PUBLIC NOTICE PROJECT: Trans Bay Cable Maintenance Project
|
|
|
- Francine Andrews
- 10 years ago
- Views:
Transcription
1 SAN FRANCISCO DISTRICT PUBLIC NOTICE PROJECT: Trans Bay Cable Maintenance Project Regulatory Division 1455 Market Street, 16 th Floor San Francisco, CA PUBLIC NOTICE NUMBER: S PUBLIC NOTICE DATE: COMMENTS DUE DATE: PERMIT MANAGER: Nina Cavett-Cox TELEPHONE: INTRODUCTION: Trans Bay Cable LLC (POC: James Alligan, ), One Letterman Drive, Building C 5 th Floor, San Francisco, through its agent, URS Corporation, San Francisco (POC: Ian Austin, , has applied to the U.S. Army Corps of Engineers (USACE), San Francisco District, for a Department of the Army Permit to allow in-bay maintenance activities needed to protect the Trans Bay Cable (Cable) over a 10-year period. The Cable is buried under San Francisco Bay and Carquinez Strait and runs from the City of Pittsburg in Contra Costa County through New York Slough, Carquinez Strait, San Pablo Bay, and San Francisco Bay to an upland Converter Station site in the vicinity of Potrero Point in the City and County of San Francisco, California. This Department of the Army permit application is being processed pursuant to the provisions of Section 404 of the Clean Water Act of 1972, as amended (33 U.S.C et seq.), Section 10 of the Rivers and Harbors Act of 1899, as amended (33 U.S.C. 403 et seq.), and Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972, as amended (33 U.S.C et seq.). 2. PROPOSED PROJECT: Project Site Location: The Cable runs from the City of Pittsburg in Contra Costa County through New York Slough, Carquinez Straits, San Pablo Bay, and San Francisco Bay to an upland Converter Station site in the vicinity of Potrero Point in the City and County of San Francisco, California (enclosure 1). Project Site Description: The Cable is a 53-mile long submarine high-voltage direct current (HVDC) cable that transmits electricity between the Pacific Gas and Electric Company (PG&E) substation in Pittsburg, California, and PG&E substation at Portero in San Francisco, California. Construction of the Cable was completed in During Cable installation most of the Cable alignment, except at utility crossings, was buried to a depth of 3 to 6 feet below the Bay floor using a hydroplow. At utility crossings the Cable is protected by concrete mattress or rock riprap. The Cable provides 400 megawatts of power to the City of San Francisco. The Cable bundle, which consists of 2 transmission cables and a fiber-optic cable for communication between the converter stations, is approximately 10-inches in diameter. The action area for the proposed Cable maintenance includes the waters of San Francisco Bay, San Pablo Bay, and the Carquinez Strait. Additionally, benthic habitat on the existing Cable includes, concrete mattresses, submerged debris, and soft bottom substrates. The open water areas of the Carquinez Strait provide habitat for marine invertebrates, fish, birds, and marine mammals. Benthic habitat within the action area is dominated by Bay sand and mud which provides habitat for many bottom feeder species. Along the eastern edge of the aquatic portion of the project action area, riprap shoreline is present, which provides marginal habitat for rock crabs, birds, and some fish species. Jurisdictional waters of the U.S. subject to regulation under Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act within the project action area include: open water marine habitat, mud flat habitat, riprap shoreline, and salt marsh habitat. Project Description: The applicant proposes to conduct maintenance over the next 10 years along exposed sections of the 53-mile long alignment of the Cable. Maintenance activities would take place along the areas were the cable is exposed. Generally, these locations coincided with areas where the Cable could not be buried or where the current has exposed the pipe. The proposed 1
2 maintenance activities would include the following activities: hand jetting to increase the depth of the burial of the Cable in sand/sediment waves, the placement of additional protective mattresses, and rock fill to support an eroded area at the Kinder Morgan pipeline crossing. The concrete mattresses (enclosure 2) are flexible concrete blocks connected with high-tensile fiber rope. The mattresses are 8 feet by 20 feet and are generally 9 inches thick. In order to install the mattresses they would be lifted by crane onboard a derrick barge, and slowly lowered to the Bay bottom. The mattresses would then be guided by divers to the required position for placement. At the Kinder Morgan pipeline crossing location rock bags would be placed on each side of the cable. A small volume of rock fill would be placed under the Cable to hold it in place, and concrete mattresses would be placed over the Cable for additional protection. It is anticipated that hand jetting would disturb a total bottom area of approximately 2,820 square feet. In addition, a total of 225 cubic yards of concrete mattresses and rock fill would be placed along 13,000 square feet of area surrounding the Cable. Basic Project Purpose: The basic project purpose comprises the fundamental, essential, or irreducible purpose of the project, and is used by USACE to determine whether the project is water dependent. The basic project purpose is to conduct Cable maintenance. The Corps has determined that the project is water dependent. Overall Project Purpose: The overall project purpose serves as the basis for the Section 404(b)(1) alternatives analysis, and is determined by further defining the basic project purpose in a manner that more specifically describes the applicant's goals for the project, while allowing a reasonable range of alternatives to be analyzed. The overall project purpose is to address the maintenance activities that may be required over the next 10 years along exposed sections of the Cable. Project