TECHNICAL SPECIFICATION FOR HIGH MAST LIGHTING SYSTEM, 20 MTRS HEIGHT

Similar documents
SPECIFICATIONS FOR TENDER NO: PSNR/SCP/VKS/E 1635 ANNEXURE I TECHNICAL SPECIFICATIONS FOR LIGHTING HIGH MAST

How To Build A High Mast Power Plant

TS 813 GROUNDING AND BONDING TTD TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD CONTROLLER CABINET GROUNDING

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

TELESCOPE Motorized Lighting Suspension

EARTHING AND BONDING AT SECONDARY SUBSTATIONS

Pressure monitoring equipment for oil-sf 6. bushings, type GOEK

E S T I M A T E TENDER FOR ELECTRICAL & DATA CABLING WORK FOR BANK OF INDIA, KALAWAD ROAD BRANCH(GROUND FLOOR)-RAJKOT CITY

TECHNICAL INFORMATION

Network Standard Advice No. 1420C 9/6/2011

ScottishPower Distribution Cables & Equipment. Metal Theft

NATIONAL COIR RESEARCH AND MANAGEMENT INSTITUTE (NCRMI) KUDAPPANAKUNNU.P.O, THIRUVANANTHAPURAM NOTICE INVITING LIMITED QUOTATION

CHAPTER NO. 27 QUANTITIES OF MATERIALS

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

MEDIUM VOLTAGE CE-BF SWITCHBOARDS. UP TO 40.5 kv. CE - BF - C - en - REV

Gulf Cable & Electrical Ind. Co.

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

XLPE PRODUCTION PLANT FOR THIRUVALLA UNIT OF TRACO CABLE LTD

CHAPTER VIII LINE PLANT SYSTEM COMMUNICATION THROUGH RE CABLE

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables

Bill of Quantities. Factory Services Date:

Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling

Session 14 Cable Support Systems

TARIFF CODE and updates standard

Uncovered Decks & Porches

TECHNICAL DATA & SERVICE MANUAL SPLIT SYSTEM AIR CONDITIONER INDOOR UNIT: AW52AL AW64AL AW52AL AW64AL /05

IRRIGATION PUMPING Table of Contents - Section 900

SCHEDULE ' A ' TECHNICAL SPECIFICATION FOR SINGLE CORE,UNARMOURED L.T.XLPE POWER CABLE FOR DISTRIBUTION NETWORK IN MAHARASHTRA

DESCRIPTION UNIT QTY RATE TOTAL (KSHS) Supply and install the following: -

VIPERFLEX ELECTRIC CABLE

FACTORY AUTOMATION. Manual Laying loops for Loop detector LC10-1 and LC10-2

Section 21. Telecommunication Hardware. BuyLog Catalog 21-1

Whitepaper. Modular Substation Cable Termination Design. Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada

HV Submarine Cable Systems Design, Testing and Installation

MODEL HSR-007 Direct Drive Rolling Steel

VOLUME AND SURFACE AREAS OF SOLIDS

T A B L E T 1 T E S T S A N D I N S P E C T I O N C A B L E P C U T A N D P C U T - A

ŠKODA MACHINE TOOL HORIZONTAL MILLING AND BORING MACHINES ŠKODA HCW

MAST ARMS & POLES. Ornamental Pole Top & Bases

MUNICODE SERVICES LTD.

2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding

FIRE RESISTANT CABLE CONSTRUCTION OF CABLES

Consultants Handbook

SunnyMec 3000 The innovative bi-axial PV tracker Data Sheet

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

Outdoor 33.6W Dual Port Passive Power-over-Ethernet Midspan For External Security Cameras and Wireless Access Points

INSULATION SYSTEMS FOR CODUCTORS

Accessories for GF and RA machines

Libellula 50/55 kw WIND TURBINE TECHNICAL DESCRIPTION

Screened cable and data cable segregation

Cables, Cable Laying & Accessories Manual

Geotechnical Building Works (GBW) Submission Requirements

Sports and High Mast Lighting Poles Phone: (866) Fax: (817)

TECHNICAL SPECIFICATION FOR ELECTRICAL WIRING / PANELS / SWITCH GEAR

ACTIV-8 PLUS Insulated Conductor Bar

METHOD OF STATEMENT FOR STATIC LOADING TEST

EARTHING SYSTEM CALCULATION

TECHNICAL SPECIFICATIONS

BOQ FOR ELECTRICAL WORK OF HLST IN GROUND FLOOR AT S.B.I. LHO BHOPAL.

