S. Gledhill 1 P. Alegria da Silva 2 S. Marks 3



From this document you will learn the answers to the following questions:

What kind of connections did Aurecon draw from the design sketches?

What did Aurecon produce in the 3D Revit?

What is the structural design of the Bus Interchange Building?

Similar documents
4B The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig some of the trusses that are used in steel bridges

Hunter College school of Social Work Thesis Proposal

SEISMIC DESIGN. Various building codes consider the following categories for the analysis and design for earthquake loading:

FOUNDATION DESIGN. Instructional Materials Complementing FEMA 451, Design Examples

SHARP. Focus. AESS serves as the focal point of a small eye-care office in Austin. BY BRIAN SAYRE, P.E., AND K. MARK MERRYMAN, P.E.

Prepared For San Francisco Community College District 33 Gough Street San Francisco, California Prepared By

HOW TO DESIGN CONCRETE STRUCTURES Foundations

SEISMIC RETROFITTING OF STRUCTURES

Miss S. S. Nibhorkar 1 1 M. E (Structure) Scholar,

COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP

DESIGN OF BLAST RESISTANT BUILDINGS IN AN LNG PROCESSING PLANT

Technical Notes 3B - Brick Masonry Section Properties May 1993

DESIGNERS GUIDE TO DOMESTIC CONSERVATORIES

A 38-story design-build steel structure features a staggered-truss frame

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI

Detailing of Reinforcment in Concrete Structures

EAST LYME HIGH SCHOOL

Timber Frame Construction

WI LEY Blackwell. Multi-storey Precast Concrete Framed Structures. Colin K. Jolly MSc, PhD, CEng, MICE, FIStructE

Steel joists and joist girders are

HIGH LEVEL SEISMIC UPGRADE COST ESTIMATE FOR CENTRE BLOCK, PARLIAMENT HILL

Sisal Composite Ltd. Apparel 4 Ltd. JM Knit Ltd. Natun Para, Hemayetpur, Savar, Dhaka-1340 ( N, E)

SECTION 7 Engineered Buildings Field Investigation

ABOUT CWB CERTIFICATION/ QUALIFICATION The work CWB does on behalf of our clients can be divided into five main categories:

TECHNICAL NOTE. Design of Diagonal Strap Bracing Lateral Force Resisting Systems for the 2006 IBC. On Cold-Formed Steel Construction INTRODUCTION

9.3 Two-way Slabs (Part I)

Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

Chapter 3 Pre-Installation, Foundations and Piers

SEISMIC UPGRADE OF OAK STREET BRIDGE WITH GFRP

Chapter 6 ROOF-CEILING SYSTEMS

Analysis and Repair of an Earthquake-Damaged High-rise Building in Santiago, Chile

Property Inspection. 83A Ascot Avenue North New Brighton Christchurch STRUCTURAL REPORT

Structural Retrofitting For Earthquake Resistance

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

Costs of Base-isolation and Earthquake Insurance in New Zealand

ASHULIA APPARELS LTD. Client Summary Report

How To Build A Luxury Apartment Complex In London

CH. 2 LOADS ON BUILDINGS

Page & Turnbull imagining change in historic environments through design, research, and technology

Rehabilitation of Existing Foundation Building to Resist Lateral and Vertical Loads

Worked Example 2 (Version 1) Design of concrete cantilever retaining walls to resist earthquake loading for residential sites

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains

METHOD OF STATEMENT FOR STATIC LOADING TEST

6 RETROFITTING POST & PIER HOUSES

The Analysis of Open Web Steel Joists in Existing Buildings

US 51 Ohio River Bridge Engineering and Environmental Study

FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS

How To Understand The World Trade Center'S Structural Design

ETABS. Integrated Building Design Software. Concrete Shear Wall Design Manual. Computers and Structures, Inc. Berkeley, California, USA

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab,

ASSESSMENT AND RETROFITTING OF EXISTING RC BUILDINGS IN VIETNAM IN TERMS OF EARTHQUAKE RESISTANCES

REINFORCED CONCRETE. Reinforced Concrete Design. A Fundamental Approach - Fifth Edition. Walls are generally used to provide lateral support for:

