City and County of San Francisco Department of Public Works TABULATION OF BIDS

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

KIEWIT CM/GC Enabling/Utilities

Milestones Primary. Early Start. Orig Dur. Early Finish. Act ID. Description NOTICE TO PROCEED START CONSTRUCTION

32284 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 MAY 1, 2014

NOTICE TO CONTRACTORS

BMIC S APPETITE GUIDE EFFECTIVE JUNE 2013

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans

Building Condition Assessment Report

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

Estimating Database Checklist

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

Lindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1

Sample Drawing Package for One and Two Family Dwelling Applications

C-2 Construction, Inc. - NAICS Codes

Certification: Building Plans Examiner. Exam ID: B3

Seattle Public Schools Building Excellence IV Projects Under Construction

NAHB PRODUCT DEFINITION

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

ADVERTISEMENT FOR PREQUALIFICATION FOR THE FOLLOWING BID PACKAGES *RE-ADVERTISED*

Think Of Us First! When It s Time to Distribute Your Plans

ESTIMATE ORIG. ESTIMATE: TOTAL: $204,249 DATE: 01/15/08 DESCRIPTION OF WORK QUANTITY DIVISION TOTAL

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

VOLUME I PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

BILL OF QUANTITIES Part No.: Part Description

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Memorandum. July 16, To: Plan Commission City of Madison

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

Name of course: Residential Construction Site Management (RCSM) Level 1

Building Condition Assessment Report

Inspecting to a higher standard.

SECTION ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

SECTION EXISTING HAZARDOUS MATERIALS CONDITIONS

CHARLOTTE COUNTY Community Development Department

Exhibit C: Scope of Work and Schedule of Deliverables

Painting, Estimating. Hourly Rate Guide

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

TD AMERITRADE Park Omaha

MARKET SCOUT CONTRACTORS QUESTIONNAIRE (complete in addition to an Acord application) 1. Applicant:

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

Additions and Alterations

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K Commerce Road Renovations Project DATED: February 9, 2015

Holz Choices & Specifications

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

SWAN POINT YACHT & COUNTRY CLUB

HOWARD UNIVERSITY. I. Policy Statement. II. Rationale. III. Entities Affected by the Policy. IV. Definitions. Policy Number:

STATE OF MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY 443 Lafayette Road North St. Paul, Minnesota (651) or DIAL-DLI

Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

Notice to Property Owners

TORONTO TRANSIT COMMISSION REPORT NO.

Design Development Quality Management Phase Checklist Project Phase Checklist Series

How To Plan A Building

GENERAL LIABILITY PROGRAM FOR ARTISAN CONTRACTORS

5. Financial requirements The relevant financial requirements in the board s policies.

RESNET Building Performance Conference Orlando, FL March 2011

The work has continued on final Phase 4 and is nearing completion.

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update

Renovations for a New 18 Bed Gero-Psych Nursing Unit August 7, 2014 Lower Bucks Hospital Second Floor 501 Bath Road, Bristol, PA Addendum No.

MECHANICAL TRADE SCOPE OF WORK GUIDELINES

ATTACHMENT 1 - LEE HIGH SCHOOL CONSTRUCTION MANAGER AT RISK OLD LIBRARY RENOVATIONS PROJECT BID SUMMARY TABULATION. RFCSP # Bid Package #1

EMPLOYMENT APPLICATION

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Business Type: Artisan Contractors

February 4, Estimate

College of the Siskiyous Insurance Requirements

Information for Construction Contractors. Terry O Neill Taxpayer Service Specialist

Substantial Improvement/Damage (FEMA 50% Rule) Frequently Asked Questions and Information

Designing Schools To Reduce On-Going And Future Maintenance and Repair Costs

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

LOS ANGELES AFB, EL SEGUNDO, CA:

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

PREQUALIFIED SUBCONTRACTOR LIST

Lee, Here are the questions from bidders received between August 17, 2015 and August 24, 2015 followed by our responses.

RICHARD B. HUDGENS ARCHITECT, INC.AIA

TruexCullins Architecture Fairfield Center School Bid Documents Kitchen and Bathroom Renovation March 1, 2015

TAX APPRAISAL DISTRICT OF BELL COUNTY STORES & COMMERCIAL IMPROVEMENT CLASSIFICATION GUIDE

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

Home Improvement Contractors New Application. State of Arkansas CONTRACTORS LICENSING BOARD

Important Information for Owners of Buildings in Flood Zones

Architectural Inspection Site Structures

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

Concrete Fill On Deck, incl Rebar CONCO (GONSALVES & SANTUCCI INC)

PLEASE REFER TO YOUR INDIVIDUAL QUOTE

DRAPER ELEMENTARY SCHOOL

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

OHLONE COMMUNITY COLLEGE BOND MEASURE G

29 Broadway- 14 th Fl Tel: New York NY Fax: Due Diligence Report. New York, New York

Western Avenue South Small Business Based on Small Business Improvement Fund (SBIF) Grant Agreements