Impacts: It is anticipated that hand jetting would disturb a total area of approximately 2,820 square feet of the Bay bottom. In addition, a total of 225 cubic yards of concrete mattresses and rock fill would be placed along 13,000 square feet of area surrounding the Cable. Proposed Mitigation: The applicant intends to avoid and further minimize impacts to jurisdictional waters by implementing the following measures: implementing standard best management practices, completing work during designated work windows to reduce impacts to federally listed species, slowly moving the concrete mattresses and rock fill into position, and utilizing low pressure water jets to minimize disturbance and turbidity. A final decision regarding the need for mitigation is still under review. Project Alternatives: The applicant was required to submit alternative cable protection methods in order to show that the preferred alternative is the least environmentally damaging alternative. Alternatives provided by the applicant include two variations of protective mattresses and large diameter rock armor. 3. STATE AND LOCAL APPROVALS: Water Quality Certification: State water quality certification or a waiver is a prerequisite for the issuance of a Department of the Army Permit to conduct any activity which may result in a fill or pollutant discharge into waters of the United States, pursuant to Section 401 of the Clean Water Act of 1972, as amended (33 U.S.C et seq.). The applicant has recently submitted an application to the California Regional Water Quality Control Board (RWQCB) to obtain water quality certification for the project. Water quality issues should be directed to the Executive Officer, California Regional Water Quality Control Board, San Francisco Bay Region, 1515 Clay Street, Suite 1400, Oakland, California 94612, by the close of the comment period. Coastal Zone Management: Section 307(c) of the Coastal Zone Management Act of 1972, as amended (16 U.S.C. 1456(c) et seq.), requires a non-federal applicant seeking a federal license or permit to conduct any activity occurring in or affecting the coastal zone to obtain a Consistency Certification that indicates the activity conforms with the State s coastal zone management program. Generally, no federal license or permit will be granted until the appropriate State agency has issued a Consistency Certification or has waived its right to do so. Coastal zone management issues should be directed to the Executive Director, San Francisco Bay Conservation and Development Commission, 50 California Street, Suite 2600, San Francisco, California 94111, by the close of the comment period. 2
3 4. COMPLIANCE WITH VARIOUS FEDERAL LAWS: National Environmental Policy Act (NEPA): Upon review of the Department of the Army permit application and other supporting documentation, USACE has made a preliminary determination that the project neither qualifies for a Categorical Exclusion nor requires the preparation of an Environmental Impact Statement for the purposes of NEPA. At the conclusion of the public comment period, USACE will assess the environmental impacts of the project in accordance with the requirements of the National Environmental Policy Act of 1969 (42 U.S.C ), the Council on Environmental Quality's Regulations at 40 C.F.R. Parts , and USACE Regulations at 33 C.F.R. Part 325. The final NEPA analysis will normally address the direct, indirect, and cumulative impacts that result from regulated activities within the jurisdiction of USACE and other non-regulated activities USACE determines to be within its purview of Federal control and responsibility to justify an expanded scope of analysis for NEPA purposes. The final NEPA analysis will be incorporated in the decision documentation that provides the rationale for issuing or denying a Department of the Army Permit for the project. The final NEPA analysis and supporting documentation will be on file with the San Francisco District, Regulatory Division. Endangered Species Act (ESA): Section 7(a)(2) of the ESA of 1973, as amended (16 U.S.C et seq.), requires Federal agencies to consult with either the U.S. Fish and Wildlife Service (USFWS) or the National Marine Fisheries Service (NMFS) to ensure actions authorized, funded, or undertaken by the agency are not likely to jeopardize the continued existence of any Federally-listed species or result in the adverse modification of designated critical habitat. As the Federal lead agency for this project, USACE has conducted a review of the California Natural Diversity Data Base, digital maps prepared by USFWS and NMFS depicting critical habitat, and other information provided by the applicant, to determine the presence or absence of such species and critical habitat in the project area. Based on this review, USACE has made a preliminary determination that the following Federally-listed species and designated critical habitat are present at the project location or in its vicinity, and may be affected by project implementation. The project action area contains Federally-listed threatened steelhead (Oncorhynchus mykiss), Centeral Claifornia Coast Distinct Population Segment (DPS) and California Central Valley DPS; Chinook salmon (Oncorhynchus tshawytscha), endangered Sacramento River winter-run Evolutionarily Significant unit (ESU) and threatened Central Valley Spring-run ESU; threatened Green Sturgeon (Acipenser medirostris); and threatened Delta smelt (Hypomesus transpacificus). Critical habitat has also been designated for steelhead, Chinook salmon Sacramento River winterrun, Green Sturgeon, and Delta smelt. The overall project could potentially create localized disturbance to habitat at the maintenance locations from the following activities: placement of concrete and rock fill onto the Bay bottom, lifting material from the bottom during placement, and hand jetting. To address project related impacts