U.S. Army Corps of Engineers. Regulatory Program



Similar documents
PUBLIC NOTICE Application for Permit

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

Remaining Wetland Acreage 1,500, , ,040-39%

QUESTIONS AND ANSWERS WATERS OF THE U.S. PROPOSAL

DECISION DOCUMENT NATIONWIDE PERMIT 27

COMMUNITY CERTIFICATIONS

REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for:

GROWER ADVISORY Agriculture Regulations of the Wetlands Protection Act

Section 401 Water Quality Certification

Urban Stream Restoration Defining the Full Benefits of a Project. Warren C. High MACTEC Engineering and Consulting

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN COHASSET HARBOR COHASSET AND SCITUATE, MASSACHUSETTS

REGULATORY GUIDANCE LETTER

RE: Docket # COE ; ZRIN 0710 ZA05 Submitted via to NWP2012@usace.army.mil and Rulemaking Portal at

USDA Forest Service Proposed Soil and Water Restoration Categorical Exclusions Frequently Asked Questions Table of Contents

Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants

A Cost Analysis of Stream Compensatory Mitigation Projects in the Southern Appalachian Region 1

Environmental Law Primer. Adapted from Vermont Law School s Environmental Law Primer for Journalists

Michigan Wetlands. Department of Environmental Quality

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT

Wildlife Habitat Conservation and Management Program

United States Army Corps of Engineers, Civil Works

Northern Middlesex Council of Governments

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.

Emergency Streambank Restoration/Stabilization. Kentucky Division of Water Water Quality Certification May 2010 Educational Assistance

Prepared By: Eric Chamberlain

1. INTRODUCTION 5. THE PERMIT PROCESS

Table of Contents. Introduction Guidance Permit fact sheet Completeness checklist. Introduction

Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002

33 CFR PART 332 COMPENSATORY MITIGATION FOR LOSSES OF AQUATIC RESOURCES. Authority: 33 U.S.C. 401 et seq. ; 33 U.S.C. 1344; and Pub. L

30-DAY PUBLIC NOTICE CHELSEA RIVER, EAST BOSTON MASSACHUSETTS EMERGENCY STREAMBANK PROTECTION PROJECT

Determination of NEPA Adequacy (DNA)

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

Floodplain Development Land Use Review

Economic Analysis of Proposed Revised Definition of Waters of the United States

Plan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005.

Wetlands in MN: Resource, Regulation, Restoration

AN INITIATIVE TO IMPROVE

SEC PURPOSE. SEC DEFINITIONS. SEC COLLABORATIVE FOREST LANDSCAPE RESTORATION PROGRAM.

Flood Risk Management

Flood Risk Management


North Face. South Face. Figure Science Park Station Exteriors. Pg 1-3 MASSACHUSETTS BAY TRANSPORTATION AUTHORITY

Regulatory Features of All Coastal and Inland Ecological Restoration Limited Projects

Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey

MINIMUM STANDARDS FOR ACCEPTANCE OF AQUATIC RESOURCES DELINEATION REPORTS

Adopted 9/23/98 CHATTAHOOCHEE CORRIDOR PLAN. The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are:

US 281 AT PREMONT PUBLIC HEARING. US 281 at Premont Public Hearing

GAO PIPELINE PERMITTING. Interstate and Intrastate Natural Gas Permitting Processes Include Multiple Steps, and Time Frames Vary

3. The submittal shall include a proposed scope of work to confirm the provided project description;

Post-Flood Assessment

MASSACHUSETTS COASTAL NONPOINT PROGRAM NOAA/EPA DECISIONS ON CONDITIONS OF APPROVAL

Lower Crooked Creek Watershed Conservation Plan EXECUTIVE SUMMARY

The answers to some of the following questions are separated into two major categories:

401 Water Quality Certification and Isolated Wetlands Permitting in Ohio. Tom Harcarik Division of Surface Water

Public Notice. US Army Corps of Engineers Fort Worth District. Applicant: Sabine Mining Company. Permit Application No.