Transcription:

CORPORATE REPORT NO: R029 COUNCIL DATE: February 1, 2016 REGULAR COUNCIL TO: Mayor & Council DATE: February 1, 2016 FROM: General Manager, Planning and Development General Manager, Finance & Technology FILE: 0800-20 (Newton Rec Centre Expansion) SUBJECT: Award of Contract for Construction of an Addition to the Newton Recreation Centre and Wave Pool Roof Replacement RECOMMENDATION The Planning and Development Department and Finance & Technology Department recommend that Council: 1. Receive this report for information. 2. Approve the award of a contract, as generally described in this report, to Heatherbrae Builders Co. Ltd. ("Heatherbrae"), as General Contractor, to construct the Newton Recreation Centre Addition and Wave Pool Roof Replacement project at a total base value of the contract being $6,054,216.03.00, excluding GST; and 3. Authorize an expenditure authority for this contract of $6,455,000.00.00 excluding GST. PURPOSE The purpose of this report is to obtain approval to award a contract related to the construction of an addition to the Newton Recreation Centre and Wave Pool Roof Replacement (the "Project"). BACKGROUND Council approved the construction of the subject addition to the Newton Rec Centre as part of the City s Capital budget. A Request for Expressions of Interest and Statement of Qualifications(''RFEOI/SOQ ) was developed for the purpose of obtaining a General Contractor for pre-construction services for the project and to allow the City to lock-in prices related to the general conditions associated with construction of the project and for overall management of the construction project. The City issued RFEOI/SOQ #1220-050-2015-002, advertising it on the City s website and posting it on the BC Bid Website. The City received 25 submissions by the close of the process on January 14, 2016.

- 2 - Following the RFEI/SOQ process, six proponents were shortlisted and requested to submit a financial proposal, including pricing, separately, for pre-construction services and for general contractor services. All six proponents responded. Based on an evaluation of the proposals it was concluded that the proposal from Heatherbrae provided the best overall value to the City. In October 2015, Heatherbrae was awarded the contract for pre-construction services for the Project, which included assisting with the design, value-engineering, and review of scheduling and cost estimation. Heatherbrae has performed these services and it is now proposed that the contract with Heatherbrae be extended to include general contractor services for construction of the Project. DISCUSSION A Request for Proposal No. 1220-030-2015-004(A) and (B) was issued for the Project under which each trade was tendered separately. This process follows the City s competitive procurement process. The Request for Proposal for each trade was published on the City's website and posted on the BC Bid website. A list of the proponents who submitted a financial proposal for each trade is contained in Appendix "I" along with the respective price they submitted. In each case, the proponent providing the lowest quotation that fully meets the specifications of the related work is being awarded that element of work. The successful quote for each trade is being combined into a "stipulated price" contract that includes an allowance for general conditions and contract management fees. This stipulated price contract amounts to $6,054,216.03.00, excluding GST. Heatherbrae will assume the risk associated with delivering the work of the contract within the stipulated price. Funding Funding in support of the subject contract is available within Council-2015 approved Capital Budget. Project Schedule Construction of the Project is expected to commence mid-february 2016 and be completed by Spring of 2017. CONCLUSION Based on the above discussion, it is recommended that Council: Approve the award of a contract, as generally described in this report, to Heatherbrae Builders Co. Ltd., as General Contractor, to construct the Newton Recreation Centre Addition and Wave Pool Roof Replacement project at a total base value of the contract being $6,054,216.03.00, excluding GST; and

- 3 - Authorize an expenditure authority for this contract of $6,455,000.00.00 excluding GST. Original signed by Jean Lamontagne General Manager Planning and Development Original signed by Vivienne Wilke General Manager Finance & Technology AA:saw Attachment: Appendix "I" Results of the Request for Quotations Process v:\wp-docs\civicfacilities\16data\01211130ar.docx SAW 2/1/16 10:54 AM

