SWAN POINT YACHT & COUNTRY CLUB



Similar documents
Code Requirements for Existing Buildings

NC Rehab Code Case Study Cheerwine Building January 17, 2002; rev 4/12/02

2006 IBC BUILDING CODE CHECKLIST FOR COMMERCIAL PROJECTS

Building Condition Assessment Report

PROJECT SUMMARY. Scope of work details: (If phased construction, please see plan submittal guidelines.)

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

Certification: Building Plans Examiner. Exam ID: B3

Commercial Building Valuation Report

Ch. 58 DIVISION D-O 34 CHAPTER 58. DIVISION D-O ORDINARY COMMERCIAL, INDUSTRIAL, OFFICE OCCUPANCY GROUP CONSTRUCTION TYPE MAXIMUM STORY HEIGHT

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

July 29, Revise Section 1.1 (BACKGROUND AND CONTEXT) to the following:

COMMON FOR ARCHITECTS AND ENGINEERS Excerpts from HB 2284, 82 nd R

17,280 square feet Overview:


Design Development Quality Management Phase Checklist Project Phase Checklist Series

General Fire Code Requirements Within Commercial Tenant Spaces

Gramercy Place Condo Association, Inc.

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

Educational. Educational-Existing 1/28/2014. OCCUPANT LOADS [no change] Application. Application

Building Permits Permit Counter

Milestones Primary. Early Start. Orig Dur. Early Finish. Act ID. Description NOTICE TO PROCEED START CONSTRUCTION

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1

Design Options (Tradeoffs) Allowed by the 2012 Building Codes for Properties with Sprinkler Systems. April 2013

Commercial Building Valuation Report

Does Wall Township require an inspection by the building department on resale of a home?

Schedule B to By-law Part A Fees Payable for Permits

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

The Florida Building Code

MAJOR 2015 MN RESIDENTIAL CODE CHANGES Effective Date: January 24 th, 2015

VILLAGE OF HUDSON FALLS 220 MAIN STREET HUDSON FALLS, NY (518) /

9770 CULVER BOULEVARD CULVER CITY, CA Incidental improvements: improvements that do not qualify as minor or

TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST

Building Codes Update: The 2009 International Fire Code and the Apartment Industry

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

New York City Department of Buildings

ESTIMATE ORIG. ESTIMATE: TOTAL: $204,249 DATE: 01/15/08 DESCRIPTION OF WORK QUANTITY DIVISION TOTAL

M E M O R A N D U M. To: Partnership for Safer Buildings Date: 21 March 2003

BROWNSVILLE STRUCTURES STUDY. July Prepared by. LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania

Page 1 of 6 COMPLIANCE CHECKLIST. > Long Term Care Facility - Nursing Unit

Comparison of the Structural Provisions in the International Existing Building Code 2012 versus the Rhode Island State Rehabilitation Code

New York City Department of Buildings

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

Schedule B to By-law

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

Building Code Clarifications - 7. Fire Resistance

SECTION ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

BUILDING INSPECTORS INSPECTION FORM FOR CHILD CARE CENTERS

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

KIEWIT CM/GC Enabling/Utilities

T170 Interior Design Technology MTCU Code Program Learning Outcomes

RESIDENTIAL PHOTOVOLTAIC SUBMITTAL REQUIREMENTS

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

City of Peterborough

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

Sample Drawing Package for One and Two Family Dwelling Applications

BUILDING PERMIT SPECIFICATIONS

Facility Assessment for East Main Street, Huntley, IL

Fire Barriers & Fire Stopping

Number Northern Arizona University Facility Services Section Page. Effective April 1, 2011

SECTION XI OPINION OF PROBABLE COST

LOUISVILLE FIRE PROTECTION DISTRICT 895 West Via Appia, Louisville, Colorado

* Any required illumination shall be arranged so that the failure of any single lighting unit shall not leave any area in darkness.

We hope these Frequently Asked Questions will be of use both to municipal officials and fire inspectors.