Environmental Review Process

US Army Corps of Engineers Authorities and Programs

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014

Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy

Miquon Creek STREAM RESTORATION PROJECT WHO WE ARE

MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore MD

PUBLIC NOTICE PROJECT: Trans Bay Cable Maintenance Project

Sims Bayou Federal Flood Damage Reduction Project

The Muddy River: A Century of Change

PENNSYLVANIA STATE PROGRAMMATIC GENERAL PERMIT-4 (PASPGP-4) July 1, 2011

Recognizing Wetlands. For additional information contact your local U.S. Army Corps of Engineers office. Pitcher plant.

Gold Ray Dam Interagency Technical Team Meeting

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN

Chehalis River Basin Flood Damage Reduction Capital Budget Approved by Legislature in June 2013

APPENDIX C LIST OF EA RECIPIENTS

As stewards of the land, farmers must protect the quality of our environment and conserve the natural resources that sustain it by implementing

Public Law and Non-Structural Alternatives to Levee Repairs

Oregon. Climate Change Adaptation Framework

Living on the Fox River

ENVIRONMENTAL PROTECTION AGENCY

UNITED STATES OF AMERICA 131 FERC 62,175 FEDERAL ENERGY REGULATORY COMMISSION. United Water Conservation District Project No.

For additional information on qualifications and experience of representative EDGE senior staff members, please contact us.

Oxbow Restoration for Fish Habitat and Water Quality

Goal 1 To protect the public health, safety and property from the harmful effects of natural disasters.

USDA CROSS TRAINING PROGRAM ONLINE AGLEARN TRAINING

Transcription:

U.S. Army Corps of Engineers Regulatory Program

Regulatory Authorities Section 10 of the Rivers & Harbors Act of 1899 Section 404 of the Clean Water Act

Section 10 of the Rivers and Harbors Act of 1899 Regulated Activities Structures and Work in Navigable Waters of the U.S. (Lake Champlain, Lake Memphremagog, major rivers, and international rivers in VT and NY) -Dredging -Structures in, over, or under a navigable waterway -Private docks -Water intake lines -Aerial transmission lines -Submarine cables -Marinas

Section 404 of the Clean Water Act Regulated Activities Any activity that would involve the permanent or temporary placement of dredged or fill material into any waterway or wetland, including: Pond construction Mechanized landclearing Landscaping Land Development (i.e., housing, commercial, industrial, etc.) Cofferdams

Section 404 of the Clean Water Act Regulated Activities Roads, culverts, bridges Bedding and backfill for utility lines Shoreline stabilization Sidecasting of material from excavation of new drainage ditches Installation of drainage tile

Agricultural Exemptions - Plowing, tilling, etc., provided the work would not result in a change to the hydrology of the wetland - Farm or Stock Ponds - Maintenance, but not construction, of drainage ditches - Farm roads

VT General Permit Forms of Authorization New England District Vermont Minimal Impact Projects impacts not to exceed one acre Individual Permit Projects with greater than minimal impacts or in excess of one acre of impact South Bay, Lake Memphremagog, Newport, VT

Forms of Authorization New York District -Individual Permits -Nationwide General Permits - NWP #3 Maintenance - NWP# 13 Bank Stabilization - NWP #14 Linear Transportation Projects - NWP #18 Minor Discharges - NWP #39 Commercial/Institutional Developments - NWP # 40 Agricultural Activities

Individual Permit In VT, projects with direct/indirect impacts to waters of U.S. in excess of one acre or projects which do not meet the criteria of the VT GP In NY, projects which do not otherwise meet the criteria and thresholds of the NWPs.