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

THE DESIGN OF BUILDING SERVICES FOR EARTHQUAKE RESISTANCE

DESIGN OF SLABS. Department of Structures and Materials Engineering Faculty of Civil and Environmental Engineering University Tun Hussein Onn Malaysia

Introduction. Eurocodes. Specification. Cost

QUALITY ASSURANCE FOR STRUCTURAL ENGINEERING FIRMS

Technical Assignment 2 TABLE OF CONTENTS

SEISMIC DESIGN OF HIGHWAY BRIDGES

Seismic Assessment of Engineering Systems in Hospitals A Challenge for Operational Continuity

FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012

Page 1 of Sven Alexander Last revised SB-Produksjon STATICAL CALCULATIONS FOR BCC 250

INTRODUCTION TO LIMIT STATES

The minimum reinforcement for the stem wall is the placement of:

CE591 Lecture 8: Shear Walls

Seismic performance evaluation of an existing school building in Turkey

EVALUATION OF SEISMIC RESPONSE - FACULTY OF LAND RECLAMATION AND ENVIRONMENTAL ENGINEERING -BUCHAREST

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

Date, Time and Place: Presented by: Presented to: 22 August 2013, 0900 hrs, Pier 1 The Embarcadero, San Francisco

Project Report. Structural Investigations Hotel del Sol Yuma, Arizona

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since.

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

Construction Laborer Dies after Falling off Collapsed Precast Concrete Floor Slab

Module 5 (Lectures 17 to 19) MAT FOUNDATIONS

Seismic Retrofitting for School Buildings in Japan Nonstructual Seismic Retrofitting

EARTHQUAKE DESIGN OF BUILDINGS

The following sketches show the plans of the two cases of one-way slabs. The spanning direction in each case is shown by the double headed arrow.

APPENDIX H DESIGN CRITERIA FOR NCHRP PROJECT NEW BRIDGE DESIGNS

Chapter 3 - Structural Design

THE STAR, DARLING HOTEL AND SPA PYRMONT, NSW. Associate Director, Taylor Thomson Whitting Ltd, Sydney, Australia

Optimum proportions for the design of suspension bridge

Expected Performance Rating System

How To Design A Post Tensioned Deck For A Building

Design and Construction of Cantilevered Reinforced Concrete Structures

CE591 Fall 2013 Lecture 26: Moment Connections

Current Status of Seismic Retrofitting Technology

Transcription:

Steel Innovations Conference 2015 Auckland, New Zealand 3-4 September 2015 THE DELIVERY OF THE NEW CHRISTCHURCH BUS INTERCHANGE S. Gledhill 1 P. Alegria da Silva 2 S. Marks 3 ABSTRACT The new Christchurch Bus Interchange is the New Zealand Government anchor project 19. Its program, design and delivery were highly focused on creating a place for pedestrians, buses and retail which forms a central terminus of the newly rebuilt central city. The CERA led anchor project has placed this new facility on the critical path for the city s recovery. From its initial conceptual design in January 2014, to its fast track tender in May 2014, through to its completion in August 2015, the project has exceeded all manner of local and national norms for construction. The resulting building is an exemplar Civic asset which will enhance Christchurch public transport and it will increase the access and engagement to the new central business district. Structural steel was the enabler of the structural form needed to create this civic space, while also accomplishing the architectural vision. The author delves into some of the design, detailing decisions and architectural challenges that the use of structural steel helped overcome. This paper outlines the fast track design and documentation process, key decisions and process adopted enroute which contributed to its success. This project provides clients and consultants a clear view of the benefits of industry collaboration and a look into the future of building procurement, highlighting the benefits and challenges overcome in its delivery. Introduction Architectus and Aurecon were appointed to design and document the New Christchurch Bus Interchange following the business case feasibility. The site is located in central Christchurch, on the old Christchurch City Council Civic office site, and its design intent is to serve as a central hub to interlink bus movements within the network. The New Christchurch Bus Interchange is designed to accommodate up to 96 bus movements per hour with arrival and departures bays for sixteen buses. The project was undertaken as a Design and Build contract with the design team novated to Southbase and Theiss Joint Venture (TSB) for the completion of the detailed design and construction. The design commenced in January 2014 and the design team was novated to the design build contractor TSB in June 2014. 1 Technical Director Aurecon - Buildings, PO Box 1061 Christchurch 8140, New Zealand 2 Senior Structural Engineer Aurecon - Buildings, PO Box 9762 Auckland, New Zealand 3 Structural Engineer Aurecon - Buildings, PO Box 1061 Christchurch 8140, New Zealand