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Repairs, Remodeling, Additions, and Retrofitting

Short Interval Production Schedule Research

REGULATIONS for INSTALLATION, MAINTENANCE, and TESTING APPLICATION PACKET

Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series

Errata has been identified as follows:

Lindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1

Flexible Office Space Up to 66,240 Ft 2

Classroom Door Security & Locking Hardware

H:\forms\handouts\bldg049 1 of 11 Revised Mar 2/15/dh

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

City of Riverside Building & Safety Division Phone: (951)

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

Think Of Us First! When It s Time to Distribute Your Plans

FIRE SAFETY INSPECTION REPORT

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

RULES AND REGULATIONS CONTRACTOR WORK

Building Condition Assessment Report

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS

REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY:

Vestibule Case Study. Vestibule Requirement Intent [2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, , ]

APPLICATION FOR NEW CONSTRUCTION

Transcription:

SWAN POINT YACHT & COUNTRY CLUB PROJECT INFORMATION: SCOPE OF WORK: INTERIOR ALTERATIONS ABBREVIATIONS: VICINITY MAP 33 East Charles Street PO Box 598 30-934-8078 PROPERTY MANAGER: DOTTIE HARPER BROOKFIELD RESIDENTIAL 320 JERMANTOWN ROAD, SUITE 50 FAIRFAX, VA 22030 703.270.403 PROJECT ADDRESS: SWAN POINT YACHT AND COUNTRY CLUB 550 SWAN POINT BOULEVARD ARCHITECT: L D HOLMES ARCHTIECTS, P.C. PO BOX 598 33 EAST CHARLES STREET LA PLATA, MD 20646 30-934-8078 MECHANICAL, PLUMBING AND ELECTRICAL ENGINEER : LEWIS ENGINEERING ASSOCIATES 2884 RIVERWATCH DRIVE MECHANICSVILLE, MD 20695 30-884-3370 LEWISENG.NET GOVERNING CODES: International Building Code 202 [IEBC 202] Maryland State Fire Prevention Code NFPA LIFE SAFETY CODE [NFPA 202] CODE INFORMATION: EXISTING BUILDING ALTERATION LEVEL 2 TOTAL AREA = 6,800 SF AREA OF WORK = 5,585 SF USE GROUP - MIXED N-SEPARATED [ASSEMBLY A-2, BUSINESS, MERCANTILE] BUILDING INFORMATION CONSTRUCTION - 5B HEIGHT AND AREA - HEIGHT - STORY AREA - FIRST FLOOR - 6,800 SF MAXIMUM ALLOWABLE FROM TABLE 503 WITH SPRINKLER INCREASE = A a =[A t + [A t x I s ]] A a = [ 6,000 SF + [6,000 x 3]] = 24,000 SF MAX OCCUPANCY LOAD = 548 PERSONS SEE OCCUPANT LOAD TABLE FOR CALCULATIONS EGRESS CAPACITY Egress Components (other than stairs) = 0.2 X 548=09.6" MAIN ENTRANCE = 54.8" MIN. Exits Provided = 9 MAXIMUM TRAVEL DISTANCE: 250 ft Sprinkled MAXIMUM COMMON PATH OF TRAVEL: 75 ft DEAD END CORRIDORS: 50 ft FIRE RESISTANCE RATINGS Exterior Bearing Walls... 0 Exterior Non Bearing Walls... 0 Interior Bearing Walls and Partitions... 0 Interior Non-Bearing Walls and Partitions... 0 Floor Construction and Supporting Members.. 0 Roof Construction and Supporting Members.. 0 Corridors...0 INTERIOR FINISH REQUIREMENTS FLOORS: NE WALLS AND CEILINGS: CLASS A OR B FULLY SPRINKLED WITH A SUPERVISED FIRE ALARM SYSTEM WORK SHALL INCLUDE RECONFIGURATION OF THE BAR, NEW BAR EQUIPMENT, CABINETRY AND PLUMBING. MODIFICATIONS SHALL BE MADE TO THE COFFERED CEILING IN THE BAR AND REMOVAL OF THE EXISTING DOMED CEILING STRUCTURE IN THE LOBBY. MODIFICATIONS WILL BE MADE TO EXISTING LIGHTING. IN ADDITION REMOVAL AND REPLACEMENT OF FINISHES SHALL INCLUDE ACOUSTICAL CEILINGS, FLOOR COVERINGS AND TRIM. SEE KEY PLAN FOR EXTENT OF WORK. GENERAL : COPYRIGHT 20 - LD HOLMES ARCHITECTS, PC All rights reserved. The copying or reuse of these documents, or portions thereof, for other than the original project or the purpose originally intended, without the written consent of LD Holmes Architects, PC is expressly prohibited.. No Changes to the plans are permitted. The architect shall not be responsible for any departure from these drawings at any time during construction. 