to these species and designated critical habitat, USACE will initiate informal consultation with USFWS and NMFS, pursuant to Section 7(a) of the Act. Any required consultation must be concluded prior to the issuance of a Department of the Army Permit for the project. Magnuson-Stevens Fishery Conservation and Management Act (MSFCMA): Section 305(b)(2) of the MSFCMA of 1966, as amended (16 U.S.C et seq.), requires Federal agencies to consult with the NMFS on all proposed actions authorized, funded, or undertaken by the agency that may adversely affect essential fish habitat (EFH). EFH is defined as those waters and substrate necessary to fish for spawning, breeding, feeding, or growth to maturity. EFH is designated only for those species managed under a Federal Fisheries Management Plan (FMP), such as the Pacific Groundfish FMP, the Coastal Pelagics FMP, and the Pacific Coast Salmon FMP. As the Federal lead agency for this project, USACE has conducted a review of digital maps prepared by NMFS depicting EFH to determine the presence or absence of EFH in the project area. Based on this review, USACE has made a preliminary determination that EFH is present at the project location or in its vicinity, and that the critical elements of EFH may be adversely affected by project implementation. The action area is classified as EFH under the MSFCMA and is designated as a Habitat Areas of Particular Concern (HAPC) for various fish species within the Pacific Groundfish and Coastal Pelagic FMPs. The Bay is considered an estuarine system that serves as breeding and rearing grounds for the following fish stocks: Coastal Pelagic EFH, Pacific Pelagic EFH, and Pacific Salmon EFH. The placement of concrete mattresses, hand jetting, and rock filling activities associated with the proposed action may affect EFH in the 3
4 following ways: localized and temporary turbidity, disturbance of habitat, and a change in habitat from the permanent placement of the concrete mattresses and rock fill. To address project related impacts to EFH, USACE will initiate consultation with NMFS, pursuant to Section 305(5(b)(2) of the Act. Any required consultation must be concluded prior to the issuance of a Department of the Army Permit for the project. Marine Protection, Research, and Sanctuaries Act (MPRSA): Section 302 of the MPRS of 1972, as amended (16 U.S.C et seq.), authorizes the Secretary of Commerce, in part, to designate areas of ocean waters, such as the Cordell Bank, Gulf of the Farallones, and Monterey Bay, as National Marine Sanctuaries for the purpose of preserving or restoring such areas for their conservation, recreational, ecological, or aesthetic values. After such designation, activities in sanctuary waters authorized under other authorities are valid only if the Secretary of Commerce certifies that the activities are consistent with Title III of the Act. No Department of the Army Permit will be issued until the applicant obtains the required certification or permit. The project does not occur in sanctuary waters, and a preliminary review by USACE indicates the project would not likely affect sanctuary resources. This presumption of effect, however, remains subject to a final determination by the Secretary of Commerce, or his designee National Historic Preservation Act (NHPA): Section 106 of the NHPA of 1966, as amended (16 U.S.C. 470 et seq.), requires Federal agencies to consult with the appropriate State Historic Preservation Officer to take into account the effects of their undertakings on historic properties listed in or eligible for listing in the National Register of Historic Places. Section 106 of the Act further requires Federal agencies to consult with the appropriate Tribal Historic Preservation Officer or any Indian tribe to take into account the effects of their undertakings on historic properties, including traditional cultural properties, trust resources, and sacred sites, to which Indian tribes attach historic, religious, and cultural significance. As the Federal lead agency for this undertaking, USACE has conducted a review of latest published version of the National Register of Historic Places, survey information on file with various city and county municipalities, and other information provided by the applicant, to determine the presence or absence of historic and archaeological resources within the permit area. Based on this review, USACE has made a preliminary determination that historic or archaeological resources are not likely to be present in the permit area, and that the project either has no potential to cause effects to these resources or has no effect to these resources. USACE will render a final determination on the need for consultation at the close of the comment period, taking into account any comments provided by the State Historic Preservation Officer, the Tribal Historic Preservation Officer, the Advisory Council on Historic Preservation, and Native American Nations or other tribal governments. If unrecorded archaeological resources are discovered during project implementation, those operations affecting such resources will be temporarily suspended until USACE concludes Section 106 consultation with the State Historic Preservation Officer or the Tribal Historic Preservation Officer to take into account any project related impacts to those resources. 5. COMPLIANCE WITH THE SECTION 404(b)(1) GUIDELINES: Projects resulting in discharges of dredged or fill material into waters of the United States must comply with the Guidelines promulgated by the Administrator of the Environmental Protection Agency under Section 404(b) of the Clean Water Act (33 U.S.C. 1344(b)). An evaluation pursuant to the Guidelines indicates the project is dependent on location in or proximity to waters of the United States to achieve the basic project purpose. This conclusion raises the (rebuttable) presumption of the availability of a practicable alternative to the project that would result in less adverse impact to the aquatic ecosystem, while not causing other major adverse environmental consequences. The applicant has submitted an analysis of project alternatives which is being reviewed by USACE. 