Table 1: Christchurch Bus Interchange Project Details Project Value End User client Tenant Developer Contractor Project Architect Engineer Steel Fabricator Circa $ 53 Million NZD Christchurch City Council (CCC) and Environment Canterbury Regional Council (ECAN) Environment Canterbury Regional Council (ECAN) Canterbury Earthquake Recovery Authority (CERA) Southbase & Theiss JV Architectus (Aurecon s Client) Aurecon all engineering services including Structural John Jones Steel New Zealand The project is the first of the Canterbury Earthquake Recovery Authority (CERA) led anchor projects and was completed in August 2015. Building Brief Client Brief The new Christchurch Bus Interchange building is a single storey L shaped building, constructed as two seismically separated buildings, known as Lichfield and Colombo buildings which corresponds to the adjacent streets. The Lichfield Building is a rectangular shaped building along the Lichfield Street frontage with the potential for a future three storey development over following demolition of the current building. The Colombo Building is approximately rectangular in shape with a feature architectural roof. The area at the corner of Colombo and Lichfield Streets, the Main Entrance Corner, is a single storey structure with a vaulted cantilever roof to accentuate the building s main entrance. The buildings are constructed on shallow foundations over competent gravels. The foundations of the Lichfield building were future proofed to allow them to receive a future three storey building. Figure 1: Site Strategy Summary, left image, and Architectural Concept showing a section through the Colombo Building, right image (images courtesy of Architectus) The Colombo Building consists of a complex 3 dimensional structural steel roof frame that provides a front entry which cantilevers in excess of 17m, providing an overwhelming sense of height and space, and civic amenity. The columns range in length from 5 to 11m all of which typically deliver frame action. After initially exploring resilient structural design options, the client adopted a more cost effective steel moment frame of traditional design without diagonal braces interfering with views or use.

The complex roof structure incorporates a 3 dimensional seismic bracing frame set within the confined architectural envelope. A vaulted inverted M roof shape is adopted to provide volume and space, whilst also providing support for the upper roof substrate. Figure 2: Image showing the Colombo building soffit which consists of folded aluminum panels on a secondary steel grillage (image courtesy of Architectus) For the Lichfield building one of the client requirements was the provision of a foundation system that would provide vertical support to a potential future multi-storey building. For the development of this new multi-storey building, the current Lichfield building superstructure would need to be demolished and replaced. The column base plate detail allows for the removal and replacement of the existing steel columns. The new columns will need to project up to support and brace the floors above while maintaining their current plan locations within the building envelope. Structural Brief The structural design of the Bus Interchange Building supports the client s project requirements by providing larges open areas with glazed facades and roof skylights enabling a greater exposure to the natural light. The double height vaulted Colombo building roof space allows natural light to penetrate the space and its shape has been inspired by Christchurch s gothic heritage. The structural system for both buildings is achieved by two-way steel moment resisting frames (SMRF s) which, allows for the architectural roof shape and to maintain the open areas required within the interchange building for passenger movements. Figure 3: Architect s impression of the Christchurch Bus Interchange (images courtesy of Architectus) The building is likely to contain people gathered in crowds or groups while in transit, and the structural design reflects the importance level 3 factors for the facility (SANZ, 2002). The new bus interchange has not been designed for a specific post-disaster function.