Newton Recreation Centre Addition & Wave Pool Roof Replacement Results of the Request for Quotations Process (Only the lowest three complete and compliant bids are listed) Appendix "I" 1. Demolition (5 contractors provided bids prices exclude GST) 3R Demolition Corp. $192,000.00 Matcon Demolition Ltd. $195,506.00* T&T Demolition Ltd. $201,200.00 * Adjusted bid value to include re & re owner equipment. 2. Asphalt (1 contractor provided bid price excludes GST) Grandview Blacktop $13,307.00 3. Site Works (3 contractors provided bids prices exclude GST) Bar-G Excavating Ltd. $306,900.00 RTR Terra Contracting Ltd. $318,000.00 Drake Excavating Ltd. $341,403.50 4. Landscaping (6 contractors provided bids prices exclude GST) Green As Grass Lawn & Garden Inc. $114,007.00 Cedar Crest Lands (BC) Ltd. $129,372.00 Blue Pine Enterprises Ltd. $130,446.50* * Adjusted bid value to include missing scope. 5. Concrete & Formwork (1 contractor provided bid prices exclude GST) Heatherbrae Builders Co. Ltd. $140,000.00 6. Concrete Rebar (1 contractor provided bid price excludes GST) LMS Limited Partners $29,500.00 7. Structural & Misc. Steel (5 contractors provided bids prices exclude GST) PMC Builders & Developers LLP $375,865.00 Advanced Steel Structures (2011) Inc. $385,060.00* Macform Construction Group $397,500.00* * Adjusted bid values to include missing scope.

- 2-8. Stainless Steel Railing (1 contractor provided bid price excludes GST) Crosstown Metal Industries Ltd. $14,286.00 9. Glulam (2 contractors provided bids prices exclude GST) Fraserwood Industries Ltd. $126,897.77 Western Archrib a division of 316291 Alberta Ltd. $134,646.00* * Adjusted bid value to include prefabrication and finish of glulams. 10. Rough Carpentry (2 contractors provided bids prices exclude GST) Heatherbrae Builders Co. Ltd. $180,000.00 Finished Construction Ltd. $184,000.00 11. Finish Carpentry (2 contractors provided bids prices exclude GST) Finished Construction Ltd. $35,000.00 Heatherbrae Builders Co. Ltd. $42,500.00 12. Millwork (5 contractors provided bids prices exclude GST) Woodrose Woodworking $97,375.00 Morinwood Mfg Inc. $102,538.00 Island Architectural Millwork Ltd. $130,000.00 13. Waterproofing (1 contractor provided bid price excludes GST) Libra Envelope Investments $10,510.80 14. Spray Insulation (3 contractors provided bids prices exclude GST) Greer Spray Foam Ltd. $4,600.00 Arctic Insulation $8,185.00 15. Metal Cladding (4 contractors provided bids prices exclude GST) Lam Metal Contracting Ltd. $89,360.35 Link Design Services Inc. $99,000.00 Cascade Roofing & Waterproofing (2007) Inc. $148,353.00 16. Wood Cladding (1 contractor provided bid price excludes GST) Cascade Roofing & Waterproofing (2007) Inc. $52,841.00

- 3-17. Roof Anchors (1 contractor provided bid price excludes GST) Atlas Anchor Systems (B.C.) Ltd. $17,380.00 18. Roofing (5 contractors provided bids prices exclude GST) Transwest Roofing Ltd. $123,881.00 Metro Roofing & Sheet Metal Ltd. $124,300.00 Cascade Roofing & Waterproofing (2007) Inc. $158,526.00 19. Metal Doors & Frames and Wood Doors (3 contractors provided bids prices exclude GST) Shanahans Limited Partnership $5,108.00 Accurate Door & Hardware Co. $5,620.00 Allmar $6,900.00 20. Finish Hardware (3 contractors provided bids prices exclude GST) Allmar $47,269.00 Shanahans Limited Partnership $50,000.00 Accurate Door & Hardware Co. $55,380.00 21. Security Grill (3 contractors provided bids prices exclude GST) Allmar $9,195.00 Shanahans Limited Partnership $11,235.00 Accurate Door & Hardware Co. $12,000.00 22. Glazing (4 contractors provided bids prices exclude GST) Semiahmoo Glass Ltd. $694,500.00 Phoenix Glass Inc. $702,688.00* Glastech Glazing Contractors Ltd. $807,538.00 * Adjusted bid value to include missing scope and redesign for alterative product. 23. Glazing Film (1 contractor provided bid price excludes GST) Newco Products $20,672.85 24. Drywall & Steel Stud (5 contractors provided bids prices exclude GST) Winwood Construction Ltd. $198,829.00 POS Construction Ltd. $215,000.00 Cobra Interiors Ltd. $215,295.00