6. PUBLIC INTEREST EVALUTION: The decision on whether to issue a Department of the Army Permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the project and its intended use on the public interest. Evaluation of the probable impacts requires a careful weighing of the public interest factors relevant in each particular case. The benefits that may accrue from the project must be balanced against any reasonably foreseeable detriments of project implementation. The decision on permit issuance will, therefore, reflect the national concern for both protection and utilization of important resources. Public interest factors which may be relevant to the decision process include conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, 4
5 fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. 7. CONSIDERATION OF COMMENTS: USACE is soliciting comments from the public; Federal, State and local agencies and officials; Native American Nations or other tribal governments; and other interested parties in order to consider and evaluate the impacts of the project. All comments received by USACE will be considered in the decision on whether to issue, modify, condition, or deny a Department of the Army Permit for the project. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, and other environmental or public interest factors addressed in a final environmental assessment or environmental impact statement. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the project. 8. SUBMITTING COMMENTS: During the specified comment period, interested parties may submit written comments to Nina Cavett-Cox, San Francisco District, Regulatory Division, 1455 Market Street, 16 th Floor, San Francisco, California ; comment letters should cite the project name, applicant name, and public notice number to facilitate review by the Regulatory Permit Manager. Comments may include a request for a public hearing on the project prior to a determination on the Department of the Army permit application; such requests shall state, with particularity, the reasons for holding a public hearing. All substantive comments will be forwarded to the applicant for resolution or rebuttal. Additional project information or details on any subsequent project modifications of a minor nature may be obtained from the applicant and/or agent, or by contacting the Regulatory Permit Manager by telephone or cited in the public notice letterhead. An electronic version of this public notice may be viewed under the Current Public Notices tab on the USACE website: 5
PUBLIC NOTICE Application for Permit
PUBLIC NOTICE Application for Permit 30-Day Notice Issue Date: June 20, 2016 Expiration Date: July 20, 2016 US Army Corps of Engineers No: NWP-2010-535 Oregon Department of State Lands No: 58311-RF Interested
30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN COHASSET HARBOR COHASSET AND SCITUATE, MASSACHUSETTS
.-ro:'j - I US Army Corps of Engineers r& New England District 696 Virginia Road Concord, MA 01742-2751 Public Notice In Reply Refer to: Mr. Craig Martin [email protected] Programs/Project Management
30-DAY PUBLIC NOTICE CHELSEA RIVER, EAST BOSTON MASSACHUSETTS EMERGENCY STREAMBANK PROTECTION PROJECT
PUBLIC NOTICE Engineering/Planning 696 Virginia Road Concord, MA 01742 Date: 10 November, 2015 Comment Period Ends: 10 December, 2015 In Reply, Refer To: Robert Russo Or by e-mail: [email protected]
Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants
OMB Approval No.: 0648-0538 Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants Instructions The National Environmental Policy
Section 401 Water Quality Certification
Section 401 Water Quality Certification Department of Health Environmental Management Division Clean Water Branch Voice: (808) 586-4309 Fax: (808) 586-4352 http://www.hawaii.gov/health/environmental/water/cleanwater/index.html
GAO PIPELINE PERMITTING. Interstate and Intrastate Natural Gas Permitting Processes Include Multiple Steps, and Time Frames Vary
GAO United States Government Accountability Office Report to Congressional Committees February 2013 PIPELINE PERMITTING Interstate and Intrastate Natural Gas Permitting Processes Include Multiple Steps,
CHAPTER 8. FEDERALLY-LISTED ENDANGERED OR THREATENED SPECIES
1. INTRODUCTION AND DEFINITIONS. CHAPTER 8. FEDERALLY-LISTED ENDANGERED OR THREATENED SPECIES a. General. The Biotic Resources chapter in Appendix A of Order 1050.1E combines information on Federally-listed
National Marine Sanctuaries Act
Please note: This text is from the fourth edition of Federal Historic Preservation Laws, published in 2006 by the National Center for Cultural Resources, National Park Service, Department of the Interior.
J. Template Environmental Checklist for FEMA/HUD Using the Template Environmental Checklist for FEMA and HUD Responsible Entities EHP Reviews
J. Template Environmental Checklist for FEMA/HUD Using the Template Environmental Checklist for FEMA and HUD Responsible Entities EHP Reviews As discussed in the Unified Federal Review Guidance for EHP
COMMUNITY CERTIFICATIONS
National Flood Insurance Program Community Rating System COMMUNITY CERTIFICATIONS Public reporting burden for this form is estimated to average 4 hours for annual recertification, per response. The burden
Department of the Interior. Departmental Manual
Page 1 of 10 Department of the Interior Departmental Manual Effective Date: 10/23/2015 Series: Public Lands Part 600: Public Land Policy Chapter 6: Implementing Mitigation at the Landscape-scale Originating
RE: Docket # COE 2010 0035; ZRIN 0710 ZA05 Submitted via email to [email protected] and Rulemaking Portal at www.regulations.gov.