BILL OF QUANTITY FOR THE HVAC WORKS OF The Institute of space technology, near Toll Plaza (G.T. Road,) Islamabad

EC DECLARATION OF CONFORMITY FOR MACHINES

EDS KV TRIPLEX CABLE

DESIGN CLARIFICATION (DC)

Undergrounding high voltage electricity transmission. The technical issues

SECTION 22 LIGHTNING PROTECTION SYSTEM

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance

8' W x 8' H or 10' H Peak Style Shelter Assembly Instructions

SCHEDULE ' A' TECHNICAL SPECIFICATION FOR 11/22/33KV H.T.XLPE POWER CABLE FOR DISTRIBUTION NETWORK IN MAHARASHTRA (SPECIFICATION NO.

Corporate Profile ROYAL. MODERN ROYAL ELECTRIC Ideal Power Solution MRE ELECTRICAL, INSTRUMENTATION & COMMUNICATION SYSTEMS

GALVANIC CATHODIC PROTECTION 1.0 CONTENTS. 1.1 Aluminium Anodes. 1.2 Zinc Anodes. 1.3 Magnesium Anodes SECTION

TECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.)

ELEKTROTEHNI KO PODJETJE Leskoπkova cesta 12, 1000 Ljubljana, SLOVENIA

Split-type Air-Conditioner INSTALLATION MANUAL CONTENTS FOR INSTALLER MXZ-3A30NA MXZ-4A36NA ATTENTION. English. Français. Español

Attachment G-1: Pit Latrine Diagram. Fig E.1a: Pit Latrine. Fig E.1b: Plan View of Twin Pits

CHAPTER 2 QUANTITY TAKE-OFF

800 Communications Circuits

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

SCHEDULE OF RATE FOR ARC FOR MAINTENANCE OF CP & ASSOCIATED SYSTEM FOR HVJ, DVPL - I and DVPL - II PIPELINE UNDER KHERA PIPELINE JURISDICTION

Fault location on power cables. Fault location on power cables

UGVCL/SP/591/11KV HT AB CABLE

SECTION SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

Installation Instructions for Solar Pumps USER MANUAL FOR SPS, SPC, SPSC SPQB, SPGJ SERIES SOLAR PUMPS AND PUMP CONTROLLERS

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

How To Retaining Wall Guide

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

Worldwide network in over 40 countries.

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS:

33.6W Power over Ethernet Waterproof Adapter PoE Plus Single Port Injector for Outdoor Application

italtec PRINTED CIRCUITS EQUIPMENT PRINTED CIRCUITS EQUIPMENT Insulator machines Echting machines Special equipment and machines

Installation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: No.: SE-...

INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION

WOLFFKRAN. 1 Schedule drawing. 1.1 Schedule drawing, WOLFF clear. max. hook height above ground. Data WOLFF clear

PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE

INSTALLATION INSTRUCTIONS HUSTLER 4-BTV, 5-BTV TRAP VERTICAL WARNING INSTALLATION OF THIS PRODUCT NEAR POWER LINES IS DANGEROUS

Pro-Lift Steel Pile Foundation Repair

Cold Room & Refrigeration System (Casserole Assembly) No of units: 1

DELHI METRO RAIL CORPORATION LIMITED. (A Joint Venture of Govt. of India & GNCTD) MASS RAPID TRANSPORT SYSTEM PHASE III. Contract: - CE -16 VOLUME-6

Transcription:

TECHNICAL SPECIFICATION FOR HIGH MAST LIGHTING SYSTEM, 20 MTRS HEIGHT Annexure A Sl.No. Description 1 Scope: The scope cover the design, manufacturing, supply and delivery at GCF Jabalpur on FOR basis and Erection and Commissioning of High mast lighting, 20 Mtrs. height shaft with single dip hot galvanized, lantern carriage, double drum internal winch motor, trailing steel wire rope, control panel, head frame along with 12 Nos. of 2x400 watts Metal Halide flood light fitting complete with MH T lamps 400Watts along with aviation light on top of the high mast as per detailed technical sheet given in Annexure B. Acceptable Make of High Mast : Bajaj / GE / Philips / Transrail Lighting only. 2 Erection & Commissioning: The supplier must do the Erection, Commissioning of all the supplied High mast Lighting systems at different location at GCF Estate ( Site will be earmarked by GCF authority) by constructing of shallow foundation with M15 grade concrete considering the safe soil bearing capacity at site as 10T/sqmtr at 2 Mtrs depth with all materials and labours, including installation of mast feeder pillar by grouting stand on the concrete with all material and labours 3 To complete the Erection and commissioning the following materials, works will also be required to execute by the supplier. Supplier has to quote separately. 3.1 Supply, Laying and connection of XLPE insulated, underground, galvanized steel wire / tape armoured, aluminium conductor cable, 1100V grade, stranded conductor, over all PVC insulated &sheathed, 4 core, 16 sq.mm in size. Make of cable: Havells / Gloster/ Polycab / Universal / Paragan / CCI. Qty. Reqd. 7 Nos. 7 Nos. 600 RM Rate / Each In Rs Total In Rs

3.2 Excavation of trench in soft soil, 0.75Mtr in depth and 0.30 mtr. in width for laying of 135CM above Underground cable. 3.3 Cutting opening in cement concrete wall (any description) track for inserting / laying of 2.7CM pipe/cable in size 30mtrx0.3mtrx0.3mtr 3.4 Spreading of river sand in trench, 0.3 M in 36CM width and 02.M in depth(0.1 M below & 0.1M above the cable) for cable protection including material & Labour. 3.5 Laying of brick, subclass B over the cable in 12CM trench to protect the cable protection including material & Labour. 3.6 Returning & refilling of the excavated soil in trench including spreading, watering and well 81CM ramming in layer 3.7 Cement concrete type B 1:2:4 mm grade aggregated in foundation and mass concrete in wall / floor or track any thickness size as 6CM required including plasters as directed including material & labour 3.8 Supplying & Fixing of GI pipe medium grade 50mm dia. Laid in ground / fitted in wall or 100RM under the road with all fixing accessories 3.9 Boring for bored cast in situ piles of dia. 200 mm dia., in soil, getting out and disposal of soil 30 RM using DMC method 3.10 Making of Earthing complete with Galvanized steel pipe electrode 40mm dia. Bore medium grade 2.5 mtr in length buried directly in ground with top edge not less than 1.25mtr below ground level, connected with earthing 14 Nos. lead of 4.00 mm dia GI wire all in shown in plate no 4 of SSR to be connected with earth test point all as specified in MES SSR specification including making of pit chamber, chamber cover and testing protection including material & Labour. ER value should not more than 2.0 ohms. Encl: Annexure B Detailed technical data sheet for High mast System

Annexure-B DETAILED TECHNICAL DATA SHEET FOR 20 MTRS. HIGH MAST SYSTEM High Mast Structure Height of Mast : 20Mtrs Material construction : S355 Grade as per BS-EN 10025 Thickness in mm : Top 3mm; Bottom 4mm Cross section of mast in Polygon( No. of sides) : 20 sides (min) No. of section and : In Two sections, Botom-10.88Mtr(app) Length of individual section Top-9.42Mtrs(app) Base and Top diameter : Top Dia. 150mm(Min) Bottom Dia. 460m(Min) Type of Joints : Stress fit side joints Length of overlap : 0.40 to 0.5Mtrs Metal protection treatment : HOT DIP GALVANIZED THROUGH Thickness of Galvanization : 65 micron(min) as per IS EN ISO1461 Base opening and door size : 1200mm x 250mm Type of blocking arrangement And door panel : Double internal Details of slack board inside : PVC board 200mm x 500mm x 8mm The base compartment Terminal box power control : Sheet metal box of suitable size in 2mmThick to accommodate required MCBs. Thickness of base plate : 25mm Size of anchor plate & Thickness : Uniform pitch circle dia. Of 590mm Details of Template : Uniform pitch circle dia. 590mm Weight of mast in Kgs : 550Kgs (min) (without accessories) Lighting protection finial : G.I.single spike of length 1200mm Make of Mast : BAJAJ / GE POWER / PHILIPS / TRANSRAIL LIGHTING (TEST TO BE CARRIED OUT AT OEM END / FACTORY) Dynamic Loading as per Prevailing at Site: Max. wind speed : 44 m/s as per IS 875 Part III Max. gust speed time : 3 seconds Height above ground level (These : 10 Mtrs. above two levels are measured) Factor of Safety for wind load : 1.25 Factor of Safety for other load : 1.15 ( as per TR No. 7)