- 4-25. Stucco (2 contractors provided bids prices exclude GST) BJ Plastering & Consultants Ltd. $21,088.00 Charles Joesph Plastering Ltd. $43,500.00 26. Polish Concrete (1 contractor provided bid price excludes GST) Danamac Concrete Systems $13,783.00 27. Flooring (4 contractors provided bids prices exclude GST) Benefit Floors Ltd. $75,479.00 Atmosphere Interiors Ltd. $78,000.00 DL Watts Flooring Ltd. $80,343.00 28. Wrestling Mats (1 contractor provided bid price excludes GST) Ostberg Wrestling Supplies Inc. $59,356.00* * Adjusted bid value to include additional labour. 29. Painting (5 contractors provided bids prices exclude GST) Lincor Enterprises Ltd. $55,796.00 Concord Painting & Wall Covering Ltd. $55,800.00* M&L Painting Ltd. $94,870.00 * Adjusted bid value to include exterior anti-graffiti coating. 30. Washroom Accessories (3 contractors provided bids prices exclude GST) Allmar $7,725.00 Accurate Door & Hardware Co. $9,000.00 Shanahans Limited Partnership $9,340.00 31. Elevator (3 contractors provided bids prices exclude GST) Richmond Elevator $165,800.00 Schindler Elevator Corporation $178,000.00* KONE Inc. $217,411.00 * Adjusted bid value to include glass cab finishes. 32. Mechanical (6 contractors provided bids prices exclude GST) 0994960 BC Ltd. dba JF Butler & Sons $511,100.00 Canstar Mechanical Ltd. $521,800.00* Triwest Mechanical Ltd. $526,650.00 * Adjusted bid value to include sprinklers and to meet specs.

- 5-33. Electrical (5 contractors provided bids prices exclude GST) Claytonwood Electrical Contracting Inc. $462,000.00* Alpine Electric Ltd. $575,000.00 McKinley Electric Ltd. $598,500.00 * Adjusted bid value to include fire stopping and scanning & coring 34. Security Electrical (1 contractor provided bid price excludes GST) Canem Systems Ltd. $38,277.00 35. Negotiated prices for the purpose of valuing outstanding scopes related to the above Work divisions (prices exclude GST) Heatherbrae Builders Co. Ltd. Temp Supports & Scaffolding $20,000.00 Temp Public Access $12,000.00 Temp Weather Protection $35,000.00 Misc. Cutting, Coring, E-ray & Scanning $10,000.00 Gravel Construction Road $15,000.00 Klassikdrain $4,100.00 Modified Lawn Basin $1,200.00 Repair Existing Masonry above ceiling $5,000.00 Mics. Allowance (re & re Doors for Phasing) $3,000.00 Modification to Window Sills $500.00 Re & Re Wall Panel in Multi-Purpose Room for Steel $2,500.00 Crystalline Waterproofing $2,000.00 Krystol Waterstop System $1,500.00 Anti Bird Spikes $1,000.00 Flashing, Sheet Metal & Break Shape Shading $10,000.00 Flashing Fire Stopping $10,000.00 Sealants $5,000.00 Glazing Film (Addendum # 2) $500.00 Temp Fire Escape Door $2,000.00 Wall Repairs for OWSJ Upgrades $7,500.00 Re & Re Ceilings for OWSJ Upgrades $5,000.00 Re & Re Ceilings for Sprinkler Installations $5,000.00 Fire Retardant paint $15,000.00 Floor Sealer $750.00 Wrestling Mats Deliver, Curing, and Ventilation $5,000.00 Total Negotiated Prices: $178,550.00

- 6-36. Cash Allowances (prices exclude GST ) Description Budget Temporary Walls Protection $20,000.00 Tree Protection, Pruning, Removal $42,170.00 Temp Facilities, Phasing during Lobby Renovation $15,000.00 Record Drawings $25,000.00 Hazmat and Lead Abatement $10,000.00 Site Paving (bases, prep & finish) Div 2 $50,000.00 Bench Concrete $6,000.00 Bridge deck over rain garden footings $2,000.00 Line Painting $500.00 Refinish Owner provided chairs $2,450.00 Custom Light Poles $19,600.00 LED Lights to Wood Dec $1,000.00 Repairs to existing slab on grade $9,750.00 Misc. Seismic $5,000.00 Wood Panel Walls & Ceilings $50,000.00 Re & Re Roof for Structural Upgrades $5,000.00 Rolling Coil Door $45,000.00 Auto Operator Integration $5,000.00 Acoustic Treatment (Floating Wood Floor) $28,200.00 Perimeter Sound Insulation Strip $2,500.00 Relocate Entry Mat $2,000.00 Tactile Strips and Anti Slip Finish $5,000.00 Turnstiles $120,000.00 Signage $20,000.00 Seismic Joint (Roof Only) $7,500.00 Misc. Interior Expansion $10,000.00 Allowance for Maintenance of Existing mech System $15,000.00 Allowance for Adjustments for OWSJ - mech $15,000.00 Allowance for relocate existing mech units $12,000.00 Temp Fire Alarm re & re verification $8,000.00 Allowance for Maintenance of Existing Elec System $10,000.00 Allowance for Adjustments for OWSJ - Elec $10,000.00 Wave Pool Roof Remediation $500,000.00 Total Cash Allowances: $1,078,670.00 Sub- total (items 1 36) $5,566,908.77 General Conditions $320,300.00 Contract Management Fees $167,007.26 Total Contract Value (excluding GST) $6,054,216.03 v:\wp-docs\civicfacilities\16data\01211130ar.docx SAW 2/1/16 10:54 AM