Figure 4: Architect s impression of the Christchurch Bus Interchange: Main Entrance Corner Cantilever and photograph of Bus interchange under construction, right image (image courtesy of Architectus) Structural Design Philosophy The building frame typically consists of circular hollow section (CHS) steel columns, hot rolled steel I section beams and custom welded steel I section beams. The main entrance (corner portion) of the building is created by utilizing the custom welded beams (CWB s) and custom welded columns (CWS s) in a portal frame configuration. The architectural roof form at the main entrance, is formed by an extensive 17m long cantilever, via shaped CWB s that cantilever and are folded on plan projecting outward from the entry portal. The transfer of lateral loads through the roof diaphragm is achieved by utilizing steel cross bracing that follows the undulating roof plans and transfers the induced lateral loads to the SMRF s. The SMRF s have been designed in accordance with NZS1170.5:2004 (SNZ, 2004) and NZS3404:1997 (SNZ, 1997) for both a serviceability limit state (SLS) earthquake and an ultimate limit state (ULS) earthquake. The SLS represents an event with a 50 year return period and the ULS represents an event with a 1000 year return period (SANZ, 2002). A design ductility of µ=1.25 and a structural performance factor of Sp=0.925 have been used for the ULS design actions to determine the inertial effects and deformations under an ULS level event. Based on this design approach the beams and columns are expected to remain mostly undamaged following a design level earthquake. The maximum acceptable ULS design drift limit has been defined as 2.5% in accordance with NZS1170.5:2004 (SNZ, 2004). The calculated expected elastic drift levels are typically around 1.5%, when subjected to ULS loading criteria. This lower level of drift enables a more efficient integration with the facades and secondary non-structural elements. The Colombo building foundation system is a grillage of reinforced concrete two-way beams which, are founded on 400 mm of compacted backfill. The north corner of the building, is the exception to this as it relies on an extensive concrete pad to resist the high overturning loads generated from the main entry cantilever roof support system. The columns base plate connections and foundations have been designed for the seismic overstrength actions. The Lichfield building foundation system is a reinforced concrete raft, designed for the future development of three suspended concrete floors above the current good floor level. The design of this future multi-storey building was taken to a preliminary stage, and was based on having a structural system consisting of two-way SMRF s.

Design Challenges Program The structural and architectural design began in early 2014 and the design team had approximately 3 months to deliver preliminary documentation suitable for tender, with the foundation consent deadline due in April 2014. Architect and engineer started a series of regular workshops to develop the architectural and structural form. The main entrance corner was a key design focus of the early sessions since, it constitutes the main access to the Bus Interchange and provides direct access to the Retail Precinct. The early and continuous collaboration between engineer and architect was crucial to meet the tight project deadlines. The engineer and architect agreed on a design program with issue dates for frozen architectural envelope drawings and, with those frozen backgrounds the structural team worked towards ensuring that the structural members sizes, connections and positioning fit within the architectural constraints. Aurecon engineers produced specific connection design intent details for the steel fabricator to review for buildability and, once agreed upon those connections were then modelled in 3D Revit. Later on in the design process, during the steel fabrication phase, Aurecon engineers held weekly meetings with the steel fabricators to support the TSB s delivery program. Figure 5: Image of the Christchurch Bus Interchange South Elevation under construction (image courtesy of Architectus) To meet the program target delivery dates one of the implemented solutions was to separate the primary and secondary steel packages to allow for the fabrication of primary steel to begin, while the secondary steel was still being designed. This assisted in shortening the delivery program in terms of shop drawings commencement and in the procurement of non-standard steel sections. Despite the separation in the delivery of the steel packages, there was an element of overlap between those packages with respect to the detailing. Roof Geometry The complex geometrical roof shape of the Colombo building also presented some design and detailing challenges. The majority of the moment connections are different from one another and required specific design and detailing. In addition to the complex 3D Revit model, Aurecon produced detailed design intent sketches of the moment connections, gathered feedback from both the structural steel fabricator and the contractor, and worked collaboratively towards the delivery of cost-effective and structurally robust connections.