April 18, 2011 U.S. Army Corps of Engineers Attn: CECW CO R 441 G Street, N.W. Washington, DC 20314 1000 RE: Docket # COE 2010 0035; ZRIN 0710 ZA05 Submitted via email to [email protected] and Rulemaking
MEMORANDUM. March 9, 2007
MEMORANDUM March 9, 2007 TO: FROM: SUBJECT: MEMBERS, PORT COMMISSION Hon. Anne Lazarus, President Hon. Kimberly Brandon, Vice President Hon. Rodney Fong Hon. Michael Hardeman Monique Moyer Executive Director
UTILITIZATION OF ECOHYDROLOGIC MODELS IN FLOODPLAIN FISH PASSAGE AND HABITAT RESTORATION EVALUATION
UTILITIZATION OF ECOHYDROLOGIC MODELS IN FLOODPLAIN FISH PASSAGE AND HABITAT RESTORATION EVALUATION Joshua A. Israel, Fish Biologist, U.S Bureau of Reclamation, Sacramento, CA. [email protected]; Paul
DECISION DOCUMENT NATIONWIDE PERMIT 27
DECISION DOCUMENT NATIONWIDE PERMIT 27 This document discusses the factors considered by the Corps of Engineers (Corps) during the issuance process for this Nationwide Permit (NWP). This document contains:
RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION
RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION CX Log #: DOI-BLM-OR-V060-2015-032-CX CE Exemption category: 516 DM 11.9, E.12: Grants of right-of-way wholly within the boundaries
March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633
ADDENDUM TO THE MICHELSON WATER RECLAMATION PLANT PHASE 2 & 3 CAPACITY EXPANSION PROJECT FEBRUARY 2006 FINAL ENVIRONMENTAL IMPACT REPORT AND THE SAN JOAQUIN FRESHWATER MARSH ENHANCEMENT PLAN REVISED SEPTEMBER
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580
SECTION 9 SUMMARY OF COORDINATION, PUBLIC VIEWS AND COMMENTS
SECTION 9 SUMMARY OF COORDINATION, PUBLIC VIEWS AND COMMENTS This page intentionally left blank. 9.0SUMMARY OF COORDINATION, PUBLIC VIEWS AND COMMENTS 9.1 PUBLIC OUTREACH AND PUBLIC INVOLVEMENT Public
AN INITIATIVE TO IMPROVE
L OW E R C A R M E L R I V E R A N D L AG O O N F L O O D P L A I N R E S TO R AT I O N A N D E N H A N C E M E N T P R O J E C T AN INITIATIVE TO IMPROVE FLOOD PROTECTION RESTORE AND PROTECT RIPARIAN
US Army Corps of Engineers Authorities and Programs
US Army Corps of Engineers Authorities and Programs Section 206; Flood Plain Management Services Program Section 22; Planning assistance to States General Investigations (large-scale flood risk reduction)
An Act To Facilitate Testing and Demonstration of Renewable Ocean Energy Technology Be it enacted by the People of the State of Maine as follows:
PLEASE NOTE: Legislative Information cannot perform research, provide legal advice, or interpret Maine law. For legal assistance, please contact a qualified attorney. An Act To Facilitate Testing and Demonstration
National Environmental Policy Act/ Clean Water Act Section 404 (NEPA/404) Merger Process and Agreement for Transportation Projects in Colorado
Background In a May 12, 2003, letter from Mr. James L. Connaughton, Executive Office of the President, Council on Environmental Quality, to Mr. Norman Y. Minneta, Secretary of Transportation, Mr. Connaughton
National Ocean Council
LEGAL AUTHORITIES RELATING TO THE IMPLEMENTATION OF COASTAL AND MARINE SPATIAL PLANNING TABLE OF CONTENTS I. THE LEGAL AUTHORITY FOR COASTAL AND MARINE SPATIAL PLANNING (CMSP)...1 II. OPERATIONAL PROGRAMS...2
Gold Ray Dam Interagency Technical Team Meeting
Gold Ray Dam Interagency Technical Team Meeting Agenda Public Outreach, Funding, Monitoring EA/BA/Permit Updates Deconstruction Plans Fish Passage & Salvage Plan Hydraulic Modeling Next Steps Public Outreach,
Department of Defense MANUAL
Department of Defense MANUAL NUMBER 4715.03 November 25, 2013 USD(AT&L) SUBJECT: Integrated Natural Resources Management Plan (INRMP) Implementation Manual References: See Enclosure 1 1. PURPOSE. In accordance
33 CFR PART 332 COMPENSATORY MITIGATION FOR LOSSES OF AQUATIC RESOURCES. Authority: 33 U.S.C. 401 et seq. ; 33 U.S.C. 1344; and Pub. L. 108 136.
