional Freight Needs Roadway Data Collection and Analysis 31 LRTPs Work Programs Intermodal Facility Plans and Studies SIS Work Program INFOUSA Freight Employment Data Freight Related Land Use Truck Traffic Annual Average Daily Traffic (AADT) Truck Percentage FDOT Truck Growth Rate Analysis on SIS Roadways FDOT Railroad Crossing and Delay Analysis Studies FDOT Other Freight Studies Hot Spot Field Reviews

Draft Regional Freight Needs Roadway Draft Roadway Needs Plan Needs listed in Plan by County, but coordinated to ensure regional consistency Needs Projects Classified into 7 Project Types Freeway Capacity Improvements Freeway Traffic Operations Improvements Arterial Capacity Improvements Intersection Traffic Operations Improvements Corridor Traffic Operations Improvements ITS Improvements Truck Parking 32

Draft Regional Freight Needs Miami Dade County Roadways 33

Draft Regional Freight Needs Broward County Roadways 34

Draft Regional Freight Needs Palm Beach County Roadways 35

Draft Regional Freight Needs Palm Beach County Roadways 36

37 Questions?