Steel procurement The circular hollow steel sections (CHS) forming part of the SMRF s required for the project were not readily available in New Zealand, hence they were ordered by the New Zealand Government, as client supply items, direct from China. Since the steel delivery from China requires a 14 week lead time, the steel procurement became part of the critical path. Aurecon prepared a material requirements specification for the CHS sections procurement to assure compliance with the New Zealand Standards. This included manufacturing tolerances, welding specification, mechanical and chemical properties as outlined in EN 10219:2006 (EN, 2006). Material testing requirements were also outlined, as well as the steel supplier responsibilities, such as to provide appropriate third party New Zealand certifications. Asian based Aurecon structural engineers also visited the steel mill prior to the shipping of the steel to New Zealand to carry out a visual inspection. Analysis Aurecon developed 3D models of the Colombo and Lichfield Buildings using the finite element software ETABS Nonlinear V9.7.4 (CSI, 2014). These models were used to design the building structure for gravity and seismic actions which, utilized the modal response spectrum method, as defined by the loading code NZS1170.5:2004 (SNZ, 2004). Figure 6: 3D ETABS models of Colombo and Lichfield Buildings, left and right respectively Raft Slab Analysis by the Finite Element Method SAFE (CSI, 2014) was used to model and analyse the concrete raft foundation and to design the flexural and shear reinforcement. Three sets of subgrade soil spring stiffness s were provided by the geotechnical engineer for each building foundation design. The first set of spring stiffness s was used to analyse the structural behavior of the foundation under gravity actions, at both the serviceability limit state (SLS) and the ultimate limit state (ULS). The second set of spring stiffness s was used to analyse the structural response of the foundation under seismic actions. For post-earthquake reconsolidation settlements a final set of spring stiffness s was adopted in the design. Figure 7: 3D SAP2000 model (CSI, 2014) of column base connection showing bolts in tension (left image) and a site photograph with the base plate and HD bolts in place (right image)

To verify and optimize plate thicknesses, the column base plates were modeled with the finite element package SAP2000 (CSI, 2014) and a series of non-linear analyses were undertaken to measure the stresses that developed in the plate, the bearing stresses in the concrete foundation and the distribution of tension force in the bolts. The loads considered in the design include the overstrength moment of the columns combined with tension and compression actions. The design of the connections were based on the SAP2000 (CSI, 2014) models and on the paper Circular Base Plates with Large Eccentric Loads (Liu, D., 2004). Superstructure Design Design The design of the two-way SMRF s was undertaken in accordance to NZS3404:1997 (SNZ, 1997) for a category 3 steel moment resisting frame with the columns being designed for the beam s flexural strength overcapacity. The main entrance corner roof cantilever structure is supported on the welded portal frames which transfer the gravity and seismic loads to the mass concrete pad. The large overturning actions produced by 17 m long cantilever are resisted by the mass concrete pad. To provide direct shear and tension load transfer to the foundations, the CWC s are partially cast into the foundation pad, as stubs, and a column splice is provided at mid-height. The portal frame and foundation detailing was also carried out to take into account buildability and the temporary support of the CWC s. An alternative foundation option considered was to use tension piles, as opposed to the foundation pad, but this was value engineering out to avoid the introduction of an additional construction trade on site and to fasttrack the construction process. Foundation Design The main entrance corner foundation was designed and detailed using beam theory and the strut and tie theory for the derived overstrength capacities of the CWC s under the nominally ductile loads. To determine the system s flexibility the soil-structure interaction was modeled in SAP2000 (CSI, 2014). The Lichfield building raft foundation was designed considering the natural ground conditions taking into account three sets of soils stiffness s which were provided by the geotechnical engineer. The stiffness s values were modelled in the SAFE (CSI, 2014) program and iteratively analysed until convergence was achieved. Safety in Design Safety in design has been a central part of the design process, given the space utilization and the client requirements. An example of safety in design are in the precast wall design criteria. The precast walls shown in figure 8 form the waiting passenger s seats behind the bus fingers, and have been designed to accommodate the horizontal impact load of a bus in accordance to AS/NZS 1170.1 Supplement 1:2002 (SNZ, 2002).

Figure 8: Image showing the Bus Interchange Bus fingers (arrival bay) with concrete precast seat for awaiting passengers (image courtesy of Architectus) Detailing The team s approach to detailing, in particular to the complex connections in the Colombo Building, was to produce a series of concept sketches for the contractor and steel fabricator to review for buildability. A design team workshop was then organized to discuss ideas and to agree the most cost and time effective approach following fabricator and contractor feedback, Aurecon completed the steel detailing and Revit modelling. Figure 9: Tree column details from conception, left image, to completion. Top right image, illustrates the 3D Revit modelling of the connection, whilst the bottom right image shows the finished column detail A good example, of this collaboration process are in the design of the tree columns. The tree columns were conceived as a cost effective solution for supporting skylights and the roof protrusions. These connections employ bolts in double shear and utilizes readily available equal angles sections as gussets and load transfer mechanisms. The main drivers for the connection detailing were structural performance, costeffectiveness and to minimize erection times.