33 CFR PART 332 COMPENSATORY MITIGATION FOR LOSSES OF AQUATIC RESOURCES Authority: 33 U.S.C. 401 et seq. ; 33 U.S.C. 1344; and Pub. L. 108 136. Source: 73 FR 19670, Apr. 10, 2008, unless otherwise noted.
Submarine Cable Projects and the ONMS Regulations
NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION OFFICE OF NATIONAL MARINE SANCTUARIES INTERIM POLICY AND PERMIT GUIDANCE FOR SUBMARINE CABLE PROJECTS APRIL 2009 PURPOSE AND APPLICATION The purpose of this
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers
U.S. Environmental Protection Agency, Region IX Response to Comments on the Goleta Sanitary District Draft NPDES Permit and 301(h) TDD
U.S. Environmental Protection Agency, Region IX Response to Comments on the Goleta Sanitary District Draft NPDES Permit and 301(h) TDD A. Kamil S. Azoury of Goleta Sanitary District provided comments on
Appendix A. The Marine Life Protection Act (MLPA)
Appendix A. The Marine Life Protection Act (MLPA) THE PEOPLE OF THE STATE OF CALIFORNIA DO ENACT AS FOLLOWS: SECTION 1. Chapter 10.5 (commencing with Section 2850) is added to Division 3 of the Fish and
DEPARTMENT OF THE ARMY SECTION 404 REGIONAL GENERAL PERMIT CHANNEL AND BANK PROTECTION STRUCTURES ON THE SOUTH PLATTE RIVER
DEPARTMENT OF THE ARMY SECTION 404 REGIONAL GENERAL PERMIT CHANNEL AND BANK PROTECTION STRUCTURES ON THE SOUTH PLATTE RIVER Permit Expires: December 31, 2017 Regional General Permit No. 87-01 Issuing Office:
Chapter 5. Other Accounts 5-1
Chapter 5 Other Accounts 5-1 Other Discretionary Funds (Dollars in Thousands) FY 2006 FY 2007 Program Changes Total Other Discretionary Funds Coastal Zone Management Fund $0 $0 $0 $0 Fisherman's Contingency
How To Decide If A Dam Removal Is Safe For Water Quality
Report Issue Paper: Water Quality Certification Procedures for Klamath River Restoration Project By: Steve Kirk and Debra Sturdevant March 2012 Last Updated: 3/14/12 DEQ 11-WQ-047 This report prepared
3. The submittal shall include a proposed scope of work to confirm the provided project description;
QIN Shoreline Master Program Project Summary The Shoreline Master Program (SMP) development process for the Quinault Indian Nation (QIN) includes the completion of inventory and analysis report with corresponding
Pipeline Regulatory and Environmental Permits
Chapter 3 Pipeline Regulatory and Environmental Permits William E. Bauer Chapter Outline Introduction 57 3.1 Regulation of Interstate Pipelines 58 3.1.1 FERC-Regulated Natural Gas Pipelines 58 3.1.2 FERC-Regulated
Regulating Offshore Renewable Energy Leasing and Development
Regulating Offshore Renewable Energy Leasing and Development Robert P. LaBelle Acting Associate Director Offshore Energy and Minerals Management Bureau of Ocean Energy Management, Regulation and Enforcement
USDA Forest Service Proposed Soil and Water Restoration Categorical Exclusions Frequently Asked Questions 2013-09-05 Table of Contents
USDA Forest Service Proposed Soil and Water Restoration Categorical Exclusions Frequently Asked Questions 2013-09-05 Table of Contents What is the Final Rule implemented by the Forest Service?... 2 Why
NOAA s Role in the Licensing of Offshore LNG Terminals
NOAA s Role in the Licensing of Offshore LNG Terminals Emily Lindow, National Oceanic and Atmospheric Administration Senior Advisor to the Under Secretary of Commerce for Oceans and Atmosphere NOAA and
The Everglades & Northern Estuaries; St. Lucie River Estuary, Indian River Lagoon & Caloosahatchee Estuary. Water Flows & Current Issues
The Everglades & Northern Estuaries; St. Lucie River Estuary, Indian River Lagoon & Caloosahatchee Estuary Water Flows & Current Issues Florida Governor Rick Scott August 20, 2013 Upper Chain of Lakes
LOCATION: In Elliott Bay, Puget Sound at Seattle, King County, Washington.