Alternatives Analysis Only the Least Environmentally Damaging Practicable Alternative (LEDPA) to accomplish the basic project purpose can be permitted

Alternatives Analysis/Mitigation Sequencing AVOID impacts to waters of the U.S. to the maximum extent practicable (off-site alternatives analysis; leads to LEDPA site) MINIMIZE impacts to waters of the U.S. (at the LEDPA site) to the maximum extent practicable MITIGATE for the unavoidable impacts of the project

INDIVIDUAL PERMIT EVALUATION PROCESS Complete for Processing 15-30 day Public Notice Comments by Agencies, interested groups, public May need public hearing Application Submitted Final Decision by District May be Appealed to Division Issued Denied Full Public Interest Review Factors Other Requirements Conservation Safety Water Quality Certification Economics Water Quality 404b1 Compliance Aesthetic Fish/Wildlife NEPA Wetlands Erosion CZM Historic Prop. Water Supply. End. Species Act Flood hazards Food/Fiber Prod Wild/Scenic Rivers Floodplain Property ownership Essential Fish Habitat Land Use General Env. Concerns Navigation Needs/Welfare of the people Recreation Mineral Needs Energy Needs

Our Resource Agency Partners U.S. Fish & Wildlife Service U.S. Environmental Protection Agency National Marine Fisheries Service USDA NRCS VT/NY State Historic Preservation Offices VT/NYS Departments of Environmental Conservation Adirondack Park Agency

U.S. Fish & Wildlife Service U.S. Fish & Wildlife Service - Impacts to fish and wildlife habitat - Impacts - Required to fish to consult and wildlife under habitat Section 7 of the Endangered Species Act when - Required to consult under Section 7 of a project could result in impacts to a the Endangered Species Act when a Federally listed threatened or project could result in impacts to a endangered species or their critical Federally listed threatened or endangered habitat. species or their critical habitat.

U.S. Environmental Protection Agency - Impacts to Water Quality - Alternatives [Compliance with 404(b)(1) Guidelines]

National Marine Fisheries Service - Impacts to Essential Fish Habitat

USDA Natural Resources Conservation Service - Agricultural issues

VT and NY State Historic Preservation Offices Effects to cultural resources (archaeological and/or historic) that are eligible for the National Register of Historic Places

VT and NYS Departments of Environmental Conservation - Water Quality Certification - Similar goals in regulatory programs

Adirondack Park Agency Activities within the Adirondack Park

Questions on the Permit Process??

Vermont Agricultural Conversions

The Problem: Large land conversion projects where forest is being converted into cropland. Smaller projects where existing farm fields have been expanded or improved with additional drainage.

Why Do We Have Jurisdiction? While the conversion of wetland to cropland still retains the acreage as open space, the methodology necessary to accomplish the conversion is usually jurisdictional. Mechanized landclearing Ditching with sidecasting of excavated material Discharge of fill (backfilling) associated with the installation of drainage tile

RESOLVED Sheldon, VT Total Forest Cleared - About 90 acres Converted Wetland 7.7 acres - Case referred to U.S. Attorney - Consent decree filed; civil penalty paid; restoration of 5.5 acres completed; ATF permit issued for retention of 2.2 acres

RESOLVED Fairfield, VT 4.6 acres of wetland conversion and relocation of stream Case referred to U.S. Attorney Consent Decree Restoration Complete Civil Penalty Paid

RESOLVED St. Albans, VT - 42 acre conversion of forested, scrub-shrub, and old field wetland. - Joint Corps/EPA negotiations with landowner and his attorney for resolution - Restoration of 32 acres; ATF permit for retention of 10 acres of conversion issued

ON-GOING Irasburg, VT 4 separate sites Cook About 40 acres of direct impact Some restoration completed Resolution anticipated in 2008 Frecette Gleason

Back Coventry Road Pre/Post Clearing

Flow

Flow

Flow

Corps of Engineers VT Project Office 8 Carmichael Street, Suite 205 Essex Junction, Vermont 05452 Marty Abair or Mike Adams Martha.a.abair@usace.army.mil Michael.s.adams@usace.army.mil 802 872-2893 Fax 802 879-7638 www.nae.usace.army.mil/

New York District, Corps of Engineers Regulatory Field Office Building 10, 3 rd Floor 1 Buffington Street Watervliet, New York 12189-4000 518 266-6350 Fax 518 266-6366 www.nan.usace.army.mil/