2. All layout Dimensions as indicated shall be adjusted where required. Rough openings required by specific building components shall take precedence for proper fit of finished component. 3. Never scale drawings: Contractor shall refer to written dimensions only. All dimensions and conditions shall be verified in the field and any discrepancies reported to the architects prior to construction. In all cases the details and drawings shall be checked with existing conditions from work in place, and variations, if any, be referred to the architect for adjustment. The contractor will be held responsible for the fit of work in place. 4. All work shall be done in accordance with local codes and as indicated on drawings. DEMOLITION & CONSTRUCTION : Coordinate all work and schedule with the owner or designated agent. Protect all areas not included in the work. Any damage that occurs as a result of the work shall be repaired to a like new condition at G.C. expense. No alterations to the existing structural members are allowed unless specifically noted and approved by the owner or owner's agent in writing. All conditions and dimensions shown are for reference only and must be field verified at the site. Upon completion of demolition all conditions and dimensions are to be checked for variances. Report any discrepancies immediately to the project manager. Any unnoted existing conditions which may conflict with the proposed new work and may require modification, relocation and or removal shall be identified and reported to the architect at once. Refer to Architectural drawings for scope of new work and to confirm termination and/or removal of existing fixtures, devices and services. Any modification to existing Fire Alarm system must be approved by local Fire Marshall. Entire System shall be tested upon completion of work. Maintain and/or repair all fire rated assemblies and separations (wall, floor, ceiling, or between adjacent spaces, etc.) to maintain any fire rating as required by code. Provide and / or maintain all fire stopping as required by code. Repair any damage that occurs during demolition to any assembly scheduled to remain. KEY PLAN: ADA AFF AHJ A.S.O. COMAR DM EX EXIST NFPA WD American Disability Act Above Finished Floor Authority Having Jurisdiction As Selected by Owner Annotated Code of Maryland DEMO EXISTING EXISTING National Fire Protection Association WOOD LIST OF DRAWINGS: ARCHITECTURAL C. COVER SHEET D. DEMOLITION FLOOR PLAN D.2 DEMOLITION REFLECTED CEILING PLAN A. FIRST FLOOR PLAN A.2 REFLECTED CEILNG PLAN A2. BAR MILLWORK DETAILS A2.2 BAR MILLWORK DETAILS A3. SCHEDULES AND MECHANICAL, PLUMBING AND ELECTRICAL MEP SWAN POINT YACHT & COUNTRY CLUB OCCUPANT LOAD BUILDING CODE IBC 202 FIRE CODE NFPA 202 RM # ROOM NAME AREA SF FACTOR OCCUPANTS FACTOR OCCUPANTS 550 SWAN POINT BOULEVARD DESIGN LOADS: FLOOR LOAD... 40 PSF GROUND SW LOAD... 25 PSF SOIL BEARING CAPACITY... 500 PSF BASIC WIND SPEED... 90 MPH FROST DEPTH... 24" SEISMIC DESIGN CATEGORY... A BUILDING AREA = 6,800 SF AREA OF WORK = 5,585 SF EXP. DATE //203 PROJECT NUMBER:203..02 DATE:2/24/204 COVER SHEET C

00 002 D0 007 D02 009 D03 25 33 East Charles Street PO Box 598 30-934-8078 06 07 24 08 05 04 09 03 23 22 8 6 7 5 3 4 0 2 02 26 2 20 550 SWAN POINT BOULEVARD 9 0 00 EXP. DATE //203 0 2' 4' 8' SCALE: /4" = '-0" PROJECT NUMBER:203..02 DATE:2/24/204 FIRST FLOOR DEMO DEMOLITION FLOOR PLAN D.