US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management
UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Elba Liquefaction Company, L.L.C. Southern LNG Company, L.L.C. Elba Express Company, L.L.C. Docket No. PF13-3-000 NOTICE OF INTENT TO PREPARE
Habitat Conservation Plan Incidental Take License Information Package
Habitat Conservation Plan Incidental Take License Information Package Hawaiian stilt, a eo, Himantopus mexicanus knudseni - Photo: Garret Lau State of Hawaii Department of Land and Natural Resources Division
Multiple Species Conservation Program County of San Diego. A Case Study in Environmental Planning & The Economic Value of Open Space
Multiple Species Conservation Program County of San Diego A Case Study in Environmental Planning & The Economic Value of Open Space Amy M. Fox Land Use Law Case Study Autumn Semester, 1999 Multiple Species
DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. 20314-1000
DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. 20314-1000 CEMP-SPD (l105-2-10a) APR 1 5 2012 THE SECRETARY OF THE ARMY 1. I submit for transmission to Congress my report on coastal
STIPULATED SETTLEMENT AGREEMENT AND ORDER OF DISMISSAL - 1-
STEPHANIE M. PARENT (OSB #92590) Pacific Environmental Advocacy Center 100 15 SW Terwilliger Blvd. Portland, OR 972 1 9 Phone (503) 768-6736 Fax (503) 768-6642 parentalclark. edu Attorney for Plaintiffs
Jacksonville Port Authority: Fire and Rescue Marine Fire Station #40, Jacksonville, Florida
Draft Tiered Site-Specific Environmental Assessment Jacksonville Port Authority: Fire and Rescue Marine Fire Station #40, Jacksonville, Florida Port Security Grant Program Project # 2008-GB-T8-K019 November
Goal 1 To protect the public health, safety and property from the harmful effects of natural disasters.
Plan Framework for Coastal Management The purpose of this element is to provide for the protection of residents and property in within the coastal area of the host community, and to limit expenditures,
Environmental Law Primer. Adapted from Vermont Law School s Environmental Law Primer for Journalists
Environmental Law Primer Adapted from Vermont Law School s Environmental Law Primer for Journalists General Categories Command and Control Liability Disclosure Ecosystem and Place-based Programs Marketable
A Functional Classification System for Marine Protected Areas in the United States
A Functional Classification System for Marine Protected Areas in the United States The U.S. Classification System: An Objective Approach for Understanding the Purpose and Effects of MPAs as an Ecosystem
Beach Management Funding Assistance Program
FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION DIVISION OF WATER RESOURCE MANAGEMENT Beach Management Funding Assistance Program Local Government Funding Requests: Ranking Criteria for Beach and Inlet
NASA Stennis Space Center Environmental Resources Document
16.0 Major Environmental Considerations for Proposed Actions All construction, rocket testing, and operations that may potentially impact environmental media, such as air, water, land, aquatic and biotic
FWS Cultural Resource Management Planning
I. What is required? FWS Cultural Resource Management Planning A number of laws, regulations, and Fish and Wildlife Service policies address cultural resource management planning requirements and objectives.
1. INTRODUCTION 5. THE PERMIT PROCESS
1. INTRODUCTION Laws of the United States and the State of Iowa have assigned the US Army Corps of Engineers and the Iowa Department of Natural Resources with specific and different regulatory roles designed
UNITED STATES DISTRICT COURT DISTRICT OF OREGON ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) )
Case 3:09-cv-00729-HA Document 20 Filed 07/09/10 Page 1 of 10 Page ID#: 86 IGNACIA S. MORENO, Assistant Attorney General SETH M. BARSKY, Acting Section Chief BRADLEY H. OLIPHANT, Trial Attorney (Cal. Bar
Urban Stream Restoration Defining the Full Benefits of a Project. Warren C. High MACTEC Engineering and Consulting
Urban Stream Restoration Defining the Full Benefits of a Project Warren C. High MACTEC Engineering and Consulting Economics in the Decision Process Return on Investment Willingness to Pay Municipal Growth
Ocean Dumping Act: A Summary of the Law
Claudia Copeland Specialist in Resources and Environmental Policy December 15, 2010 Congressional Research Service CRS Report for Congress Prepared for Members and Committees of Congress 7-5700 www.crs.gov
2008 Compensatory Mitigation Rule: Overview and Highlights. Jenny Thomas U.S. Environmental Protection Agency Wetlands Division July 2014
2008 Compensatory Mitigation Rule: Overview and Highlights Jenny Thomas U.S. Environmental Protection Agency Wetlands Division July 2014 Outline Background Rule goals Rule structure 8 sections Highlight
U.S. DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MEDFORD DISTRICT GRANTS PASS FIELD OFFICE 2164 NE Spalding Ave Grants Pass, OR 97526
A. Background U.S. DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MEDFORD DISTRICT GRANTS PASS FIELD OFFICE 2164 NE Spalding Ave Grants Pass, OR 97526 Categorical Exclusion Determination and Decision
Preliminary Views on the Draft Early Restoration Programmatic Environmental Impact Statement and Phase III Early Restoration Plan
Preliminary Views on the Draft Early Restoration Programmatic Environmental Impact Statement and Phase III Early Restoration Plan The Deepwater Horizon Natural Resource Damage Assessment Trustees (Trustees)
The National Environmental Policy Act (NEPA)
The National Environmental Policy Act (NEPA) Steve Kokkinakis National Oceanic and Atmospheric Administration Office of Program Planning and Integration NEPA Compliance and Coordination The National Environmental
DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment
DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment Water Protection Bureau Name of Project: Applicant: Ueland Land Development LLC Type of Project: Proposed discharge of treated domestic wastewater
Regulatory Features of All Coastal and Inland Ecological Restoration Limited Projects
Eligibility Checklist This Ecological Restoration Limited Project Eligibility Checklist guides the applicant in determining if their project is eligible to file as an Inland or Coastal Ecological Restoration
PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY
PIPELINE ROUTING PERMIT For A NATURAL GAS PIPELINE IN DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PUC DOCKET No. G002/GP-05-1706 In accordance with the requirements
Remaining Wetland Acreage 1,500,000 915,960 584,040-39%
NEW JERSEY Original Wetland Acreage Remaining Wetland Acreage Acreage Lost % Lost 1,500,000 915,960 584,040-39% New Jersey Wetlands: Nearly 99 percent of New Jersey s wetlands are palustrine or estuarine.