The new Bus Interchange building also provides a retail space in the form of self-bracing retail pod buildings which, are supported on shallow foundations. The façade integration between the pod structures and the main Bus Interchange roof structure was detailed to accommodate the seismic drifts under the (ULS) load criteria. Figure 10: Internal view of the Bus Interchange showing the internal concept of the Colombo building, left image, and a view from the south-west corner of the Colombo building, right image, showing the self-bracing pads (images courtesy of Architectus) Other secondary non-structural elements such as the partitions, ceilings and soffits have been detailed to allow for the seismic induced drifts, with the intent of limiting damage at the serviceability limit state (SLS) earthquake. Conclusions and Lessons Learnt Collaboration between architect, engineer and steel fabricator was vital to meet the contractor s program and to deliver the steelwork on time. Aurecon engineers produced specific connection design intent details for the steel fabricator to review for buildability. The subsequent use of 3D Revit modelling allowed for speed and accuracy in the steel shop drawing stage. To streamline the RFI process, Aurecon engineers held weekly meetings with the steel fabricators to help support the TSB s delivery program. The steel procurement of un-fabricated plain steel sections from China allows the engineer to access sections sizes not commonly available in the New Zealand market, which when carefully integrated into the construction program can lead to important program benefits. It provides more options outside of the New Zealand and Australia markets, but the lengthy lead in times needs to be accounted for in the program. Consultants, contractors and owners should be aware of the extensive certification and quality assurance process needed when utilizing overseas un-certified structural steel. Consultants also should be made aware that design and build contracts require extensive engineering design and drafting resources, in particular to achieve the objectives of complex and fast track projects. Finally, the use of structural steel was crucial for the successful delivery of the new Christchurch Bus Interchange. It enabled the design intent and client requirements to be accomplished with speed and accuracy. The adoption of structural steel supported the architectural vision of larges open areas, column free spaces with a vaulted cantilever roof to accentuate the building s main entrance while delivering a fast track design and documentation process.

References AS/NZS 1170.0:2002 Australian/New Zealand Standard Structural Design Actions, Part 0: General Principles. Jointly published by Standards Australia International, Ltd., and Standards New Zealand. AS/NZS 1170.2:2002 Australia/New Zealand Standard Structural Design Action, Part 2: Wind Actions. Jointly published by Standards Australia International, Ltd., and Standards New Zealand. CSI. SAP2000: Integrated Finite Element Analysis and Design of Structures, Computer and Structures Inc., California, 2014. CSI. ETABS: Integrated Finite Element Analysis and Design of Structures, Computer and Structures Inc., California, 2014. CSI. SAFE: Slab Analysis by the Finite Element Method, Computer and Structures Inc., California, 2014. EN 10219 Hollow Structural Section "Cold formed welded structural sections of non-alloy and fine grain steels. Published by EN Standards, 2006. Liu, D., Circular Base Plates with Large Eccentric Loads. Practice Periodical on Structural Design on Structural Design and Construction, 2004. NZS 1170.5:2004 New Zealand Standard Structural Design Actions, Part 5: Earthquake actions - New Zealand, Standards New Zealand. NZS, 2006. Concrete Structures Standard (NZS 3101:2006), Part 1 The Design of Concrete and Part 2 Commentary on the Design of Concrete Structures, Standards New Zealand. Steel Construction New Zealand (2007). Steel Connect SCNZ: Parts 1 and 2. Auckland, New Zealand. Standards New Zealand (1997). NZS 3404 - Steel structures standard. Wellington, New Zealand. Standards New Zealand (2011). AS/NZS 1554.1 Structural steel welding Part 1: Welding of steel structures. Wellington, New Zealand.