550 SWAN POINT BOULEVARD 33 East Charles Street PO Box 598 30-934-8078 DEMOLITION REFLECTED CEILING PLAN 0 2' 4' 8' SCALE: /4" = '-0" EXP. DATE //203 PROJECT NUMBER:203..02 DATE:2/24/204 DEMOLITION REFLECTED CEILING PLAN D.2

25 33 East Charles Street PO Box 598 30-934-8078 06 07 24 08 05 04 09 03 23 8 6 7 5 3 4 0 2 02 26 2 22 20 550 SWAN POINT BOULEVARD 9 0 00 0 2' 4' 8' SCALE: /4" = '-0" EXP. DATE //203 FIRST FLOOR PLAN PROJECT NUMBER:203..02 DATE:2/24/204 CONSTRUCTION FLOOR PLAN A.

550 SWAN POINT BOULEVARD 33 East Charles Street PO Box 598 30-934-8078 REFLECTED CEILING PLAN EXP. DATE //205 PROJECT NUMBER:203..02 DATE:2/24/204 CONSTRUCTION REFLECTED CEILING PLAN A.2

FIREPLACE ELEVATION 6 /2" = '-0" 33 East Charles Street PO Box 598 30-934-8078 BACK BAR ELEVATION /2" = '-0" 550 SWAN POINT BOULEVARD BAR ELEVATION 2 /2"='-0" BAR ELEVATION 3 /2"='-0" BAR ELEVATION 4 /2"='-0" BAR ELEVATION EQUIPMENT PLAN 6 /2"='-0" EQUIPMENT SCHEDULE POWER. DESCRIPTION MANUFACTURER MODEL AMPS VOLTS PHASE ACCESSORIES COMMENTS EXP. DATE //205 PROJECT NUMBER:203..02 DATE:2/24/204 BAR MILLWORK DETAILS MILLWORK PLAN 5 /2"='-0" A2.

33 East Charles Street PO Box 598 30-934-8078 5 /2" = '-0" 6 /2" = '-0" 7 /2" = '-0" 550 SWAN POINT BOULEVARD EXP. DATE //205 PROJECT NUMBER:203..02 DATE:2/24/204 /2" = '-0" 2 /2" = '-0" 3 /2" = '-0" 4 /2" = '-0" BAR MILLWORK AND DETAILS A2.2

DOOR AND FRAME SCHEDULE DOOR FRAME SIZE MARK ROOM NAME WD HGT DOOR ELEVATIONS THK MATL EL GLAZING MFR. MATL MODEL FIRE RATING LABEL HARDWARE SET A B D C E F HARDWARE SETS 5 33 East Charles Street PO Box 598 30-934-8078 COFFER DETAIL 3"='-0" ROOM FINISH SCHEDULE WALLS TRIM FINISH FINISH 2 FIELD TRIM CROWN BASE CEILING CASING CHAIR RAIL MATL GRID TRAY FINISHES LIGHTING SCHEDULE ACOUSTICAL CEILING TILE (ACT) MANUFACTURER PRODUCT NAME PRODUCT NUMBER SIZE GRID SYSTEM LAMP. DESCRIPTION LOCATION MFR. MODEL SIZE FINISH BASE 4 # LIGHT COVE DETAIL 3"='-0" CARPET (CPT) MANUFACTURER PATTERN PRODUCT FIBER CLASS VINYL TILE (VT) MANUFACTURER CLASS 550 SWAN POINT BOULEVARD FLOOR ROOM NAME ROOM NUMBE R TILE (T) MFR PRODUCT SIZE GROUT MFR GROUT CLR INSTALLATION CROWN DETAIL 3 3"='-0" PLASTIC LAMINATE (PLAM) MFR MISCELLANEOUS ITEM COLLECTION PRODUCT INSTALLATION MISCELLANEOUS ELECTRICAL. DESCRIPTION MFR. MODEL DESCRIPTION FINISH PAINT (PT) MANUFACTURER PRODUCT SHEEN REMARKS 2 BUILT UP CROWN DETAIL 3"='-0" EXP. DATE //205 PROJECT NUMBER:203..02 DATE:2/24/204 SCHEDULES AND CHAIR RAIL DETAIL 3"='-0" A3.