North Face. South Face. Figure 1.1-2 Science Park Station Exteriors. Pg 1-3 MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
North Face South Face MASSACHUSETTS BAY TRANSPORTATION AUTHORITY Pg 1-3 Figure 1.1-2 Science Park Station Exteriors MASSACHUSETTS BAY TRANSPORTATION AUTHORITY Pg 1-4 Figure 1.1-3 Science Park Station Platform
The Donut Hole Sunset The San Francisco-Pacifica Exclusion Zone
The Donut Hole Sunset The San Francisco-Pacifica Exclusion Zone Changes to the exclusionary factors since designation Presentation to the Gulf of the Farallones National Marine Sanctuary Advisory Council
RESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS
RESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS by Hany Elwany, Ph.D. Scripps Institution of Oceanography Headwaters to Oceans Conference 25 October 2003 CE Ref #03-22 San Diego County Lagoons
Federal Register / Vol. 73, No. 33 / Tuesday, February 19, 2008 / Rules and Regulations
Federal Register / Vol. 73, No. 33 / Tuesday, February 19, 2008 / Rules and Regulations 9035 553(d)(3). This finding is based upon the reasons provided above for waiver of prior notice and opportunity
United States Army Corps of Engineers, Civil Works
United States Army Corps of Engineers, Civil Works Fiscal Year 2013 Federal Program Inventory May 2013 Table of Contents Introduction... 2 Program Inventory... 3 1. Navigation... 3 2. Flood Risk Management...
NATIONAL MARINE FISHERIES SERVICE INSTRUCTION 02-110-17
Department of Commerce $ National Oceanic & Atmospheric Administration $ National Marine Fisheries Service NATIONAL MARINE FISHERIES SERVICE INSTRUCTION 02-110-17 Protected Resource Management Endangered
TITLE 14. Fish and Game Commission Notice of Proposed Changes in Regulations
TITLE 14. Fish and Game Commission Notice of Proposed Changes in Regulations NOTICE IS HEREBY GIVEN that the Fish and Game Commission (Commission), pursuant to the authority vested by sections 7071, 7078,
CHAPTER 4 ALTERNATIVES COMPARISON
CHAPTER 4 ALTERNATIVES COMPARISON 4.1 INTRODUCTION This chapter provides a comparison of the and its alternatives as described in EIS/EIR Section 1.8.3 (s Evaluated in this EIS/EIR) and analyzed in Sections
SKAGIT COUNTY HABITAT IMPROVEMENT PLAN
SKAGIT COUNTY HABITAT IMPROVEMENT PLAN Public Works Department Natural Resources Division August 2012 Mission To create and advance restoration strategies that support Skagit County goals for promoting
UNITED STATES OF AMERICA 131 FERC 62,175 FEDERAL ENERGY REGULATORY COMMISSION. United Water Conservation District Project No.
UNITED STATES OF AMERICA 131 FERC 62,175 FEDERAL ENERGY REGULATORY COMMISSION United Water Conservation District Project No. 2153-022 ORDER APPROVING SPOIL MANAGEMENT, EROSION, AND SEDIMENT CONTROL PLAN
PROGRAMMATIC ENVIRONMENTAL ASSESSMENT
U.S. Fish and Wildlife Service, Region 1 Wildlife and Sport Fish Restoration Program FINAL PROGRAMMATIC ENVIRONMENTAL ASSESSMENT for a Streamlined Method for Approving Small Land Disposals of State Lands
Sec. 22a-1a page 1 (4-97)
Department of Environmental Protection Sec. 22a-1a page 1 (4-97) TABLE OF CONTENTS Connecticut Environmental Policy Act Definitions... 22a-1a- 1 Determination of sponsoring agency.... 22a-1a- 2 Determination