Foundation Details Type of foundation : Open Raft Shallow Footing size of foundation : As per Manufacturer s design Designed Load Bearing capacity : 10 T per sq. m at 2 Mtrs depth Design safety Factor : As per IS :456 Considered Wind pressure ( Kg./Sq. mm) : As per IS :875-1987 Considered Wind speed ( KM. /hrs.) : As per IS :875-1987 Depth of foundation : Max. 1.5 M below Ground Level Average Soil bearing capacity : As per site requirement Number of foundation bolts : 8 Nos. PCD of foundation bolts : 590 mm Type of foundation bolts : TS600/30 mm dia/850 mm Bolt diameter : 30mm LANTERN CARRIAGE Material of construction : 50 NB ERW class B -MS Pipe Diameter of carriage ring (mm) : 710mm (ID)(Min) Construction : To suit Lighting Design No. of joints : Two Nos. Buffer arrangement between carriage & Mast : PVC sleeve on carriage Load carrying capacity : 500 Kg. Total weight of assembly with fitting : As per nos. of Luminaries No. of Fittings : 12 Nos. of 2x400W MH fittings WINCH Make of winch : GE power/ Bajaj / Transrail Lighting Number of drums / winch : Double drum type Gear ratio : 53 : 1 Capacity : 500 Kg Method of operation : Integral Motor Lubrication arrangement : Permanent oil bath Type of Lubricant : SAE 140/SAE 90 Tested load per drum : 1500 Kg. for winch

STAIN LESS STEEL WIRE ROPE Make : B. W. Ltd.,/ SAFE LIFT ENGG Grade : AISI 316 Number of ropes : Two continuous Construction : 7/ 19 Center core material : Stainless steel core Diameter(mm) : 6 mm Thimble & Talurit : SS Thimble Breaking load capacity : Min 2400 Kg. x 2 Safety factor : >5 for system at full load (Test report shall be produced) CABLE Type : Trailing cable Material : Copper Conductor EPR insulated PCP sheathed No. of core : 5 core, 4.0 sq. mm No. of circuit per Mast : One Current carrying capacity : 30 Amps POWER TOOLS Model : Integral / Gear Motor Input supply : 3 phase, 415 +/- 10 % volts, 50 Hz, AC Wattage / Hp : Min. 1HP & above if required Number of speed : 6 pole, single speed, 410 RPM Operating Speed : 2 M / minute Remote control switch PB station : Pendent Switch Make : GE power / Crompton / Kirloskar TORQUE LIMITOR Lifting capacity : Up 750 Kg Adjustable / Non Adjustable : Adjustable Tripping device : Mechanical (Test report shall be produced)

LUMINARIES & CONTROL Type : Non Integral, Outdoor purpose, Aluminium die cast, weather proof, Metal Halide fitting, 2 x 400 watts along with all its control gear, PF improvement capacitor etc. with MH lamp, Tubular(T) type single ended E-40 lamp Holder Quantity : 12 Nos Make : PHILIPS / GE POWER / BAJAJ / CROMPTON GREAVES / WIPRO are only acceptable. (Test report shall be produced) Control system : shall be controlled through a programmable timer for 24 hrs. with suitable MCBs, contractors and cables. EARTHING & LIGHTNING PROTECTION Earthing No. of connection Lightning protection Finial length : Suitable size earth termination shall be provided to connect with the proposed earth pit. : Two : Shall be incorporated and the final shall be fitted in the top of the Mast and shall be connected to the proposed earth. : 1200 mm AVIATION LIGHTING Aviation light : One set of Aviation caution light shall be provided in the top of the Mast with required cabling. General The Mast, Foundation and electrical drawing should be approved before commencement of work All safety measures shall be adopted while execute ( E & C) the work GUARANTY & WARRANTY One year GUARANTY & WARRANTY certificate shall be provided by the Manufacturer of Mast and free service for first year shall be provided as when required for attending the breakdown in the system / winch etc After guaranty period service support shall be rendered by the Manufacturer of high mast..